Fiscal Year 2026-2029 Transportation Improvement Program Projects
Denver Regional Council of Governments

Projects in order by Project Number


October 2026 Amendments


2005-072
US6/Wadsworth Interchange Reconstruction

Amendment Reason: Remove $8,087,000 in state FASTER Bridge and Tunnel Enterprise funds and $35,400,000 in state Legislative funding and add $6,113,000 in state FASTER Safety funding. Total project cost decreases.

Added State Funding 10 Year Plan $1,000,000
FASTER Bridge and Tunnel Enterprise (State) Changed from $25,000,000 to $16,913,000
FASTER Safety (State) Changed from $6,000,000 to $12,113,000
RAISE (Local) Changed from $0 to $4,500,000
Removed State Funding Legislative $36,400,000

Existing Project


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (RAISE) $20,000,000 $0 $0 $0
State (FASTER Bridge and Tunnel Enterprise) $3,650,000 $13,500,000 $7,850,000 $0
State (FASTER Safety) $6,000,000 $0 $0 $0
State (Legislative) $36,400,000 $0 $0 $0
State (Permanent Water Quality) $1,800,000 $0 $0 $0
State (Regional Priority Projects) $14,700,000 $0 $0 $0
State (TC Contingency) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $82,550,000 $13,500,000 $7,850,000 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$107,070,000 $103,900,000 $0 $210,970,000

Revised Funding Table


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (RAISE) $20,000,000 $0 $0 $0
State (10 Year Plan) $1,000,000 $0 $0 $0
State (FASTER Bridge and Tunnel Enterprise) $16,913,000 $0 $0 $0
State (FASTER Safety) $6,000,000 $6,113,000 $0 $0
State (Permanent Water Quality) $1,800,000 $0 $0 $0
State (Regional Priority Projects) $14,700,000 $0 $0 $0
State (TC Contingency) $0 $0 $0 $0
Local $4,500,000 $0 $0 $0
Total $64,913,000 $6,113,000 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$107,070,000 $71,026,000 $0 $178,096,000



2008-103
Region 1 FASTER Bridge and Tunnel Enterprise Pool

Amendment Reason: Transfer $5,700,000 in prior funds to the Floyd Hill project (2022-020). Total project cost decreases.

Existing Project


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
State (FASTER Bridge and Tunnel Enterprise) $0 $2,100,000 $0 $0
State (Legislative) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $2,100,000 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$6,200,000 $2,100,000 $0 $8,300,000

Pool Project Listing

This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.


Agency/Project NameDescriptionNotesCost
I-70 WB Over US 6Clear Creek (Floyd Hill)$5,700,000
Several Bridges in Region 1Bridge Prescoping$500,000
Six bridges on I76Fatigue crack repairs$2,100,000

Revised Funding Table


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
State (FASTER Bridge and Tunnel Enterprise) $0 $2,100,000 $0 $0
State (Legislative) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $2,100,000 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$500,000 $2,100,000 $0 $2,600,000

Revised Pool Project Listing

This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.


Agency/Project NameDescriptionNotesCost
I-70 WB Over US 6Clear Creek (Floyd Hill)$5,700,000 shown on Project# 2022-020$0
Several Bridges in Region 1Bridge Prescoping$500,000
Six bridges on I76Fatigue crack repairs$2,100,000



2012-121
Region 4 Non-Regionally Significant RPP Pool

Amendment Reason: Add $5,509,000 in state Regional Priority Project funding, add one pool project and adjust two pool projects. Total project cost increases.

Regional Priority Projects (State) Changed from $5,995,000 to $11,504,000
Pool Added - CO66 and WCR13

Existing Project


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
State (Regional Priority Projects) $1,800,000 $4,195,000 $0 $0
Local $0 $0 $0 $0
Total $1,800,000 $4,195,000 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$6,392,000 $5,995,000 $0 $12,387,000

Pool Project Listing

This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.


Agency/Project NameDescriptionNotesCost
SH-119/SH-52 Transit Bypass Lanes$470,000 in RPP in TIP# 2020-081$0
Coffman St. Busway$1,230,000 in RPP in TIP# 2020-083$0
CO119 and Hover Intersection$12,300,000 in RPP in TIP# 2020-081$0
CO119 Safety and Operational Systems Evals$800,000
CO52 Safety and Operational Systems Evals$1,000,000
US36 Guardrail$4,965,000 in FASTER in Project# 2008-077$1,000,000
Boulder shotcrete repairs$195,000

Revised Funding Table


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
State (Regional Priority Projects) $1,800,000 $9,704,000 $0 $0
Local $0 $0 $0 $0
Total $1,800,000 $9,704,000 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$6,392,000 $11,504,000 $0 $17,896,000

Revised Pool Project Listing

This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.


Agency/Project NameDescriptionNotesCost
SH-119/SH-52 Transit Bypass Lanes$470,000 in RPP in TIP# 2020-081$0
Coffman St. Busway$1,230,000 in RPP in TIP# 2020-083$0
CO119 and Hover Intersection$7,300,000 in RPP in TIP# 2020-081$0
CO119 Safety and Operational Systems Evals$800,000
CO52 Safety and Operational Systems Evals$1,000,000
US36 Guardrail$4,965,000 in FASTER in Project# 2008-077$1,500,000
Boulder shotcrete repairs$195,000
CO66 and WCR13$2,500,000



2020-081
CO119 Operational Improvements: Boulder to Longmont

Amendment Reason: Swap $7,000,000 in state Transportation Commission Contingency and $5,000,000 in state Regional Priority Project, and $3,000,000 in state FASTER Safety funds for $15,000,000 in federal RAISE funds, and add $996,000 in state FASTER Safety funding and local match. Total project cost increases.

FASTER Safety (State) Changed from $18,000,000 to $15,996,000
RAISE (Federal) Changed from $0 to $15,000,000
RAISE (Local) Changed from $2,000,000 to $0
Regional Priority Projects (State) Changed from $5,000,000 to $0
TC Contingency (State) Changed from $7,000,000 to $0
Transportation Alternatives-CDOT (Local) Changed from $662,000 to $12,407,000

Existing Project


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Critical Culvert) $136,000 $0 $0 $0
Federal (MMOF - ARPA - DRCOG) $0 $0 $0 $0
Federal (RAISE) $0 $0 $0 $0
Federal (STBG-Pandemic) $0 $0 $0 $0
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
Federal (Transportation Alternatives-CDOT) $1,679,000 $0 $0 $0
State (10 Year Plan) $0 $0 $0 $0
State (FASTER Safety) $18,000,000 $0 $0 $0
State (House Bill 1466 - MMOF) $0 $0 $0 $0
State (Intelligent Transportation System) $0 $0 $0 $0
State (Legislative) $4,719,000 $2,992,000 $0 $0
State (Planning and Research Initiatives) $0 $0 $0 $0
State (Regional Priority Projects) $0 $5,000,000 $0 $0
State (Surface Treatment) $850,000 $0 $0 $0
State (TC Contingency) $7,000,000 $0 $0 $0
Local $1,662,000 $1,000,000 $0 $0
Local (RTD Funds Only) $0 $0 $0 $0
Total $34,046,000 $8,992,000 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$143,721,000 $43,038,000 $0 $186,759,000

Revised Funding Table


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Critical Culvert) $136,000 $0 $0 $0
Federal (MMOF - ARPA - DRCOG) $0 $0 $0 $0
Federal (RAISE) $0 $15,000,000 $0 $0
Federal (STBG-Pandemic) $0 $0 $0 $0
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
Federal (Transportation Alternatives-CDOT) $1,679,000 $0 $0 $0
State (10 Year Plan) $0 $0 $0 $0
State (FASTER Safety) $15,000,000 $996,000 $0 $0
State (House Bill 1466 - MMOF) $0 $0 $0 $0
State (Intelligent Transportation System) $0 $0 $0 $0
State (Legislative) $4,719,000 $2,992,000 $0 $0
State (Planning and Research Initiatives) $0 $0 $0 $0
State (Regional Priority Projects) $0 $0 $0 $0
State (Surface Treatment) $850,000 $0 $0 $0
State (TC Contingency) $0 $0 $0 $0
Local $1,662,000 $10,745,000 $0 $0
Local (RTD Funds Only) $0 $0 $0 $0
Total $24,046,000 $29,733,000 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$143,721,000 $53,779,000 $0 $197,500,000



2022-020
I70 Floyd Hill Improvements

Amendment Reason: Add Clear Creek County portion of scope and funding to project. Total project cost increases.

Added Federal Funding Bridge On-System $2,707,000
Added State Funding FASTER Bridge and Tunnel Enterprise $5,553,000
Added Federal Funding PROTECT $15,637,000
Added State Funding Regional Priority Projects $12,112,000
Scope Updated

Existing Project


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
State (Legislative) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$17,300,000 $0 $0 $17,300,000

Revised Funding Table


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Bridge On-System) $0 $2,707,000 $0 $0
Federal (PROTECT) $15,637,000 $0 $0 $0
State (Bridge On-System) $0 $0 $0 $0
State (FASTER Bridge and Tunnel Enterprise) $5,553,000 $0 $0 $0
State (Legislative) $0 $0 $0 $0
State (Regional Priority Projects) $9,173,000 $2,939,000 $0 $0
Local $0 $0 $0 $0
Total $30,363,000 $5,646,000 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$868,449,000 $36,009,000 $0 $904,458,000



2022-074
Colorado Boulevard Bus Rapid Transit - Precon

Amendment Reason: Adjust funding based on recently approved Transportation Commission action. Total project cost decreases.

Removed State Funding Legislative $12,000,000
Removed State Funding Legislative-Transit $10,000,000

Existing Project


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
State (Legislative) $7,000,000 $5,000,000 $0 $0
State (Legislative-Transit) $5,000,000 $5,000,000 $0 $0
Local $0 $0 $0 $0
Total $12,000,000 $10,000,000 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$31,651,000 $22,000,000 $0 $53,651,000

Revised Funding Table


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
State (10 Year Plan) $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$10,900,000 $0 $21,000,000 $31,900,000



2022-081
US85 Corridor Improvements: Brighton to Fort Lupton

Amendment Reason: Adjust scope to cover intersection safety improvements along the corridor, add $6,400,000 in state 10 Year Plan funding, and $4,400,000 in future funding. Total project cost increases.

10 Year Plan (State) Changed from $0 to $6,400,000
Scope Updated

Existing Project


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
State (10 Year Plan) $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$300,000 $0 $0 $300,000

Revised Funding Table


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
State (10 Year Plan) $0 $6,400,000 $0 $0
Total $0 $6,400,000 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$300,000 $6,400,000 $4,400,000 $11,100,000



2024-008
Federal Blvd Bus Rapid Transit: Englewood Station to Wagon Road Park-n-Ride

Amendment Reason: Add $26,200,000 in state 10 Year Plan funding. Total project cost increases.

10 Year Plan (State) Changed from $91,402,000 to $117,602,000

Existing Project


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Carbon Reduction Program) $0 $0 $0 $0
Federal (Surface Transportation Block Grant) $10,476,000 $4,017,000 $0 $0
State (10 Year Plan) $29,402,000 $2,000,000 $30,000,000 $30,000,000
State (House Bill 1466 - MMOF) $0 $0 $0 $0
State (Legislative) $0 $0 $0 $0
State (Legislative-Transit) $5,453,000 $8,133,000 $0 $0
Local $2,240,000 $0 $0 $0
Local (RTD Funds Only) $0 $0 $0 $0
Total $47,571,000 $14,150,000 $30,000,000 $30,000,000
Project Phase to Initiate Design ROW None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$32,753,000 $121,721,000 $0 $154,474,000

Revised Funding Table


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Carbon Reduction Program) $0 $0 $0 $0
Federal (Surface Transportation Block Grant) $10,476,000 $4,017,000 $0 $0
State (10 Year Plan) $29,402,000 $2,000,000 $43,100,000 $43,100,000
State (House Bill 1466 - MMOF) $0 $0 $0 $0
State (Legislative) $0 $0 $0 $0
State (Legislative-Transit) $5,453,000 $8,133,000 $0 $0
Local $2,240,000 $0 $0 $0
Local (RTD Funds Only) $0 $0 $0 $0
Total $47,571,000 $14,150,000 $43,100,000 $43,100,000
Project Phase to Initiate Design ROW None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$32,753,000 $147,921,000 $0 $180,674,000



2024-105
US287 Safety Median: Lafayette to Larimer County Line

Amendment Reason: Swap Legislative for 10 Year Plan funding, add $15,000,000 in state 10-Year Plan funding, and $12,000,000 in future funding. Total project cost increases.

Added State Funding 10 Year Plan $17,860,000
Removed State Funding Legislative $2,860,000

Existing Project


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (INFRA) $14,475,000 $0 $0 $0
State (FASTER Safety) $1,802,000 $2,400,000 $4,699,000 $0
State (Legislative) $2,860,000 $0 $0 $0
State (Safety) $1,594,000 $3,233,000 $0 $0
Local $0 $0 $0 $0
Total $20,731,000 $5,633,000 $4,699,000 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$498,000 $31,063,000 $0 $31,561,000

Revised Funding Table


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (INFRA) $14,475,000 $0 $0 $0
State (10 Year Plan) $2,860,000 $15,000,000 $0 $0
State (FASTER Safety) $1,802,000 $2,400,000 $4,699,000 $0
State (Safety) $1,594,000 $3,233,000 $0 $0
Local $0 $0 $0 $0
Total $20,731,000 $20,633,000 $4,699,000 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$498,000 $46,063,000 $12,000,000 $58,561,000



Request
I25 Segment 4: CO7 to CO66 - Preconstruction

Amendment Reason: Add a new project for I25 Segment 4.

New Project


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
State (Regional Priority Projects) $0 $2,000,000 $0 $0
Local $0 $0 $0 $0
Total $0 $2,000,000 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$0 $2,000,000 $38,238,000 $40,238,000



Request
Eisenhower Johnson Memorial Tunnel

Amendment Reason: Add new project.

New Project


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Freight) $0 $0 $0 $0
State (10 Year Plan) $0 $0 $0 $0
State (Construction Tunnel Program) $0 $6,500,000 $0 $0
Local $0 $0 $0 $0
Total $0 $6,500,000 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$53,000,000 $6,500,000 $0 $59,500,000



Request
CO7 Pavement and Safety Improvements: US287 to 119th

Amendment Reason: Add new 10 Year Plan project.

New Project


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
State (10 Year Plan) $0 $10,000,000 $0 $0
Total $0 $10,000,000 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$0 $10,000,000 $0 $10,000,000



Request
I70 Climbing Lane: Herman Gulch to US6

Amendment Reason: Add new project.

New Project


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Freight) $0 $0 $0 $0
State (10 Year Plan) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$2,300,000 $0 $10,000,000 $12,300,000



Request
Idaho Springs Mobility Hub

Amendment Reason: Add new project.

New Project


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
State (10 Year Plan) $0 $6,300,000 $0 $0
Total $0 $6,300,000 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$0 $6,300,000 $0 $6,300,000