Fiscal Year 2026-2029 Transportation Improvement Program Projects
Denver Regional Council of Governments

Projects in order by Project Number


October 2026 Administrative Modifications


2007-095
Region 4 Surface Treatment Pool

Amendment Reason: Revise one pool project scope. Total project cost remains the same.

Pool Added - US36
Pool Removed - Boulder: CO119

Existing Project


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Strategic Safety Funds) $1,000,000 $0 $0 $0
State (Cost Escalation Fund) $0 $0 $0 $0
State (Surface Treatment) $18,861,000 $12,604,000 $12,684,000 $13,000,000
Local $0 $0 $0 $0
Total $19,861,000 $12,604,000 $12,684,000 $13,000,000


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$23,511,000 $58,149,000 $0 $81,660,000

Pool Project Listing

This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.


Agency/Project NameDescriptionNotesCost
SH-119Nederland West to Roundabout$6,025,000
CO728th to US287Project also has $2,000,000 in 2018-003$9,559,000
LongmontDiamond grind and slabs$4,278,000
CO157A: Pearl NorthDiamond Grind and Slabs$8,245,000
CO119 and CO7US36 to Boulder Canyon$7,200,000
CO52I25 to US85Also has funding in 2007-133$13,590,000
CO66East of I25$4,027,000
Boulder: CO119Valmont to Baseline$8,900,000
CO42 LouisvilleResurfacing$12,500,000
US36 guardrail$151,000

Revised Funding Table


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Strategic Safety Funds) $1,000,000 $0 $0 $0
State (Cost Escalation Fund) $0 $0 $0 $0
State (Surface Treatment) $18,861,000 $12,604,000 $12,684,000 $13,000,000
Local $0 $0 $0 $0
Total $19,861,000 $12,604,000 $12,684,000 $13,000,000


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$23,511,000 $58,149,000 $0 $81,660,000

Revised Pool Project Listing

This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.


Agency/Project NameDescriptionNotesCost
SH-119Nederland West to Roundabout$6,025,000
CO728th to US287Project also has $2,000,000 in 2018-003$9,559,000
LongmontDiamond grind and slabs$4,278,000
CO157A: Pearl NorthDiamond Grind and Slabs$8,245,000
CO119 and CO7US36 to Boulder Canyon$7,200,000
CO52I25 to US85Also has funding in 2007-133$13,590,000
CO66East of I25$4,027,000
US36Iris to Baseline$8,900,000
CO42 LouisvilleResurfacing$12,500,000
US36 guardrail$151,000



2007-133
Region 4 Bridge On-System Pool

Amendment Reason: Revise one pool project scope. Total project cost remains the same.

Pool Added - US36
Pool Removed - CO119 Boulder

Existing Project


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Bridge On-System) $821,000 $0 $0 $450,000
State (Bridge On-System) $79,000 $0 $0 $0
Local $0 $0 $0 $0
Total $900,000 $0 $0 $450,000


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$522,000 $1,350,000 $0 $1,872,000

Pool Project Listing

This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.


Agency/Project NameDescriptionNotesCost
CO7 and Boulder Creek$522,000
CO52I25 to US85Also has funding in 2007-095$821,000
CO119 BoulderValmont to BaselineAlso has funding in 2007-095$350,000
CO42 LouisvilleAlso has funding in 2007-095$100,000

Revised Funding Table


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Bridge On-System) $821,000 $0 $0 $450,000
State (Bridge On-System) $79,000 $0 $0 $0
Local $0 $0 $0 $0
Total $900,000 $0 $0 $450,000


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$522,000 $1,350,000 $0 $1,872,000

Revised Pool Project Listing

This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.


Agency/Project NameDescriptionNotesCost
CO7 and Boulder Creek$522,000
CO52I25 to US85Also has funding in 2007-095$821,000
US36Iris to BaselineAlso has funding in 2007-095$350,000
CO42 LouisvilleAlso has funding in 2007-095$100,000



2016-004
Regional Transportation Operations and Technology Set-Aside

Amendment Reason: Remove $4,795,000 to program to individual set-aside projects. Total project cost decreases.

Surface Transportation Block Grant (Federal) Changed from $12,228,000 to $7,433,000
Surface Transportation Block Grant (Local) Changed from $3,057,000 to $1,858,000

Existing Project


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $2,228,000 $5,000,000 $5,000,000 $0
Local $557,000 $1,250,000 $1,250,000 $0
Total $2,785,000 $6,250,000 $6,250,000 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$14,910,000 $15,285,000 $0 $30,195,000

Pool Project Listing

This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.


Agency/Project NameDescriptionNotesCost
CentennialS2S Communication (FY21-23)$800,000

Revised Funding Table


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $2,228,000 $205,000 $5,000,000 $0
Local $557,000 $51,000 $1,250,000 $0
Total $2,785,000 $256,000 $6,250,000 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$14,910,000 $9,291,000 $0 $24,201,000

Revised Pool Project Listing

This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.


Agency/Project NameDescriptionNotesCost
CentennialS2S Communication (FY21-23)$800,000



2016-057
Region 1 RPP Pool

Amendment Reason: Add one new pool project. Total project cost remains the same.

Pool Added - Region 1 pavement distress repairs

Existing Project


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
State (Regional Priority Projects) $15,566,000 $17,966,000 $17,966,000 $17,966,000
Local $0 $0 $0 $0
Total $15,566,000 $17,966,000 $17,966,000 $17,966,000


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$0 $69,464,000 $0 $69,464,000

Pool Project Listing

This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.


Agency/Project NameDescriptionNotesCost
Small projects/consultants/closeouts$5,600,000
local agency contributionsIncluded in various TIP pages$5,000,000
Design$2,000,000
Steel Bridge Girders CleanoutRegionwide$1,000,000
Maintenance Paving Support IDIQRegionwide$5,000,000
C470/I70 Emergency Bridge Repair$1,780,000
Expansion Device ReplacementI76 and I225$5,000,000
C470/Quincy Ramp Roundabouts$1,363,000
I76 and Dahlia Bridge Repair$1,657,000
I225 at 2nd and 6th$4,000,000
US40 and Tonn Valley Emergency Drainage$220,000
US6/Wadsworth Interchange Reconstruction$14,700,000 in RPP in TIP# 2005-072$0
I70 and Kipling Bridge Deck Repairs$3,900,000 in RPP in TIP# 2026-021$0
I270 Corridor Improvements$1,000,000 in RPP in TIP# 2020-068$0
US85 culvert repairBetween Promenade Parkway and New Beale Street$2,100,000

Revised Funding Table


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
State (Regional Priority Projects) $15,566,000 $17,966,000 $17,966,000 $17,966,000
Local $0 $0 $0 $0
Total $15,566,000 $17,966,000 $17,966,000 $17,966,000


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$0 $69,464,000 $0 $69,464,000

Revised Pool Project Listing

This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.


Agency/Project NameDescriptionNotesCost
Small projects/consultants/closeouts$5,600,000
local agency contributionsIncluded in various TIP pages$5,000,000
Design$2,000,000
Steel Bridge Girders CleanoutRegionwide$1,000,000
Maintenance Paving Support IDIQRegionwide$5,000,000
C470/I70 Emergency Bridge Repair$1,780,000
Expansion Device ReplacementI76 and I225$5,000,000
C470/Quincy Ramp Roundabouts$1,363,000
I76 and Dahlia Bridge Repair$1,657,000
I225 at 2nd and 6th$4,000,000
US40 and Tonn Valley Emergency Drainage$220,000
US6/Wadsworth Interchange Reconstruction$14,700,000 in RPP in TIP# 2005-072$0
I70 and Kipling Bridge Deck Repairs$3,900,000 in RPP in TIP# 2026-021$0
I270 Corridor Improvements$1,000,000 in RPP in TIP# 2020-068$0
US85 culvert repairBetween Promenade Parkway and New Beale Street$2,100,000
Region 1 pavement distress repairsRegionwide$2,000,000



2022-059
Hampden Complete Streets: Broadway to Lafayette

Amendment Reason: Cancel project at sponsor"s request. Total project cost decreases.

Existing Project


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Transportation Alternatives-DRCOG) $0 $0 $0 $0
State (House Bill 1466 - MMOF) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$9,125,000 $0 $0 $9,125,000

Revised Funding Table


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Transportation Alternatives-DRCOG) $0 $0 $0 $0
State (House Bill 1466 - MMOF) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$0 $0 $0 $0



2024-039
CO52 Intersection Safety Improvements: WCR5 to WCR7 - Precon

Amendment Reason: Adjust scope as approved by the Southwest Weld County Transportation Forum. Total project cost remains the same.

Scope Updated

Existing Project


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $72,000 $74,000 $0 $0
Local $19,000 $19,000 $0 $0
Total $91,000 $93,000 $0 $0
Project Phase to Initiate Design ROW None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$167,000 $184,000 $0 $351,000

Revised Funding Table


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $72,000 $74,000 $0 $0
Local $19,000 $19,000 $0 $0
Total $91,000 $93,000 $0 $0
Project Phase to Initiate Design ROW None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$167,000 $184,000 $0 $351,000



2024-063
R1 Safe Wildlife Crossings Pool

Amendment Reason: Add $267,000 in state 10 Year Plan funding and add one pool project. Total project cost increases.

Added State Funding 10 Year Plan $267,000
Pool Added - Empire Wildlife Crossing

Existing Project


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
State (Legislative) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$500,000 $0 $0 $500,000

Pool Project Listing

This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.


Agency/Project NameDescriptionNotesCost
US285 and I70 Wildlife Fencing$500,000

Revised Funding Table


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
State (10 Year Plan) $0 $267,000 $0 $0
Total $0 $267,000 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$500,000 $267,000 $0 $767,000

Revised Pool Project Listing

This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.


Agency/Project NameDescriptionNotesCost
US285 and I70 Wildlife Fencing$500,000
Empire Wildlife CrossingRight of way phase$267,000



2026-032
US85: Sedalia to Meadows Parkway

Amendment Reason: Add $970,000 in state 10 Year Plan funds. Total project cost increases.

10 Year Plan (State) Changed from $0 to $970,000
Congressional Allocation (Local) Changed from $0 to $125,000

Existing Project


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congressional Allocation) $500,000 $0 $0 $0
State (10 Year Plan) $0 $0 $0 $0
State (Permanent Water Quality) $0 $300,000 $0 $0
State (Regional Priority Projects) $9,000 $0 $0 $0
Local $0 $0 $0 $0
Total $509,000 $300,000 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$8,342,000 $809,000 $0 $9,151,000

Revised Funding Table


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congressional Allocation) $500,000 $0 $0 $0
State (10 Year Plan) $0 $970,000 $0 $0
State (Permanent Water Quality) $0 $300,000 $0 $0
State (Regional Priority Projects) $9,000 $0 $0 $0
Local $125,000 $0 $0 $0
Total $634,000 $1,270,000 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$8,342,000 $1,904,000 $0 $10,246,000



Request
City-Wide Traffic Camera Deployment

Amendment Reason: Add new project from the Regional Transportation Operations and Technology Set-Aside.

New Project


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $0 $411,000 $0 $0
Local $0 $86,000 $0 $0
Total $0 $497,000 $0 $0
Project Phase to Initiate None Construction None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$0 $497,000 $0 $497,000



Request
Using Accessible Pedestrian Signals to Enhance Vulnerable Road User Safety and Mobility

Amendment Reason: Add new project from the Regional Transportation Operations and Technology Set-Aside.

New Project


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $0 $400,000 $0 $0
Local $0 $100,000 $0 $0
Total $0 $500,000 $0 $0
Project Phase to Initiate None Procurement None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$0 $500,000 $0 $500,000



Request
South Broadway Advanced Traffic System

Amendment Reason: Add new project from the Regional Transportation Operations and Technology Set-Aside.

New Project


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $0 $501,000 $0 $0
Local $0 $104,000 $0 $0
Total $0 $605,000 $0 $0
Project Phase to Initiate None Procurement None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$0 $605,000 $0 $605,000



Request
Mobility Analytics and Coordination Ecosystem

Amendment Reason: Add new project from the Regional Transportation Operations and Technology Set-Aside.

New Project


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $0 $750,000 $0 $0
Local $0 $750,000 $0 $0
Total $0 $1,500,000 $0 $0
Project Phase to Initiate None Other Phase None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$0 $1,500,000 $0 $1,500,000



Request
South Broadway Multimodal Signal Improvement Project

Amendment Reason: Add new project from the Regional Transportation Operations and Technology Set-Aside.

New Project


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $0 $239,000 $0 $0
Local $0 $50,000 $0 $0
Total $0 $289,000 $0 $0
Project Phase to Initiate None Procurement None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$0 $289,000 $0 $289,000



Request
Fiber Equipment Procurement on Chatfield Avenue

Amendment Reason: Add new project from the Regional Transportation Operations and Technology Set-Aside.

New Project


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $0 $695,000 $0 $0
Local $0 $174,000 $0 $0
Total $0 $869,000 $0 $0
Project Phase to Initiate None Procurement None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$0 $869,000 $0 $869,000



Request
Fiber Equipment Procurement on Kipling Parkway

Amendment Reason: Add new project from the Regional Transportation Operations and Technology Set-Aside.

New Project


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $0 $451,000 $0 $0
Local $0 $113,000 $0 $0
Total $0 $564,000 $0 $0
Project Phase to Initiate None Procurement None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$0 $564,000 $0 $564,000



Request
Traffic Signal Controller Upgrade

Amendment Reason: Add new project from the Regional Transportation Operations and Technology Set-Aside.

New Project


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $0 $252,000 $0 $0
Local $0 $0 $0 $0
Total $0 $252,000 $0 $0
Project Phase to Initiate None Procurement None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$0 $252,000 $0 $252,000



Request
Centralized Transit Signal Priority System: Center-to-Center Communications

Amendment Reason: Add new project from the Regional Transportation Operations and Technology Set-Aside.

New Project


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $0 $705,000 $0 $0
Local $0 $0 $0 $0
Total $0 $705,000 $0 $0
Project Phase to Initiate None Other Phase None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$0 $705,000 $0 $705,000



Request
Traffic Signal Smart Upgrade

Amendment Reason: Add new project from the Regional Transportation Operations and Technology Set-Aside.

New Project


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $0 $391,000 $0 $0
Local $0 $137,000 $0 $0
Total $0 $528,000 $0 $0
Project Phase to Initiate None Procurement None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$0 $528,000 $0 $528,000



Request
McCaslin Multi-Use Trail

Amendment Reason: Add new project with $250,000 in federal Congressionally Directed Spending funds.

New Project


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congressional Allocation) $0 $250,000 $0 $0
Local $0 $52,000 $0 $0
Total $0 $302,000 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$0 $302,000 $0 $302,000