Table of Contents
Projects in order by TIP Year -Project Listings-
2024-2027 Transportation Improvement Program (Approved TIP)
RTD Preventive Maintenance: Transit Vehicle Overhaul and Maintenance
Project Name:
RTD Preventive Maintenance: Transit Vehicle Overhaul and Maintenance
Identification Number:
1997-084
Project Type:
Transit Vehicles
Performance Measures:
Transit Assets, Transit Safety
Affected Counties:
Regional
Affected Municipalities:
None
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
Ongoing program: Overhaul and maintenance for transit vehicles. A portion of these 5307 funds will be applied to capital cost of contracting. RTD has privatized service on fixed-routes and private carriers provide capital maintenance in addition to fixed-route bus service. In addition to routine capital maintenance, RTD will apply 5307 capital maintenance funds to bus fuel cost and utility cost for LRT vehicles as a result of the Federal Transit Administration expanded definition of allowable cost.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Section 5307)
$83,200,000
$84,900,000
$87,400,000
$90,000,000
State (Section 5307)
$0
$0
$0
$0
Local
$27,700,000
$28,300,000
$29,100,000
$30,000,000
Total
$110,900,000
$113,200,000
$116,500,000
$120,000,000
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$460,600,000
$0
$460,600,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
02/16/2023
Amended
Add $43,800,000 in federal Section 5307 funding. Total project cost increases.
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Proposed for adoption into 2020-2023
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
State of Good Repair
Project Name:
State of Good Repair
Identification Number:
1999-052
Project Type:
Transit Operational Improvements
Performance Measures:
Transit Assets, Transit Safety
Affected Counties:
Denver
Affected Municipalities:
Denver
Subregion(s):
None
Open to Public:
None
STIP-ID:
SST6740.010
Project Scope:
Funds will be used for on-going maintenance of fixed guideways, track, rolling stock, electrical substations and rail stations.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Section 5337 State of Good Repair)
$27,500,000
$28,050,000
$28,900,000
$29,800,000
State (Section 5337 State of Good Repair)
$0
$0
$0
$0
Local
$6,880,000
$7,000,000
$7,200,000
$7,440,000
Total
$34,380,000
$35,050,000
$36,100,000
$37,240,000
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$142,770,000
$0
$142,770,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
02/16/2023
Amended
Add $32,010,000 in federal Section 5337 funds. Total project cost increases.
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Proposed for adoption into 2020-2023
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
Regional TDM Set-Aside: TMA Partnerships
Project Name:
Regional TDM Set-Aside: TMA Partnerships
Identification Number:
1999-097
Project Type:
Air Quality Improvement Projects
Performance Measures:
Congestion
Affected Counties:
Regional
Affected Municipalities:
None
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
The Regional TDM Pool promotes alternatives to SOV travel, with the intent to reduce mobile source emissions.
This pool includes funds for 1) eight TMA regional partnerships (CMAQ; $120k each/year), and 2) unallocated TDM non-infrastructure funding. Non-infrastructure projects to be selected through calls for projects using STBG funding and programmed individually in TIP.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congestion Mitigation / Air Quality)
$960,000
$960,000
$960,000
$960,000
Federal (Surface Transportation Block Grant)
$0
$95,000
$500,000
$500,000
Local
$240,000
$264,000
$365,000
$365,000
Total
$1,200,000
$1,319,000
$1,825,000
$1,825,000
Project Phase to Initiate
TDM
TDM
TDM
TDM
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$2,777,000
$6,169,000
$0
$8,946,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/27/2024
Amended
Add unprogrammed funding from returned project. Total project cost increases.
05/16/2024
Amended
Add Fiscal Year 2024 and 2024 Transportation Management Association partnerships. Total project cost remains the same.
09/21/2023
Amended
Remove FY 2024 and FY 2025 Surface Transportation Block Grant funding programmed to individual projects in FY 2024/2025 Call for Projects.
08/17/2023
Amended
Proposed for adoption into 2024-2027
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name Description Notes Cost
Bicycle Colorado Digital Bicycle-Friendly Driving Course (20/21) $202,000
Transportation Solutions Pandemic Recovery and TDM Marketing Campaign (22/23) $174,000
Community Cycles Ride by Ebike (22/23) $83,000
West Corridor TMA Culturally Sensitive Encouragement and Marketing Campaigns (22/23) $83,000
West Corridor TMA Colfax Safety Project Outreach (22/23) $29,000
Downtown Denver Partnership Denver Open Streets (22/23) $255,000
City of Aurora/Northeast Transportation Connections Aurora Aerotropolis/I-70 TDM Prgm Development & Implementation (22/23) $108,000
Commuting Solutions Expansion of B-Cycle Bikeshare System - Feasibility Study (22/23) $66,000
DRMAC Getting There Travel Training (22/23) $177,000
Commuting Solutions TDM Partnership (22/23) $200,000
Boulder Transportation Connections TDM Partnership (22/23) $200,000
Denver South TMA TDM Partnership (22/23) $200,000
Downtown Denver Partnership TDM Partnership (22/23) $200,000
Northeast Transportation Connections TDM Partnership (22/23) $200,000
Smart Commute Metro North TDM Partnership (22/23) $200,000
Transportation Solutions TDM Partnership (22/23) $200,000
West Corridor TMA TDM Partnership (22/23) $200,000
Unallocated 2024/2025 non-infrastructure $95,000
Commuting Solutions Partnership (Fiscal Years 2024-2025) $240,000
Boulder Transportation Connections Partnership (Fiscal Years 2024-2025) $240,000
Denver South Partnership (Fiscal Years 2024-2025) $240,000
Downtown Denver Partnership Partnership (Fiscal Years 2024-2025) $240,000
Northeast Transportation Connections Partnership (Fiscal Years 2024-2025) $240,000
Smart Commute Partnership (Fiscal Years 2024-2025) $240,000
Transportation Solutions Partnership (Fiscal Years 2024-2025) $240,000
West Corridor Transportation Management Association Partnership (Fiscal Years 2024-2025) $240,000
2024-2027 Transportation Improvement Program (Approved TIP)
US85 Widening: Cook Ranch to Meadows
Project Name:
US85 Widening: Cook Ranch to Meadows
Identification Number:
2001-154
Project Type:
Roadway Capacity
Performance Measures:
Congestion, Pavement Condition, Safety, Travel Time Reliability
Affected Counties:
Douglas
Affected Municipalities:
Castle Rock, Littleton
Subregion(s):
None
Open to Public:
None
STIP-ID:
SDR5055
Project Scope:
Design and construct capacity improvements determined by the I-25 / US-85 Corridor EIS Record of Decision (see also TIP-ID 1999-002 in the 2001-2006 TIP). Widen from Cook Ranch Rd to Meadows Pkwy from 2 to 4 lanes.
Roadway segments, listed in order of anticipated completion, and open to public year include:
Daniels Park Rd. to SH-67 (Sedalia); 2021
Castlegate to Daniels Park Rd; 2026
Meadows Pkwy. to Castlegate; 2026
2020-2023 DRCOG funding through Douglas County is for preconstruction activities from SH-67 to Daniels Park Rd.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Faster Safety)
$0
$0
$0
$0
Federal (Freight)
$0
$0
$0
$0
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
State (Faster Safety)
$0
$0
$0
$0
State (Regional Priority Projects)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$94,702,000
$0
$37,300,000
$132,002,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Proposed for adoption into 2020-2023
10/18/2018
Amended
Add $850,000 in state RPP in FY 2019. Total project cost increases.
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
US6/Wadsworth Interchange Reconstruction
Project Name:
US6/Wadsworth Interchange Reconstruction
Identification Number:
2005-072
Project Type:
Roadway Capacity
Performance Measures:
Bridge Condition, Congestion, Safety
Affected Counties:
Jefferson
Affected Municipalities:
Lakewood
Subregion(s):
None
Open to Public:
2025
STIP-ID:
SDR7066
Project Scope:
Phase I: Begin environmental assessment for Wadsworth Blvd (SH-121) from 4th Ave to 13th Ave including US-6 interchange reconstruction [$500,000 of STP-Metro funds in FY 2005 and $6 million of RPP funds in FY2006]
Phase II: Replace US-6 and Wadsworth Blvd interchange including improvements and widening to Wadsworth Blvd [$17.5 million of RPP funds in FY 2010 for design and right-of-way].
The Legislative funding in FY 2022-2024 will cover ROW, utilities, final design and construction to completely reconstruct the interchange including improved traffic turning movements, noise walls, permanent water quality improvements, and enhanced bicycle and pedestrian facilities.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
State (FASTER Bridge and Tunnel Enterprise)
$0
$0
$8,000,000
$12,000,000
State (Legislative)
$10,000,000
$0
$0
$0
State (Regional Priority Projects)
$2,209,000
$0
$0
$0
State (TC Contingency)
$2,898,000
$0
$0
$0
Local
$0
$0
$0
$0
Total
$15,107,000
$0
$8,000,000
$12,000,000
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$92,000,000
$35,107,000
$0
$127,107,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
04/18/2024
Amended
Add $2,209,000 in state Regional Priority Project funds. Total project cost increases.
11/15/2023
Amended
Add $2,898,000 in state Transportation Commission Contingency funds. Total project cost increases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
11/17/2022
Amended
Add $5,000,000 in state FASTER-Safety funding and $60,000,000 in state Legislative funding. Total project cost increases.
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
FasTracks Northwest Rail Corridor: Downtown Longmont Station
Project Name:
FasTracks Northwest Rail Corridor: Downtown Longmont Station
Identification Number:
2007-050
Project Type:
Rapid Transit
Performance Measures:
Congestion, Transit Assets, Transit Safety
Affected Counties:
Boulder
Affected Municipalities:
Longmont
Subregion(s):
None
Open to Public:
None
STIP-ID:
SST7015.007
Project Scope:
Implementation of Downtown Longmont Intermodal Center.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Local (RTD Funds Only)
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$17,945,000
$0
$0
$17,945,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Proposed for adoption into 2020-2023
04/20/2017
Amended
Proposed for adoption into 2018-2021
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
Region 1 Hazard Elimination Pool
Project Name:
Region 1 Hazard Elimination Pool
Identification Number:
2007-073
Project Type:
Safety
Performance Measures:
Freight Reliability, Safety, Travel Time Reliability
Affected Counties:
Adams, Arapahoe, Broomfield, Denver, Douglas, Jefferson
Affected Municipalities:
None
Subregion(s):
None
Open to Public:
None
STIP-ID:
SR16682
Project Scope:
CDOT Region 1 Hazard Elimination pool. Specific projects will not be listed.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Strategic Safety Funds)
$371,000
$3,650,000
$0
$0
State (Safety)
$17,000,000
$17,000,000
$17,000,000
$17,000,000
Local
$0
$0
$0
$0
Total
$17,371,000
$20,650,000
$17,000,000
$17,000,000
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$72,021,000
$0
$72,021,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
06/26/2024
Amended
Add $3,650,000 in federal Strategic Safety Funds. Total project cost increases.
10/18/2023
Amended
Add $371,000 in federal SAE funds. Total project cost increases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
11/17/2022
Amended
Remove $8,500,000 in state Safety funding that will be programmed to a separate project. Total project cost decreases.
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
Region 1 Hot Spot Pool
Project Name:
Region 1 Hot Spot Pool
Identification Number:
2007-074
Project Type:
Safety
Performance Measures:
Congestion, Safety
Affected Counties:
Adams, Arapahoe, Broomfield, Denver, Douglas, Jefferson
Affected Municipalities:
None
Subregion(s):
None
Open to Public:
None
STIP-ID:
SR16683
Project Scope:
CDOT Region 1 Hot Spot Pool. Specific projects will not be listed.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
State (Safety)
$433,000
$433,000
$433,000
$433,000
Local
$0
$0
$0
$0
Total
$433,000
$433,000
$433,000
$433,000
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$1,732,000
$0
$1,732,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Proposed for adoption into 2020-2023
04/20/2017
Amended
Proposed for adoption into 2018-2021
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
Region 1 Traffic Signal Pool
Project Name:
Region 1 Traffic Signal Pool
Identification Number:
2007-075
Project Type:
Safety
Performance Measures:
Congestion, Safety, Travel Time Reliability
Affected Counties:
Adams, Arapahoe, Broomfield, Denver, Douglas, Jefferson
Affected Municipalities:
None
Subregion(s):
None
Open to Public:
None
STIP-ID:
SR16684
Project Scope:
CDOT Region 1 pool for traffic signal projects. Specific projects will not be listed.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
State (Safety)
$3,491,000
$3,168,000
$3,162,000
$3,162,000
Local
$0
$0
$0
$0
Total
$3,491,000
$3,168,000
$3,162,000
$3,162,000
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$12,983,000
$0
$12,983,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Proposed for adoption into 2020-2023
10/18/2018
Amended
Remove $1,100,000 of funding in FY 2019 and transfer to 2016-020 in order to move funding into one location.
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
Region 1 Bridge On-System Pool
Project Name:
Region 1 Bridge On-System Pool
Identification Number:
2007-078
Project Type:
Roadway - Bridge
Performance Measures:
Bridge Condition, Freight Reliability, Safety
Affected Counties:
Adams, Arapahoe, Broomfield, Denver, Douglas, Jefferson
Affected Municipalities:
None
Subregion(s):
None
Open to Public:
None
STIP-ID:
SR16712
Project Scope:
The Bridge On-System Pool funds various bridge, culvert, tunnel, and wall projects throughout CDOT Region 1.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Bridge On-System)
$17,400,000
$5,738,000
$9,950,000
$9,900,000
State (Bridge On-System)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$17,400,000
$5,738,000
$9,950,000
$9,900,000
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$42,988,000
$0
$42,988,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
09/19/2024
Amended
Transfer $3,882,000 in federal Bridge On-System funds to new I25 Resurfacing project. Total project cost decreases.
05/16/2024
Amended
Add $8,000,000 in federal Bridge On-System funds and adjust one pool project. Total project cost increases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name Description Notes Cost
Essential Culvert Repairs $13,220,000
Essential Wall Repairs $5,300,000
Preventative Bridge Maintenance Proactive work, including scour work, fiber wrap $8,500,000
Joint Treatments $6,800,000
Deck Treatments Resurfacing/overlays $7,000,000
Bridge Essential Repairs Generally reactive; girder cleanouts $6,040,000
2024-2027 Transportation Improvement Program (Approved TIP)
Region 1 Bridge Off-System Pool
Project Name:
Region 1 Bridge Off-System Pool
Identification Number:
2007-079
Project Type:
Roadway - Bridge
Performance Measures:
Bridge Condition
Affected Counties:
Adams, Arapahoe, Broomfield, Denver, Douglas, Jefferson
Affected Municipalities:
None
Subregion(s):
None
Open to Public:
None
STIP-ID:
SR17001
Project Scope:
The Bridge Off-System Pool funds off-system bridge projects throughout CDOT Region 1.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Bridge Off-System)
$2,131,000
$0
$0
$0
State (Bridge Off-System)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$2,131,000
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$7,011,000
$2,131,000
$0
$9,142,000
Amendment History
Date Status Description
01/30/2025
Proposed
Adopted into the 2026-2029 TIP.
01/29/2025
Amended
Remove one pool project and $1,241,000 in prior funding. Total project cost decreases.
04/18/2024
Amended
Add two pool projects and $2,131,000 in federal Bridge Off-System funds. Total project cost increases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
07/11/2023
Amended
Add $1,779,000 in federal Bridge Off-System funds, local match, and one new pool project. Total project cost increases.
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name Description Notes Cost
Dartmouth Ave @ S Platte River $1,392,000
Rio Grande St @ Slaughterhouse Gulch $406,000
112th Ave @ Fulton Ditch $500,000
Potomac St @ O'Brien Canal (partial replacement) $760,000
Chambers @ Sand Creek Bridge (Aurora) $214,000
Community Center Dr. Northglenn $524,000
West Dartmouth Ave. Englewood $229,000
Laredo St Bridge Rehab Aurora $1,779,000
Tower Road At 3rd Creek $720,000
88th At Wolf Creek $1,410,000
2024-2027 Transportation Improvement Program (Approved TIP)
Region 4 Traffic Signal Pool
Project Name:
Region 4 Traffic Signal Pool
Identification Number:
2007-091
Project Type:
Safety
Performance Measures:
Congestion, Safety, Travel Time Reliability
Affected Counties:
Boulder, Weld
Affected Municipalities:
None
Subregion(s):
None
Open to Public:
None
STIP-ID:
SR46668
Project Scope:
Pool funds traffic signal projects in CDOT Region 4 (Boulder and SW Weld Counties). Specific projects will not be listed.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
State (Planning and Research Initiatives)
$0
$0
$0
$0
State (Safety)
$250,000
$250,000
$250,000
$250,000
Local
$0
$0
$0
$0
Total
$250,000
$250,000
$250,000
$250,000
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$660,000
$1,000,000
$0
$1,660,000
Amendment History
Date Status Description
11/25/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
03/18/2021
Amended
Remove PRI funding. Total project cost decreases.
06/17/2020
Amended
Add funding to FY 2021, 2022, and 2023. Total project cost increases.
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
Region 4 Hot Spot Pool
Project Name:
Region 4 Hot Spot Pool
Identification Number:
2007-092
Project Type:
Safety
Performance Measures:
Congestion, Safety
Affected Counties:
Boulder, Weld
Affected Municipalities:
None
Subregion(s):
None
Open to Public:
None
STIP-ID:
SR46667
Project Scope:
Pool funds hot spot projects in CDOT Region 4 (Boulder and SW Weld Counties). Specific projects will not be listed.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
State (Safety)
$100,000
$100,000
$100,000
$100,000
Local
$0
$0
$0
$0
Total
$100,000
$100,000
$100,000
$100,000
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$400,000
$400,000
$0
$800,000
Amendment History
Date Status Description
11/25/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Proposed for adoption into 2020-2023
04/20/2017
Amended
Proposed for adoption into 2018-2021
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
Region 4 Hazard Elimination Pool
Project Name:
Region 4 Hazard Elimination Pool
Identification Number:
2007-094
Project Type:
Safety
Performance Measures:
Safety
Affected Counties:
Boulder, Weld
Affected Municipalities:
None
Subregion(s):
None
Open to Public:
None
STIP-ID:
SR46666
Project Scope:
Pool funds hazard elimination projects in CDOT Region 4 (Boulder and SW Weld Counties). Specific projects will not be listed.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Strategic Safety Funds)
$0
$3,000,000
$0
$0
State (Safety)
$1,000,000
$2,000,000
$1,000,000
$1,000,000
Local
$1,000,000
$2,000,000
$1,000,000
$1,000,000
Total
$2,000,000
$7,000,000
$2,000,000
$2,000,000
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$11,000,000
$13,000,000
$0
$24,000,000
Amendment History
Date Status Description
11/25/2024
Proposed
Adopted into the 2026-2029 TIP.
09/19/2024
Amended
Add $2,000,000 in federal Strategic Safety Funds and $1,000,000 in state Safety funds, as well as $1,000,000 local match. Total project cost increases.
06/26/2024
Amended
Add $1,000,000 in federal Strategic Safety Funds. Total project cost increases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
08/19/2021
Amended
Remove individually listed pool projects. Total project cost remains the same.
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
Region 4 Surface Treatment Pool
Project Name:
Region 4 Surface Treatment Pool
Identification Number:
2007-095
Project Type:
Roadway Reconstruction
Performance Measures:
Pavement Condition
Affected Counties:
Boulder, Weld
Affected Municipalities:
None
Subregion(s):
None
Open to Public:
None
STIP-ID:
SR45218
Project Scope:
Projects in CDOT Region 4 (Boulder and SW Weld Counties) to be approved for pool funding by Region 4 Director.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
State (Cost Escalation Fund)
$0
$2,000,000
$0
$0
State (Surface Treatment)
$9,500,000
$11,530,000
$7,000,000
$4,936,000
Local
$0
$481,000
$0
$0
Total
$9,500,000
$14,011,000
$7,000,000
$4,936,000
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$15,400,000
$35,447,000
$0
$50,847,000
Amendment History
Date Status Description
03/04/2025
Proposed
Adopted into the 2026-2029 TIP.
03/04/2025
Amended
Add one pool project and $2,936,000 in state Surface Treatment funds. Total project cost increases.
12/19/2024
Amended
Adjust one pool project and add $239,000 in state Cost Escalation Funds. Total project cost increases.
11/21/2024
Amended
Add $10,030,000 in state Surface Treatment funds, $1,761,000 in state Cost Escalation Funds, and local match. Also add three pool projects. Total project cost increases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name Description Notes Cost
36B Lyons South Project also has $490 in FASTER funds in TIP# 2008-077 $2,225,000
SH-119 Nederland West to Roundabout $6,025,000
CO7 28th to US287 Project also has $2,000,000 in 2018-003 $9,559,000
Longmont Diamond Grind and Slabs $508,000
CO157A: Pearl North Diamond Grind and Slabs $3,462,000
CO119 and CO7 US36 to Boulder Canyon $4,900,000
2024-2027 Transportation Improvement Program (Approved TIP)
Region 1 Surface Treatment Pool
Project Name:
Region 1 Surface Treatment Pool
Identification Number:
2007-096
Project Type:
Roadway Reconstruction
Performance Measures:
Pavement Condition
Affected Counties:
Adams, Arapahoe, Broomfield, Denver, Douglas, Jefferson
Affected Municipalities:
None
Subregion(s):
None
Open to Public:
None
STIP-ID:
SR15215
Project Scope:
Projects in CDOT Region 1 to be approved for Pool Funding by Region 1 Director.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
State (Surface Treatment)
$36,057,000
$11,864,000
$42,187,000
$42,684,000
Local
$0
$0
$0
$0
Total
$36,057,000
$11,864,000
$42,187,000
$42,684,000
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$16,782,000
$132,792,000
$0
$149,574,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
09/19/2024
Amended
Update pool projects and transfer $21,500,000 to new I25 Resurfacing project. Total project cost decreases.
02/22/2024
Amended
Transfer $4,100,000 in state Surface Treatment funds to TIP ID# 2024-084. Total project cost decreases.
11/15/2023
Amended
Remove five completed pool projects, modify descriptions and costs for thirteen pool projects, and add one new pool project. Total project cost decreases.
10/18/2023
Amended
Remove one completed pool project, remove one pool project split into own TIP project, add four new pool projects, and transfer $9,500,000 in state Surface Treatment funds to new I70: Chief Hosa to W Colfax project. Total project cost decreases.
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name Description Notes Cost
CO88 (Federal Blvd) Alameda Ave to Louisiana Ave $8,500,000
CO86 Woodlands Blvd to IREA Access $2,500,000
CO7 I25 to US85 $13,200,000
US85 I76 to 124th Ave $8,100,000
SH-224 I-25 to US-6 $5,000,000
US40 MP 252 to I70 $12,000,000
SH-391 Hampden Ave to Jewell Ave $4,000,000
US287 I70 to 92nd Ave $10,100,000
SH-265 I-70 to US-6 $4,600,000
CO8 Soda Lakes Rd to McIntyre St $1,000,000
Design Various Locations $2,000,000
US85 Florida to I25 $3,000,000
CO74 Evergreen DT to Cold Springs Gulch $7,200,000
US285 Federal to Dahlia $10,800,000
CO83 MP 70.9 to Mississippi $6,300,000
US6 19th to Colfax $6,500,000
Alameda Bryant to S Lipan St $3,500,000
CO88 W Asbury to W Belleview $9,000,000
CO72 I70 to W 52nd $5,000,000
CO121 4th to 37th $5,100,000
Maintenance Various Locations $2,000,000
US285 Pine Junction to Foxton Road $8,100,000
CO35 I70 to I270 $400,000
2024-2027 Transportation Improvement Program (Approved TIP)
Region 4 Bridge On-System Pool
Project Name:
Region 4 Bridge On-System Pool
Identification Number:
2007-133
Project Type:
Roadway - Bridge
Performance Measures:
Bridge Condition, Freight Reliability
Affected Counties:
Boulder, Weld
Affected Municipalities:
None
Subregion(s):
None
Open to Public:
None
STIP-ID:
SR46598
Project Scope:
Pool funds Region 4 On-System bridge projects.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Bridge On-System)
$2,484,000
$2,484,000
$0
$0
State (Bridge On-System)
$516,000
$516,000
$0
$0
Local
$0
$0
$0
$0
Total
$3,000,000
$3,000,000
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$8,350,000
$6,000,000
$0
$14,350,000
Amendment History
Date Status Description
12/19/2024
Proposed
Adopted into the 2026-2029 TIP.
12/19/2024
Amended
Adjust one pool project. Total project cost remains the same.
08/17/2023
Amended
Proposed for adoption into 2024-2027
05/16/2023
Amended
Add one new pool project and $350,000 of federal Bridge On-System funds. Total project cost increases.
04/22/2021
Amended
Proposed for adoption into 2022-2025
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name Description Notes Cost
I-25 Preventative Maintenance (FY20) $200,000
Boulder Polyester Overlay $2,705,000
Critical Culvert Construction (FY 22) Pkg D - SH-170 $222,000
CO7 and Boulder Creek $522,000
2024-2027 Transportation Improvement Program (Approved TIP)
Safe Routes to School Pool
Project Name:
Safe Routes to School Pool
Identification Number:
2007-144
Project Type:
Safety
Performance Measures:
Congestion, Safety
Affected Counties:
Regional
Affected Municipalities:
None
Subregion(s):
None
Open to Public:
None
STIP-ID:
SDR7024
Project Scope:
Improvements to encourage children to walk and bicycle to school by improving safety and reducing traffic fuel consumption, and air pollution in the vicinities of schools.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Safe Routes to School)
$1,171,000
$0
$0
$0
State (Safe Routes to School)
$0
$0
$0
$0
Local
$294,000
$0
$0
$0
Total
$1,465,000
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$8,034,000
$1,465,000
$0
$9,499,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
05/16/2023
Amended
Add three new pool projects and $1,171,000 in federal Safe Routes to School funding. Total project cost increases.
07/22/2021
Amended
Edit funding source to reflect federal Safe Routes to School funding is used. Total project cost remains the same.
05/19/2021
Amended
Add four pool projects. Total project cost increases.
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name Description Notes Cost
Denver DPS-Cole Arts & Science Academy Multimodal Improvements $350,000
Jefferson County Fairmount ES & Cornerstone Montessori School Ped/Bike Safety Improvements $265,000
Frederick Thunder Valley K-8 Multipurpose Trail Project $300,000
Boulder County South Heatherwood Intersection and Sidewalk Improvements $350,000
Edgewater Edgewater School Crossing and Traffic Calming Project $134,000
Thornton Westgage Community School Sidewalks $314,000
Denver McAuliffe International School Pedestrian Improvements (FY20) $500,000
Lyons 4th Ave Pedestrian Bridge and Connection (FY20) $500,000
Lakewood 1st Ave Sidewalks (FY20) $435,000
Boulder Mesa Elementary Safety Improvements (FY20) $193,000
Denver Smith Elementary Intersection Improvements (FY22) $402,000
Arvada Secrest Elementary Sidewalk (FY22) $508,000
Mead Town of Mead Regional Trail (FY22) $425,000
Denver Advancing a Culture of Active Transportation in Schools (FY22) $67,000
Adams County Lowell Blvd & 54th Ave Crossing Improvements (FY24) $121,000
Columbine Valley Wilder Walk and Bike Way (FY24) $342,000
Boulder Safe Routes for Manhattan Middle School (FY24) $708,000
2024-2027 Transportation Improvement Program (Approved TIP)
Region 1 Design Pool
Project Name:
Region 1 Design Pool
Identification Number:
2007-164
Project Type:
Other
Performance Measures:
Affected Counties:
Adams, Arapahoe, Broomfield, Denver, Douglas, Jefferson
Affected Municipalities:
None
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
The design pool prepares CDOT for future construction opportunities. Projects to be approved for pool funding by Region 1 Director.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Freight)
$0
$0
$0
$0
State (Legislative)
$0
$0
$0
$0
State (Regional Priority Projects)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$10,250,000
$0
$0
$10,250,000
Amendment History
Date Status Description
07/22/2024
Amended
Remove one pool project and transfer $750,000 of prior year state Legislative funding to I25 Greenland Wildlife Overpass project. Total project cost decreases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
02/17/2022
Amended
Add one new pool project and add $2,000,000 in federal FR8 funding. Total project cost increases.
12/16/2021
Amended
Remove one pool project and reduce state legislative funding by $1,500,000.
09/27/2021
Amended
Proposed for adoption into 2022-2025
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name Description Notes Cost
Kings Valley Interchange $1,000,000
Regionwide Bottleneck Reductions $2,500,000
US-85 Daniels to Meadows $500,000
Bicycle/Pedestrian Grade Separations $4,250,000
SH-79 Bridge over I-70 $2,000,000
2024-2027 Transportation Improvement Program (Approved TIP)
Region 4 Bridge Off-System Pool
Project Name:
Region 4 Bridge Off-System Pool
Identification Number:
2008-028
Project Type:
Roadway - Bridge
Performance Measures:
Bridge Condition
Affected Counties:
Boulder, Weld
Affected Municipalities:
None
Subregion(s):
None
Open to Public:
None
STIP-ID:
SR46601
Project Scope:
Bridge Off-System Pool funds off-system bridge projects throughout CDOT Region 4 (Boulder and SW Weld Counties).
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Bridge Off-System)
$4,408,000
$1,923,000
$0
$0
State (Bridge Off-System)
$0
$0
$0
$0
Local
$2,133,000
$481,000
$0
$0
Total
$6,541,000
$2,404,000
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$3,049,000
$8,945,000
$0
$11,994,000
Amendment History
Date Status Description
01/30/2025
Proposed
Adopted into the 2026-2029 TIP.
01/29/2025
Amended
Adjust one pool project and add $1,923,000 in federal Bridge Off-System funds and local match. Total project cost increases.
03/21/2024
Amended
Add one new pool project and $308,000 in federal Bridge Off-System funding. Total project cost increases.
01/17/2024
Amended
Add two pool projects and adjust one existing pool project. Add $4,100,000 in federal Bridge Off-System funds. Total project cost increases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name Description Notes Cost
WCR34 - Mead (Fiscal Year 2022/2024) $1,746,000
120th St over Coal Creek (FY23) $513,000
WCR20 (FY23) $730,000
WCR3 north of WCR12 (FY23) $1,036,000
Rock Creek Pkwy Rehab (Fiscal Year 2024) $1,077,000
WCR26 - Firestone (Fiscal Year 2024) $1,438,000
WCR4 - Lochbuie (Fiscal Year 2024/2025) $2,231,000
2024-2027 Transportation Improvement Program (Approved TIP)
Region 1 FASTER Pool
Project Name:
Region 1 FASTER Pool
Identification Number:
2008-076
Project Type:
Safety
Performance Measures:
Pavement Condition, Congestion, Freight Reliability, Safety, Travel Time Reliability
Affected Counties:
Adams, Arapahoe, Broomfield, Denver, Douglas, Jefferson
Affected Municipalities:
None
Subregion(s):
None
Open to Public:
None
STIP-ID:
SR17002
Project Scope:
CDOT Region 1 Faster Safety projects. Individual projects will not be listed.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Faster Safety)
$10,200,000
$0
$0
$0
State (Faster Safety)
$23,218,000
$22,300,000
$21,550,000
$25,550,000
Local
$0
$0
$0
$0
Total
$33,418,000
$22,300,000
$21,550,000
$25,550,000
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$23,181,000
$102,818,000
$0
$125,999,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
07/22/2024
Amended
Transfer $2,000,000 in state FASTER-Safety funding to new I25/CO7 Interim Transit Improvements project, and $7,500,000 to new I25 Greenland Wildlife Overpass project. Total project cost decreases.
12/19/2023
Amended
Remove $12,800,000 in prior funding transferred to 2024-084. Total project cost decreases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
12/21/2022
Amended
Add one new pool project. Total project cost remains the same.
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
Region 4 FASTER Pool
Project Name:
Region 4 FASTER Pool
Identification Number:
2008-077
Project Type:
Safety
Performance Measures:
Freight Reliability, Congestion, Pavement Condition, Safety, Travel Time Reliability
Affected Counties:
Boulder, Weld
Affected Municipalities:
None
Subregion(s):
None
Open to Public:
None
STIP-ID:
SR46606
Project Scope:
Pool contains safety-related improvements and upgrades based on the FASTER funding program (Colorado Senate Bill 108) in CDOT Region 4.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Faster Safety)
$0
$0
$0
$0
State (Faster Safety)
$5,000,000
$5,000,000
$0
$0
Local
$0
$0
$0
$0
Total
$5,000,000
$5,000,000
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$12,500,000
$10,000,000
$0
$22,500,000
Amendment History
Date Status Description
11/25/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
03/16/2023
Amended
Add one new pool project for bike/ped safety improvements along US-287 at four intersections in Longmont (9th Ave., Mountain View Ave., 17th Ave., & 23rd Ave.). Total project cost remains the same.
05/19/2021
Amended
Add new pool project. Total project cost remains the same.
04/22/2021
Amended
Proposed for adoption into 2022-2025
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name Description Notes Cost
SH-66 and WCR 13 Radii Widening $36,000
SH-119 Nederland West to Roundabout $2,500,000
US-287 Bike/Ped Safety Improvements Four Intersections in Longmont $1,521,000
2024-2027 Transportation Improvement Program (Approved TIP)
Region 1 FASTER Bridge and Tunnel Enterprise Pool
Project Name:
Region 1 FASTER Bridge and Tunnel Enterprise Pool
Identification Number:
2008-103
Project Type:
Roadway - Bridge
Performance Measures:
Bridge Condition, Freight Reliability
Affected Counties:
Adams, Arapahoe, Broomfield, Denver, Douglas, Jefferson
Affected Municipalities:
None
Subregion(s):
None
Open to Public:
None
STIP-ID:
SST8000
Project Scope:
Pool contains bridge-related improvements and repairs based on the FASTER Bridge Enterprise funding program (Colorado Senate Bill 108) in CDOT Region 1.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
State (FASTER Bridge and Tunnel Enterprise)
$7,700,000
$2,500,000
$15,000,000
$24,750,000
State (Legislative)
$0
$0
$0
$16,250,000
Local
$0
$0
$0
$0
Total
$7,700,000
$2,500,000
$15,000,000
$41,000,000
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$29,844,000
$66,200,000
$0
$96,044,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
10/17/2024
Amended
Add $500,000 in state FASTER Bridge Enterprise funds and add one pool project. Total project cost increases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
06/17/2020
Amended
Add funding and 3 new pool projects. Total funding amount increases.
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name Description Notes Cost
I-70 WB Over US 6 Clear Creek (Floyd Hill) $5,700,000
Speer and 23rd Bridge Replacements $60,000,000
I-76 over York St. E-17-GW and E-14-GV $12,535,000
I-70 over W. 32nd Ave. Replace 2 Bridges $13,773,000
Several Bridges in Region 1 Bridge Prescoping $500,000
2024-2027 Transportation Improvement Program (Approved TIP)
CDOT FASTER Transit Pool
Project Name:
CDOT FASTER Transit Pool
Identification Number:
2008-105
Project Type:
Transit Operational Improvements
Performance Measures:
Congestion, Safety, Transit Assets, Transit Safety
Affected Counties:
Regional
Affected Municipalities:
None
Subregion(s):
None
Open to Public:
None
STIP-ID:
SR17004
Project Scope:
Pool contains CDOT transit-related projects based on the FASTER Transit program (Colorado Senate Bill 108).
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
State (FASTER Transit)
$7,483,000
$3,886,000
$3,000,000
$3,000,000
Local
$1,042,000
$971,000
$750,000
$750,000
Total
$8,525,000
$4,857,000
$3,750,000
$3,750,000
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$6,924,000
$20,882,000
$0
$27,806,000
Amendment History
Date Status Description
12/19/2024
Proposed
Adopted into the 2026-2029 TIP.
12/19/2024
Amended
Add three pool projects and $670,000 in state FASTER funding. Total project funding increases.
11/15/2023
Amended
Transfer one pool project to 2018-004 and update one pool project funding. Total project cost decreases.
09/21/2023
Amended
Add three new pool projects, and add $374,000 in state FASTER-Transit funds and $94,000 in local match. Total project cost increases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name Description Notes Cost
RTD East Colfax/15L Transit Enhancements Project $770,000
RTD Mineral PnR Bridge Rehab (FY17) $57,000
RTD Thornton PnR Passenger Amenities (FY17) $308,000
RTD US-36 and Sheridan PnR (FY18) $1,500,000
RTD Bus Replacements (FY20) $2,000,000
Boulder Vehicle Replacement (FY21) $323,000
VIA Bus Cameras (FY21) $151,000
DRCOG HST/FASTER Set-Aside (See TIP-ID 2020-079) $0
VIA Facility Security Improvements (FY23) $120,000
RTD East Metro Roof Replacement (FY23) $3,171,000
RTD District Shops Hoist Replacement (FY23) $2,929,000
VIA 2 Replacement Vans (FY23) $166,000
Boulder 3 Replacement Buses (FY23) $938,000
VIA Equipment (FY23) $278,000
VIA Construction (FY23) $96,000
VIA Maintenance Equipment (FY24) $71,000
VIA Facility Design (FY24) $96,000
Via Mobility Software Upgrades (Fiscal Year 2025) $50,000
Boulder Vehicle (Fiscal Year 2025) $620,000
RTD Vehicle (Fiscal Year 2025) $3,000,000
2024-2027 Transportation Improvement Program (Approved TIP)
DRCOG Second Commitment to FasTracks
Project Name:
DRCOG Second Commitment to FasTracks
Identification Number:
2012-010
Project Type:
Transit Operational Improvements
Performance Measures:
Transit Assets, Congestion, Safety, Transit Safety
Affected Counties:
Regional
Affected Municipalities:
None
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
Set aside to fund second commitment in principle to FasTracks corridors not yet allocated. Individual projects will be TIP’d upon approval of Policy Amendments per the process and requirements of DRCOG Resolution 20-2008 (July, 2008).
Corridor projects previously approved using second commitment funds include:
- West Corridor (TIP ID 2007-042)- July 2010, $7,422,000
- US-36 Corridor (TIP ID 2008-114)- Feb 2011, $2,755,000
- Denver Union Station (TIP ID 2007-057)- July 2010, $2,519,000
- East Corridor (TIP ID 2008-111)- Nov 2011, $13,350,000.
- Gold Corridor (TIP ID 2008-111)- May 2012, $6,461,000.
- Northwest Corridor (TIP ID 2007-050)- May 2012, $1,200,000; June 2016, $5,058,000;
September 2017, $1,746,000..
- North Metro Corridor (TIP ID 2007-055)- May 2012, $7,451,000.
- I-225 Corridor (TIP ID 2007-056)- July 2012, $7,250,000.
- Southeast Corridor (TIP ID 2007-059) - July 2017, $1,928,000.
- Southwest Extension (TIP ID 2022-033) - June 2023, $2,089,000
Remaining allocations include:
- Central Corridor $771,000
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$771,000
$0
$0
$0
Local
$193,000
$0
$0
$0
Total
$964,000
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$59,036,000
$964,000
$0
$60,000,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
05/16/2023
Amended
Transfer $2,089,000 in federal Surface Transportation Block Grant funding to TIP ID# 2022-033 for their Second Commitment in Principal amount to be applied toward multimodal access improvements to Mineral Station. Pool total decreases.
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Proposed for adoption into 2020-2023
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
Way to Go: Regional TDM Program
Project Name:
Way to Go: Regional TDM Program
Identification Number:
2012-064
Project Type:
Air Quality Improvement Projects
Performance Measures:
Congestion
Affected Counties:
Regional
Affected Municipalities:
None
Subregion(s):
None
Open to Public:
None
STIP-ID:
SST6803.069
Project Scope:
DRCOG will partner with transportation management agencies in the region to cooperatively carry out a comprehensive and coordinated program to mitigate traffic congestion and poor air quality through reducing travel demand. As part of The Program, DRCOG will offer:
(a) Web-accessible CarPool matching programs for individuals and employers
(b) SchoolPool programs with web-accessible matching software
(c) Vanpool Services with web-accessible matching software
(d) Telework programs
(e) Regional Bike to Work Day Coordination
(f) Guaranteed Ride Home programs
(g) Support, Assistance, Materials, and Collateral for DRCOG services
(h) Regional TDM web-page, portal, and web-applications supportive of The Program
(i) Regional TDM services telephone numbers
(j) Customer service staff for written, telephone, or email referrals, inquiries or issues
(k) Developing and maintaining a marketing program to efficiently and effectively meet Program goals
(l) Conducting surveys to determine the benefits of The Program
(m) Reporting Program outcomes
(n) Business Outreach
(o) Maintaining an employer outreach database for shared use
(p) Providing training and facilitating professional development opportunities
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congestion Mitigation / Air Quality)
$5,124,000
$0
$4,800,000
$0
Local
$100,000
$0
$100,000
$0
Total
$5,224,000
$0
$4,900,000
$0
Project Phase to Initiate
TDM
None
TDM
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$10,124,000
$0
$10,124,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
06/16/2022
Amended
Add $417,000 in CMAQ funds to FY2022. Total project cost increases.
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Proposed for adoption into 2020-2023
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
Enhanced Mobility of Seniors and Individuals with Disabilities (FTA 5310 - CDOT)
Project Name:
Enhanced Mobility of Seniors and Individuals with Disabilities (FTA 5310 - CDOT)
Identification Number:
2012-107
Project Type:
Transit Operational Improvements
Performance Measures:
Transit Safety, Congestion, Safety, Transit Assets
Affected Counties:
Regional
Affected Municipalities:
None
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
Funds will be used for Mobility Management and activities such as purchase of vans and operating assistance for door-to-door service for older adults and people with disabilities.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Section 5310)
$4,128,000
$0
$0
$0
Local
$1,381,000
$0
$0
$0
Total
$5,509,000
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$34,561,000
$5,509,000
$0
$40,070,000
Amendment History
Date Status Description
12/10/2024
Proposed
Adopted into the 2026-2029 TIP.
06/26/2024
Amended
Increase cost of one pool project and add $17,000 in federal Section 5310 funds. Total project cost increases.
12/19/2023
Amended
Add two new pool projects and $1,110,000 in federal Section 5310 funding. Total project cost increases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/24/2023
Amended
Remove two pool projects and add one new FY 2023 Small Urban pool projects. Total project cost decreases.
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name Description Notes Cost
Via Mobility Services Bus replacement (FY19 Small Urban) $105,000
Easter Seals Minivan replacement (FY19 Large Urban) $38,000
Seniors Resource Center Bus Replacement (FY19 Large Urban) $408,000
Via Mobility Management (FY19 Large Urban) $227,000
Seniors Resource Center Mobility Management (FY19 Large urban) $248,000
Seniors Resource Center Operating (FY19 Large Urban) $273,000
DRMAC Mobility Management (FY19 Large Urban) $250,000
Douglas County Mobility Management (FY19 Large Urban) $375,000
Continuum of Colorado Operating (FY19 Large Urban) $90,000
Continuum of Colorado Vehicle Replacement (FY19 Large Urban) $68,000
Easter Seals Colorado Vehicle Replacement (FY19 Large Urban) $55,000
SRC Vehicle Replacement (FY19 Large Urban $42,000
SRC Bus Replacement (FY19 Large Urban) $72,000
SRC Bus Replacement (FY19 Large Urban) $124,000
Adams County Mobility Management (FY20) $108,000
Broomfield 1 Vehicle Expansion (FY20) Funded also with HST $54,000
Broomfield Equipment (FY20) Funded also with HST $25,000
DRMAC Mobility Management (FY20) Funded also with HST $288,000
SRC Mobility Management (FY20) Funded also with HST $439,000
SRC Operating (FY20) Funded also with HST $385,000
SRC Van Expansion (FY20) Funded also with HST $83,000
SRC BOC Expansion (FY20) Funded also with HST $73,000
VIA Mobility Management (FY20) $192,000
Douglas County 1 Van Expansion (FY20) $48,000
Douglas County Mobility Management (FY20) $395,000
Easter Seals 1 BOC Expansion (FY20) $52,000
Laradon Hall Society Van Replacement (FY20) $103,000
Goodwill - Denver Replacement Vehicle (FY20) $55,000
Continuum of Colorado Operating (FY21) $135,000
VIA 2 Replacement Vehicles (FY21 Small Urban) $180,000
VIA Mobility Management (FY22 Small Urban) $573,000
VIA One BOC Replacement (FY22 Small Urban) $144,000
Laradon Hall Society 3 Replacement Vehicles (FY22 Small Urban) $176,000
Via 4 Replacement Vans (Fiscal Year 2022 Small Urban) $333,000
VIA Mobility Management (FY23 Small Urban) $585,000
VIA Operating (FY23 Small Urban) $491,000
Laradon Hall Society 5 Vehicle Replacements (FY23 Small Urban) $392,000
Via Operating (Fiscal Year 2024 Small Urban) $510,000
Via Mobility Management (Fiscal Year 2024 Small Urban) $600,000
2024-2027 Transportation Improvement Program (Approved TIP)
RTD Capital Improvements: Bus and Facilities Funding
Project Name:
RTD Capital Improvements: Bus and Facilities Funding
Identification Number:
2012-108
Project Type:
Transit Vehicles
Performance Measures:
Congestion, Safety, Transit Assets, Transit Safety
Affected Counties:
Regional
Affected Municipalities:
None
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
Funds will be directed to capital improvements including facility upgrades and the purchase of fuel efficient buses and vans equipped with ADA-compliant lifts.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Section 5339)
$6,730,000
$6,940,000
$7,140,000
$7,360,000
Local
$1,690,000
$1,740,000
$1,790,000
$1,840,000
Total
$8,420,000
$8,680,000
$8,930,000
$9,200,000
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$18,244,000
$35,230,000
$0
$53,474,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
05/16/2024
Amended
Add $18,244,000 in prior year funding incorrectly not carried forward to new TIP. Total project cost increases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Proposed for adoption into 2020-2023
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
Region 1 Rockfall/Geohazard Pool
Project Name:
Region 1 Rockfall/Geohazard Pool
Identification Number:
2012-115
Project Type:
Safety
Performance Measures:
Freight Reliability, Safety, Travel Time Reliability
Affected Counties:
Jefferson
Affected Municipalities:
None
Subregion(s):
None
Open to Public:
None
STIP-ID:
SDN6678
Project Scope:
Rockfall mitigation and other geohazard work in multiple locations within CDOT Region 1. Specific projects will not be listed.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
State (Rockfall Mitigation)
$500,000
$500,000
$500,000
$500,000
Local
$0
$0
$0
$0
Total
$500,000
$500,000
$500,000
$500,000
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$2,000,000
$0
$2,000,000
Amendment History
Date Status Description
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
05/20/2020
Amended
Add funding. Overall project funding increases.
08/22/2019
Amended
Proposed for adoption into 2020-2023
11/29/2018
Amended
Restore from the 2016-2021 TIP. Add state rockfall funding; increase total project funding.
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
Region 4 2013 Flood-Related Projects Pool
Project Name:
Region 4 2013 Flood-Related Projects Pool
Identification Number:
2012-116
Project Type:
Roadway Reconstruction
Performance Measures:
Bridge Condition, Pavement Condition, Safety
Affected Counties:
Boulder, Weld
Affected Municipalities:
None
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
Pool contains flood-related repair projects from the fall of 2013 flood event.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Federal Emergency )
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$278,335,000
$0
$0
$278,335,000
Amendment History
Date Status Description
08/17/2023
Amended
Proposed for adoption into 2024-2027
10/21/2021
Amended
Add $6,000,000 in FY 22 for SH-7 repairs. Total project cost increases.
04/22/2021
Amended
Proposed for adoption into 2022-2025
01/11/2021
Amended
Shift funds from FY 20 to FY 21. Total project funding increases.
08/22/2019
Amended
Proposed for adoption into 2020-2023
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name Description Notes Cost
PR SH7 Flood Repair MP 19-33
2024-2027 Transportation Improvement Program (Approved TIP)
Region 4 Non-Regionally Significant RPP Pool
Project Name:
Region 4 Non-Regionally Significant RPP Pool
Identification Number:
2012-121
Project Type:
Roadway Operational Improvements
Performance Measures:
Congestion, Freight Reliability, Pavement Condition, Safety, Travel Time Reliability, Bridge Condition
Affected Counties:
Boulder, Weld
Affected Municipalities:
None
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
Pool contains projects selected under the Non-Regionally Significant Regional Priority Program in CDOT Region 4 (DRCOG-TIP area only).
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
State (Regional Priority Projects)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$6,392,000
$0
$0
$6,392,000
Amendment History
Date Status Description
11/25/2024
Proposed
Adopted into the 2026-2029 TIP.
10/18/2023
Amended
Move $7,300,000 in RPP funds to TIP ID# 2020-081. Total project cost decreases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
02/16/2023
Amended
Remove eight pool projects incorrectly programmed with RPP funds.
11/17/2022
Amended
Add six new pool projects. Total project cost remains the same.
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name Description Notes Cost
SH-66: WCR 7 Intersection Imp $1,000,000
SH-119/SH-52 Transit Bypass Lanes $470 in RPP in TIP# 2020-081 $0
Coffman St. Busway $1,230 in RPP in TIP# 2020-083 $0
SH-119/Hover Intersection $7,300 in RPP in TIP# 2020-081 $0
2024-2027 Transportation Improvement Program (Approved TIP)
Air Quality Improvements Set-Aside
Project Name:
Air Quality Improvements Set-Aside
Identification Number:
2016-002
Project Type:
Air Quality Improvement Projects
Performance Measures:
Affected Counties:
Regional
Affected Municipalities:
None
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
Funding for specialized air quality improvement outreach activities including ozone, localized, and focused. SIP modeling is located under TIP ID 2016-058.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congestion Mitigation / Air Quality)
$4,420,000
$1,776,000
$1,626,000
$1,378,000
Local
$1,105,000
$444,000
$406,000
$344,000
Total
$5,525,000
$2,220,000
$2,032,000
$1,722,000
Project Phase to Initiate
Other Phase
Other Phase
Other Phase
Other Phase
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$11,499,000
$0
$11,499,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
09/19/2024
Amended
Roll $2,000,000 in unspent funds from prior years into current set-aside program. Total project cost increases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Proposed for adoption into 2020-2023
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
Regional Transportation Operations and Technology Set-Aside
Project Name:
Regional Transportation Operations and Technology Set-Aside
Identification Number:
2016-004
Project Type:
Traffic Signals/ITS
Performance Measures:
Congestion, Safety, Travel Time Reliability, Transit Safety
Affected Counties:
Regional
Affected Municipalities:
None
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
A pool to fund capital improvements to traffic signal systems, traffic signal timing and coordination work, traffic signal system engineering and design, intelligent transportation systems projects, and technology integration.
All FY24 and beyond selected projects will be individually depicted and use STBG. All pre-FY24 projects are funded with CMAQ.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$2,357,000
$1,268,000
$528,000
$5,000,000
Local
$589,000
$317,000
$132,000
$1,250,000
Total
$2,946,000
$1,585,000
$660,000
$6,250,000
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$10,379,000
$11,441,000
$0
$21,820,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
10/18/2023
Amended
Remove $10,847,000 to program to individual set-aside projects. Total project cost decreases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
09/17/2020
Amended
Add pool projects from recent call and adjust funding. Total project cost increases.
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name Description Notes Cost
Aurora Signal System Upgrade (FY22) Funded at 100% $460,000
Aurora Signal Controller Upgrades (FY23) Funded at 100% $796,000
Boulder ATSPM & System Communication (FY22-23) $1,349,000
CDOT R1 Advance Detection (FY21,23) Funded at 100% $892,000
CDOT R1 Traffic Camera Expansion (FY21-23) $161,000
Centennial S2S Communication (FY21-23) $800,000
Commerce City ATSPM System (FY21-22) $190,000
Denver Bluetooth Expansion (FY23) $977,000
Denver Adaptive Signal Control & ATSPM System (FY22) Funded at 100% $891,000
Denver Pedestrian Detection (FY21) $927,000
Douglas County ATSPM System (FY22) $292,000
Jefferson County System Communication (FY21) Funded at 100% $434,000
Littleton System Communication (FY21-22) $590,000
Lone Tree Adaptive Signal Control (FY22) Funded at 100% $200,000
Parker Traffic Responsive Signal Control (FY21) $400,000
RTD TSP Data Management (FY21-22) Funded at 100% $530,000
RTD TSP Conditionality (FY21-22) Funded at 100% $450,000
2024-2027 Transportation Improvement Program (Approved TIP)
FLEX Route Extension: Boulder to Longmont
Project Name:
FLEX Route Extension: Boulder to Longmont
Identification Number:
2016-011
Project Type:
Transit Service
Performance Measures:
Transit Assets, Congestion, Safety
Affected Counties:
Boulder
Affected Municipalities:
Boulder, Longmont, Unincorporated
Subregion(s):
Boulder
Open to Public:
2020
STIP-ID:
None
Project Scope:
This project will extend the existing FLEX route by providing service from Longmont to Boulder. This extension will create up to five, round-trip, weekday trips. These trips will run as a complement to the existing FLEX trips between Ft. Collins and Longmont, which will remain with their existing run times and with the same destinations.
Destinations for the route within Boulder include: Boulder Junction (30th & Pearl), Boulder Transit Center/ downtown Boulder (14th & Walnut), and the University of Colorado at Boulder campus.
2020-2023 TIP funding adds one new weekday midday trip, four new weekend trips, and support for the existing weekday peak period trips.
Fiscal Year 2023 funding goes toward the purchase of on-route electric vehicle chargers for battery electric buses at Transfort's South Transit Center in Fort Collins.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congestion Mitigation / Air Quality)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$2,778,000
$0
$0
$2,778,000
Amendment History
Date Status Description
07/22/2024
Amended
Change the scope for $250,000 in Fiscal Year 2023 federal Congestion Mitigation/Air Quality funds to new Transfort electric vehicle chargers. Total project cost remains the same.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Per FY20 project delays report, shift FY20-23 funding to FY21-24. Proposed for adoption into 2022-2025.
10/22/2020
Amended
Increase local match. Total project cost increases.
08/22/2019
Amended
Proposed for adoption into 2020-2023
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
Wadsworth Operations and Widening: 35th to I70
Project Name:
Wadsworth Operations and Widening: 35th to I70
Identification Number:
2016-020
Project Type:
Roadway Capacity
Performance Measures:
Transit Assets, Transit Safety, Congestion, Pavement Condition, Safety, Travel Time Reliability
Affected Counties:
Jefferson
Affected Municipalities:
Wheat Ridge
Subregion(s):
Jefferson
Open to Public:
2024
STIP-ID:
None
Project Scope:
This project will widen Wadsworth Blvd from W 35th Ave to W 48th Ave from 4 to 6 lanes. Features include:
• 8-10 ft. wide sidewalks along both sides of the corridor separated from the street with 2-4 ft. wide paved buffers or 8 ft wide landscaped amenity zone
• An 12 ft wide multi-use path on the east side of Wadsworth Blvd between 35th and 44th
• Street and pedestrian-level lighting
• Landscaped center medians, raised crosswalks, and access consolidation
• Continuous flow intersections with single left turns at 38th and 44th; additional left turns at the four crossover signals and at 41st
• Traffic signals upgrades and bicycle detection
• Transit stop enhancements including shelters, benches, and kiosks
2020-2023 TIP funding continues the project north to I-70.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congestion Mitigation / Air Quality)
$0
$0
$0
$0
Federal (Congressional Allocation)
$4,000,000
$0
$0
$0
Federal (STBG-Pandemic DRCOG Region)
$0
$0
$0
$0
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
State (Legislative)
$0
$0
$0
$0
State (Safety)
$0
$0
$0
$0
State (Surface Treatment)
$0
$0
$0
$0
Local
$832,000
$0
$0
$0
Total
$4,832,000
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$60,369,000
$4,832,000
$0
$65,201,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
05/16/2023
Amended
Add $4,000,000 in federal Congressional funding. Total project cost increases.
03/16/2023
Amended
Add $1,360,000 in state Legislative funding from the Region 1 Revitalizing Main Streets Pool. Total project cost increases.
12/21/2022
Amended
Add $1,100,000 in state Safety funds. Total project cost increases.
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
I25/Broadway Station Interchange Improvements
Project Name:
I25/Broadway Station Interchange Improvements
Identification Number:
2016-021
Project Type:
Roadway Capacity
Performance Measures:
Congestion, Pavement Condition, Safety, Travel Time Reliability
Affected Counties:
Denver
Affected Municipalities:
Denver
Subregion(s):
Denver
Open to Public:
2024
STIP-ID:
None
Project Scope:
This project modifies S. Broadway around the I-25 interchange.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (STBG-Pandemic DRCOG Region)
$0
$0
$0
$0
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$89,922,000
$0
$0
$89,922,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Proposed for adoption into 2020-2023
11/16/2017
Amended
Add $1,221,000 of state Permanent Water Quality funding in FY 2018. Total project cost increases.
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
16th St. Mall Rehabilitation: Market to Civic Center Station
Project Name:
16th St. Mall Rehabilitation: Market to Civic Center Station
Identification Number:
2016-028
Project Type:
Multimodal
Performance Measures:
Transit Safety, Safety
Affected Counties:
Denver
Affected Municipalities:
Denver
Subregion(s):
Regional
Open to Public:
2024
STIP-ID:
None
Project Scope:
Project will reconstruct 16th St. Mall with a new granite pavement system, install bulb-outs, landscaping, and realign transitway and sidewalks.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
State (MMOF)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$113,000,000
$0
$0
$113,000,000
Amendment History
Date Status Description
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
02/19/2020
Amended
Change FY 2022 STP-Metro funding to MMOF. Overall project funding remains the same.
08/22/2019
Amended
Proposed for adoption into 2020-2023
08/17/2017
Amended
Roll Forward project and funding from 2016-2021 TIP and place $4,799,000 in federal STP-Metro funding and $1,200,000 of local funding into FY 2018 in order to obligate. Total project funding remains unchanged.
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
East Lafayette Multimodal Path Connection: Commerce to Lafayette Park-n-Ride
Project Name:
East Lafayette Multimodal Path Connection: Commerce to Lafayette Park-n-Ride
Identification Number:
2016-029
Project Type:
Active Transportation
Performance Measures:
Congestion, Safety
Affected Counties:
Boulder
Affected Municipalities:
Lafayette
Subregion(s):
Boulder
Open to Public:
2020
STIP-ID:
None
Project Scope:
This project widens existing sidewalks and constructs new 10 ft wide concrete multi-use paths along South Boulder Rd from City Center Dr east to 120th St, and then continuing south along 120th St, connecting to existing sidewalks at Commerce Ct. Two additional connections will be made to the north from South Boulder Rd; one on Merlin Dr to Sanchez Elementary School, and another on City Center Dr to west of Strathmore Ln.
A physically-protected crossing at Avalon St, 20 bicycle parking spaces, AASHTO compliant lighting, and way-finding signage with destination and distance information will also be included.
Region 4 TAP funds will fill in existing infrastructure gaps with 10 ft wide multi use path, concrete sidewalk with ADA accessible curb ramps, 1.8 miles of AASHTO-standard on-street bike lanes, enhanced pedestrian and bicycle crossings along South Boulder Rd and 120th St, as well as at the planned South Boulder Rd/120th St signalized intersection that integrates crosswalks, pedestrian lighting, concrete median refuges, and pedestrian-activated signage.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
Federal (Transportation Alternatives-DRCOG)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$10,359,000
$0
$0
$10,359,000
Amendment History
Date Status Description
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/11/2020
Amended
Add $2,600,000 in additional local overmatch for the increase of one underpass to two after project award. Total project cost increases.
06/17/2020
Amended
Import into the 20-23 TIP and add local overmatch to account for the increase of one underpass to two after project award. Total project cost increases.
08/17/2017
Amended
Correct FY 2018 CDOT TAP funding to agree with award and add FY 2019 CDOT TAP funding. Total project funding increases.
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
I25 Managed Lanes: 120th to E470
Project Name:
I25 Managed Lanes: 120th to E470
Identification Number:
2016-055
Project Type:
Roadway Capacity
Performance Measures:
Bridge Condition, Congestion, Freight Reliability, Pavement Condition, Safety, Travel Time Reliability
Affected Counties:
Adams, Broomfield
Affected Municipalities:
Broomfield, Thornton, Westminster, Unincorporated
Subregion(s):
None
Open to Public:
2024
STIP-ID:
None
Project Scope:
This project will extend the existing and under construction managed lanes project (TIPID 2012-073), utilizing existing and new ROW. The project will result in one new managed lane in each direction from the current project's northern terminus near 120th to E470. Project will resurface the entire stretch, add traffic management, sound wall, tolling/ITS equipment and safety, bridge, and drainage improvements.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (TIFIA)
$0
$0
$0
$0
Federal (Tolling)
$0
$0
$0
$0
State (Regional Priority Projects)
$0
$0
$0
$0
State (Tolling)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$121,477,000
$0
$0
$121,477,000
Amendment History
Date Status Description
08/17/2023
Amended
Proposed for adoption into 2024-2027
07/11/2023
Amended
Remove $4,800,000 in federal TIFIA loans and add $4,800,000 in state toll funding. Total project cost remains the same.
07/21/2022
Amended
Refinanced TIFIA loan. $23,630,000 of prior loan funding moves into FY23 and increases by $4,800,000. Total project cost increases.
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Proposed for adoption into 2020-2023
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
Region 1 ITS Pool
Project Name:
Region 1 ITS Pool
Identification Number:
2016-056
Project Type:
Traffic Signals/ITS
Performance Measures:
Transit Safety, Congestion, Freight Reliability, Safety, Travel Time Reliability
Affected Counties:
Adams, Arapahoe, Broomfield, Denver, Douglas, Jefferson
Affected Municipalities:
None
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
CDOT Region 1 ITS Pool. Specific projects will not be listed.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
State (Intelligent Transportation System)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$8,000,000
$0
$0
$8,000,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Proposed for adoption into 2020-2023
04/20/2017
Amended
Proposed for adoption into 2018-2021
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
Region 1 RPP Pool
Project Name:
Region 1 RPP Pool
Identification Number:
2016-057
Project Type:
Other
Performance Measures:
Bridge Condition, Congestion, Freight Reliability, Pavement Condition, Safety, Travel Time Reliability
Affected Counties:
Adams, Arapahoe, Broomfield, Denver, Douglas, Jefferson
Affected Municipalities:
None
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
CDOT Region 1 RPP Pool. Funds projects with RPP funds.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
State (Regional Priority Projects)
$17,750,000
$8,085,000
$15,050,000
$18,170,000
State (TC Contingency)
$4,800,000
$0
$0
$0
Local
$0
$0
$0
$0
Total
$22,550,000
$8,085,000
$15,050,000
$18,170,000
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$63,855,000
$0
$63,855,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
06/26/2024
Amended
Add $1,657,000 of Transportation Commission Contingency funds and one pool project. Total project cost increases.
03/21/2024
Amended
Add two new pool projects and $1,363,000 in state Transportation Commission Contingency funds. Total project cost increases.
02/22/2024
Amended
Add one pool project, adjust one pool project funding using existing unallocated funding, and add $1,780,000 in state Transportation Commission Contingency funds. Total project cost increases.
10/18/2023
Amended
Transfer $9,000,000 in state Regional Priority Project funds to new I70: Chief Hosa to W Colfax project. Total project cost decreases.
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name Description Notes Cost
Small projects/consultants/closeouts $8,000,000
local agency contributions Included in various TIP pages $5,000,000
Design $2,000,000
Steel Bridge Girders Cleanout Regionwide $1,000,000
Maintenance Paving Support IDIQ Regionwide $5,000,000
C470/I70 Emergency Bridge Repair $1,780,000
Expansion Device Replacement I76 and I225 $5,000,000
C470/Quincy Ramp Roundabouts $1,363,000
I76 and Dahlia Bridge Repair $1,657,000
2024-2027 Transportation Improvement Program (Approved TIP)
Ozone State Implementation Plan (SIP) Modeling
Project Name:
Ozone State Implementation Plan (SIP) Modeling
Identification Number:
2016-058
Project Type:
Air Quality Improvement Projects
Performance Measures:
Congestion
Affected Counties:
Regional
Affected Municipalities:
None
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
Conduct modeling and strategy analysis to ensure that the region will be able to meet anticipated new standards by the mandated deadlines for tighter standards for ozone.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$360,000
$180,000
$180,000
$0
Local
$90,000
$45,000
$45,000
$0
Total
$450,000
$225,000
$225,000
$0
Project Phase to Initiate
Other Phase
None
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$900,000
$0
$900,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Proposed for adoption into 2020-2023
04/18/2019
Amended
Add $120,000 transferred from 2016-002. Total project cost increases.
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
C470 Toll Express Lanes: I25 to Wadsworth
Project Name:
C470 Toll Express Lanes: I25 to Wadsworth
Identification Number:
2016-059
Project Type:
Roadway Capacity
Performance Measures:
Bridge Condition, Congestion, Freight Reliability, Pavement Condition, Safety, Travel Time Reliability
Affected Counties:
Arapahoe, Douglas, Jefferson
Affected Municipalities:
None
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
One tolled express lane in each direction on C-470 between I-25 and approximately Wadsworth Blvd, with auxiliary lanes in required locations. Safety and operational improvements between I-25 and Quebec St. Improvements to ramps including direct-connect ramps at I-25 and C-470.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Bond/Loans)
$0
$0
$0
$0
Federal (TIFIA)
$0
$0
$0
$0
State (Bond/Loans)
$0
$0
$0
$0
State (Operations)
$0
$0
$0
$0
State (Permanent Water Quality)
$0
$0
$0
$0
State (RAMP)
$0
$0
$0
$0
State (TC Contingency)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$344,061,000
$0
$0
$344,061,000
Amendment History
Date Status Description
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Proposed for adoption into 2020-2023
01/17/2019
Amended
Add $11,000,000 of state TC Contingency and $14,000,000 of state RAMP funding in FY 2018. Total project cost increases.
08/17/2017
Amended
Adjust funding amounts and years to reflect current funding scenario post-TIFIA loan closing.
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
RTD Bus Purchases
Project Name:
RTD Bus Purchases
Identification Number:
2016-063
Project Type:
Transit Vehicles
Performance Measures:
Transit Safety, Transit Assets
Affected Counties:
Regional
Affected Municipalities:
None
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
Project to be used by RTD to purchase buses to be used region-wide.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congestion Mitigation / Air Quality)
$0
$0
$0
$0
Federal (Section 5339)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$5,000,000
$0
$0
$5,000,000
Amendment History
Date Status Description
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Proposed for adoption into 2020-2023
07/10/2019
Amended
Add $7,500,000 of FTA Section 5339 funding and $7,500,000 of RTD match in FY 2019 for bus purchases. Total project increases.
11/29/2018
Amended
Add $90,000 of CMAQ funding in FY 2019 transferred from TIPID 2016-002. Total project cost increases.
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
Transit Operating and Capital (FTA 5311)
Project Name:
Transit Operating and Capital (FTA 5311)
Identification Number:
2016-065
Project Type:
Transit Operational Improvements
Performance Measures:
Congestion, Transit Assets, Transit Safety
Affected Counties:
Regional
Affected Municipalities:
None
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
Expends 5311 grant funds on transit for non-Urbanized Areas.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Section 5311)
$800,000
$800,000
$830,000
$850,000
State (Section 5311)
$0
$0
$0
$0
Local
$600,000
$600,000
$620,000
$650,000
Total
$1,400,000
$1,400,000
$1,450,000
$1,500,000
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$2,099,000
$5,750,000
$0
$7,849,000
Amendment History
Date Status Description
12/10/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
06/17/2020
Amended
Adjust funding for one pool project. Total funding amount decreases.
04/16/2020
Amended
Add one project from recent call for projects. Total project cost increases.
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name Description Notes Cost
SRC (Jefferson Co) Cutaway Replacement (FY17) $66,000
VIA 1 Bus Replacement (FY20 Rural) $91,000
2024-2027 Transportation Improvement Program (Approved TIP)
US85 Operational Improvements: I76 to 124th
Project Name:
US85 Operational Improvements: I76 to 124th
Identification Number:
2016-078
Project Type:
Roadway Operational Improvements
Performance Measures:
Pavement Condition, Congestion, Safety, Travel Time Reliability
Affected Counties:
Adams
Affected Municipalities:
Brighton, Commerce City
Subregion(s):
None
Open to Public:
None
STIP-ID:
SR16719.043
Project Scope:
US-85 corridor operational improvements between I-76 and 124th Ave.
Current funding is for pre-construction activities, including ROW, environmental, and design.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
State (Regional Priority Projects)
$0
$0
$0
$0
State (TC Contingency)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$17,437,000
$0
$0
$17,437,000
Amendment History
Date Status Description
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Proposed for adoption into 2020-2023
10/18/2018
Amended
Add $338,000 of state RPP in FY 2019. Total project cost increases.
04/19/2018
Amended
Add $900,000 in state Transportation Commission Contingency (TCC) funds and $1,199,000 in Regional Project Priority funds in FY 2018 for ROW acquisition. Total project funding increases.
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
88th NEPA Study: I76 to CO2
Project Name:
88th NEPA Study: I76 to CO2
Identification Number:
2016-079
Project Type:
Study
Performance Measures:
Pavement Condition, Congestion, Safety
Affected Counties:
Adams
Affected Municipalities:
Commerce City, Unincorporated
Subregion(s):
Adams
Open to Public:
None
STIP-ID:
None
Project Scope:
A NEPA study will be performed to determine the environmental effects of the proposed roadway project on 88th Ave, from NB I-76 Ramp to Highway 2.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$250,000
$0
$0
$250,000
Amendment History
Date Status Description
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Proposed for adoption into 2020-2023
09/22/2016
Amended
Adopted into the 2016-2021 TIP from the waitlist.
2024-2027 Transportation Improvement Program (Approved TIP)
19th St Multimodal Improvements: Norwood to Sumac
Project Name:
19th St Multimodal Improvements: Norwood to Sumac
Identification Number:
2016-084
Project Type:
Active Transportation
Performance Measures:
Safety, Congestion
Affected Counties:
Boulder
Affected Municipalities:
Boulder
Subregion(s):
None
Open to Public:
2019
STIP-ID:
SR470001
Project Scope:
This project would add missing sections of sidewalk and replace sub-standard sidewalk along 19th St from Norwood Ave to Sumac Ave. Additional, new on-street bicycle lanes will be added and ADA compliant curb access ramps and curb cuts will be installed.
Funded with CDOT TAP funds.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Transportation Alternatives-DRCOG)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$890,000
$0
$0
$890,000
Amendment History
Date Status Description
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Proposed for adoption into 2020-2023
04/20/2017
Amended
Proposed for adoption into 2018-2021
01/19/2017
Amended
Reduce FY 2018 and FY 2019 local match to $41,000 in each year. Overall funding decreases.
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
Region 1 ADA Projects
Project Name:
Region 1 ADA Projects
Identification Number:
2018-001
Project Type:
Roadway Operational Improvements
Performance Measures:
Safety
Affected Counties:
Adams, Arapahoe, Broomfield, Denver, Douglas, Jefferson
Affected Municipalities:
None
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
CDOT Region 1 pool to fund ADA-type projects.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
State (ADA)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$44,972,000
$0
$0
$44,972,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
10/17/2019
Amended
Add funding to FY 2020 and 2021. Total project cost increases.
08/22/2019
Amended
Proposed for adoption into 2020-2023
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
Region 1 Transportation Alternatives (TA) Pool
Project Name:
Region 1 Transportation Alternatives (TA) Pool
Identification Number:
2018-002
Project Type:
Active Transportation
Performance Measures:
Congestion, Safety
Affected Counties:
Adams, Arapahoe, Broomfield, Denver, Douglas, Jefferson
Affected Municipalities:
None
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
Pool contains TA funds and projects selected by CDOT Region 1.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Transportation Alternatives-CDOT)
$3,205,000
$774,000
$3,345,000
$0
Local
$667,000
$56,000
$696,000
$0
Total
$3,872,000
$830,000
$4,041,000
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$14,231,000
$8,743,000
$0
$22,974,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
09/19/2024
Amended
Remove one pool project and $2,500,000 in federal Transportation Alternatives funds and $625,000 in local match. Funds transferred to project 2022-012. Total project cost decreases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
03/16/2023
Amended
Remove one pool project and $2,505,000 in prior year funding. Total project cost decreases.
04/22/2021
Amended
Proposed for adoption into 2022-2025
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name Description Notes Cost
Jefferson County Peaks and Plains: Mouth of Clear Creek Canyon Segment $852,000
Evergreen North Lake Trail $200,000
Denver 47th and York Safe Crossing Project $2,500,000
Golden US-6 Wildlife Crossing and Multi-use Trail Improvements $400,000
Golden West Colfax Ave Sidewalk/Connectivity Project $530,000
Jefferson County Peaks to Plains - Huntsman Gulch to Rigor Mortis Rapids $1,653,000
Westminster Citywide Multimodal Transportation Safety, Access, and Connections Improvem $199,000
Arvada Alkire St Sidepath $1,200,000
Denver NE Trails to Transit Connectivity Project $1,150,000
Broomfield 120th Ave Complete Streets $2,335,000
Golden Ford St $1,200,000
Wheat Ridge Peaks to Plains Trail $952,000
Jefferson County Open Space I70 Trail Geological Point of Interest $1,804,000
Sheridan Mary Carter Greenway - US285 Underpass $752,000
Denver South Platte River Trail Improvements See Project 2022-012 $0
2024-2027 Transportation Improvement Program (Approved TIP)
Region 4 ADA Projects
Project Name:
Region 4 ADA Projects
Identification Number:
2018-003
Project Type:
Roadway Operational Improvements
Performance Measures:
Safety
Affected Counties:
Boulder, Weld
Affected Municipalities:
None
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
CDOT Region 4 (DRCOG portions only) pool to fund ADA-type projects. Specific projects will not be listed.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
State (ADA)
$250,000
$2,250,000
$250,000
$250,000
Local
$0
$0
$0
$0
Total
$250,000
$2,250,000
$250,000
$250,000
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$2,000,000
$3,000,000
$0
$5,000,000
Amendment History
Date Status Description
11/25/2024
Proposed
Adopted into the 2026-2029 TIP.
11/21/2024
Amended
Add $2,000,000 in state Americans with Disabilities Act funding. Total project cost increases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
06/17/2020
Amended
Reduce funding to align with actual revenues. Total project cost decreases.
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
Transit Capital Program (FTA 5339)
Project Name:
Transit Capital Program (FTA 5339)
Identification Number:
2018-004
Project Type:
Transit Vehicles
Performance Measures:
Transit Assets, Transit Safety, Congestion
Affected Counties:
Regional
Affected Municipalities:
None
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
Expends 5339 grant funds on capital transit for urbanized areas.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Section 5339)
$1,238,000
$0
$0
$0
Local
$310,000
$0
$0
$0
Total
$1,548,000
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$2,773,000
$1,548,000
$0
$4,321,000
Amendment History
Date Status Description
12/10/2024
Proposed
Adopted into the 2026-2029 TIP.
11/15/2023
Amended
Add one new pool project. Total project cost increases.
09/21/2023
Amended
Add three new pool projects, and add $1,031,000 in federal Section 5339 funds and $258,000 in local match. Total project cost increases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/24/2023
Amended
Add two new pool projects. Total project cost increases.
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name Description Notes Cost
VIA 2 Vehicle Replacements (FY21 Small Urban) $180,000
VIA 9 Vehicle Replacements (FY23) $728,000
VIA 2 Vehicle Expansion (FY23) $303,000
VIA 9 Van Replacements (FY24) $610,000
VIA Diesel Bus Replacement (FY24) $118,000
VIA 2 Bus Expansion (FY24) $303,000
VIA Software Improvements (FY24) $207,000
2024-2027 Transportation Improvement Program (Approved TIP)
Vasquez Operational Improvements: 52nd to 64th
Project Name:
Vasquez Operational Improvements: 52nd to 64th
Identification Number:
2018-009
Project Type:
Roadway Operational Improvements
Performance Measures:
Congestion, Freight Reliability, Pavement Condition, Safety, Travel Time Reliability
Affected Counties:
Adams
Affected Municipalities:
Commerce City
Subregion(s):
None
Open to Public:
2024
STIP-ID:
None
Project Scope:
Geometric and operational improvements to Vasquez, including the intersection at 60th Ave. and interchange at I-270.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congestion Mitigation / Air Quality)
$0
$0
$0
$0
Federal (Congressional Allocation)
$4,000,000
$0
$0
$0
Federal (Freight)
$0
$0
$0
$0
State (Legislative)
$0
$1,442,000
$8,560,000
$0
State (Regional Priority Projects)
$0
$0
$0
$0
State (Safety)
$4,279,000
$4,279,000
$0
$0
Local
$832,000
$0
$0
$0
Total
$9,111,000
$5,721,000
$8,560,000
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$12,000,000
$23,392,000
$0
$35,392,000
Amendment History
Date Status Description
01/15/2025
Proposed
Adopted into the 2026-2029 TIP.
01/15/2025
Amended
Add $8,560,000 in state Legislative funding. Total project cost increases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
05/16/2023
Amended
Add $4,000,000 in federal Congressional funding. Total project cost increases.
04/22/2021
Amended
Proposed for adoption into 2022-2025
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
Region 1 Permanent Water Quality Pool
Project Name:
Region 1 Permanent Water Quality Pool
Identification Number:
2018-011
Project Type:
Other
Performance Measures:
Affected Counties:
Adams, Arapahoe, Broomfield, Denver, Douglas, Jefferson
Affected Municipalities:
None
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
CDOT R1 pool for permanent water quality projects.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
State (Permanent Water Quality)
$40,000
$764,000
$0
$2,199,000
Local
$0
$0
$0
$0
Total
$40,000
$764,000
$0
$2,199,000
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$6,402,000
$3,003,000
$0
$9,405,000
Amendment History
Date Status Description
03/04/2025
Proposed
Adopted into the 2026-2029 TIP.
03/04/2025
Amended
Remove one pool project and $1,995,000 in prior funds. Total project cost decreases.
07/22/2024
Amended
Remove one pool project, transfer $1,249,000 in state Permanent Water Quality funds to new I25/CO7 Interim Transit Improvement project, adjust funding of two pool projects, and add $2,239,000 in state Permanent Water Quality funds. Total project cost increases.
03/21/2024
Amended
Adjust one pool project and add $110,000 in state Permanent Water Quality funds. Total project cost increases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name Description Notes Cost
I-76 Water Quality Facilities York St. to Dahlia St. $1,640,000
12th and Wadsworth Boulevard Water Quality Pond $1,800,000
CO7 Bike Path Widening $1,203,000
2024-2027 Transportation Improvement Program (Approved TIP)
Westminster Quiet Zones: BNSF Railway and Lowell, W 72nd, and Bradburn
Project Name:
Westminster Quiet Zones: BNSF Railway and Lowell, W 72nd, and Bradburn
Identification Number:
2018-013
Project Type:
Safety
Performance Measures:
Affected Counties:
Adams
Affected Municipalities:
Westminster
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
Design and construct supplemental safety measures to comply with Federal Railroad Administration requirements to make crossing locations quiet zone compliant. Improvements will be made at Lowell Blvd, W. 72nd Ave, and Bradburn Blvd where they intersect with the BNSF Railway.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$1,455,000
$0
$0
$1,455,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/24/2023
Amended
Proposed for adoption into 2022-2025
10/19/2017
Amended
Add new project with funding from the Northwest Corridor SCIP funding.
2024-2027 Transportation Improvement Program (Approved TIP)
I25 Capacity Improvements: Castle Rock to El Paso County Line
Project Name:
I25 Capacity Improvements: Castle Rock to El Paso County Line
Identification Number:
2018-014
Project Type:
Roadway Capacity
Performance Measures:
Bridge Condition, Congestion, Freight Reliability, Pavement Condition, Safety, Travel Time Reliability
Affected Counties:
Douglas
Affected Municipalities:
None
Subregion(s):
None
Open to Public:
2021
STIP-ID:
None
Project Scope:
Add one new express lane in each direction from Castle Rock to the El Paso County line.
Total CDOT project cost is approximately $367 million and extends south of the DRCOG boundary to Monument.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Faster Safety)
$0
$0
$0
$0
Federal (Freight)
$0
$0
$0
$0
Federal (INFRA)
$0
$0
$0
$0
State (FASTER Bridge and Tunnel Enterprise)
$0
$0
$0
$0
State (Faster Safety)
$0
$0
$0
$0
State (Legislative)
$0
$0
$0
$0
State (Surface Treatment)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$356,200,000
$0
$0
$356,200,000
Amendment History
Date Status Description
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
01/16/2020
Amended
Add $650,000 in federal Freight funding for improvements to the SB rest area to turn it into a chain-up station. Total project costs increase.
12/18/2019
Amended
Add $26 million in new SB 267 funding in FY 2020. Total project cost increases.
10/17/2019
Amended
Add $8,000,000 in federal Freight funding for a southbound truck climbing lane and $50,000 in local funding and wildlife elements. Total project cost increases.
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
I25/CO119 Transit Facility Improvements
Project Name:
I25/CO119 Transit Facility Improvements
Identification Number:
2018-015
Project Type:
Transit Passenger Facilities
Performance Measures:
Congestion, Travel Time Reliability, Bridge Condition, Freight Reliability, Pavement Condition, Transit Assets, Transit Safety, Safety
Affected Counties:
Weld
Affected Municipalities:
None
Subregion(s):
None
Open to Public:
2023
STIP-ID:
SSP4428
Project Scope:
Construct Bustang passenger stations and stops with appropriate pedestrian facilities, ADA ramps, and bus pullouts. Additional funding in Project #2022-017.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (MMOF - ARPA - CDOT)
$500,000
$0
$0
$0
State (Legislative)
$0
$140,000
$0
$0
Local
$0
$0
$0
$0
Total
$500,000
$140,000
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$8,351,000
$640,000
$0
$8,991,000
Amendment History
Date Status Description
12/19/2024
Proposed
Adopted into the 2026-2029 TIP.
12/19/2024
Amended
Add $140,000 in state Legislative funding. Total project cost increases.
04/18/2024
Amended
Add $1,000 in previous state Legislative funding and $500,000 in federal Multimodal Transportation and Mitigation Options Fund - American Rescue Plan Act - CDOT funds. Total project cost increases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
05/23/2022
Amended
Reduce state Legislative funding by $373,000. Total project cost decreases.
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
Transit Capital Program (State SB 228)
Project Name:
Transit Capital Program (State SB 228)
Identification Number:
2018-016
Project Type:
Transit Operational Improvements
Performance Measures:
Congestion, Transit Assets, Transit Safety
Affected Counties:
Regional
Affected Municipalities:
None
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
Pool contains transit-related projects funded from CDOT DTR calls for projects with State SB-228 funding.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
State (Legislative-Transit)
$392,000
$1,190,000
$0
$0
Local
$98,000
$680,000
$0
$0
Total
$490,000
$1,870,000
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$458,000
$2,360,000
$0
$2,818,000
Amendment History
Date Status Description
12/19/2024
Proposed
Adopted into the 2026-2029 TIP.
12/19/2024
Amended
Add three new pool projects and $635,000 in state Legislative-Transit funding. Total project cost increases.
11/21/2024
Amended
Add two pool projects and $555,000 in state Legislative funding. Total project cost increases.
09/21/2023
Amended
Add one new pool project, and add $392,000 in state Legislative-Transit funding and $98,000 in local match. Total project cost increases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name Description Notes Cost
Laradon Hall 1 Vehicle Purchase (FY24) $392,000
Via Mobility Operating (Fiscal Year 2025) $510,000
Via Mobility Mobility Management (Fiscal Year 2025) $600,000
Easterseals Colorado Vehicle (Fiscal Year 2025) $80,000
2024-2027 Transportation Improvement Program (Approved TIP)
CO119 BRT Enhancements in Boulder and Longmont
Project Name:
CO119 BRT Enhancements in Boulder and Longmont
Identification Number:
2020-001
Project Type:
Transit Operational Improvements
Performance Measures:
Transit Assets, Congestion, Safety, Transit Safety, Travel Time Reliability
Affected Counties:
Boulder
Affected Municipalities:
Boulder, Longmont
Subregion(s):
None
Open to Public:
2026
STIP-ID:
SDR5000
Project Scope:
The project will construct BRT elements including bus stop improvements and Park-n-Ride stations in Boulder and Longmont.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Local (RTD Funds Only)
$8,000,000
$8,000,000
$0
$0
Total
$8,000,000
$8,000,000
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$16,000,000
$0
$16,000,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
10/18/2023
Amended
Remove funding and scope from 2022-2025 Regional and Subregional Share Calls for Projects. Funding and scope moved to TIP ID# 2020-081. Project funding decreases.
08/17/2023
Amended
Proposed for adoption into 2024-2027, add new funding from 2024-2027 Regional and Subregional Shares Calls for Projects.
02/16/2023
Amended
Replace $350,000 in RPP funding with $350,000 in Legislative funding per CDOT R4.
09/22/2022
Amended
Add new scope from 2022-2025 Regional and Subregional Shares Calls for Projects.
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
Peaks to Plains Trail: CO6 from Tunnel 1 to Big Easy Trailhead
Project Name:
Peaks to Plains Trail: CO6 from Tunnel 1 to Big Easy Trailhead
Identification Number:
2020-002
Project Type:
Active Transportation
Performance Measures:
Congestion, Safety
Affected Counties:
Jefferson
Affected Municipalities:
Unincorporated
Subregion(s):
Regional, Adams, Jefferson
Open to Public:
2028
STIP-ID:
None
Project Scope:
The project will build a 3-mile 10-foot ADA path along SH-6, including bike/pedestrian bridges, trailheads, and creek access points.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$1,900,000
$329,000
$2,777,000
$13,994,000
State (MMOF)
$0
$0
$0
$0
Local
$700,000
$1,000,000
$9,200,000
$43,100,000
Total
$2,600,000
$1,329,000
$11,977,000
$57,094,000
Project Phase to Initiate
Environmental
Design
Construction
Construction
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$30,000,000
$73,000,000
$0
$103,000,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027 and add new funding and scope from 2024-2027 Regional and Subregional Shares Calls for Projects.
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Proposed for adoption into the 20-23 TIP.
2024-2027 Transportation Improvement Program (Approved TIP)
CO7 Corridor Multimodal Improvements: Foothills Pkwy to Brighton - Precon
Project Name:
CO7 Corridor Multimodal Improvements: Foothills Pkwy to Brighton - Precon
Identification Number:
2020-007
Project Type:
Roadway Operational Improvements
Performance Measures:
Pavement Condition, Congestion, Safety, Travel Time Reliability, Freight Reliability, Transit Assets
Affected Counties:
Adams, Boulder, Broomfield, Weld
Affected Municipalities:
Boulder, Brighton, Broomfield, Erie, Lafayette, Thornton, Unincorporated
Subregion(s):
Broomfield, Adams, Boulder, SW Weld
Open to Public:
None
STIP-ID:
None
Project Scope:
Pre-construction activities on CO7 from Boulder County (outside of the City of Boulder) to US85 in Brighton for future multimodal construction improvements. Note: work in the City of Boulder included in separate TIP project (TIPID 2022-082).
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congestion Mitigation / Air Quality)
$436,000
$1,424,000
$0
$0
Federal (Surface Transportation Block Grant)
$210,000
$210,000
$0
$0
State (Legislative)
$0
$230,000
$0
$0
State (MMOF)
$583,000
$2,820,000
$0
$0
State (Regional Priority Projects)
$208,000
$712,000
$0
$0
Local
$30,000
$545,000
$0
$0
Total
$1,467,000
$5,941,000
$0
$0
Project Phase to Initiate
Design
Design
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$10,000,000
$7,408,000
$0
$17,408,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/24/2023
Amended
Reduce project by $1,153,000 in federal CMAQ funds, $340,000 in state Legislative funds, and $1,304,000 in state MMOF funds. City of Boulder elements broken into separate project.
02/16/2023
Amended
Replace $570,000 in RPP funding with $570,000 in Legislative funding per CDOT R4 and add $328,000 in local match.
09/22/2022
Amended
Add new scope from 2022-2025 Regional and Subregional Shares Calls for Projects.
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
Aurora Missing Sidewalk Program
Project Name:
Aurora Missing Sidewalk Program
Identification Number:
2020-009
Project Type:
Active Transportation
Performance Measures:
Safety, Congestion
Affected Counties:
Adams, Arapahoe
Affected Municipalities:
Aurora
Subregion(s):
Adams, Arapahoe
Open to Public:
2024
STIP-ID:
None
Project Scope:
Construct detached sidewalks along arterial and collector streets to close gaps in portions of Aurora’s sidewalk network. All sidewalks will be constructed within 1/2 mile of a school and within areas with high rates of three or more vulnerable populations above the average for the DRCOG area.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Transportation Alternatives-DRCOG)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$2,885,000
$0
$0
$2,885,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Adopted in the 2020-2023 TIP.
2024-2027 Transportation Improvement Program (Approved TIP)
Nine Mile Station Bicycle and Pedestrian Bridge over Parker Rd.
Project Name:
Nine Mile Station Bicycle and Pedestrian Bridge over Parker Rd.
Identification Number:
2020-010
Project Type:
Active Transportation
Performance Measures:
Congestion, Safety
Affected Counties:
Arapahoe
Affected Municipalities:
Aurora
Subregion(s):
Arapahoe
Open to Public:
2023
STIP-ID:
None
Project Scope:
Construct a bicycle and pedestrian bridge over Parker Rd. from the Point redevelopment project to the Nine Mile RTD Station.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congressional Allocation)
$0
$850,000
$0
$0
Federal (STBG-Pandemic DRCOG Region)
$0
$0
$0
$0
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
Local
$0
$213,000
$0
$0
Total
$0
$1,063,000
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$7,400,000
$1,063,000
$0
$8,463,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
06/26/2024
Amended
Add $850,000 in federal Congressional Allocation funding. Total project cost increases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Adopted in the 2020-2023 TIP.
2024-2027 Transportation Improvement Program (Approved TIP)
Inverness Dr West Bicycle and Pedestrian Facilities: Fulton to Inverness Dr East
Project Name:
Inverness Dr West Bicycle and Pedestrian Facilities: Fulton to Inverness Dr East
Identification Number:
2020-011
Project Type:
Active Transportation
Performance Measures:
Congestion, Safety
Affected Counties:
Arapahoe
Affected Municipalities:
Centennial, Unincorporated
Subregion(s):
Arapahoe
Open to Public:
2023
STIP-ID:
None
Project Scope:
Construct bicycle and pedestrian facilities along Clinton St./Inverness Dr. West, from Fulton St. to Inverness Dr. East.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congestion Mitigation / Air Quality)
$0
$0
$0
$0
Federal (STBG-Pandemic DRCOG Region)
$0
$0
$0
$0
State (MMOF)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$5,922,000
$0
$0
$5,922,000
Amendment History
Date Status Description
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
12/17/2020
Amended
Shift FY 2020 to FY 2022, as project sponsor is not federalizing the design process. Total project cost remains the same.
08/22/2019
Amended
Adopted in the 2020-2023 TIP.
2024-2027 Transportation Improvement Program (Approved TIP)
Oxford Station Pedestrian Bridge: Over Oxford Ave
Project Name:
Oxford Station Pedestrian Bridge: Over Oxford Ave
Identification Number:
2020-012
Project Type:
Active Transportation
Performance Measures:
Congestion, Safety
Affected Counties:
Arapahoe
Affected Municipalities:
Englewood
Subregion(s):
Arapahoe
Open to Public:
2022
STIP-ID:
None
Project Scope:
Construct a grade-separated bicycle and pedestrian bridge over Oxford Ave. east of Santa Fe Dr., including nearby trails.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
Federal (Transportation Alternatives-DRCOG)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$2,000,000
$0
$0
$2,000,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Adopted in the 2020-2023 TIP.
2024-2027 Transportation Improvement Program (Approved TIP)
CO119 Bikeway: Boulder to Longmont - Precon
Project Name:
CO119 Bikeway: Boulder to Longmont - Precon
Identification Number:
2020-013
Project Type:
Active Transportation
Performance Measures:
Congestion, Safety
Affected Counties:
Boulder
Affected Municipalities:
Unincorporated
Subregion(s):
Boulder
Open to Public:
None
STIP-ID:
SDR5000
Project Scope:
Complete design and environmental clearances for a bikeway along CO119 from Boulder to Longmont.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$1,383,000
$0
$0
$1,383,000
Amendment History
Date Status Description
10/18/2023
Amended
Remove construction funding and scope from 2022-2025 Regional and Subregional Share Calls for Projects. Funding and scope moved to TIP ID# 2020-081. Project funding decreases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
02/16/2023
Amended
Replace $575,000 in RPP funding with $575,000 in Legislative funding per CDOT R4.
09/22/2022
Amended
Add new scope from 2022-2025 Regional and Subregional Shares Calls for Projects.
04/22/2021
Amended
Proposed for adoption into 2022-2025
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
Rock Creek/Coal Creek Trail Connection: 104th from Coal Creek Trail to Rock Creek Trail
Project Name:
Rock Creek/Coal Creek Trail Connection: 104th from Coal Creek Trail to Rock Creek Trail
Identification Number:
2020-014
Project Type:
Active Transportation
Performance Measures:
Safety, Congestion
Affected Counties:
Boulder
Affected Municipalities:
Louisville, Unincorporated
Subregion(s):
Boulder
Open to Public:
2023
STIP-ID:
None
Project Scope:
Construct a new regional multi-use path, connecting Broomfield, Louisville, and Lafayette on open space property immediately east of 104th Ave.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
State (MMOF)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$950,000
$0
$0
$950,000
Amendment History
Date Status Description
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Adopted in the 2020-2023 TIP.
2024-2027 Transportation Improvement Program (Approved TIP)
Downtown ADA Sidewalk Connections: Jackson, 1st, Jefferson
Project Name:
Downtown ADA Sidewalk Connections: Jackson, 1st, Jefferson
Identification Number:
2020-015
Project Type:
Active Transportation
Performance Measures:
Safety
Affected Counties:
Boulder
Affected Municipalities:
Nederland
Subregion(s):
Boulder
Open to Public:
2023
STIP-ID:
None
Project Scope:
Design and construct new ADA pedestrian facilities connecting the regional PnR with the main commercial area and visitor center.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
State (MMOF)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$1,550,000
$0
$0
$1,550,000
Amendment History
Date Status Description
11/25/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Adopted in the 2020-2023 TIP.
2024-2027 Transportation Improvement Program (Approved TIP)
US36 Bikeway Extension: Superior to Broomfield
Project Name:
US36 Bikeway Extension: Superior to Broomfield
Identification Number:
2020-017
Project Type:
Active Transportation
Performance Measures:
Congestion, Safety
Affected Counties:
Boulder, Broomfield
Affected Municipalities:
Broomfield, Superior, Unincorporated
Subregion(s):
Boulder
Open to Public:
2022
STIP-ID:
None
Project Scope:
Construct a new regional multi-use path connecting Superior and Broomfield on the west side of US-36.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Transportation Alternatives-DRCOG)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$1,312,000
$0
$0
$1,312,000
Amendment History
Date Status Description
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Adopted in the 2020-2023 TIP.
2024-2027 Transportation Improvement Program (Approved TIP)
US36/Broomfield and US36/Flatiron Bike-N-Ride Shelters, Amenities, Operations, and Marketing
Project Name:
US36/Broomfield and US36/Flatiron Bike-N-Ride Shelters, Amenities, Operations, and Marketing
Identification Number:
2020-018
Project Type:
Active Transportation
Performance Measures:
Congestion, Safety
Affected Counties:
Broomfield
Affected Municipalities:
Broomfield
Subregion(s):
Broomfield
Open to Public:
2024
STIP-ID:
None
Project Scope:
Construct 3 remaining Bike-N-Ride shelters for US-36 BRT stations in Broomfield. Funding support for marketing & operations provided by Commuting Solutions.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$650,000
$0
$0
$650,000
Amendment History
Date Status Description
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Adopted in the 2020-2023 TIP.
2024-2027 Transportation Improvement Program (Approved TIP)
Industrial Ln. Bikeway Phase 2: Bike/Ped Bridge over BNSF to US36/Flatiron Station
Project Name:
Industrial Ln. Bikeway Phase 2: Bike/Ped Bridge over BNSF to US36/Flatiron Station
Identification Number:
2020-019
Project Type:
Active Transportation
Performance Measures:
Congestion, Safety
Affected Counties:
Broomfield
Affected Municipalities:
Broomfield
Subregion(s):
Broomfield
Open to Public:
2024
STIP-ID:
None
Project Scope:
Construct Phase 2 of the Industrial Ln. bikeway, from US-36 at the Midway Multi-use Bridge over BNSF to the US-36/Flatiron Station.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Carbon Reduction Program)
$0
$0
$0
$0
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$3,501,000
$0
$0
$3,501,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
03/17/2022
Amended
Add $2,186,000 in CRP funding in FY23 and add $547,000 in local match as part of Spring 2022 Wait List Process. Total project cost increases.
04/22/2021
Amended
Proposed for adoption into 2022-2025
02/19/2020
Amended
Move funding from FY 2020 to FY 2021 and switch funding type from TA to STP-Metro. Total project costs remain the same.
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
C470 Grade-Separated Trail over Acres Green Drive
Project Name:
C470 Grade-Separated Trail over Acres Green Drive
Identification Number:
2020-021
Project Type:
Active Transportation
Performance Measures:
Congestion, Safety
Affected Counties:
Douglas
Affected Municipalities:
Lone Tree
Subregion(s):
Douglas
Open to Public:
2023
STIP-ID:
None
Project Scope:
Grade-separate the C-470 Regional Trail over Acres Green Dr.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
State (MMOF)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$3,569,000
$0
$0
$3,569,000
Amendment History
Date Status Description
12/20/2024
Amended
Reduce project by $431,000 state Multimodal Transportation and Mitigation Options Fund unused funds at project close-out. Total project cost decreases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Adopted in the 2020-2023 TIP.
2024-2027 Transportation Improvement Program (Approved TIP)
Evergreen Lake Trail Improvements: Evergreen Dam to Upper Bear Creek Rd
Project Name:
Evergreen Lake Trail Improvements: Evergreen Dam to Upper Bear Creek Rd
Identification Number:
2020-025
Project Type:
Active Transportation
Performance Measures:
Congestion, Safety
Affected Counties:
Jefferson
Affected Municipalities:
None
Subregion(s):
Jefferson
Open to Public:
2024
STIP-ID:
None
Project Scope:
Reconstruct and improve the existing trail on the north side of Evergreen Lake. The upper track (near road level) is an off-street, hard surface accessible trail and the lower track (lake level) is a pedestrian-only natural surfaces/wooden boardwalks trail. The project will include improvements to drainage, roadway characteristics, safety and accessibility improvements, and support infrastructure at and near the project site.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
State (Regional Priority Projects)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$4,664,000
$0
$0
$4,664,000
Amendment History
Date Status Description
08/17/2023
Amended
Proposed for adoption into 2024-2027
03/17/2022
Amended
Add $400,000 in STBG funds as part of Spring 2022 Wait List Process. Total project cost increases.
09/16/2021
Amended
Add Phase 2 funding from FY22 CMPI project selection.
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Adopted in the 2020-2023 TIP.
2024-2027 Transportation Improvement Program (Approved TIP)
Colfax Complete Streets: Violet to I70
Project Name:
Colfax Complete Streets: Violet to I70
Identification Number:
2020-026
Project Type:
Active Transportation
Performance Measures:
Congestion, Safety, Travel Time Reliability
Affected Counties:
Jefferson
Affected Municipalities:
Golden, Unincorporated
Subregion(s):
Jefferson
Open to Public:
2026
STIP-ID:
None
Project Scope:
Phase 1 includes constructing roadway improvements, including intersection improvements at Rooney Rd. and the intersection of Heritage Rd. and Colfax Ave. Drainage improvements, sidewalks, bike lanes will be included.
Phase 2 includes constructing an off-street trail along Lena Gulch.
Phase 3 includes constructing buffered bike lanes, pedestrian refuge islands, a roundabout, turn lane improvements, and sidewalks between Violet St. and Zeta St.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congestion Mitigation / Air Quality)
$0
$3,950,000
$0
$0
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
State (MMOF)
$0
$4,950,000
$0
$0
Local
$0
$1,000,000
$0
$0
Total
$0
$9,900,000
$0
$0
Project Phase to Initiate
None
Construction
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$8,700,000
$9,900,000
$0
$18,600,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/22/2022
Amended
Add new scope from 2022-2025 Subregional Share Call for Projects.
03/17/2022
Amended
Add $1,360,000 in STBG funds and $340,000 in local match as part of Spring 2022 Wait List process. Total project cost increases.
04/22/2021
Amended
Proposed for adoption into 2022-2025
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
St Vrain Greenway, Phase 13: CO119 to St Vrain State Park
Project Name:
St Vrain Greenway, Phase 13: CO119 to St Vrain State Park
Identification Number:
2020-027
Project Type:
Active Transportation
Performance Measures:
Safety, Congestion
Affected Counties:
Weld
Affected Municipalities:
Longmont, Unincorporated
Subregion(s):
Boulder
Open to Public:
2023
STIP-ID:
None
Project Scope:
Extend greenway trail into St. Vrain State Park.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
State (MMOF)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$3,000,000
$0
$0
$3,000,000
Amendment History
Date Status Description
11/25/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Adopted in the 2020-2023 TIP.
2024-2027 Transportation Improvement Program (Approved TIP)
Greenway Trail: CR37 to Stagecoach
Project Name:
Greenway Trail: CR37 to Stagecoach
Identification Number:
2020-028
Project Type:
Active Transportation
Performance Measures:
Congestion, Safety
Affected Counties:
Weld
Affected Municipalities:
Lochbuie
Subregion(s):
SW Weld
Open to Public:
2023
STIP-ID:
None
Project Scope:
Construct a greenway trail through open space from CR-37 to Stagecoach Ave.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
State (MMOF)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$1,125,000
$0
$0
$1,125,000
Amendment History
Date Status Description
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Adopted in the 2020-2023 TIP.
2024-2027 Transportation Improvement Program (Approved TIP)
CO66/WCR7 Pedestrian Underpass
Project Name:
CO66/WCR7 Pedestrian Underpass
Identification Number:
2020-029
Project Type:
Active Transportation
Performance Measures:
Safety
Affected Counties:
Weld
Affected Municipalities:
Mead
Subregion(s):
SW Weld
Open to Public:
2025
STIP-ID:
None
Project Scope:
Construct a trail and pedestrian underpass under SH-66, just west of WCR-7.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Transportation Alternatives-DRCOG)
$825,000
$0
$0
$0
Local
$206,000
$0
$0
$0
Total
$1,031,000
$0
$0
$0
Project Phase to Initiate
Construction
None
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$1,969,000
$1,031,000
$0
$3,000,000
Amendment History
Date Status Description
11/25/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Adopted in the 2020-2023 TIP.
2024-2027 Transportation Improvement Program (Approved TIP)
120th/US85 Interchange Improvements - Precon
Project Name:
120th/US85 Interchange Improvements - Precon
Identification Number:
2020-031
Project Type:
Roadway Capacity
Performance Measures:
Congestion, Pavement Condition, Safety, Travel Time Reliability, Bridge Condition
Affected Counties:
Adams
Affected Municipalities:
Brighton, Commerce City
Subregion(s):
Adams
Open to Public:
None
STIP-ID:
None
Project Scope:
Acquire right-of-way for a future diverging diamond interchange, including two bridge structures.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
State (Regional Priority Projects)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$12,600,000
$0
$0
$12,600,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Adopted in the 2020-2023 TIP.
2024-2027 Transportation Improvement Program (Approved TIP)
88th Widening: I76 to CO2
Project Name:
88th Widening: I76 to CO2
Identification Number:
2020-032
Project Type:
Roadway Capacity
Performance Measures:
Congestion, Pavement Condition, Travel Time Reliability
Affected Counties:
Adams
Affected Municipalities:
Commerce City, Unincorporated
Subregion(s):
Adams
Open to Public:
2026
STIP-ID:
None
Project Scope:
Preconstruction and construction activities along 88th Ave. from I-76 to CO2. Activities include roadway widening, bridge replacement, upgraded and interconnected traffic signals, and constructing multi-use path, sidewalk, and crossing improvements along the corridor.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$3,000,000
$3,000,000
$0
$0
Federal (Transportation Alternatives-DRCOG)
$0
$720,000
$0
$0
State (MMOF)
$0
$1,200,000
$0
$0
Local
$9,825,000
$10,305,000
$0
$0
Total
$12,825,000
$15,225,000
$0
$0
Project Phase to Initiate
Construction
Construction
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$6,400,000
$28,050,000
$0
$34,450,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
05/16/2024
Amended
Add active transportation scope and funding from Project# 2022-049. Total project cost increases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Adopted in the 2020-2023 TIP.
2024-2027 Transportation Improvement Program (Approved TIP)
104th Widening: Colorado to US85 - Precon
Project Name:
104th Widening: Colorado to US85 - Precon
Identification Number:
2020-033
Project Type:
Roadway Capacity
Performance Measures:
Congestion, Pavement Condition, Travel Time Reliability
Affected Counties:
Adams
Affected Municipalities:
Commerce City, Thornton, Unincorporated
Subregion(s):
Adams
Open to Public:
None
STIP-ID:
None
Project Scope:
Pre-construction activities for the future widening of roadway and adjacent shared-use paths.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$1,890,000
$735,000
$0
$0
State (Regional Priority Projects)
$375,000
$0
$0
$0
Local
$435,000
$315,000
$0
$0
Total
$2,700,000
$1,050,000
$0
$0
Project Phase to Initiate
Design
ROW
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$2,000,000
$3,750,000
$0
$5,750,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Adopted in the 2020-2023 TIP.
2024-2027 Transportation Improvement Program (Approved TIP)
County Line Capacity Improvements: Broadway to University
Project Name:
County Line Capacity Improvements: Broadway to University
Identification Number:
2020-035
Project Type:
Roadway Capacity
Performance Measures:
Congestion, Pavement Condition, Travel Time Reliability
Affected Counties:
Arapahoe, Douglas
Affected Municipalities:
Centennial, Littleton
Subregion(s):
Arapahoe, Douglas
Open to Public:
2024
STIP-ID:
None
Project Scope:
Reconstruct and widen roadway from 2 to 4 lanes, including sidewalks.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$20,000,000
$0
$0
$20,000,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
02/16/2023
Amended
Change sponsor from Centennial to Douglas County. No change to total project cost.
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Adopted in the 2020-2023 TIP.
2024-2027 Transportation Improvement Program (Approved TIP)
US6/Heritage Interchange - Precon
Project Name:
US6/Heritage Interchange - Precon
Identification Number:
2020-037
Project Type:
Roadway Capacity
Performance Measures:
Bridge Condition, Pavement Condition, Congestion, Safety, Travel Time Reliability
Affected Counties:
Jefferson
Affected Municipalities:
Golden
Subregion(s):
Jefferson
Open to Public:
None
STIP-ID:
None
Project Scope:
Conduct preconstruction activities (design, ROW, utility, environmental, public engagement) to convert the at-grade intersection to a grade-separated interchange.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$480,000
$1,960,000
$1,960,000
$0
State (Legislative)
$0
$0
$0
$0
Local
$120,000
$490,000
$490,000
$0
Total
$600,000
$2,450,000
$2,450,000
$0
Project Phase to Initiate
Design
ROW
Other Phase
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$4,000,000
$5,500,000
$0
$9,500,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
07/22/2021
Amended
Add $1,000,000 in state Legislative funding in FY 23. Total project cost increases.
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Adopted in the 2020-2023 TIP.
2024-2027 Transportation Improvement Program (Approved TIP)
CO66 Improvements: Hover to Main - Precon
Project Name:
CO66 Improvements: Hover to Main - Precon
Identification Number:
2020-038
Project Type:
Roadway Capacity
Performance Measures:
Congestion, Pavement Condition, Travel Time Reliability
Affected Counties:
Boulder
Affected Municipalities:
Longmont, Unincorporated
Subregion(s):
Boulder
Open to Public:
None
STIP-ID:
None
Project Scope:
Design for future capacity improvements on SH-66, between US-287 and Hover St.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
State (Regional Priority Projects)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$650,000
$0
$0
$650,000
Amendment History
Date Status Description
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Adopted in the 2020-2023 TIP.
2024-2027 Transportation Improvement Program (Approved TIP)
Sheridan/US36 Multimodal Improvements
Project Name:
Sheridan/US36 Multimodal Improvements
Identification Number:
2020-039
Project Type:
Multimodal
Performance Measures:
Congestion, Pavement Condition, Safety
Affected Counties:
Adams, Jefferson
Affected Municipalities:
Westminster
Subregion(s):
Adams, Jefferson
Open to Public:
2023
STIP-ID:
None
Project Scope:
Construct a multimodal underpass to provide a first and final mile connection between US-36/Sheridan Park-n-Ride/Bus Rapid Transit (BRT) station, US-36 Bikeway, and Downtown Westminster. Improves Sheridan Blvd. to a six-lane roadway with appropriate turn lanes from the US-36 bridge to Turnpike Dr.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congestion Mitigation / Air Quality)
$0
$0
$0
$0
State (Regional Priority Projects)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$8,500,000
$0
$0
$8,500,000
Amendment History
Date Status Description
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Adopted in the 2020-2023 TIP.
2024-2027 Transportation Improvement Program (Approved TIP)
CO42 Multimodal Improvements: Empire/Lock to CO7 - Precon
Project Name:
CO42 Multimodal Improvements: Empire/Lock to CO7 - Precon
Identification Number:
2020-040
Project Type:
Multimodal
Performance Measures:
Congestion, Safety, Transit Assets, Transit Safety
Affected Counties:
Boulder
Affected Municipalities:
Lafayette, Louisville
Subregion(s):
Boulder
Open to Public:
None
STIP-ID:
None
Project Scope:
Preconstruction activities for improvements to the CO42 corridor in Louisville, including protected bike lanes, protected intersections, transit improvements, and streetscaping.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
State (10 Year Plan-Capital Funds)
$0
$0
$0
$0
State (House Bill 1466 - MMOF)
$800,000
$0
$0
$0
State (Legislative)
$0
$0
$0
$0
Local
$800,000
$0
$0
$0
Total
$1,600,000
$0
$0
$0
Project Phase to Initiate
ROW
None
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$6,900,000
$1,600,000
$0
$8,500,000
Amendment History
Date Status Description
11/25/2024
Proposed
Adopted into the 2026-2029 TIP.
09/19/2024
Amended
Shift $800,000 in Fiscal Year 2024 funds and $2,400,000 in prior year funds from Multimodal Transportation and Mitigation Options Fund - American Rescue Plan Act funds to House Bill 1466 General Funds. Total project cost remains the same.
08/17/2023
Amended
Proposed for adoption into 2024-2027
02/16/2023
Amended
Replace $4,000,000 in RPP funding with $3,000,000 in Legislative and $1,000,000 in 10C funding per CDOT R4.
09/22/2022
Amended
Add new scope from 2022-2025 Subregional Share Call for Projects.
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
CO7 Multimodal Improvements: 38th/Marine to Cherryvale
Project Name:
CO7 Multimodal Improvements: 38th/Marine to Cherryvale
Identification Number:
2020-041
Project Type:
Multimodal
Performance Measures:
Congestion, Safety
Affected Counties:
Boulder
Affected Municipalities:
Boulder
Subregion(s):
Boulder
Open to Public:
2024
STIP-ID:
None
Project Scope:
Construct multi-use paths, enhanced bus stops, and new pedestrian facilities on Arapahoe Ave. (SH-7).
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$1,900,000
$0
$0
$1,900,000
Amendment History
Date Status Description
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Adopted in the 2020-2023 TIP.
2024-2027 Transportation Improvement Program (Approved TIP)
CO7/119th Intersection Improvements
Project Name:
CO7/119th Intersection Improvements
Identification Number:
2020-042
Project Type:
Multimodal
Performance Measures:
Pavement Condition, Safety
Affected Counties:
Boulder
Affected Municipalities:
Erie, Lafayette
Subregion(s):
Boulder
Open to Public:
2023
STIP-ID:
None
Project Scope:
Operational improvements for additional left turn lanes and new BRT stops.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congestion Mitigation / Air Quality)
$0
$0
$0
$0
Federal (STBG-Pandemic)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$12,053,000
$0
$0
$12,053,000
Amendment History
Date Status Description
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Adopted in the 2020-2023 TIP.
2024-2027 Transportation Improvement Program (Approved TIP)
South Boulder Rd At-Grade Crossing Improvements: Via Capri to Courtesy
Project Name:
South Boulder Rd At-Grade Crossing Improvements: Via Capri to Courtesy
Identification Number:
2020-043
Project Type:
Multimodal
Performance Measures:
Safety
Affected Counties:
Boulder
Affected Municipalities:
Louisville
Subregion(s):
Boulder
Open to Public:
2022
STIP-ID:
None
Project Scope:
Improve non-motorized safety by constructing five crossing treatments across South Boulder Rd.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$1,433,000
$0
$0
$1,433,000
Amendment History
Date Status Description
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Adopted in the 2020-2023 TIP.
2024-2027 Transportation Improvement Program (Approved TIP)
Micro Transit Service & Mobility Options: North I-25 Area
Project Name:
Micro Transit Service & Mobility Options: North I-25 Area
Identification Number:
2020-045
Project Type:
Transit Service
Performance Measures:
Transit Assets, Congestion
Affected Counties:
Adams, Broomfield
Affected Municipalities:
Broomfield, Thornton, Westminster, Unincorporated
Subregion(s):
Adams
Open to Public:
2020
STIP-ID:
None
Project Scope:
Flexible Micro Transit Service and Mobility Options addressing underserved workforce needs in the North I-25 area: 120th to 160th and Huron to Washington.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congestion Mitigation / Air Quality)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Local (RTD Funds Only)
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$2,000,000
$0
$0
$2,000,000
Amendment History
Date Status Description
03/05/2025
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
09/18/2019
Amended
Adjust years of funding. Total project cost remains the same.
08/22/2019
Amended
Adopted in the 2020-2023 TIP.
2024-2027 Transportation Improvement Program (Approved TIP)
Downtown Boulder Station Improvements
Project Name:
Downtown Boulder Station Improvements
Identification Number:
2020-047
Project Type:
Transit Passenger Facilities
Performance Measures:
Transit Assets, Congestion
Affected Counties:
Boulder
Affected Municipalities:
Boulder
Subregion(s):
Boulder
Open to Public:
2024
STIP-ID:
None
Project Scope:
Construct new sawtooth bays to accommodate regional and local buses and alleviate overcrowding at the 14th and Walnut St. Station.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Local (RTD Funds Only)
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$982,000
$0
$0
$982,000
Amendment History
Date Status Description
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Adopted in the 2020-2023 TIP.
2024-2027 Transportation Improvement Program (Approved TIP)
HOP Electric Bus Purchases
Project Name:
HOP Electric Bus Purchases
Identification Number:
2020-048
Project Type:
Transit Vehicles
Performance Measures:
Transit Assets, Congestion
Affected Counties:
Boulder
Affected Municipalities:
Boulder
Subregion(s):
Boulder
Open to Public:
2023
STIP-ID:
None
Project Scope:
Purchase battery electric buses and charging equipment to further advance the electrification of the HOP fleet in Boulder.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
State (FASTER Transit)
$0
$0
$0
$0
State (MMOF)
$0
$0
$0
$0
State (Settlement Fund)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$5,343,000
$0
$0
$5,343,000
Amendment History
Date Status Description
08/17/2023
Amended
Proposed for adoption into 2024-2027
12/16/2021
Amended
Revise project scope from transit service expansion to bus purchases. Total project cost decreases.
04/22/2021
Amended
Per FY20 project delays report, shift FY20-22 funding to FY21-23. Proposed for adoption into 2022-2025.
08/22/2019
Amended
Adopted in the 2020-2023 TIP.
2024-2027 Transportation Improvement Program (Approved TIP)
Federal Blvd Transit Improvements: Floyd to 54th
Project Name:
Federal Blvd Transit Improvements: Floyd to 54th
Identification Number:
2020-049
Project Type:
Transit Operational Improvements
Performance Measures:
Transit Assets, Transit Safety, Congestion
Affected Counties:
Adams, Denver
Affected Municipalities:
Denver
Subregion(s):
Denver
Open to Public:
2024
STIP-ID:
None
Project Scope:
Utilize operational improvements and treatments to improve transit speed, reliability, and amenities on Federal Blvd from Floyd to 54th Ave.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Local (RTD Funds Only)
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$4,000,000
$0
$0
$4,000,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Adopted in the 2020-2023 TIP.
2024-2027 Transportation Improvement Program (Approved TIP)
Industrial and Nickel/Commerce Intersection Operational Improvements
Project Name:
Industrial and Nickel/Commerce Intersection Operational Improvements
Identification Number:
2020-050
Project Type:
Roadway Operational Improvements
Performance Measures:
Congestion, Safety
Affected Counties:
Broomfield
Affected Municipalities:
Broomfield
Subregion(s):
Broomfield
Open to Public:
2024
STIP-ID:
None
Project Scope:
Construct modifications of the 3-way intersection to improve safety and reduce delay, including a coordinated traffic signal with US-287 & BNSF railway.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$1,619,000
$0
$0
$1,619,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Adopted in the 2020-2023 TIP.
2024-2027 Transportation Improvement Program (Approved TIP)
CO86/5th and Founders/Ridge Intersection Operational Improvements
Project Name:
CO86/5th and Founders/Ridge Intersection Operational Improvements
Identification Number:
2020-051
Project Type:
Roadway Operational Improvements
Performance Measures:
Congestion, Safety, Travel Time Reliability
Affected Counties:
Douglas
Affected Municipalities:
Castle Rock
Subregion(s):
Douglas
Open to Public:
2023
STIP-ID:
None
Project Scope:
Operational improvements, including bicycle/pedestrian safety improvements.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congestion Mitigation / Air Quality)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$6,500,000
$0
$0
$6,500,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Adopted in the 2020-2023 TIP.
2024-2027 Transportation Improvement Program (Approved TIP)
I70/CO79 Eastbound Ramp Improvements
Project Name:
I70/CO79 Eastbound Ramp Improvements
Identification Number:
2020-053
Project Type:
Roadway Operational Improvements
Performance Measures:
Congestion, Freight Reliability, Pavement Condition, Safety, Travel Time Reliability
Affected Counties:
Adams, Arapahoe
Affected Municipalities:
Bennett
Subregion(s):
Adams, Arapahoe
Open to Public:
2022
STIP-ID:
None
Project Scope:
Widen interchange footprint, relocate existing ramp interchange, and signalize the eastbound off-ramp.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congestion Mitigation / Air Quality)
$0
$0
$0
$0
Federal (STBG-Pandemic DRCOG Region)
$0
$0
$0
$0
State (Regional Priority Projects)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$2,200,000
$0
$0
$2,200,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Adopted in the 2020-2023 TIP.
2024-2027 Transportation Improvement Program (Approved TIP)
Parker/Quincy/Smoky Hill Intersection Operational Improvements
Project Name:
Parker/Quincy/Smoky Hill Intersection Operational Improvements
Identification Number:
2020-056
Project Type:
Roadway Operational Improvements
Performance Measures:
Congestion, Safety, Travel Time Reliability
Affected Counties:
Arapahoe
Affected Municipalities:
Aurora
Subregion(s):
Arapahoe
Open to Public:
2024
STIP-ID:
None
Project Scope:
Reconfigure NB Smoky Hill Rd./Quincy Ave. approach to three exclusive left turn lanes and a shared through-right lane. Reconfigure WB Quincy Ave./NB Parker Rd. for three right turn lanes, shift the crosswalk across Parker Rd., undertake signal improvements, and install/widen sidewalks.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congestion Mitigation / Air Quality)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$9,171,000
$0
$0
$9,171,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Adopted in the 2020-2023 TIP.
2024-2027 Transportation Improvement Program (Approved TIP)
Dry Creek Operational Improvements: I25 to Inverness Dr East
Project Name:
Dry Creek Operational Improvements: I25 to Inverness Dr East
Identification Number:
2020-057
Project Type:
Roadway Operational Improvements
Performance Measures:
Congestion, Safety
Affected Counties:
Arapahoe
Affected Municipalities:
Centennial
Subregion(s):
Arapahoe
Open to Public:
2025
STIP-ID:
None
Project Scope:
Extend the eastbound through/right lane from NB I-25 Off Ramp to connect to right turn lane at the Inverness Dr. East, shared path improvements along the south side of Dry Creek Rd., signage & pavement markings on the SB Clinton St. for ease to SB I-25.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congestion Mitigation / Air Quality)
$0
$496,000
$0
$0
Local
$0
$124,000
$0
$0
Total
$0
$620,000
$0
$0
Project Phase to Initiate
Construction
None
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$4,520,000
$620,000
$0
$5,140,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
06/26/2024
Amended
Add funding from the closeout of project 2020-058. The Arapahoe Forum has approved. Total funding has increased.
08/17/2023
Amended
Proposed for adoption into 2024-2027
05/23/2022
Amended
Adjust project scope. Project cost remains the same.
04/22/2021
Amended
Proposed for adoption into 2022-2025
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
US285/Broadway Operational Improvements
Project Name:
US285/Broadway Operational Improvements
Identification Number:
2020-059
Project Type:
Roadway Operational Improvements
Performance Measures:
Bridge Condition, Congestion, Pavement Condition, Safety, Travel Time Reliability
Affected Counties:
Arapahoe
Affected Municipalities:
Englewood
Subregion(s):
Arapahoe
Open to Public:
2024
STIP-ID:
None
Project Scope:
Reconstruct the bridge over US-285, lengthen turn lanes, ped/bike improvements, reconstruct on/off-ramps, eliminate lane drops, and provide through lanes in each direction.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
State (Regional Priority Projects)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$7,651,000
$0
$0
$7,651,000
Amendment History
Date Status Description
10/17/2024
Amended
Project cancelled by sponsor and $6,369,000 in unused federal Surface Transportation Block Grant funds returned to DRCOG for reprogramming. $880,000 in unused local match removed as well. Total project cost decreases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
05/23/2022
Amended
Add $500,000 in state RPP funds. Total project cost increases.
04/24/2022
Amended
Add $1,800,000 in RPP funds and $3,100,000 in local funds. Total project cost increases.
04/22/2021
Amended
Proposed for adoption into 2022-2025
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
Mineral/Santa Fe Operational Improvements
Project Name:
Mineral/Santa Fe Operational Improvements
Identification Number:
2020-060
Project Type:
Roadway Operational Improvements
Performance Measures:
Congestion, Safety, Travel Time Reliability, Freight Reliability
Affected Counties:
Arapahoe
Affected Municipalities:
Littleton
Subregion(s):
Arapahoe
Open to Public:
2026
STIP-ID:
None
Project Scope:
Provide quadrant road in the southwest corner of the intersection, eliminate left turn phases at intersection, install new/upgraded traffic signals, and expand active transportation facilities.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congestion Mitigation / Air Quality)
$0
$0
$0
$0
Federal (Surface Transportation Block Grant)
$1,167,000
$5,723,000
$0
$0
Local
$3,033,000
$6,067,000
$0
$0
Total
$4,200,000
$11,790,000
$0
$0
Project Phase to Initiate
Construction
Construction
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$11,441,000
$15,990,000
$0
$27,431,000
Amendment History
Date Status Description
01/30/2025
Proposed
Adopted into the 2026-2029 TIP.
01/30/2025
Amended
Correct error in funding amount by adding $1,000,000 in federal Surface Transportation Block Grant funds. Total project cost increases.
11/21/2024
Amended
Add $3,390,000 in federal Surface Transportation Block Grant funds returned from Project 2020-059 and reallocated by the Arapahoe County Subregional Forum. Total project cost increases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
I25/Alameda Operational Improvements: Valley Highway Phase 2.0
Project Name:
I25/Alameda Operational Improvements: Valley Highway Phase 2.0
Identification Number:
2020-061
Project Type:
Roadway Operational Improvements
Performance Measures:
Bridge Condition, Congestion, Pavement Condition, Safety
Affected Counties:
Denver
Affected Municipalities:
Denver
Subregion(s):
Denver
Open to Public:
2023
STIP-ID:
None
Project Scope:
Construct a new/widened Alameda Bridge over the S. Platte River, local street improvements to Lipan St., pedestrian and bicycle facility improvements on the road, and a grade-separated S. Platte River Greenway path.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
State (Regional Priority Projects)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$33,200,000
$0
$0
$33,200,000
Amendment History
Date Status Description
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Adopted in the 2020-2023 TIP.
2024-2027 Transportation Improvement Program (Approved TIP)
I25/Lincoln Traffic and Mobility Improvements
Project Name:
I25/Lincoln Traffic and Mobility Improvements
Identification Number:
2020-062
Project Type:
Roadway Operational Improvements
Performance Measures:
Pavement Condition, Congestion, Safety, Travel Time Reliability
Affected Counties:
Douglas
Affected Municipalities:
Lone Tree
Subregion(s):
Douglas
Open to Public:
None
STIP-ID:
None
Project Scope:
Complete Value Engineering Study, NEPA, and final design associated with long term interchange solutions.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
Local
$1,750,000
$0
$0
$0
Total
$1,750,000
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$6,750,000
$1,750,000
$0
$8,500,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
03/17/2022
Amended
Add $2,000,000 in STBG funds in FY23 and add $2,750,000 in local match as part of the Spring 2022 Wait List Process. Overall funding increases.
04/22/2021
Amended
Proposed for adoption into 2022-2025
05/20/2020
Amended
Adjust funding per Step 1 funding advancements of the Spring 2020 Waiting List Protocol. Overall funding remains the same.
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
Parker Rd Operational Improvements: Lincoln to Pine
Project Name:
Parker Rd Operational Improvements: Lincoln to Pine
Identification Number:
2020-063
Project Type:
Roadway Operational Improvements
Performance Measures:
Congestion, Safety, Travel Time Reliability
Affected Counties:
Douglas
Affected Municipalities:
Parker
Subregion(s):
Douglas
Open to Public:
2023
STIP-ID:
None
Project Scope:
Construct pedestrian and traffic operational improvements, including a new multiuse path.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congestion Mitigation / Air Quality)
$0
$0
$0
$0
Federal (Faster Safety)
$0
$0
$0
$0
State (Faster Safety)
$0
$0
$0
$0
State (MMOF)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$4,000,000
$0
$0
$4,000,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Adopted in the 2020-2023 TIP.
2024-2027 Transportation Improvement Program (Approved TIP)
CO83 Safety Improvements: Bayou Gulch to El Paso County
Project Name:
CO83 Safety Improvements: Bayou Gulch to El Paso County
Identification Number:
2020-064
Project Type:
Roadway Operational Improvements
Performance Measures:
Congestion, Safety, Travel Time Reliability
Affected Counties:
Douglas
Affected Municipalities:
None
Subregion(s):
Douglas
Open to Public:
2024
STIP-ID:
None
Project Scope:
Construct safety improvements, possibly including passing lanes, intersection improvements, turn lanes, and others to reduce crashes.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congestion Mitigation / Air Quality)
$0
$0
$0
$0
Federal (Faster Safety)
$0
$0
$0
$0
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
State (Faster Safety)
$2,615,000
$7,123,000
$3,980,000
$0
State (Regional Priority Projects)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$2,615,000
$7,123,000
$3,980,000
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$12,127,000
$13,718,000
$0
$25,845,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
02/16/2023
Amended
Remove $1,567,000 in state FASTER-Safety funding and add $1,567,000 in federal Hazard Elimination funding. No change to total project cost
11/17/2022
Amended
Add $13,845,000 in state FASTER-Safety funding. Total project cost increases.
04/24/2022
Amended
Add $400,000 in STBG transferred from 2020-022. Reduce local match by $400,000. Total project cost remains the same.
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
JC73: CO74 to Buffalo Park Operational Improvements
Project Name:
JC73: CO74 to Buffalo Park Operational Improvements
Identification Number:
2020-066
Project Type:
Roadway Operational Improvements
Performance Measures:
Congestion, Safety
Affected Counties:
Jefferson
Affected Municipalities:
None
Subregion(s):
Jefferson
Open to Public:
2024
STIP-ID:
None
Project Scope:
Construct safety and operational improvements, including bike lanes/shoulders and pedestrian facilities. Roadway will be reconstructed, including drainage improvements and bridge replacement.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$12,500,000
$0
$0
$12,500,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Adopted in the 2020-2023 TIP.
2024-2027 Transportation Improvement Program (Approved TIP)
I270 Corridor Improvements: I70 to I25
Project Name:
I270 Corridor Improvements: I70 to I25
Identification Number:
2020-068
Project Type:
Roadway Operational Improvements
Performance Measures:
Bridge Condition, Congestion, Freight Reliability, Pavement Condition, Safety, Travel Time Reliability
Affected Counties:
Adams, Denver
Affected Municipalities:
Commerce City, Denver, Unincorporated
Subregion(s):
Adams
Open to Public:
None
STIP-ID:
None
Project Scope:
Environmental Assessment, preconstruction activities, and early action projects to address safety, reliability, and operational issues along the entire corridor.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (RAISE)
$0
$4,800,000
$0
$0
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
State (FASTER Bridge and Tunnel Enterprise)
$6,250,000
$400,000
$0
$0
State (Legislative)
$74,500,000
$10,000,000
$70,000,000
$0
Local
$0
$0
$0
$0
Total
$80,750,000
$15,200,000
$70,000,000
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$28,750,000
$165,950,000
$0
$194,700,000
Amendment History
Date Status Description
12/19/2024
Proposed
Adopted into the 2026-2029 TIP.
12/19/2024
Amended
Add $4,800,000 in federal RAISE funds. Total project cost increases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
02/16/2023
Amended
Add $10,100,000 in state FASTER-Bridge Enterprise funding. Total project cost increases.
02/17/2022
Amended
Add $30,000,000 in state Legislative funding. Add preconstruction and early action projects to project scope. Total project cost increases.
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
13th Ave Multimodal Mobility Study: Yosemite to High Line Canal Trail/Chambers
Project Name:
13th Ave Multimodal Mobility Study: Yosemite to High Line Canal Trail/Chambers
Identification Number:
2020-069
Project Type:
Study
Performance Measures:
Congestion, Safety
Affected Counties:
Arapahoe
Affected Municipalities:
Aurora
Subregion(s):
Arapahoe
Open to Public:
2021
STIP-ID:
None
Project Scope:
Perform a multimodal corridor study between Yosemite St. and the High Line Canal Trail (east of Chambers Rd.).
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$500,000
$0
$0
$500,000
Amendment History
Date Status Description
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Adopted in the 2020-2023 TIP.
2024-2027 Transportation Improvement Program (Approved TIP)
Parker Rd Multimodal Transportation and Safety Study: Mississippi to Hampden
Project Name:
Parker Rd Multimodal Transportation and Safety Study: Mississippi to Hampden
Identification Number:
2020-070
Project Type:
Study
Performance Measures:
Congestion, Safety, Travel Time Reliability
Affected Counties:
Arapahoe, Denver
Affected Municipalities:
Aurora, Denver, Unincorporated
Subregion(s):
Arapahoe
Open to Public:
None
STIP-ID:
None
Project Scope:
Multimodal and operational improvements study.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
State (Regional Priority Projects)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$1,735,000
$0
$0
$1,735,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/24/2022
Amended
Adjust scope and title. Decrease STBG funds by $155,000. Decrease match by $110,000. Total project cost decreases.
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Adopted in the 2020-2023 TIP.
2024-2027 Transportation Improvement Program (Approved TIP)
US287/120th Multimodal and Safety Study: Alter to Lowell
Project Name:
US287/120th Multimodal and Safety Study: Alter to Lowell
Identification Number:
2020-071
Project Type:
Study
Performance Measures:
Congestion, Safety, Travel Time Reliability
Affected Counties:
Adams, Broomfield
Affected Municipalities:
Broomfield, Westminster
Subregion(s):
Broomfield
Open to Public:
None
STIP-ID:
None
Project Scope:
Study to improve multimodal access, safety, and capacity from Alter St. to Lowell Blvd.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
State (Regional Priority Projects)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$600,000
$0
$0
$600,000
Amendment History
Date Status Description
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Adopted in the 2020-2023 TIP.
2024-2027 Transportation Improvement Program (Approved TIP)
Broomfield Transit Needs Assessment & Pilot Project
Project Name:
Broomfield Transit Needs Assessment & Pilot Project
Identification Number:
2020-072
Project Type:
Study
Performance Measures:
Congestion, Transit Safety
Affected Counties:
Broomfield
Affected Municipalities:
Broomfield
Subregion(s):
Broomfield
Open to Public:
None
STIP-ID:
None
Project Scope:
Within the City and County of Broomfield, study unmet transit needs, evaluate existing services and gaps, develop short range recommendations for Broomfield Easy Ride, evaluate marketing, recommend service improvements, marketing, and pilots. Implement priority recommended pilot services.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$280,000
$0
$0
$0
Local
$70,000
$0
$0
$0
Total
$350,000
$0
$0
$0
Project Phase to Initiate
Bus Service - Year 1
None
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$450,000
$350,000
$0
$800,000
Amendment History
Date Status Description
12/10/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
05/19/2021
Amended
Adjust funding per year per FTA guidance. Total project cost stays the same.
04/22/2021
Amended
Per FY20 Project Delays report, shift FY20-23 funding to FY21-24.
Proposed for adoption into 2022-2025.
08/22/2019
Amended
Adopted in the 2020-2023 TIP.
2024-2027 Transportation Improvement Program (Approved TIP)
Front Range Trail Study: CO93 from North Table Mountain Park to Boulder County
Project Name:
Front Range Trail Study: CO93 from North Table Mountain Park to Boulder County
Identification Number:
2020-073
Project Type:
Study
Performance Measures:
Congestion, Safety
Affected Counties:
Jefferson
Affected Municipalities:
Arvada, Unincorporated
Subregion(s):
Jefferson
Open to Public:
None
STIP-ID:
None
Project Scope:
Identify multimodal trail alignment alternatives along SH-93, from North Table Mountain Park to the County line. The study will include recommendations regarding trail alignment, width, surfacing, access points, road crossings, and required easements.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
State (MMOF)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$250,000
$0
$0
$250,000
Amendment History
Date Status Description
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Adopted in the 2020-2023 TIP.
2024-2027 Transportation Improvement Program (Approved TIP)
Broomfield FlexRide
Project Name:
Broomfield FlexRide
Identification Number:
2020-076
Project Type:
Transit Service
Performance Measures:
Transit Assets, Congestion, Transit Safety
Affected Counties:
Broomfield
Affected Municipalities:
Broomfield
Subregion(s):
Broomfield
Open to Public:
2022
STIP-ID:
None
Project Scope:
Operations, marketing, and capital purchases to expand and modify service boundaries, destinations, and operational hours of the existing FlexRide services within the City and County of Broomfield.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congestion Mitigation / Air Quality)
$360,000
$0
$0
$0
Local
$90,000
$0
$0
$0
Total
$450,000
$0
$0
$0
Project Phase to Initiate
Bus Service - Year 3
None
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$1,350,000
$450,000
$0
$1,800,000
Amendment History
Date Status Description
12/10/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Proposed for adoption in 2020-2023 TIP.
2024-2027 Transportation Improvement Program (Approved TIP)
Community Mobility Planning and Implementation Set-Aside
Project Name:
Community Mobility Planning and Implementation Set-Aside
Identification Number:
2020-077
Project Type:
Study
Performance Measures:
Transit Assets, Congestion, Safety, Transit Safety
Affected Counties:
Regional
Affected Municipalities:
None
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
The Community Mobility Planning and Implementation (CMPI) Set-Aside supports small area planning and small infrastructure projects that contribute to the implementation of key outcomes of Metro Vision and the Metro Vision Regional Transportation Plan.
The program goals support (1) diverse, livable communities, (2) development of connected urban centers and multimodal corridors, (3) a transportation system that is well-connected and serves all modes of travel, (4) healthy and active choices, and (5) access to opportunity for residents of all ages, incomes and abilities.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$7,310,000
$0
$0
$7,310,000
Amendment History
Date Status Description
08/17/2023
Amended
Proposed for adoption into 2024-2027
03/16/2023
Amended
Remove one pool project. Total project cost remains the same.
09/16/2021
Amended
Add FY 2022 pool projects and increase local match. Total project cost increases.
04/22/2021
Amended
Proposed for adoption into 2022-2025
04/16/2020
Amended
Using project savings from the previous Centennial project, fully fund the Thornton Trail Wayfinding project and partially fund the Denver Mobility Choice Network project based on March 2020 DRCOG Board action. Reduce Unprogrammed. Reallocate funding by year and adjust pool project year names. Total project coat remains the same.
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name Description Notes Cost
Castle Rock Downtown Alley Master Plan (FY20) $180,000
West Colfax BID Colfax Viaduct Planning Study (FY20/21) $200,000
Edgewater Sheridan Corridor Master Plan: Sloan's Lake (FY20) $140,000
Thornton Eastlake Streetscape Conceptual Plan (FY21) $145,000
Adams County SW County Sidewalk Community Prioritization Planning (FY20) $35,000
Boulder Curbside Management Policy and Program (FY21) $248,000
Lakewood Alameda Corridor Shared-Use Path (FY20/21) $336,000
Denver Passenger Amenity Program (FY20) $200,000
Westminster US-36/Church Ranch Station Multimodal Access Improvements (FY20) $83,000
Sheridan Safe Stops Through Sheridan (FY20) $158,000
Littleton Downtown Raised Pedestrian Crossings (FY20/21) $214,000
Boulder Enhanced Pedestrian/Bicyclist Crossings (FY21) $230,000
Aurora 25th Ave. Pedestrian Improvements (FY20) $391,000
Thornton Trail Wayfinding Signage ( FY20) $250,000
Denver Mobility Choice Network (FY21) $247,000
Boulder County North Foothills Bikeway Feasibility Study (FY22) $331,000
Denver Permanent Outdoor Expansion (FY22) $207,000
Arvada Little Dry Creek Trail Grade Separation (FY23) $83,000
Boulder Speed Limit Setting and Signing Framework (FY23) $103,000
Lakewood 40 West ArtLine Framework Plan (FY22/23) $112,000
Sheridan S. Federal Blvd. Plan - Safe Streets through Sheridan (FY23) $76,000
Westminster 72nd Avenue Corridor Study and Plan (FY22) $190,000
Superior McCaslin Underpass Feasibility Study (FY22) $83,000
Denver Westwood-Athmar Park Transportation Management Program (FY23) $300,000
Evergreen Parks & Rec District Phase 2 Enhancements scope and funding included in TIP# 2020-025 $0
RTD University of Denver Station Bike Shelter (FY22/23) $124,000
Castle Rock Castle Rock Downtown Pedestrian Lighting Improvements (FY22/23) $480,000
Superior Superior Wayfinding (FY22) $100,000
Thornton Thornton Transit Study (FY22/23) $137,000
Unprogrammed $187,000
2024-2027 Transportation Improvement Program (Approved TIP)
US285 Congestion Management Study: Lowell/Knox to I25
Project Name:
US285 Congestion Management Study: Lowell/Knox to I25
Identification Number:
2020-078
Project Type:
Study
Performance Measures:
Congestion, Travel Time Reliability
Affected Counties:
Arapahoe, Denver
Affected Municipalities:
Cherry Hills Village, Denver, Englewood, Sheridan, Unincorporated
Subregion(s):
Arapahoe
Open to Public:
None
STIP-ID:
None
Project Scope:
Congestion managment study on US-285 from Lowell Blvd./Knox Ct. to I-25.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
State (Regional Priority Projects)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$1,600,000
$0
$0
$1,600,000
Amendment History
Date Status Description
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Adopted into the 2020-2023 TIP.
2024-2027 Transportation Improvement Program (Approved TIP)
Human Services Transportation/FASTER Set-Aside
Project Name:
Human Services Transportation/FASTER Set-Aside
Identification Number:
2020-079
Project Type:
Transit Service
Performance Measures:
Transit Assets, Transit Safety, Congestion
Affected Counties:
Regional
Affected Municipalities:
None
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
TIP Set-Aside that funds underfunded and underserved trips and rolling stock expansion to improve service and mobility for older adults and people with disabilities.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congestion Mitigation / Air Quality)
$1,318,000
$0
$1,266,000
$2,000,000
State (FASTER Transit)
$210,000
$0
$0
$0
State (MMOF)
$682,000
$2,000,000
$734,000
$0
Local
$1,300,000
$500,000
$500,000
$500,000
Total
$3,510,000
$2,500,000
$2,500,000
$2,500,000
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$5,813,000
$11,010,000
$0
$16,823,000
Amendment History
Date Status Description
12/20/2024
Proposed
Adopted into the 2026-2029 TIP.
12/20/2024
Amended
Swap $2,734,000 in federal Congestion Mitigation/Air Quality funds for state Multimodal Transportation and Mitigation Options Funds available from 2020-021. Total project cost remains the same.
05/16/2024
Amended
Add two new pool projects and local match funds from recent Section 5310 solicitation. Total project cost increases.
12/19/2023
Amended
Shift $210,000 in unallocated state FASTER funding from prior years to Fiscal Year 2024. Total project cost remains the same.
08/17/2023
Amended
Proposed for adoption into 2024-2027
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name Description Notes Cost
Boulder County - Operating (FY20) - $177 Funded with FASTER $0
City of Boulder - Operating (FY20) - $17 Funded with FASTER $0
VIA - Operating (FY20) - $43 Funded with FASTER $0
VIA - Capital Replacement-BOC (FY20) - $87 Funded with FASTER $0
VIA - Capital Replacement-Van (FY20) - $56 Funded with FASTER $0
Broomfield - Capital 1 Vehicle Expansion (FY20) - $11 Funded with FASTER and also with 5310 $0
Broomfield - Capital Equipment (FY20) - $5 Funded with FASTER and also with 5310 $0
DRMAC - Mobility Management (FY20) - $60 Funded with FASTER and also with 5310 $0
Douglas County - Operating (FY20) - $138 Funded with FASTER $0
DRCOG - Program Administration (FY20) - $97 Funded with FASTER $0
VIA - SRC Fleet Acquisition (FY20) - $250 Funded with FASTER $0
VIA - Capital 4 Vehicle Expansion - $58 Funded with FASTER and also with 5310 $0
Boulder County - Operating (FY21-22) - $150 Funded with FASTER $0
VIA - Operating (FY21-22) - $500 Funded with FASTER and also with 5310 $0
A Little Help - Mobility Management (FY21-22) - $45 Funded with FASTER $0
Douglas County - Mobility Management (FY21-22) - $287 Funded with FASTER and also with 5310 $0
DRMAC - Mobility Management (FY21-22) - $74 Funded with FASTER and also with 5310 $0
VIA - Mobility Management (FY21-22) - $100 Funded with FASTER and also with 5310 $0
A Little Help - Capital Facilities (FY21-22) - $25 Funded with FASTER $0
VIA - Capital Software (FY21-22) - $42 Funded with FASTER and also with 5310 $0
VIA - Capital Security Cameras (FY21-22) - $242 Funded with FASTER $0
A Little Help - Mobility Management (FY23) - $34 Funded with FASTER $0
Boulder County - Operating (FY23) - $200 Funded with FASTER $0
Denver Inner City Parish - Capital 1 Vehicle Expansion (FY23) - $73 Funded with FASTER $0
Douglas County - Capital 2 Vehicle Replacements (FY23) - $120 Funded with FASTER $0
Douglas County - Mobility Management (FY23) - $248 Funded with FASTER and also with 5310 $0
DRMAC - Mobility Management (FY23) - $63 Funded with FASTER and also with 5310 $0
Firestone - Operating (FY23) - $32 Funded with FASTER $0
VIA - Capital Facilities (FY23) - $600 Funded with FASTER $0
VIA - Mobility Management (FY23) - $145 Funded with FASTER and also with 5310 $0
VIA - Operating (FY23) - $116 Funded with FASTER and also with 5310 $0
A Little Help - Capital - Software (FY24) - $25 Funded with CMAQ, FASTER $0
A Little Help - Mobility Management (FY24) - $40 Funded with MMOF, FASTER $0
AbleLight - Capital 2 Vehicle Replacements (FY24) - $170 Funded with CMAQ $0
Boulder County - Mobility Management (FY24) - $40 Funded with FASTER $0
Douglas County - Capital 1 Vehicle Expansion (FY24) - $124 Funded with CMAQ $0
Douglas County - Capital EV Charging Station (FY24) - $44 Funded with CMAQ $0
Douglas County - Mobility Management (FY24) - $162 Funded with FASTER and also 5310 $0
DRCOG - Mobility Management (FY24) - $55 Funded with MMOF $0
DRMAC - Mobility Management (FY24) - $74 Funded with FASTER and also 5310 $0
Jewish Family Service - Capital 1 Vehicle Expansion (FY24) - $54 Funded with CMAQ $0
Lakewood - Capital 2 Vehicle Replacements (FY24) - $247 Funded with CMAQ $0
Laradon Hall - Capital 2 Vehicle Replacements (FY24) - $153 Funded with CMAQ $0
Erie - Operating (FY24) - $200 Funded with CMAQ $0
VIA - Operating (FY24) - $515 Funded with MMOF, FASTER, and also 5310 $0
DRCOG - Program Administration (FY24) - $254
Douglas County - Mobility Management (Fiscal Year 2025) - $51,000 Funded with FASTER and also 5310 $0
Via - Operating (Fiscal Year 2025) - $38,000 Funded with FASTER and also with 5310 $0
Capital Projects $2,386,000
Mobility Management Projects $1,478,000
Operating Projects $2,126,000
Program Administration $297,000
2024-2027 Transportation Improvement Program (Approved TIP)
CDOT Trust Settlement Pool
Project Name:
CDOT Trust Settlement Pool
Identification Number:
2020-080
Project Type:
Transit Vehicles
Performance Measures:
Transit Assets, Transit Safety, Congestion
Affected Counties:
Regional
Affected Municipalities:
None
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
The pool funds projects from a settlement with a car manufacturer. The funds will be used to reduce air pollution in Colorado.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
State (Settlement Fund)
$957,000
$0
$0
$0
Local
$0
$0
$0
$0
Total
$957,000
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$2,947,000
$957,000
$0
$3,904,000
Amendment History
Date Status Description
12/10/2024
Proposed
Adopted into the 2026-2029 TIP.
09/21/2023
Amended
Add two new pool projects and $212,000 in state Settlement funds. Total project cost increases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
07/11/2023
Amended
Add $745,000 in state Settlement funds. Total project cost increases.
04/24/2023
Amended
Add one new pool project. Total project cost increases.
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name Description Notes Cost
RTD Purchase 15 Battery Electric Bus Replacements (FY20) See new RTD Electric Bus Purchases project $0
RTD 12 Battery Electric Chargers w/ Infrastructure (FY20) See new RTD Electric Bus Purchases project $0
Boulder 4 Electric Bus Replacements (FY21) $2,490,000
Boulder 4 Electric Bus Chargers (FY21) $340,000
VIA Electric Bus Replacement (FY21) $167,000
VIA Vehicles (FY23) $212,000
VIA Vehicle Replacment (FY24) $162,000
VIA Charging Equipment (FY24) $50,000
2024-2027 Transportation Improvement Program (Approved TIP)
CO119 Operational Improvements: Boulder to Longmont
Project Name:
CO119 Operational Improvements: Boulder to Longmont
Identification Number:
2020-081
Project Type:
Roadway Operational Improvements
Performance Measures:
Transit Assets, Transit Safety, Congestion, Safety, Travel Time Reliability
Affected Counties:
Boulder
Affected Municipalities:
Boulder, Longmont, Unincorporated
Subregion(s):
Regional, Boulder
Open to Public:
2027
STIP-ID:
SDR5000
Project Scope:
This project will improve safety and mobility on the CO119 corridor from Boulder to Longmont. Project will design and construct: transit, intersection, safety and bike/pedestrian improvements at the intersections of Jay Rd, 63rd St, Niwot Rd, and Airport Rd; reconstruct CO52 and Hover St intersections; queue bypass lanes at: Jay Rd, 63rd St, CO52, Niwot Rd, Airport Rd (SB only); BRT stations at 63rd St, CO52 and Niwot Rd; Park-n-Rides at 63rd St and Niwot Rd; and bikeway from Foothills Pkwy to Hover St, including 6 underpasses and two bike/pedestrian bridges.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (MMOF - ARPA - DRCOG)
$3,619,000
$0
$0
$0
Federal (RAISE)
$0
$25,000,000
$0
$0
Federal (STBG-Pandemic)
$0
$0
$0
$0
Federal (Surface Transportation Block Grant)
$0
$4,001,000
$0
$0
Federal (Transportation Alternatives-CDOT)
$0
$0
$1,679,000
$0
State (10 Year Plan-Capital Funds)
$0
$23,080,000
$0
$0
State (House Bill 1466 - MMOF)
$0
$30,313,000
$0
$0
State (Intelligent Transportation System)
$0
$80,000
$0
$0
State (Legislative)
$37,718,000
$0
$0
$0
State (Planning and Research Initiatives)
$0
$0
$0
$0
State (Regional Priority Projects)
$7,770,000
$0
$0
$0
Local
$590,000
$338,000
$1,662,000
$1,000,000
Local (RTD Funds Only)
$15,500,000
$3,653,000
$0
$0
Total
$65,197,000
$86,465,000
$3,341,000
$1,000,000
Project Phase to Initiate
Construction
Construction
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$7,059,000
$156,003,000
$0
$163,062,000
Amendment History
Date Status Description
03/04/2025
Proposed
Adopted into the 2026-2029 TIP.
03/04/2025
Amended
Add $80,000 in state Intelligent Transportation System funds. Total project cost increases.
09/19/2024
Amended
Shift $29,811,000 from Multimodal Transportation and Mitigation Options Fund - American Rescue Plan Act and $502,000 in federal Surface Transportation Block Grant funds to House Bill 1466 General Funds, add $2,153,000 in Regional Transportation District funds and $38,000 in local funds. Total project cost increases.
08/27/2024
Amended
Swap $23,080,000 in state Legislative funding to state 10-Year Plan funding and shift funding to Fiscal Year 2025. Swap $5,000,000 in state Legislative-Transit funding to state Legislative funding. Decrease state Legislative funding by $99,000. Correct Regional Priority Project funding from local to state. Total project cost decreases.
04/18/2024
Amended
Reduce state Legislative funding by $99,000. Total project cost decreases.
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
Coffman Busway: 1st to 9th
Project Name:
Coffman Busway: 1st to 9th
Identification Number:
2020-083
Project Type:
Transit Service
Performance Measures:
Congestion, Transit Assets, Transit Safety
Affected Counties:
Boulder
Affected Municipalities:
Longmont
Subregion(s):
Boulder
Open to Public:
2024
STIP-ID:
None
Project Scope:
Design and construct a dedicated center-lane busway on Coffman Street between 1st and 9th Avenues in downtown Longmont and completion of a new multimodal street from Boston to 1st which will be critical to connecting the planned Bus Rapid Transit for CO119 and US287 and connecting people walking and on bikes from the St Vrain Greenway trail just south of the site to downtown Longmont just north of the project.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congestion Mitigation / Air Quality)
$0
$0
$0
$0
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
Federal (Transportation Alternatives-CDOT)
$572,000
$428,000
$0
$0
State (Regional Priority Projects)
$0
$0
$0
$0
Local
$143,000
$107,000
$0
$0
Total
$715,000
$535,000
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$6,900,000
$1,250,000
$0
$8,150,000
Amendment History
Date Status Description
04/18/2024
Amended
Add $1,000,000 in federal Colorado Department of Transportation - Transportation Alternatives funds and local match transferred from Project # 2024-062. Total project cost increases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
06/17/2020
Amended
Adjust FY 2023 local match amounts and types. Overall project cost remains unchanged.
10/24/2019
Amended
New project created from the original SH-119 BRT project.
2024-2027 Transportation Improvement Program (Approved TIP)
CO119/CO52 Transit Bypass Lanes
Project Name:
CO119/CO52 Transit Bypass Lanes
Identification Number:
2020-084
Project Type:
Transit Operational Improvements
Performance Measures:
Transit Assets, Congestion, Transit Safety
Affected Counties:
Boulder
Affected Municipalities:
None
Subregion(s):
Boulder
Open to Public:
None
STIP-ID:
SDR5000
Project Scope:
Design and construct transit bypass lanes on SH-119 at the northbound and southbound approaches to the SH-52 intersection.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congestion Mitigation / Air Quality)
$0
$0
$0
$0
State (Regional Priority Projects)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Local (RTD Funds Only)
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$0
$0
$0
Amendment History
Date Status Description
10/18/2023
Amended
Remove funding at the request of project sponsor. Funding and scope moved to TIP ID# 2020-081. Project funding decreases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
06/17/2020
Amended
Adjust FY 2023 local match amounts and types. Overall project cost remains unchanged.
11/20/2019
Amended
New project created from the original SH-119 BRT project.
2024-2027 Transportation Improvement Program (Approved TIP)
28th St Business Access Transit Lanes: Iris to Valmont
Project Name:
28th St Business Access Transit Lanes: Iris to Valmont
Identification Number:
2020-085
Project Type:
Transit Operational Improvements
Performance Measures:
Congestion, Transit Assets, Transit Safety
Affected Counties:
Boulder
Affected Municipalities:
Boulder
Subregion(s):
Boulder
Open to Public:
2023
STIP-ID:
None
Project Scope:
Construct Business Access Transit (BAT) lanes on 28th St. between Iris and Valmont.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$5,700,000
$0
$0
$5,700,000
Amendment History
Date Status Description
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
11/20/2019
Amended
New project created from the original SH-119 BRT project.
2024-2027 Transportation Improvement Program (Approved TIP)
I25 Valley Highway Phases 3 and 4: Santa Fe to 20th
Project Name:
I25 Valley Highway Phases 3 and 4: Santa Fe to 20th
Identification Number:
2020-086
Project Type:
Roadway Operational Improvements
Performance Measures:
Bridge Condition, Congestion, Freight Reliability, Pavement Condition, Safety, Travel Time Reliability, Transit Assets, Transit Safety
Affected Counties:
Denver
Affected Municipalities:
Denver
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
Valley Highway Phases 3 and 4 consolidate heavy and light rail tracks away from I-25 and provide space to improve safety through highway geometric and access improvements. This project also includes funding for I-25 Corridor Traffic and Revenue Study.
FY20 funds are primarily for ROW purchases.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Bond/Loans)
$0
$0
$0
$0
State (Bond/Loans)
$0
$0
$0
$0
State (Legislative)
$0
$0
$0
$0
State (Regional Priority Projects)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$63,205,000
$0
$0
$63,205,000
Amendment History
Date Status Description
08/17/2023
Amended
Proposed for adoption into 2024-2027
08/19/2021
Amended
Increase legislative funding by $2,130,000 in FY22. Total project cost increases.
04/22/2021
Amended
Proposed for adoption into 2022-2025
01/14/2021
Amended
Swap SB-1 funding for RPP funding in FY 2020. Add HPTE loan funding and SB-267 funding in FY 2021. Total project cost increases.
09/17/2020
Amended
Decreasing legislative (SB-1) funding from $60,000,000 to $575,000 after notification that previously awarded legislative funding is being taken away from this project due to COVID-19 impacts to state revenues. Total project cost decreases.
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
Safer Main Streets Pool
Project Name:
Safer Main Streets Pool
Identification Number:
2020-087
Project Type:
Roadway Operational Improvements
Performance Measures:
Congestion, Safety
Affected Counties:
Regional
Affected Municipalities:
None
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
Urban arterial safety investments, with a focus on bicycle and pedestrian mobility. Improvements include shoulders, striping, medians, traffic signals, and safe crossings that align with DRCOG's Vision Zero elements.
Pool funding contains both DRCOG and state funding sources.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
State (Legislative)
$0
$0
$0
$0
State (Legislative-Transit)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$85,394,000
$0
$0
$85,394,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
02/22/2024
Amended
Remove one pool project and move $2,300,000 in prior year state Legislative funding to TIP ID# 2022-008. Total project cost decreases.
01/30/2024
Amended
Remove one pool project and move $7,060,000 in prior year state Legislative-Transit funding and $2,940,000 in prior year state Legislative funding to TIP ID# 2024-048. Total project cost decreases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
08/19/2021
Amended
Add one new pool project. Add $2,500,000 in state legislative funding. Total project cost increases.
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name Description Notes Cost
Arapahoe County Arapahoe Road at Olathe St Intersection Improvements $450,000
Arapahoe County S. Federal Blvd. Sidewalk Improvements $464,000
Boulder Safer Signals, Safer Streets $435,000
Boulder 28th St. (US 36) and Colorado Ave. Protected Intersection $2,104,000
Boulder 30th Street – Separated Bike Lanes (SH-7/Arapahoe Avenue – Colorado Avenue) Funding on TIP ID# 2022-008 $0
Boulder County US 36 Intersections Improvements Project (Lyons to Boulder) $240,000
Broomfield US 287/ 120th Avenue Sidepath Infill & Transit Access Improvements $2,000,000
Broomfield CO 128 / US 36 Bikeway Connection $296,000
Broomfield 112th/Uptown Ave. Complete Streets and Railroad Safety Improvements $3,542,000
Centennial Arapahoe and Clarkson Traffic Signal and Bike Lane Continuation $400,000
Centennial S Holly St HAWK Signal and Pedestrian Improvements $250,000
Commerce City Colorado Boulevard Bicycle and Pedestrian Improvements $2,720,000
Denver Mississippi Avenue Vision Zero Safety Project $2,132,000
Denver SH-88/Federal Boulevard Median Gaps $3,600,000
Denver West Colfax Pedestrian and Transit Improvements + Partial E. Colfax $10,000,000
Denver Broadway Corridor Multi-Modal Improvements (Elevate Project) $9,600,000
Denver Federal Blvd Pedestrian Improvement Project $3,812,000
Douglas County US Highway 85 Shoulder Widening (Castle Rock Parkway to Daniels Park Road) $880,000
Englewood West Dartmouth Ave Multimodal Safety $1,260,000
Erie County Line Road Telleen to Evans $2,360,000
Littleton Mineral Station East Mobility-shed Improvements $1,600,000
Littleton Prince Street Link Project $615,000
Lone Tree Rapid Rectangular Flashing Beacons (RRFBs) $248,000
Lone Tree and Douglas County C-470 Trail Connector to RTD/Park Meadows LRT $1,600,000
Longmont SH-119 & Sunset St Intersection Multimodal Safety Improvements (SDR5000) $1,200,000
Morrison Morrison Main Street Revitalization $426,000
Nederland Nederland Crosswalk Improvements $280,000
Northglenn Connect Northglenn Multimodal Improvements $560,000
Superior US 36 Bikeway Extension - Rock Creek Parkway Segment $320,000
Denver Evans Ave Vision Zero Safety Project $744,000
Douglas County C-470 Trail & University Blvd Ped Grade Separation $5,120,000
Parker Parker Rd (SH-83) Multi-Use Trail/Sidewalk $3,200,000
RTD Improving ADA Accessibility in Metro Denver $905,000
CDOT R1 Urban Arterials Safety Study $2,500,000
Lakewood West Colfax Pedestrian Safety and Infrastructure Project Funding on TIP ID# 2024-048 $0
2024-2027 Transportation Improvement Program (Approved TIP)
I25/CO119 Interchange Improvements
Project Name:
I25/CO119 Interchange Improvements
Identification Number:
2020-088
Project Type:
Roadway Operational Improvements
Performance Measures:
Pavement Condition, Congestion, Freight Reliability, Safety, Bridge Condition
Affected Counties:
Weld
Affected Municipalities:
None
Subregion(s):
None
Open to Public:
None
STIP-ID:
SR46600.089
Project Scope:
Reconstruct interchange. FY20 SB-267 funding will be used to purchase ROW.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
State (Legislative)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$3,871,000
$0
$0
$3,871,000
Amendment History
Date Status Description
08/17/2023
Amended
Proposed for adoption into 2024-2027
05/23/2022
Amended
Add $371,000 in state Legislative funding. Total project cost increases.
04/22/2021
Amended
Proposed for adoption into 2022-2025
01/16/2020
Amended
New project.
2024-2027 Transportation Improvement Program (Approved TIP)
47th/BNSF Missing Sidewalks
Project Name:
47th/BNSF Missing Sidewalks
Identification Number:
2020-090
Project Type:
Active Transportation
Performance Measures:
Safety
Affected Counties:
Boulder
Affected Municipalities:
Boulder
Subregion(s):
None
Open to Public:
2024
STIP-ID:
23629
Project Scope:
Construct missing sidewalks on 47th St. north and south of the BNSF railroad crossing. Project uses CDOT-allocated TA funding.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Transportation Alternatives-CDOT)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$636,000
$0
$0
$636,000
Amendment History
Date Status Description
11/25/2024
Proposed
Adopted into the 2026-2029 TIP.
11/15/2023
Amended
Correct Denver Regional Council of Governments - Transportation Alternatives funding to Colorado Department of Transportation - Transportation Alternatives funding. Total project cost remains the same.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
04/16/2020
Amended
New project.
2024-2027 Transportation Improvement Program (Approved TIP)
I70/Picadilly New Interchange
Project Name:
I70/Picadilly New Interchange
Identification Number:
2020-091
Project Type:
Roadway Capacity
Performance Measures:
Congestion, Freight Reliability, Safety, Travel Time Reliability, Bridge Condition, Pavement Condition
Affected Counties:
Adams, Arapahoe
Affected Municipalities:
Aurora
Subregion(s):
None
Open to Public:
2026
STIP-ID:
None
Project Scope:
This project builds a new diverging diamond interchange at I-70 and Picadilly Rd., just west of E-470, and reconstructs and realigns Picadilly Rd. between 11th Ave. and Smith Rd. This project also adds auxiliary lanes to both eastbound and westbound I-70 between Picadilly Rd. and Tower Rd.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (BUILD)
$5,000,000
$5,000,000
$0
$0
Federal (Faster Safety)
$0
$0
$0
$0
State (Faster Safety)
$0
$0
$0
$0
Local
$3,840,000
$3,840,000
$0
$0
Total
$8,840,000
$8,840,000
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$49,535,000
$17,680,000
$0
$67,215,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
07/21/2022
Amended
Add $8,500,000 in FASTER Safety funding. Total project cost increases.
04/22/2021
Amended
Proposed for adoption into 2022-2025
05/20/2020
Amended
New Project.
2024-2027 Transportation Improvement Program (Approved TIP)
I70/Harlan Bridge Reconstruction
Project Name:
I70/Harlan Bridge Reconstruction
Identification Number:
2020-093
Project Type:
Roadway - Bridge
Performance Measures:
Bridge Condition, Pavement Condition
Affected Counties:
Jefferson
Affected Municipalities:
Wheat Ridge
Subregion(s):
None
Open to Public:
2022
STIP-ID:
None
Project Scope:
Reconstruction of the I-70 bridge over Harlan St.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
State (Legislative)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$21,500,000
$0
$0
$21,500,000
Amendment History
Date Status Description
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
09/17/2020
Amended
Add new project.
2024-2027 Transportation Improvement Program (Approved TIP)
State Vulnerable and Senior Transportation Funds
Project Name:
State Vulnerable and Senior Transportation Funds
Identification Number:
2020-094
Project Type:
Transit Passenger Facilities
Performance Measures:
Transit Assets, Transit Safety
Affected Counties:
Regional
Affected Municipalities:
None
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
This fund is dedicated to transportation services for vulnerable populations, including seniors.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Vulnerable )
$0
$0
$0
$0
State (Vulnerable )
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$375,000
$0
$0
$375,000
Amendment History
Date Status Description
12/10/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
12/17/2020
Amended
Add pool projects. Total project cost remains the same.
10/22/2020
Amended
New Project.
Project Pools This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name Description Notes Cost
Douglas County Operating Assistance $48,000
Douglas County Purchase of Prius $27,000
Goodwill Denver Match on 5310 Vehicle $14,000
Via Match on Mobility Management and Operating $75,000
Laradon Match on 5310 Vehicles $26,000
DRMAC Updating Software Platform $23,000
Lakewood Operating Match $20,000
Easter Seals Operating Expenses $60,000
Broomfield Match on 5310 Vehicle and COVID-19 Expenses $5,000
A Little Help Match on Operating Grants and COVID-19 Expenses $18,000
Continuum Operating Expenses $60,000
2024-2027 Transportation Improvement Program (Approved TIP)
I25/Crystal Valley New Interchange
Project Name:
I25/Crystal Valley New Interchange
Identification Number:
2020-097
Project Type:
Roadway Capacity
Performance Measures:
Bridge Condition, Congestion, Freight Reliability, Pavement Condition, Travel Time Reliability
Affected Counties:
Douglas
Affected Municipalities:
Castle Rock
Subregion(s):
Douglas
Open to Public:
None
STIP-ID:
None
Project Scope:
This project will complete pre-construction activities (environmental clearances, completing final design, and acquiring necessary right-of-way) and construction for the new I-25 and Crystal Valley Pkwy interchange complex. Project will include realignment of the east and west frontage roads and new active transportation facilities.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (BUILD)
$0
$0
$0
$0
Federal (Surface Transportation Block Grant)
$4,000,000
$2,500,000
$2,431,000
$0
Local
$38,500,000
$38,064,000
$505,000
$0
Total
$42,500,000
$40,564,000
$2,936,000
$0
Project Phase to Initiate
Construction
Construction
Construction
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$12,000,000
$86,000,000
$0
$98,000,000
Amendment History
Date Status Description
12/20/2024
Proposed
Adopted into the 2026-2029 TIP.
12/20/2024
Amended
Add $431,000 in federal Surface Transportation Block Grant funding made available by closeout of 2020-021. Total project cost remains the same.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
01/14/2021
Amended
New project.
2024-2027 Transportation Improvement Program (Approved TIP)
I70 Region 1 Noise Walls
Project Name:
I70 Region 1 Noise Walls
Identification Number:
2020-098
Project Type:
Other
Performance Measures:
Affected Counties:
Adams, Arapahoe, Denver, Jefferson
Affected Municipalities:
Arvada, Aurora, Bennett, Denver, Golden, Lakewood, Wheat Ridge, Unincorporated
Subregion(s):
None
Open to Public:
2023
STIP-ID:
None
Project Scope:
Rebuild aging and collapsed timber noise walls along I-70 within the MPO area.
Project partially funded with Region 1-directed portion of Coronavirus Response and Relief Supplemental Appropriations Act 2021 (100% Federal Share)
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (STBG-Pandemic)
$0
$0
$0
$0
State (Legislative)
$0
$0
$0
$0
State (Regional Priority Projects)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$35,800,000
$0
$0
$35,800,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/27/2021
Amended
Add $20,000,000 in state Legislative funding for phases 3-6. Total project cost increases.
06/21/2021
Amended
Add funding for Phase 2. Total project cost increases.
04/22/2021
Amended
Proposed for adoption into 2022-2025
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
I70 West Metro Bridges: I25 to C470
Project Name:
I70 West Metro Bridges: I25 to C470
Identification Number:
2020-099
Project Type:
Roadway - Bridge
Performance Measures:
Bridge Condition, Pavement Condition
Affected Counties:
Denver, Jefferson
Affected Municipalities:
Arvada, Denver, Golden, Lakeside, Wheat Ridge
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
Reconstruct approximately 5 bridges along the I-70 corridor. Specific bridge locations to be determined.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
State (Legislative)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$37,200,000
$0
$0
$37,200,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
08/19/2021
Amended
Add $2,000,000 in legislative funding. Total project cost increases
04/22/2021
Amended
Proposed for adoption into 2022-2025
01/25/2021
Amended
New project.
2024-2027 Transportation Improvement Program (Approved TIP)
Region 1 Mobility Hub Pool
Project Name:
Region 1 Mobility Hub Pool
Identification Number:
2020-100
Project Type:
Multimodal
Performance Measures:
Congestion, Safety
Affected Counties:
Regional
Affected Municipalities:
None
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
Construct mobility hubs on or along interstates in Region 1
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
State (Legislative-Transit)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$17,070,000
$0
$0
$17,070,000
Amendment History
Date Status Description
01/30/2025
Proposed
Adopted into the 2026-2029 TIP.
01/29/2025
Amended
Adjust one pool project, remove $2,100,000 in state Legislative-Transit funding transferred to Project 2022-032. Total project cost decreases.
07/22/2024
Amended
Remove one pool project and transfer $14,000,000 in prior year state Legislative-Transit funding to new I25/CO7 Interim Transit Improvement project. Total project cost decreases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
11/17/2022
Amended
Add $6,130,000 in state Legislative-Transit funding, remove one pool project, and adjust cost on two pool projects. Total project cost increases.
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name Description Notes Cost
Bustang Maintenance Facility $4,000,000
Castle Rock Mobility Hub $11,070,000
Lone Tree Mobility Hub $14,600 in Leg-T funding in TIP# 2022-032 $0
2024-2027 Transportation Improvement Program (Approved TIP)
E470/38th New Interchange
Project Name:
E470/38th New Interchange
Identification Number:
2022-001
Project Type:
Roadway Capacity
Performance Measures:
Bridge Condition, Pavement Condition, Travel Time Reliability, Congestion
Affected Counties:
Adams
Affected Municipalities:
Aurora
Subregion(s):
None
Open to Public:
2025
STIP-ID:
None
Project Scope:
Capacity improvements from the E-470 Master Plan. Construct new interchange at E-470 and 38th Ave.
Project is funded entirely through the E-470 Public Highway Authority.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$31,183,000
$0
$0
$31,183,000
Amendment History
Date Status Description
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
2024-2027 Transportation Improvement Program (Approved TIP)
E470 Widening: I70 to 104th
Project Name:
E470 Widening: I70 to 104th
Identification Number:
2022-002
Project Type:
Roadway Capacity
Performance Measures:
Congestion, Pavement Condition, Travel Time Reliability
Affected Counties:
Adams, Denver
Affected Municipalities:
Aurora, Commerce City, Denver, Unincorporated
Subregion(s):
None
Open to Public:
2025
STIP-ID:
None
Project Scope:
Capacity improvements from the E-470 Master Plan. Widen 4 to 6 lanes from I-70 to 104th Ave.
Project is funded entirely through the E-470 Public Highway Authority.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Local
$36,568,000
$0
$0
$0
Total
$36,568,000
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$74,836,000
$36,568,000
$0
$111,404,000
Amendment History
Date Status Description
12/03/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
2024-2027 Transportation Improvement Program (Approved TIP)
E470/I70 Interchange Improvements
Project Name:
E470/I70 Interchange Improvements
Identification Number:
2022-003
Project Type:
Roadway Capacity
Performance Measures:
Congestion, Bridge Condition, Freight Reliability, Pavement Condition, Travel Time Reliability
Affected Counties:
Adams, Arapahoe
Affected Municipalities:
None
Subregion(s):
None
Open to Public:
2025
STIP-ID:
None
Project Scope:
Capacity improvements from the E-470 Master Plan. Directional interchange ramps at E-470 and I-70.
Project is funded entirely through the E-470 Public Highway Authority.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Local
$28,761,000
$0
$0
$0
Total
$28,761,000
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$27,150,000
$28,761,000
$62,744,000
$118,655,000
Amendment History
Date Status Description
12/03/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
2024-2027 Transportation Improvement Program (Approved TIP)
E470 Widening: 104th to US85
Project Name:
E470 Widening: 104th to US85
Identification Number:
2022-004
Project Type:
Roadway Capacity
Performance Measures:
Congestion, Pavement Condition, Travel Time Reliability
Affected Counties:
Adams
Affected Municipalities:
Commerce City
Subregion(s):
None
Open to Public:
2029
STIP-ID:
None
Project Scope:
Capacity improvements from the E-470 Master Plan. Widen 4 to 6 lanes from 104th Ave to I-76.
Project is funded entirely through the E-470 Public Highway Authority.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Local
$0
$1,500,000
$0
$0
Total
$0
$1,500,000
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$1,500,000
$108,359,000
$109,859,000
Amendment History
Date Status Description
12/03/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
2024-2027 Transportation Improvement Program (Approved TIP)
E470/88th New Interchange
Project Name:
E470/88th New Interchange
Identification Number:
2022-005
Project Type:
Roadway Capacity
Performance Measures:
Congestion, Bridge Condition, Pavement Condition, Travel Time Reliability
Affected Counties:
Adams
Affected Municipalities:
Commerce City
Subregion(s):
None
Open to Public:
2025
STIP-ID:
None
Project Scope:
Capacity improvements from the E-470 Master Plan. Construct new interchange at E-470 and 88th Ave.
Project is funded entirely through the E-470 Public Highway Authority.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Local
$17,086,000
$0
$0
$0
Total
$17,086,000
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$17,086,000
$0
$17,086,000
Amendment History
Date Status Description
12/03/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
2024-2027 Transportation Improvement Program (Approved TIP)
Broadway Corridor Study: Belleview to C470
Project Name:
Broadway Corridor Study: Belleview to C470
Identification Number:
2022-006
Project Type:
Study
Performance Measures:
Congestion, Safety
Affected Counties:
Arapahoe
Affected Municipalities:
Englewood, Littleton
Subregion(s):
Arapahoe
Open to Public:
None
STIP-ID:
None
Project Scope:
Corridor and multimodal transportation plan from Belleview Ave. to C-470.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$1,000,000
$0
$0
$1,000,000
Amendment History
Date Status Description
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Add new project from waiting list.
2024-2027 Transportation Improvement Program (Approved TIP)
US287 BRT Feasibility & Safety Study: Longmont to Broomfield
Project Name:
US287 BRT Feasibility & Safety Study: Longmont to Broomfield
Identification Number:
2022-007
Project Type:
Study
Performance Measures:
Safety, Transit Safety
Affected Counties:
Boulder
Affected Municipalities:
Erie, Longmont, Louisville
Subregion(s):
Boulder
Open to Public:
None
STIP-ID:
None
Project Scope:
Safety analysis (crash locations and potential safety improvements) and transit operations study for the US-287 corridor between Longmont and Broomfield.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Faster Safety)
$0
$0
$0
$0
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
State (Faster Safety)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$536,000
$0
$0
$536,000
Amendment History
Date Status Description
08/17/2023
Amended
Proposed for adoption into 2024-2027
11/17/2022
Amended
Add $185,000 in state FASTER-Safety funding. Total project cost increases.
04/22/2021
Amended
Add new wait list project
2024-2027 Transportation Improvement Program (Approved TIP)
30th St Corridor Improvements: Boulder Creek to Arapahoe
Project Name:
30th St Corridor Improvements: Boulder Creek to Arapahoe
Identification Number:
2022-008
Project Type:
Active Transportation
Performance Measures:
Congestion, Safety
Affected Counties:
Boulder
Affected Municipalities:
Boulder
Subregion(s):
Boulder
Open to Public:
2024
STIP-ID:
None
Project Scope:
Build a protected intersection on the south side of the SH-7/Arapahoe and 30th St. intersection, and adds protected bicycle lanes, wider sidewalks, and landscaping on 30th St. from Arapahoe Ave. to Boulder Creek.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
State (Legislative)
$2,300,000
$0
$0
$0
State (MMOF)
$0
$0
$0
$0
Local
$575,000
$0
$0
$0
Total
$2,875,000
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$4,300,000
$2,875,000
$0
$7,175,000
Amendment History
Date Status Description
02/22/2024
Amended
Add $2,300,000 in state Legislative funding and $575,000 local match from TIP ID# 2020-087. Total project cost increases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Add new waitlist project
2024-2027 Transportation Improvement Program (Approved TIP)
County Line/WCR 1 Buffered Bike Lanes: 17th to CO66
Project Name:
County Line/WCR 1 Buffered Bike Lanes: 17th to CO66
Identification Number:
2022-009
Project Type:
Active Transportation
Performance Measures:
Congestion, Safety
Affected Counties:
Boulder, Weld
Affected Municipalities:
Longmont, Unincorporated
Subregion(s):
Boulder
Open to Public:
2026
STIP-ID:
None
Project Scope:
Construct a minimum of 7' bufferered bicycle lanes on each side of the road from 17th Ave. to SH-66.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Transportation Alternatives-DRCOG)
$0
$1,356,000
$0
$0
State (MMOF)
$0
$1,700,000
$0
$0
Local
$0
$344,000
$0
$0
Total
$0
$3,400,000
$0
$0
Project Phase to Initiate
None
Construction
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$450,000
$3,400,000
$0
$3,850,000
Amendment History
Date Status Description
11/25/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/22/2022
Amended
Add scope from 2022-2025 Subregional Share Call for Projects.
04/22/2021
Amended
Add new waitlist project
2024-2027 Transportation Improvement Program (Approved TIP)
5th St Operational Improvements: Woodlands to Ridge
Project Name:
5th St Operational Improvements: Woodlands to Ridge
Identification Number:
2022-010
Project Type:
Roadway Operational Improvements
Performance Measures:
Congestion, Pavement Condition, Safety
Affected Counties:
Douglas
Affected Municipalities:
Castle Rock
Subregion(s):
Douglas
Open to Public:
2024
STIP-ID:
None
Project Scope:
Construct a new eastbound lane from Woodlands Blvd. to Ridge Rd. to improve safety and congestion. The project will also add shoulders and a multiuse path.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$7,000,000
$0
$0
$7,000,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Add new waitlist project
2024-2027 Transportation Improvement Program (Approved TIP)
100th Ave Multimodal Improvements: Alkire to Simms
Project Name:
100th Ave Multimodal Improvements: Alkire to Simms
Identification Number:
2022-011
Project Type:
Active Transportation
Performance Measures:
Congestion, Safety
Affected Counties:
Jefferson
Affected Municipalities:
Westminster
Subregion(s):
Jefferson
Open to Public:
2023
STIP-ID:
None
Project Scope:
Construct a separated trail along W. 100th Ave. from Alkire St. to Simms St.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (STBG-Pandemic DRCOG Region)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$1,400,000
$0
$0
$1,400,000
Amendment History
Date Status Description
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Add new waitlist project
2024-2027 Transportation Improvement Program (Approved TIP)
South Platte River Trail Improvements: West Virginia to W Bayaud
Project Name:
South Platte River Trail Improvements: West Virginia to W Bayaud
Identification Number:
2022-012
Project Type:
Active Transportation
Performance Measures:
Congestion, Safety
Affected Counties:
Denver
Affected Municipalities:
Denver
Subregion(s):
Denver
Open to Public:
2024
STIP-ID:
None
Project Scope:
Trail improvements and realignment from West Virginia Ave. to the pedestrian bridge at W. Bayaud Ave.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
Federal (Transportation Alternatives-CDOT)
$0
$0
$0
$0
Federal (Transportation Alternatives-DRCOG)
$0
$0
$0
$0
State (MMOF)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$10,467,000
$0
$0
$10,467,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
09/19/2024
Amended
Swap $2,500,000 in prior year local match for federal Transportation Alternatives-CDOT funding and add $467,000 in prior year local match. Total project cost increases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
05/19/2021
Amended
Revise limits. Total project cost remains the same.
04/22/2021
Amended
Add new waitlist project
2024-2027 Transportation Improvement Program (Approved TIP)
St Vrain Trail Extension: CO66 from McConnell to US36
Project Name:
St Vrain Trail Extension: CO66 from McConnell to US36
Identification Number:
2022-013
Project Type:
Active Transportation
Performance Measures:
Congestion, Safety
Affected Counties:
Boulder
Affected Municipalities:
Lyons
Subregion(s):
Boulder
Open to Public:
2023
STIP-ID:
None
Project Scope:
Construct a new trail parallel to SH-66, from McConnell Dr. to US-36.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congressional Allocation)
$0
$800,000
$0
$0
Federal (STBG-Pandemic DRCOG Region)
$0
$0
$0
$0
Local
$0
$166,000
$0
$0
Total
$0
$966,000
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$1,200,000
$966,000
$0
$2,166,000
Amendment History
Date Status Description
11/25/2024
Proposed
Adopted into the 2026-2029 TIP.
06/26/2024
Amended
Add $800,000 in federal Congressional Allocation funding. Total project cost increases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Add new waitlist project
2024-2027 Transportation Improvement Program (Approved TIP)
US36 Multimodal Improvements: 3rd to McConnell
Project Name:
US36 Multimodal Improvements: 3rd to McConnell
Identification Number:
2022-014
Project Type:
Active Transportation
Performance Measures:
Congestion, Safety
Affected Counties:
Boulder
Affected Municipalities:
Lyons
Subregion(s):
Boulder
Open to Public:
2023
STIP-ID:
None
Project Scope:
Construct a multimodal path connecting the west end of downtown east to McConnell Dr.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (STBG-Pandemic DRCOG Region)
$0
$0
$0
$0
State (Legislative)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$2,701,000
$0
$0
$2,701,000
Amendment History
Date Status Description
08/17/2023
Amended
Proposed for adoption into 2024-2027
10/21/2021
Amended
Add $243,000 in state Legislative funding from recent Revitalizing Main Streets award
04/22/2021
Amended
Add new waitlist project
2024-2027 Transportation Improvement Program (Approved TIP)
Wadsworth Operational Improvements: Vassar to Woodard
Project Name:
Wadsworth Operational Improvements: Vassar to Woodard
Identification Number:
2022-015
Project Type:
Roadway Operational Improvements
Performance Measures:
Congestion, Pavement Condition, Safety, Travel Time Reliability
Affected Counties:
Jefferson
Affected Municipalities:
Lakewood
Subregion(s):
Jefferson
Open to Public:
2024
STIP-ID:
None
Project Scope:
Add a new acceleration/deceleration lane on NB Wadsworth Blvd. and other intersection operational improvements at Morrison Rd. Add a southbound acceleration lane on the southwest corner of the intersection, including lighting and shared-use path.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congestion Mitigation / Air Quality)
$0
$0
$0
$0
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
Federal (Transportation Alternatives-DRCOG)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$8,644,000
$0
$0
$8,644,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
05/16/2023
Amended
Swap $1,920,000 in federal CRP for $1,920,000 in federal CMAQ funding. No change to total project cost.
03/16/2023
Amended
Add $2,004,000 in federal TAP funding and $501,000 in local match transferred from Region 1 TAP Pool, and adjust scope. Total project cost increases.
09/22/2022
Amended
Add new scope from 2022-2025 Subregional Share Call for Projects.
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
Region 1 Revitalizing Main Streets Pool
Project Name:
Region 1 Revitalizing Main Streets Pool
Identification Number:
2022-016
Project Type:
Roadway Operational Improvements
Performance Measures:
Congestion, Safety
Affected Counties:
Regional
Affected Municipalities:
None
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
In support of Colorado's state COVID-19 Recovery Plan, investments support local communities as they find innovative ways to reuse public spaces and help businesses reopen safely, while improving multimodal safety and accessibility along urban arterials.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
State (Legislative)
$250,000
$250,000
$0
$0
Local
$0
$0
$0
$0
Total
$250,000
$250,000
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$4,601,000
$500,000
$0
$5,101,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
10/17/2024
Amended
Add $250,000 in state Legislative funding and add one pool project. Total project cost increases.
05/16/2024
Amended
Add one pool project and $250,000 of state Legislative funding. Total project cost increases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
03/16/2023
Amended
Remove one pool project and $1,360,000 in state Legislative funding. Project is transferred to 2016-020. Total project cost decreases.
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name Description Notes Cost
Aurora Northwest Aurora Intersection Pedestrian Safety Enhancement $1,600,000
Edgewater 25th Avenue Streetscape Project $841,000
Commerce City 68th Ave. Multimodal Safety Improvements $1,420,000
Englewood South Broadway HAWK Signal $316,000
Lakewood 40 West ArtLine Bike Path Lighting and Safety $424,000
Wheat Ridge Main Street Plaza, Event, and Park Space $250,000
Parker Pilgrim's Place Walkway $250,000
2024-2027 Transportation Improvement Program (Approved TIP)
CO7/95th Intersection Improvements
Project Name:
CO7/95th Intersection Improvements
Identification Number:
2022-018
Project Type:
Roadway Operational Improvements
Performance Measures:
Congestion, Pavement Condition, Travel Time Reliability
Affected Counties:
Boulder
Affected Municipalities:
Lafayette
Subregion(s):
None
Open to Public:
2025
STIP-ID:
SR46600.099
Project Scope:
This project will construct an expanded SH-7 and SH-42 intersection, including new general purpose lanes, BAT lanes, transit stops, and multi-use path.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Faster Safety)
$0
$0
$0
$0
Federal (Surface Transportation Block Grant)
$0
$2,272,000
$0
$0
State (Faster Safety)
$0
$0
$0
$0
State (House Bill 1466 - MMOF)
$0
$0
$0
$0
State (Legislative-Transit)
$11,640,000
$568,000
$0
$0
State (MMOF)
$2,800,000
$0
$0
$0
Local
$4,436,000
$10,000
$95,000
$95,000
Total
$18,876,000
$2,850,000
$95,000
$95,000
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$4,860,000
$21,916,000
$0
$26,776,000
Amendment History
Date Status Description
12/20/2024
Proposed
Adopted into the 2026-2029 TIP.
12/20/2024
Amended
Add $200,000 in state FASTER-Safety funding. Total project cost increases.
10/17/2024
Amended
Remove $300,000 in state Legislative-Transit funding transferred to Project 2022-061. Total project cost decreases.
09/19/2024
Amended
Shift $128,000 in prior year funds from Multimodal Transportation and Mitigation Options Fund - American Rescue Plan Act funds to House Bill 1466 General Funds. Total project cost remains the same.
02/22/2024
Amended
Replace $2,272,000 in federal Multimodal Transportation and Mitigation Options Fund-American Rescue Plan Act funds with $2,272,000 in federal Surface Transportation Block Grant funds. Total project cost remains the same.
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
I70 Escape Ramp Between Floyd Hill and Denver West
Project Name:
I70 Escape Ramp Between Floyd Hill and Denver West
Identification Number:
2022-019
Project Type:
Safety
Performance Measures:
Safety, Travel Time Reliability
Affected Counties:
Jefferson
Affected Municipalities:
Unincorporated
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
Design an emergency runaway truck ramp to improve motor vehicle safety for eastbound I-70 between Floyd Hill and Denver West and make improvements to existing Mt. Vernon escape ramp. This segment of I-70 is comprised of steep, mountainous terrain with winding curves and varying shoulder widths between MP 256.71 and 264.32.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Freight)
$0
$0
$0
$0
State (Legislative)
$0
$0
$0
$0
State (Safety)
$2,502,000
$0
$0
$0
Local
$0
$0
$0
$0
Total
$2,502,000
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$19,100,000
$2,502,000
$0
$21,602,000
Amendment History
Date Status Description
10/18/2023
Amended
Add $2,502,000 in state Safety funds. Total project cost increases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
11/17/2022
Amended
Add $4,100,000 in federal Freight funds and $13,000,000 in state Legislative funding recently awarded, and $8,500,000 in state Safety funds from Region 1 Hazard Elimination Pool (TIP ID# 2007-073).
12/16/2021
Amended
New project split from 2007-164.
2024-2027 Transportation Improvement Program (Approved TIP)
I70 Floyd Hill Improvements: JC65 to Genesee Park
Project Name:
I70 Floyd Hill Improvements: JC65 to Genesee Park
Identification Number:
2022-020
Project Type:
Roadway Operational Improvements
Performance Measures:
Pavement Condition, Safety
Affected Counties:
Jefferson
Affected Municipalities:
Unincorporated
Subregion(s):
None
Open to Public:
2024
STIP-ID:
None
Project Scope:
Construct improvements associated with the portion of the I-70 Floyd Hill project within Jefferson County, including Genesee wildlife crossing, US-40/CR-65 roundabout, parking at El Rancho, and other early action elements.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
State (Legislative)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$17,300,000
$0
$0
$17,300,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
07/21/2022
Amended
Add parking at El Rancho to project scope. Increase Legislative funding by $6,300,000. Total project cost increases.
02/17/2022
Amended
Add new project.
2024-2027 Transportation Improvement Program (Approved TIP)
3rd/Welker Intersection Improvements
Project Name:
3rd/Welker Intersection Improvements
Identification Number:
2022-021
Project Type:
Roadway Operational Improvements
Performance Measures:
Congestion, Pavement Condition, Safety, Travel Time Reliability
Affected Counties:
Weld
Affected Municipalities:
Mead
Subregion(s):
SW Weld
Open to Public:
2025
STIP-ID:
None
Project Scope:
Construct turn lanes, sidewalk, bike lanes, raised median, and traffic signal.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Carbon Reduction Program)
$0
$0
$0
$0
Federal (Congressional Allocation)
$0
$1,000,000
$0
$0
Local
$1,815,000
$208,000
$0
$0
Total
$1,815,000
$1,208,000
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$3,600,000
$3,023,000
$0
$6,623,000
Amendment History
Date Status Description
06/26/2024
Amended
Add $1,000,000 in federal Congressional Allocation funding. Total project cost increases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
03/17/2022
Amended
Add new project as part of Spring 2022 Wait List process.
2024-2027 Transportation Improvement Program (Approved TIP)
CO119/63rd Transit Bypass Lanes
Project Name:
CO119/63rd Transit Bypass Lanes
Identification Number:
2022-022
Project Type:
Transit Operational Improvements
Performance Measures:
Congestion, Travel Time Reliability
Affected Counties:
Boulder
Affected Municipalities:
Boulder
Subregion(s):
Boulder
Open to Public:
None
STIP-ID:
None
Project Scope:
Construct transit bypass lanes at the 63rd St. intersection.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (MMOF - ARPA - DRCOG)
$0
$0
$0
$0
State (Legislative-Transit)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$0
$0
$0
Amendment History
Date Status Description
10/18/2023
Amended
Remove funding at the request of project sponsor. Funding and scope moved to TIP ID# 2020-081. Project funding decreases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/22/2022
Amended
Replace state MMOF funding with federal MMOF-ARPA funding. Total project cost remains the same.
03/17/2022
Amended
Add new project as part of Spring 2022 Wait List Process.
2024-2027 Transportation Improvement Program (Approved TIP)
I25/Happy Canyon Interchange - Precon
Project Name:
I25/Happy Canyon Interchange - Precon
Identification Number:
2022-023
Project Type:
Roadway Operational Improvements
Performance Measures:
Congestion, Freight Reliability, Travel Time Reliability
Affected Counties:
Douglas
Affected Municipalities:
Castle Pines
Subregion(s):
Douglas
Open to Public:
None
STIP-ID:
None
Project Scope:
Preconstruction activities associated with replacement of the I-25 and Happy Canyon interchange from a diamond to a diverging diamond configuration.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$1,319,000
$1,119,000
$0
$0
Local
$1,081,000
$881,000
$0
$0
Total
$2,400,000
$2,000,000
$0
$0
Project Phase to Initiate
Design
Environmental
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$400,000
$4,400,000
$0
$4,800,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
09/21/2023
Amended
Correct funding amounts to include previously awarded FY24 funds (additional $200,000 in federal Surface Transportation Block Grant and $200,000 in local match). Total project cost increases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
03/17/2022
Amended
Add new project as part of Spring 2022 Wait List Process.
2024-2027 Transportation Improvement Program (Approved TIP)
88th Corridor Study: Pecos to Dahlia
Project Name:
88th Corridor Study: Pecos to Dahlia
Identification Number:
2022-024
Project Type:
Study
Performance Measures:
Congestion, Freight Reliability, Safety, Travel Time Reliability
Affected Counties:
Adams
Affected Municipalities:
Thornton
Subregion(s):
Adams
Open to Public:
None
STIP-ID:
None
Project Scope:
Corridor study to consider bicycle and pedestrian travel, transit access, and vehicular capacity needs.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$200,000
$0
$0
$0
Local
$50,000
$0
$0
$0
Total
$250,000
$0
$0
$0
Project Phase to Initiate
Study
None
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$250,000
$0
$250,000
Amendment History
Date Status Description
08/17/2023
Amended
Proposed for adoption into 2024-2027
03/17/2022
Amended
Add new project as part of Spring 2022 Wait List Process.
2024-2027 Transportation Improvement Program (Approved TIP)
Enhanced Mobility of Seniors and Individuals with Disabilities (FTA 5310 - DRCOG)
Project Name:
Enhanced Mobility of Seniors and Individuals with Disabilities (FTA 5310 - DRCOG)
Identification Number:
2022-025
Project Type:
Transit Operational Improvements
Performance Measures:
Congestion, Safety, Transit Assets, Transit Safety
Affected Counties:
Regional
Affected Municipalities:
None
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
Funds will be used for Mobility Management and activities such as purchase of vans and operating assistance for door-to-door service for older adults and people with disabilities. This pool contains FY 2021-current pool projects selected by DRCOG. For small urban and FY 2020 and previous CDOT-sponsored FTA Section 5310 projects see TIP# 2012-107).
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Section 5310)
$2,900,000
$2,900,000
$2,900,000
$2,900,000
Local
$1,511,000
$450,000
$450,000
$450,000
Total
$4,411,000
$3,350,000
$3,350,000
$3,350,000
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$5,023,000
$14,461,000
$0
$19,484,000
Amendment History
Date Status Description
12/10/2024
Proposed
Adopted into the 2026-2029 TIP.
05/16/2024
Amended
Remove completed prior awards, add 11 newly awarded projects and required local match, and update annual allotment based on new projections. Total project cost decreases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/24/2023
Amended
Add 14 new pool projects from recent FY 24 Call for Projects and correct prior funding amounts. Total project cost increases.
05/23/2022
Amended
Create new project for DRCOG sponsored FTA 5310 projects.
Project Pools This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name Description Notes Cost
DRCOG Program Administration (FY24) $293,000
VIA Mobility Management (FY24) $472,000
VIA Operating (FY24) Funded also with HST $969,000
Laradon Hall Operating (FY24) $139,000
DRCOG Mobility Management (FY24) Funded also with HST $845,000
Douglas County Mobility Management (FY24) Funded also with HST $301,000
DRMAC Mobility Management (FY24) Funded also with HST $297,000
Lakewood Operating (FY24) $60,000
A Little Help Mobility Management (Fiscal Year 2025) $20,000
Denver Regional Mobility and Access Council Mobility Management (Fiscal Year 2025) $297,000
Douglas County Mobility Management (Fiscal Year 2025) Funded also with Human Services Transportation Set-Aside $250,000
DRCOG Mobility Management (Fiscal Year 2025) $516,000
Easter Seals 1 Replacement Vehicle (Fiscal Year 2025) $94,000
Lakewood Operating (Fiscal Year 2025) $70,000
Laradon Hall Society Operating (Fiscal Year 2025) $140,000
Laradon Hall Society 1 Vehicle Replacement (Fiscal Year 2025) $102,000
Support Management 1 Vehicle Replacement (Fiscal Year 2025) $144,000
Via Operating (Fiscal Year 2025) Funded also with Human Services Transportation Set-Aside $945,000
Via Mobility Management (Fiscal Year 2025) $479,000
2024-2027 Transportation Improvement Program (Approved TIP)
Washington St Improvements: 47th to 52nd
Project Name:
Washington St Improvements: 47th to 52nd
Identification Number:
2022-026
Project Type:
Multimodal
Performance Measures:
Congestion, Pavement Condition, Safety
Affected Counties:
Denver
Affected Municipalities:
Denver
Subregion(s):
None
Open to Public:
2027
STIP-ID:
None
Project Scope:
Modernization of Washington St. from 47th Ave. to 52nd Ave. and the implementation of a more efficient lane configuration, widened sidewalks, bicycle paths, energy-efficient lighting, streetscaping treatments, and improved access to transit.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (RAISE)
$6,362,000
$0
$7,631,000
$0
Local
$2,690,000
$0
$15,344,000
$0
Total
$9,052,000
$0
$22,975,000
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$4,768,000
$32,027,000
$0
$36,795,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
07/21/2022
Amended
Create new project for RAISE Grant award.
2024-2027 Transportation Improvement Program (Approved TIP)
I25/WCR34 Emergency Bridge Replacement
Project Name:
I25/WCR34 Emergency Bridge Replacement
Identification Number:
2022-027
Project Type:
Roadway - Bridge
Performance Measures:
Bridge Condition, Freight Reliability, Pavement Condition, Safety
Affected Counties:
Weld
Affected Municipalities:
Mead
Subregion(s):
None
Open to Public:
2024
STIP-ID:
SSP4428.015
Project Scope:
Replace the overpass at I-25 and Weld County Road 34 due to damage. The bridge will be constructed to accommodate the ultimate configuration interchange as part of the I-25 Segment 5 project.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
State (TC Contingency)
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$2,000,000
$0
$0
$2,000,000
Amendment History
Date Status Description
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/22/2022
Amended
Add $1 million in state TC Contingency funds. Total project cost increases.
09/08/2022
Amended
Add new project.
2024-2027 Transportation Improvement Program (Approved TIP)
Region 1 Congressionally Directed Funding Pool
Project Name:
Region 1 Congressionally Directed Funding Pool
Identification Number:
2022-028
Project Type:
Other
Performance Measures:
Affected Counties:
Adams, Arapahoe, Broomfield, Denver, Douglas, Jefferson
Affected Municipalities:
None
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
Pool contains congressionally directed funds for projects selected in CDOT Region 1 (DRCOG TIP area only). FY23 and beyond awards are individually depicted.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congressional Allocation)
$5,362,000
$0
$0
$0
Local
$0
$0
$0
$0
Total
$5,362,000
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$3,545,000
$5,362,000
$0
$8,907,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
07/22/2024
Amended
Add three pool projects and $5,362,000 in federal Congressional Allocation funds. Total project cost increases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
05/16/2023
Amended
Add two pool projects and $3,400,000 in federal Congressional funding. Total project cost increases.
09/08/2022
Amended
Create new pool for congressionally directed funding in CDOT Region 1.
Project Pools This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name Description Notes Cost
Golden SH-93 Design $2,320,000
Commerce City Quiet Zones $615,000
Commerce City Chambers Avenue Widening $4,116,000
Golden Compactor/Roller Purchase $850,000
Thornton Quebec Street Widening $850,000
2024-2027 Transportation Improvement Program (Approved TIP)
I25 Chain Down Station: Larkspur
Project Name:
I25 Chain Down Station: Larkspur
Identification Number:
2022-029
Project Type:
Safety
Performance Measures:
Safety
Affected Counties:
Douglas
Affected Municipalities:
Unincorporated
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
Install a chain down station on northbound I-25 at mile marker 170.4 near Larkspur.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Freight)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$5,000,000
$0
$0
$5,000,000
Amendment History
Date Status Description
08/17/2023
Amended
Proposed for adoption into 2024-2027
11/17/2022
Amended
Add $2,000,000 in federal Freight funding. Total project cost increases.
09/08/2022
Amended
Create new project for chain station on I-25.
2024-2027 Transportation Improvement Program (Approved TIP)
East Colfax Bus Rapid Transit: Civic Center Station to Yosemite
Project Name:
East Colfax Bus Rapid Transit: Civic Center Station to Yosemite
Identification Number:
2022-031
Project Type:
Rapid Transit
Performance Measures:
Congestion, Transit Assets, Transit Safety, Travel Time Reliability
Affected Counties:
Denver
Affected Municipalities:
Denver
Subregion(s):
Denver
Open to Public:
2025
STIP-ID:
None
Project Scope:
Design and construct a fixed-guideway center-running bus rapid transit line along Colfax Ave between Civic Center Station and Yosemite St.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Capital Investment Grant)
$150,000,000
$0
$0
$0
Federal (Carbon Reduction Program)
$2,845,000
$0
$0
$0
Federal (Congestion Mitigation / Air Quality)
$5,686,000
$0
$0
$0
Federal (Surface Transportation Block Grant)
$8,513,000
$0
$2,685,000
$0
Local
$93,319,000
$0
$2,305,000
$0
Total
$260,363,000
$0
$4,990,000
$0
Project Phase to Initiate
CM/GC Construction
None
CM/GC Construction
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$15,126,000
$265,353,000
$0
$280,479,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
09/19/2024
Amended
Add $23,111,000 in federal Capital Investment Grant funds. Total project cost increases.
05/16/2024
Amended
Add $126,889,000 in federal Capital Investment Grant funds and local match. Total project cost increases.
12/19/2023
Amended
Swap $13,249,000 in federal Multimodal Transportation and Mitigation Options Fund - American Rescue Plan Act funds for $10,988,000 in federal Congestion Mitigation/Air Quality funds and $2,261,000 in federal Surface Transportation Block Grant funds. Total project cost remains the same.
08/17/2023
Amended
Proposed for adoption into 2024-2027, add funds from 2024-2027 Subregional Share Call for Projects.
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
Lone Tree Mobility Hub at Sky Ridge Station
Project Name:
Lone Tree Mobility Hub at Sky Ridge Station
Identification Number:
2022-032
Project Type:
Transit Operational Improvements
Performance Measures:
Congestion, Transit Assets, Transit Safety
Affected Counties:
Douglas
Affected Municipalities:
Lone Tree
Subregion(s):
Douglas
Open to Public:
2026
STIP-ID:
None
Project Scope:
Construct a mobility hub at Sky Ridge Station and I-25 to facilitate connections between all travel modes.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congestion Mitigation / Air Quality)
$0
$4,661,000
$0
$0
State (House Bill 1466 - MMOF)
$3,339,000
$0
$0
$0
State (Legislative-Transit)
$2,000,000
$12,600,000
$0
$0
Local
$2,000,000
$0
$0
$0
Total
$7,339,000
$17,261,000
$0
$0
Project Phase to Initiate
Design
Construction
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$2,000,000
$24,600,000
$0
$26,600,000
Amendment History
Date Status Description
01/30/2025
Proposed
Adopted into the 2026-2029 TIP.
01/29/2025
Amended
Add $2,100,000 in state Legislative-Transit funding transferred from Project 2020-100. Total project cost increases.
09/19/2024
Amended
Shift $3,339,000 from Multimodal Transportation and Mitigation Options Fund - American Rescue Plan Act funds to House Bill 1466 General Funds. Add $4,500,000 in state Legislative funding. Total project cost increases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
11/17/2022
Amended
Increase state Legislative-Transit funding by $10,000,000 to capture funds previously included in Region 1 Mobility Hub pool (TIP ID# 2020-100). Total project cost increases.
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
Mineral Station Area Multimodal Improvements
Project Name:
Mineral Station Area Multimodal Improvements
Identification Number:
2022-033
Project Type:
Active Transportation
Performance Measures:
Congestion, Safety
Affected Counties:
Arapahoe
Affected Municipalities:
Littleton
Subregion(s):
Arapahoe
Open to Public:
2026
STIP-ID:
None
Project Scope:
Design and construction of Mineral Station Area Improvements – path improvements from LRT station bridge to the Mary Carter Greenway Trail and bike facilities along Platte River Parkway and Carson Drive to the Mary Carter Greenway Trail at South Platte Park.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Carbon Reduction Program)
$0
$733,000
$0
$0
State (MMOF)
$0
$919,000
$0
$0
Local
$0
$186,000
$0
$0
Total
$0
$1,838,000
$0
$0
Project Phase to Initiate
None
Construction
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$557,000
$1,838,000
$0
$2,395,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/22/2022
Amended
Add new project from 2022-2025 Regional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
Southwest Weld County Trail Alignment Study
Project Name:
Southwest Weld County Trail Alignment Study
Identification Number:
2022-034
Project Type:
Study
Performance Measures:
Congestion, Safety
Affected Counties:
Weld
Affected Municipalities:
Longmont, Unincorporated, Mead, Firestone
Subregion(s):
SW Weld
Open to Public:
None
STIP-ID:
None
Project Scope:
Study potential alignments and design a regional bike/ped trail in southwest Weld County roughly along WCR26 between Union Reservoir and St Vrain State Park and along WCR7 between WCR28 and CO119.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Carbon Reduction Program)
$320,000
$0
$0
$0
Federal (MMOF - ARPA - DRCOG)
$400,000
$0
$0
$0
Local
$80,000
$0
$0
$0
Total
$800,000
$0
$0
$0
Project Phase to Initiate
Design
None
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$200,000
$800,000
$0
$1,000,000
Amendment History
Date Status Description
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
Buchtel Complete Street/Evans Intersection Improvements: University to Colorado
Project Name:
Buchtel Complete Street/Evans Intersection Improvements: University to Colorado
Identification Number:
2022-035
Project Type:
Roadway Operational Improvements
Performance Measures:
Congestion, Safety
Affected Counties:
Denver
Affected Municipalities:
Denver
Subregion(s):
Denver
Open to Public:
2026
STIP-ID:
None
Project Scope:
Construct high-comfort bike facility, ped crossing improvements, and safety enhancements along Buchtel from University Blvd. to Colorado Blvd. Intersection improvements including bike signal phase, bulbouts, and safety improvements at 5 intersections along Buchtel Blvd. and Evans Ave.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congestion Mitigation / Air Quality)
$2,395,000
$7,285,000
$0
$0
State (MMOF)
$2,927,000
$9,193,000
$0
$0
Local
$532,000
$1,908,000
$0
$0
Total
$5,854,000
$18,386,000
$0
$0
Project Phase to Initiate
Construction
Construction
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$24,240,000
$0
$24,240,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
Bike/Ped Bridge over Santa Fe: Jewell to Evans Station
Project Name:
Bike/Ped Bridge over Santa Fe: Jewell to Evans Station
Identification Number:
2022-036
Project Type:
Active Transportation
Performance Measures:
Congestion, Safety
Affected Counties:
Denver
Affected Municipalities:
Denver
Subregion(s):
Denver
Open to Public:
2026
STIP-ID:
None
Project Scope:
Construct new bike/ped bridge from Jewell Ave. to Evans LRT Station over Santa Fe Dr.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congestion Mitigation / Air Quality)
$1,198,000
$3,302,000
$0
$0
State (MMOF)
$1,996,000
$5,504,000
$0
$0
Local
$799,000
$2,203,000
$0
$0
Total
$3,993,000
$11,009,000
$0
$0
Project Phase to Initiate
Construction
Construction
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$15,002,000
$0
$15,002,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
South Platte River Trail Improvements: Mississippi to Dartmouth - Precon
Project Name:
South Platte River Trail Improvements: Mississippi to Dartmouth - Precon
Identification Number:
2022-037
Project Type:
Active Transportation
Performance Measures:
Congestion, Safety
Affected Counties:
Denver
Affected Municipalities:
Denver
Subregion(s):
Denver
Open to Public:
None
STIP-ID:
None
Project Scope:
Design a segment of upgraded trail to include a widened 12' path with shoulders, lighting, wayfinding, and new connection to Ruby Hill Park.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congestion Mitigation / Air Quality)
$750,000
$750,000
$0
$0
State (MMOF)
$1,250,000
$1,250,000
$0
$0
Local
$500,000
$500,000
$0
$0
Total
$2,500,000
$2,500,000
$0
$0
Project Phase to Initiate
Design
Environmental
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$5,000,000
$0
$5,000,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
Airport Creek Trail Underpass at BNSF
Project Name:
Airport Creek Trail Underpass at BNSF
Identification Number:
2022-038
Project Type:
Active Transportation
Performance Measures:
Congestion, Safety
Affected Counties:
Broomfield
Affected Municipalities:
Broomfield
Subregion(s):
Broomfield
Open to Public:
2026
STIP-ID:
None
Project Scope:
Design and construct a bike/ped underpass of BNSF railway between 112th Ave. and 116th Ave.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congestion Mitigation / Air Quality)
$263,000
$1,243,000
$0
$0
State (MMOF)
$437,000
$2,071,000
$0
$0
Local
$175,000
$828,000
$0
$0
Total
$875,000
$4,142,000
$0
$0
Project Phase to Initiate
Design
Construction
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$46,000
$5,017,000
$0
$5,063,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
Downtown Golden Traffic Signal Upgrade
Project Name:
Downtown Golden Traffic Signal Upgrade
Identification Number:
2022-039
Project Type:
Traffic Signals/ITS
Performance Measures:
Congestion, Freight Reliability, Safety, Travel Time Reliability
Affected Counties:
Jefferson
Affected Municipalities:
Golden
Subregion(s):
Jefferson
Open to Public:
2024
STIP-ID:
None
Project Scope:
Upgrade signals, including bicycle detection, at 10 intersections in downtown Golden.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Carbon Reduction Program)
$0
$0
$0
$0
Federal (MMOF - ARPA - DRCOG)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$0
$0
$0
Amendment History
Date Status Description
08/27/2024
Amended
Return funding per sponsor"s request. Total project cost decreases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
Jefferson County Bicycle Plan Implementation
Project Name:
Jefferson County Bicycle Plan Implementation
Identification Number:
2022-040
Project Type:
Active Transportation
Performance Measures:
Congestion, Safety
Affected Counties:
Jefferson
Affected Municipalities:
None
Subregion(s):
Jefferson
Open to Public:
2026
STIP-ID:
None
Project Scope:
Construct bicycle facilities and signage throughout unincorporated areas in the County based on priorities identified in the Jefferson County Bicycle Plan.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Carbon Reduction Program)
$168,000
$168,000
$0
$0
State (MMOF)
$207,000
$207,000
$0
$0
Local
$40,000
$40,000
$0
$0
Total
$415,000
$415,000
$0
$0
Project Phase to Initiate
Construction
Construction
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$420,000
$830,000
$0
$1,250,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
Wadsworth Shared-Use Path: 32nd to 35th
Project Name:
Wadsworth Shared-Use Path: 32nd to 35th
Identification Number:
2022-041
Project Type:
Active Transportation
Performance Measures:
Congestion, Safety
Affected Counties:
Jefferson
Affected Municipalities:
Wheat Ridge
Subregion(s):
Jefferson
Open to Public:
2026
STIP-ID:
None
Project Scope:
Construct a shared-use path from 32nd Ave. to 35th Ave., pedestrian lighting, bus stop improvements, and improvements at 32nd Ave. intersection.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congestion Mitigation / Air Quality)
$750,000
$2,000,000
$0
$0
State (MMOF)
$1,250,000
$2,500,000
$0
$0
State (Regional Priority Projects)
$200,000
$500,000
$0
$0
Local
$300,000
$0
$0
$0
Total
$2,500,000
$5,000,000
$0
$0
Project Phase to Initiate
Environmental
Construction
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$7,500,000
$0
$7,500,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/24/2023
Amended
Replace $700,000 in Safety funding with $700,000 in RPP funding. Total project cost remains the same.
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
Ward Station Multimodal Access Improvements
Project Name:
Ward Station Multimodal Access Improvements
Identification Number:
2022-042
Project Type:
Active Transportation
Performance Measures:
Congestion, Safety
Affected Counties:
Jefferson
Affected Municipalities:
Wheat Ridge
Subregion(s):
Jefferson
Open to Public:
2025
STIP-ID:
None
Project Scope:
Construct a shared-use path from I-70 North Frontage Rd. to Ward LRT Station, pedestrian bridge over the LRT tracks, pedestrian lighting and amenities.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congestion Mitigation / Air Quality)
$3,475,000
$0
$0
$0
State (House Bill 1466 - MMOF)
$4,825,000
$0
$0
$0
Local
$1,350,000
$0
$0
$0
Total
$9,650,000
$0
$0
$0
Project Phase to Initiate
Construction
None
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$9,650,000
$0
$9,650,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
09/19/2024
Amended
Shift $4,825,000 from Multimodal Transportation and Mitigation Options Fund - American Rescue Plan Act funds to House Bill 1466 General Funds. Total project cost remains the same.
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
120th Safety and Multimodal Corridor Study: US85 to Tower
Project Name:
120th Safety and Multimodal Corridor Study: US85 to Tower
Identification Number:
2022-043
Project Type:
Study
Performance Measures:
Congestion, Safety, Travel Time Reliability
Affected Counties:
Adams
Affected Municipalities:
Commerce City
Subregion(s):
Adams
Open to Public:
None
STIP-ID:
None
Project Scope:
Study to identify, evaluate, and prioritize short, medium, and long term projects along the corridor to reduce crashes, decrease traffic congestion, and accommodate non-motorized transportation.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Carbon Reduction Program)
$80,000
$0
$0
$0
State (House Bill 1466 - MMOF)
$100,000
$0
$0
$0
Local
$20,000
$0
$0
$0
Total
$200,000
$0
$0
$0
Project Phase to Initiate
Study
None
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$600,000
$200,000
$0
$800,000
Amendment History
Date Status Description
09/19/2024
Amended
Shift $100,000 in Fiscal Year 2024 and $300,000 in prior years funding from Multimodal Transportation and Mitigation Options Fund - American Rescue Plan Act funds to House Bill 1466 General Funds. Total project cost remains the same.
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
Smith Rd Multimodal Improvements: Peoria to Powhaton - Precon
Project Name:
Smith Rd Multimodal Improvements: Peoria to Powhaton - Precon
Identification Number:
2022-044
Project Type:
Active Transportation
Performance Measures:
Congestion, Safety
Affected Counties:
Adams
Affected Municipalities:
Aurora
Subregion(s):
Adams
Open to Public:
None
STIP-ID:
None
Project Scope:
Design two-way cycle track and 8' sidewalk from Peoria to Chambers, 8' sidewalk and 4' shoulder from Chambers to Picadilly, and 14' shared-use path from Picadilly to Powhaton.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Carbon Reduction Program)
$1,000,000
$0
$0
$0
State (House Bill 1466 - MMOF)
$1,250,000
$0
$0
$0
Local
$250,000
$0
$0
$0
Total
$2,500,000
$0
$0
$0
Project Phase to Initiate
Design
None
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$2,500,000
$2,500,000
$0
$5,000,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
09/19/2024
Amended
Shift $1,250,000 in Fiscal Year 2024 and $1,250,000 in prior years funding from Multimodal Transportation and Mitigation Options Fund - American Rescue Plan Act funds to House Bill 1466 General Funds. Total project cost remains the same.
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
Aurora Multimodal Access Improvements
Project Name:
Aurora Multimodal Access Improvements
Identification Number:
2022-045
Project Type:
Active Transportation
Performance Measures:
Congestion, Safety
Affected Counties:
Adams, Arapahoe
Affected Municipalities:
Aurora
Subregion(s):
Adams, Arapahoe
Open to Public:
2026
STIP-ID:
None
Project Scope:
Design and construct sidewalk to fill in gaps near transit at Havana St. at 17th Ave., Havana St. at Montview Blvd., Colfax Ave. at Laredo St., Havana St. at 13th Ave., Havana St. at 4th Way, Yale Ave. from Peoria St. to Xanadu Way, and Chambers Rd. from Hampden Circle to Nassau Ave.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Carbon Reduction Program)
$65,000
$1,791,000
$0
$0
State (MMOF)
$107,000
$2,369,000
$0
$0
Local
$43,000
$1,040,000
$0
$0
Total
$215,000
$5,200,000
$0
$0
Project Phase to Initiate
ROW
Construction
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$1,225,000
$5,415,000
$0
$6,640,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
Bennett Kiowa Creek Trail
Project Name:
Bennett Kiowa Creek Trail
Identification Number:
2022-046
Project Type:
Active Transportation
Performance Measures:
Congestion, Safety
Affected Counties:
Adams, Arapahoe
Affected Municipalities:
Bennett, Unincorporated
Subregion(s):
Adams, Arapahoe
Open to Public:
2026
STIP-ID:
None
Project Scope:
Design and construct a trail along SH-79 from Kiowa Creek North Open Space to SH-79 at Edwards Ave. and along SH-79 from Edwards Ave. to Colfax Ave.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congestion Mitigation / Air Quality)
$1,420,000
$0
$0
$0
Federal (Transportation Alternatives-DRCOG)
$0
$577,000
$0
$0
State (MMOF)
$1,775,000
$721,000
$0
$0
Local
$355,000
$145,000
$0
$0
Total
$3,550,000
$1,443,000
$0
$0
Project Phase to Initiate
Construction
Construction
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$878,000
$4,993,000
$0
$5,871,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
64th Corridor Study: CO2 to Quebec
Project Name:
64th Corridor Study: CO2 to Quebec
Identification Number:
2022-048
Project Type:
Study
Performance Measures:
Congestion, Safety
Affected Counties:
Adams
Affected Municipalities:
Commerce City
Subregion(s):
Adams
Open to Public:
None
STIP-ID:
None
Project Scope:
Study for complete streets improvements to enable improved multimodal transportation.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Carbon Reduction Program)
$38,000
$0
$0
$0
State (House Bill 1466 - MMOF)
$62,000
$0
$0
$0
Local
$25,000
$0
$0
$0
Total
$125,000
$0
$0
$0
Project Phase to Initiate
Study
None
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$125,000
$125,000
$0
$250,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
09/19/2024
Amended
Shift $62,000 in Fiscal Year 2024 and $62,000 in prior years funding from Multimodal Transportation and Mitigation Options Fund - American Rescue Plan Act funds to House Bill 1466 General Funds. Total project cost remains the same.
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
88th Ave Multimodal Improvements: I76 to CO2
Project Name:
88th Ave Multimodal Improvements: I76 to CO2
Identification Number:
2022-049
Project Type:
Active Transportation
Performance Measures:
Congestion, Safety
Affected Counties:
Adams
Affected Municipalities:
Commerce City
Subregion(s):
Adams
Open to Public:
2026
STIP-ID:
None
Project Scope:
Construct multi-use path, sidewalk, and crossing improvements along the corridor.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Transportation Alternatives-DRCOG)
$0
$0
$0
$0
State (MMOF)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$0
$0
$0
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
05/16/2024
Amended
Zero out funding to combine with Project# 2020-032. Total project cost decreases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
Thornton Multimodal Trail Study and Precon
Project Name:
Thornton Multimodal Trail Study and Precon
Identification Number:
2022-050
Project Type:
Active Transportation
Performance Measures:
Congestion, Safety
Affected Counties:
Adams
Affected Municipalities:
Thornton
Subregion(s):
Adams
Open to Public:
None
STIP-ID:
None
Project Scope:
Update the City's trails master plan and begin preconstruction on priority recommended trail improvements.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congestion Mitigation / Air Quality)
$298,000
$0
$0
$0
Federal (STBG-Pandemic DRCOG Region)
$235,000
$0
$0
$0
State (House Bill 1466 - MMOF)
$655,000
$0
$0
$0
Local
$122,000
$0
$0
$0
Total
$1,310,000
$0
$0
$0
Project Phase to Initiate
Design
None
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$400,000
$1,310,000
$0
$1,710,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
09/19/2024
Amended
Shift $655,000 in Fiscal Year 2024 and $200,000 in prior years funding from Multimodal Transportation and Mitigation Options Fund - American Rescue Plan Act funds to House Bill 1466 General Funds. Total project cost remains the same.
08/17/2023
Amended
Proposed for adoption into 2024-2027
12/21/2022
Amended
Swap $385,000 in CMAQ for $385,000 in STBG-PDR. Total project cost remains the same.
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
100th Ave Multi-Use Path: Riverdale to Forest Circle
Project Name:
100th Ave Multi-Use Path: Riverdale to Forest Circle
Identification Number:
2022-051
Project Type:
Active Transportation
Performance Measures:
Congestion, Safety
Affected Counties:
Adams
Affected Municipalities:
Thornton
Subregion(s):
Adams
Open to Public:
2026
STIP-ID:
None
Project Scope:
Design and construct a multiuse path along the north side of the corridor, including lighting and crossing treatments.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Transportation Alternatives-DRCOG)
$36,000
$191,000
$0
$0
State (MMOF)
$58,000
$318,000
$0
$0
Local
$23,000
$128,000
$0
$0
Total
$117,000
$637,000
$0
$0
Project Phase to Initiate
ROW
Construction
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$192,000
$754,000
$0
$946,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
Thornton Protected Bike Facility Study
Project Name:
Thornton Protected Bike Facility Study
Identification Number:
2022-052
Project Type:
Study
Performance Measures:
Congestion, Safety
Affected Counties:
Adams
Affected Municipalities:
Thornton
Subregion(s):
Adams
Open to Public:
None
STIP-ID:
None
Project Scope:
Feasibility study of three corridors (Pecos St. from Milky Way to Thornton Pkwy., Huron St. from 84th Ave. to 88th Ave., and 128th Ave. from I-25 to York St.) for protected bike facilities.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Carbon Reduction Program)
$0
$0
$0
$0
Federal (MMOF - ARPA - DRCOG)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$510,000
$0
$0
$510,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
Federal Blvd Bus Stop Improvements: 70th to 92nd
Project Name:
Federal Blvd Bus Stop Improvements: 70th to 92nd
Identification Number:
2022-053
Project Type:
Transit Passenger Facilities
Performance Measures:
Congestion, Safety, Transit Assets, Transit Safety
Affected Counties:
Adams
Affected Municipalities:
Westminster
Subregion(s):
Adams
Open to Public:
2025
STIP-ID:
None
Project Scope:
Design and construct concrete bus pads and bus stop amenities at 12 bus stops along Federal Blvd.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Carbon Reduction Program)
$0
$0
$0
$0
Federal (MMOF - ARPA - DRCOG)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$0
$0
$0
Amendment History
Date Status Description
02/22/2024
Amended
Zero out project at sponsor"s request. Funds are transferring to the Federal Blvd BRT project - TIP ID# 2024-008
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
High Line Canal Trail Underpass at Broadway - Precon
Project Name:
High Line Canal Trail Underpass at Broadway - Precon
Identification Number:
2022-054
Project Type:
Active Transportation
Performance Measures:
Congestion, Safety
Affected Counties:
Arapahoe
Affected Municipalities:
Littleton
Subregion(s):
Arapahoe
Open to Public:
None
STIP-ID:
None
Project Scope:
Preconstruction activities for a bike/ped underpass of S. Broadway near Arapahoe Rd.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$0
$0
$1,342,000
$1,341,000
Federal (Transportation Alternatives-DRCOG)
$0
$537,000
$0
$0
State (MMOF)
$0
$900,000
$0
$0
Local
$0
$363,000
$336,000
$335,000
Total
$0
$1,800,000
$1,678,000
$1,676,000
Project Phase to Initiate
None
Environmental
Design
ROW
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$5,154,000
$0
$5,154,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
Arapahoe County Transit and Micromobility Study
Project Name:
Arapahoe County Transit and Micromobility Study
Identification Number:
2022-055
Project Type:
Study
Performance Measures:
Congestion, Safety, Transit Assets, Transit Safety
Affected Counties:
Arapahoe
Affected Municipalities:
None
Subregion(s):
Arapahoe
Open to Public:
None
STIP-ID:
None
Project Scope:
Study to determine existing transit conditions, needs analysis, prioritized recommendations, and pilot project identification.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (MMOF - ARPA - DRCOG)
$332,000
$0
$0
$0
Federal (Surface Transportation Block Grant)
$263,000
$0
$0
$0
Local
$70,000
$0
$0
$0
Total
$665,000
$0
$0
$0
Project Phase to Initiate
Study
None
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$790,000
$665,000
$0
$1,455,000
Amendment History
Date Status Description
12/10/2024
Proposed
Adopted into the 2026-2029 TIP.
12/19/2023
Amended
Swap federal Carbon Reduction Program funds for federal Surface Transportation Block Grant funds. Total project cost remains the same.
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
Aurora Multimodal Transportation Master Plan
Project Name:
Aurora Multimodal Transportation Master Plan
Identification Number:
2022-056
Project Type:
Study
Performance Measures:
Congestion, Freight Reliability, Safety, Transit Assets, Transit Safety, Travel Time Reliability
Affected Counties:
Adams, Arapahoe, Douglas
Affected Municipalities:
Aurora
Subregion(s):
Arapahoe
Open to Public:
None
STIP-ID:
None
Project Scope:
Citywide multimodal master plan focused on complete streets, vision zero, freight, new technology, mobility hubs, system performance, implementation, and operations and maintenance.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$356,000
$424,000
$0
$0
State (MMOF)
$593,000
$707,000
$0
$0
Local
$237,000
$283,000
$0
$0
Total
$1,186,000
$1,414,000
$0
$0
Project Phase to Initiate
Study
Study
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$625,000
$2,600,000
$0
$3,225,000
Amendment History
Date Status Description
12/17/2024
Proposed
Adopted into the 2026-2029 TIP.
12/19/2023
Amended
Swap federal Carbon Reduction Program funds for federal Surface Transportation Block Grant funds. Total project cost remains the same.
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
Lone Tree Creek Trail Underpass of Arapahoe
Project Name:
Lone Tree Creek Trail Underpass of Arapahoe
Identification Number:
2022-057
Project Type:
Active Transportation
Performance Measures:
Congestion, Safety
Affected Counties:
Arapahoe
Affected Municipalities:
Centennial
Subregion(s):
Arapahoe
Open to Public:
2025
STIP-ID:
None
Project Scope:
Construct a bike/ped underpass at Arapahoe Rd.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congestion Mitigation / Air Quality)
$1,725,000
$0
$0
$0
State (House Bill 1466 - MMOF)
$2,156,000
$0
$0
$0
Local
$431,000
$0
$0
$0
Total
$4,312,000
$0
$0
$0
Project Phase to Initiate
Construction
None
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$4,312,000
$0
$4,312,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
09/19/2024
Amended
Shift $2,156,000 from Multimodal Transportation and Mitigation Options Fund - American Rescue Plan Act funds to House Bill 1466 General Funds. Total project cost remains the same.
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
Arapahoe Sidepath Improvements: I25 to Parker Rd
Project Name:
Arapahoe Sidepath Improvements: I25 to Parker Rd
Identification Number:
2022-058
Project Type:
Active Transportation
Performance Measures:
Congestion, Safety, Transit Assets, Transit Safety
Affected Counties:
Arapahoe
Affected Municipalities:
Aurora, Centennial, Greenwood Village, Unincorporated
Subregion(s):
Arapahoe
Open to Public:
2026
STIP-ID:
None
Project Scope:
Construct 8'-10' wide multi-use paths to fill in sidewalk gaps along Arapahoe Rd., upgrade curb ramps, and improve bus stops.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congestion Mitigation / Air Quality)
$0
$1,790,000
$0
$0
Federal (Surface Transportation Block Grant)
$0
$2,000,000
$0
$0
State (MMOF)
$0
$2,240,000
$0
$0
Local
$0
$788,000
$0
$0
Total
$0
$6,818,000
$0
$0
Project Phase to Initiate
None
Construction
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$6,818,000
$0
$6,818,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
11/21/2024
Amended
Add $2,000,000 in federal Surface Transportation Block Grant funds returned from Project 2020-059 and reallocated by the Arapahoe County Subregional Forum. Total project cost increases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
Hampden Complete Streets: Broadway to Lafayette
Project Name:
Hampden Complete Streets: Broadway to Lafayette
Identification Number:
2022-059
Project Type:
Multimodal
Performance Measures:
Congestion, Safety
Affected Counties:
Arapahoe
Affected Municipalities:
Englewood
Subregion(s):
Arapahoe
Open to Public:
2025
STIP-ID:
None
Project Scope:
Design and construct complete streets improvements including multi-use path, widened sidewalk, narrowed vehicle lanes, raised median, lighting, and pedestrian amenities.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Transportation Alternatives-DRCOG)
$2,190,000
$0
$0
$0
State (House Bill 1466 - MMOF)
$3,285,000
$0
$0
$0
Local
$1,369,000
$0
$0
$0
Total
$6,844,000
$0
$0
$0
Project Phase to Initiate
Construction
None
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$2,281,000
$6,844,000
$0
$9,125,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
09/19/2024
Amended
Shift $3,285,000 in Fiscal Year 2024 and $1,140,000 in prior years funding from Multimodal Transportation and Mitigation Options Fund - American Rescue Plan Act funds to House Bill 1466 General Funds. Total project cost remains the same.
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
Broadway Complete Streets Improvements: Hampden to Belleview
Project Name:
Broadway Complete Streets Improvements: Hampden to Belleview
Identification Number:
2022-060
Project Type:
Multimodal
Performance Measures:
Congestion, Safety
Affected Counties:
Arapahoe
Affected Municipalities:
Englewood
Subregion(s):
Arapahoe
Open to Public:
2025
STIP-ID:
None
Project Scope:
Design and construct complete streets improvements including sidewalks, bike/pedestrian amenities, lighting, transit stop upgrades, and bike markings on Sherman St.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (MMOF - ARPA - DRCOG)
$0
$0
$0
$0
Federal (Transportation Alternatives-DRCOG)
$1,863,000
$0
$0
$0
State (House Bill 1466 - MMOF)
$2,450,000
$0
$0
$0
Local
$588,000
$0
$0
$0
Total
$4,901,000
$0
$0
$0
Project Phase to Initiate
Construction
None
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$2,639,000
$4,901,000
$0
$7,540,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
09/19/2024
Amended
Shift $2,450,000 in Fiscal Year 2024 and $1,050,000 in prior years funding from Multimodal Transportation and Mitigation Options Fund - American Rescue Plan Act funds to House Bill 1466 General Funds. Total project cost remains the same.
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
30th Street Complete Streets: CO119 to CO7
Project Name:
30th Street Complete Streets: CO119 to CO7
Identification Number:
2022-061
Project Type:
Multimodal
Performance Measures:
Congestion, Safety
Affected Counties:
Boulder
Affected Municipalities:
Boulder
Subregion(s):
Boulder
Open to Public:
None
STIP-ID:
None
Project Scope:
Design complete street improvements along the corridor including protected bicycle facilities, enhanced bus stops, and improved pedestrian infrastructure and crossing treatments.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (MMOF - ARPA - DRCOG)
$180,000
$0
$0
$0
Federal (Transportation Alternatives-DRCOG)
$220,000
$0
$0
$0
State (House Bill 1466 - MMOF)
$200,000
$0
$0
$0
State (Legislative)
$300,000
$0
$0
$0
Local
$160,000
$0
$0
$0
Total
$1,060,000
$0
$0
$0
Project Phase to Initiate
Design
None
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$240,000
$1,060,000
$0
$1,300,000
Amendment History
Date Status Description
10/17/2024
Amended
Add $300,000 in state Legislative funding transferred from Project 2022-018. Total project cost increases.
09/19/2024
Amended
Shift $200,000 from Multimodal Transportation and Mitigation Options Fund - American Rescue Plan Act funds to House Bill 1466 General Funds. Total project cost remains the same.
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
Baseline Multimodal Improvements: 30th to Foothills
Project Name:
Baseline Multimodal Improvements: 30th to Foothills
Identification Number:
2022-062
Project Type:
Multimodal
Performance Measures:
Congestion, Safety, Transit Assets, Transit Safety
Affected Counties:
Boulder
Affected Municipalities:
Boulder
Subregion(s):
Boulder
Open to Public:
2026
STIP-ID:
None
Project Scope:
Design and construct multimodal improvements including bus stop improvements, separated bike lanes, bike parking, curb extensions, and intersection and crossing improvements.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Carbon Reduction Program)
$0
$878,000
$0
$0
State (MMOF)
$0
$1,463,000
$0
$0
Local
$0
$585,000
$0
$0
Total
$0
$2,926,000
$0
$0
Project Phase to Initiate
None
Construction
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$976,000
$2,926,000
$0
$3,902,000
Amendment History
Date Status Description
11/25/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
CO93/Table Mesa and Regent Intersection Improvements
Project Name:
CO93/Table Mesa and Regent Intersection Improvements
Identification Number:
2022-063
Project Type:
Multimodal
Performance Measures:
Congestion, Pavement Condition, Safety, Transit Assets, Transit Safety, Travel Time Reliability
Affected Counties:
Boulder
Affected Municipalities:
Boulder
Subregion(s):
Boulder
Open to Public:
2026
STIP-ID:
None
Project Scope:
Bus-only lanes at intersections, signal timing improvements, multi-use path realignment, and curb ramp upgrades.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congestion Mitigation / Air Quality)
$0
$930,000
$0
$0
State (Legislative)
$0
$0
$0
$0
State (MMOF)
$0
$1,550,000
$0
$0
Local
$0
$620,000
$0
$0
Total
$0
$3,100,000
$0
$0
Project Phase to Initiate
None
Construction
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$1,500,000
$3,100,000
$0
$4,600,000
Amendment History
Date Status Description
11/25/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
02/16/2023
Amended
Replace $1,500,000 in RPP funding with $1,500,000 in Legislative funding per CDOT R4.
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
CO119 Branding and Wayfinding Study: Boulder to Longmont
Project Name:
CO119 Branding and Wayfinding Study: Boulder to Longmont
Identification Number:
2022-064
Project Type:
Study
Performance Measures:
Congestion, Safety
Affected Counties:
Boulder
Affected Municipalities:
Boulder, Longmont, Unincorporated
Subregion(s):
Boulder
Open to Public:
None
STIP-ID:
None
Project Scope:
Study to develop consistent wayfinding signage between BRT stations, park-and-rides, commuter bikeway, and adjacent areas.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (MMOF - ARPA - DRCOG)
$0
$0
$0
$0
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
State (10 Year Plan-Capital Funds)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$350,000
$0
$0
$350,000
Amendment History
Date Status Description
12/19/2023
Amended
Swap federal Carbon Reduction Program funds for federal Surface Transportation Block Grant funds. Total project cost remains the same.
08/17/2023
Amended
Proposed for adoption into 2024-2027
02/16/2023
Amended
Replace $25,000 in RPP funds with $25,000 in 10C plans per CDOT DPD request.
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
Longmont Main/21st Bike/Ped Improvements - Precon
Project Name:
Longmont Main/21st Bike/Ped Improvements - Precon
Identification Number:
2022-065
Project Type:
Active Transportation
Performance Measures:
Congestion, Safety
Affected Counties:
Boulder
Affected Municipalities:
Longmont
Subregion(s):
Boulder
Open to Public:
None
STIP-ID:
None
Project Scope:
Study and design active transportation connections at the Main St. and 21st Ave. intersection.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congestion Mitigation / Air Quality)
$79,000
$320,000
$0
$0
State (MMOF)
$100,000
$400,000
$0
$0
Local
$21,000
$80,000
$0
$0
Total
$200,000
$800,000
$0
$0
Project Phase to Initiate
Study
Design
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$1,000,000
$0
$1,000,000
Amendment History
Date Status Description
11/25/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
Nederland Multimodal Transportation Plan
Project Name:
Nederland Multimodal Transportation Plan
Identification Number:
2022-066
Project Type:
Study
Performance Measures:
Congestion, Safety
Affected Counties:
Boulder
Affected Municipalities:
Nederland
Subregion(s):
Boulder
Open to Public:
None
STIP-ID:
None
Project Scope:
Study of existing conditions and plan for multimodal improvements including prioritized project list and implementation strategy.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (MMOF - ARPA - DRCOG)
$74,000
$0
$0
$0
Federal (Surface Transportation Block Grant)
$57,000
$0
$0
$0
Local
$18,000
$0
$0
$0
Total
$149,000
$0
$0
$0
Project Phase to Initiate
Study
None
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$51,000
$149,000
$0
$200,000
Amendment History
Date Status Description
12/19/2023
Amended
Swap federal Carbon Reduction Program funds for federal Surface Transportation Block Grant funds. Total project cost remains the same.
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
I25/Castle Pines Pkwy Bike/Ped Overpass - Precon
Project Name:
I25/Castle Pines Pkwy Bike/Ped Overpass - Precon
Identification Number:
2022-067
Project Type:
Active Transportation
Performance Measures:
Congestion, Safety
Affected Counties:
Douglas
Affected Municipalities:
Castle Pines
Subregion(s):
Douglas
Open to Public:
None
STIP-ID:
None
Project Scope:
Design a grade-separated bike/ped crossing over I25, just south of the Castle Pines Parkway bridge, and multimodal improvements at the Castle Pines Parkway interchange with I25.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congestion Mitigation / Air Quality)
$350,000
$0
$0
$0
Federal (MMOF - ARPA - DRCOG)
$250,000
$0
$0
$0
State (House Bill 1466 - MMOF)
$500,000
$0
$0
$0
Local
$400,000
$0
$0
$0
Total
$1,500,000
$0
$0
$0
Project Phase to Initiate
Design
None
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$1,500,000
$0
$1,500,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
11/21/2024
Amended
Adjust scope per Douglas County Subregional Forum action. No change to overall project cost.
09/19/2024
Amended
Shift $500,000 from Multimodal Transportation and Mitigation Options Fund - American Rescue Plan Act funds to House Bill 1466 General Funds. Total project cost remains the same.
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
Castle Rock Industrial Tributary Trail: Plum Creek to Plum Creek Trail
Project Name:
Castle Rock Industrial Tributary Trail: Plum Creek to Plum Creek Trail
Identification Number:
2022-068
Project Type:
Active Transportation
Performance Measures:
Congestion, Safety
Affected Counties:
Douglas
Affected Municipalities:
Castle Rock
Subregion(s):
Douglas
Open to Public:
2026
STIP-ID:
None
Project Scope:
Design and construct approximately one mile of 10' shared-use path connecting Philip S Miller Park to downtown Castle Rock.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congestion Mitigation / Air Quality)
$85,000
$253,000
$0
$0
State (MMOF)
$500,000
$4,082,000
$0
$0
Local
$415,000
$3,830,000
$0
$0
Total
$1,000,000
$8,165,000
$0
$0
Project Phase to Initiate
Design
Construction
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$9,165,000
$0
$9,165,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
Douglas County Transit & Multimodal Feasibility Study
Project Name:
Douglas County Transit & Multimodal Feasibility Study
Identification Number:
2022-069
Project Type:
Study
Performance Measures:
Congestion, Safety, Transit Assets, Transit Safety
Affected Counties:
Douglas
Affected Municipalities:
None
Subregion(s):
Douglas
Open to Public:
None
STIP-ID:
None
Project Scope:
Needs assessment and pilot project identification for transit and multimodal options in Douglas County.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Carbon Reduction Program)
$133,000
$0
$0
$0
Federal (MMOF - ARPA - DRCOG)
$200,000
$0
$0
$0
Local
$67,000
$0
$0
$0
Total
$400,000
$0
$0
$0
Project Phase to Initiate
Study
None
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$200,000
$400,000
$0
$600,000
Amendment History
Date Status Description
12/10/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
County Line Shared Use Path: Broadway to High Line Canal Trail
Project Name:
County Line Shared Use Path: Broadway to High Line Canal Trail
Identification Number:
2022-070
Project Type:
Active Transportation
Performance Measures:
Congestion, Safety
Affected Counties:
Douglas
Affected Municipalities:
Littleton
Subregion(s):
Douglas
Open to Public:
2026
STIP-ID:
None
Project Scope:
Design and construct a shared-use path along County Line Rd., bike improvements at Southpark Ln. intersection, and pave the High Line Canal Trail from the trailhead to the C-470 Trail.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Transportation Alternatives-DRCOG)
$45,000
$819,000
$0
$0
State (MMOF)
$75,000
$1,310,000
$0
$0
Local
$30,000
$491,000
$0
$0
Total
$150,000
$2,620,000
$0
$0
Project Phase to Initiate
ROW
Construction
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$560,000
$2,770,000
$0
$3,330,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
S Havana Bikeway: RidgeGate Station to Lone Tree City Limits
Project Name:
S Havana Bikeway: RidgeGate Station to Lone Tree City Limits
Identification Number:
2022-071
Project Type:
Active Transportation
Performance Measures:
Congestion, Safety
Affected Counties:
Douglas
Affected Municipalities:
Lone Tree
Subregion(s):
Douglas
Open to Public:
2026
STIP-ID:
None
Project Scope:
Construct 6' wide bike lanes and new protected intersection at RidgeGate Station.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congestion Mitigation / Air Quality)
$0
$300,000
$0
$0
State (MMOF)
$0
$800,000
$0
$0
Local
$0
$500,000
$0
$0
Total
$0
$1,600,000
$0
$0
Project Phase to Initiate
None
Construction
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$1,600,000
$0
$1,600,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
05/16/2023
Amended
Swap $300,000 in federal CRP funding for $300,000 in federal CMAQ funding. No change in total project cost.
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
Parker Rd Multi-Use Path East Side Gaps: Pine to Stroh
Project Name:
Parker Rd Multi-Use Path East Side Gaps: Pine to Stroh
Identification Number:
2022-072
Project Type:
Active Transportation
Performance Measures:
Congestion, Safety
Affected Counties:
Douglas
Affected Municipalities:
Parker
Subregion(s):
Douglas
Open to Public:
2026
STIP-ID:
None
Project Scope:
Construct a 10' wide shared-use path to fill in sidewalk gaps along Parker Rd. in key locations from Pine Dr. to Stroh Rd.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Carbon Reduction Program)
$0
$1,096,000
$0
$0
State (MMOF)
$0
$2,500,000
$0
$0
Local
$0
$1,404,000
$0
$0
Total
$0
$5,000,000
$0
$0
Project Phase to Initiate
None
Construction
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$5,000,000
$0
$5,000,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
32nd/I-70 Bike Lanes: Wright to Zinnia
Project Name:
32nd/I-70 Bike Lanes: Wright to Zinnia
Identification Number:
2022-073
Project Type:
Active Transportation
Performance Measures:
Congestion, Safety
Affected Counties:
Jefferson
Affected Municipalities:
Wheat Ridge
Subregion(s):
Jefferson
Open to Public:
2025
STIP-ID:
None
Project Scope:
Construct bike lanes under I-70 from Wright Ct. to Zinnia St.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congestion Mitigation / Air Quality)
$390,000
$0
$0
$0
State (House Bill 1466 - MMOF)
$500,000
$0
$0
$0
Local
$110,000
$0
$0
$0
Total
$1,000,000
$0
$0
$0
Project Phase to Initiate
Construction
None
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$1,000,000
$0
$1,000,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
09/19/2024
Amended
Shift $500,000 from Multimodal Transportation and Mitigation Options Fund - American Rescue Plan Act funds to House Bill 1466 General Funds. Total project cost remains the same.
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
Colorado Boulevard Bus Rapid Transit - Precon
Project Name:
Colorado Boulevard Bus Rapid Transit - Precon
Identification Number:
2022-074
Project Type:
Rapid Transit
Performance Measures:
Congestion, Safety, Transit Assets, Transit Safety
Affected Counties:
Regional
Affected Municipalities:
None
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
Regionwide pool for design and preconstruction activities for bus rapid transit (BRT) stations for arterial roads. Specific projects will not be listed.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
State (Legislative)
$1,664,000
$2,987,000
$5,000,000
$5,000,000
State (Legislative-Transit)
$4,000,000
$6,000,000
$5,000,000
$5,000,000
Local
$0
$0
$0
$0
Total
$5,664,000
$8,987,000
$10,000,000
$10,000,000
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$17,000,000
$34,651,000
$0
$51,651,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
10/18/2023
Amended
Add one pool project, transfer $13,349,000 in state Legislative funding and $10,000,000 in state Legislative-Transit funding to TIP ID# 2024-008. Total project cost decreases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
11/17/2022
Amended
Create new pool for design and preconstruction activities for arterial BRT in CDOT R1.
Project Pools This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name Description Notes Cost
Colorado Blvd Early Action, NEPA, & 30% Design $6,000,000
2024-2027 Transportation Improvement Program (Approved TIP)
I25/Speer and 23rd Interchange Reconstructions
Project Name:
I25/Speer and 23rd Interchange Reconstructions
Identification Number:
2022-075
Project Type:
Roadway Reconstruction
Performance Measures:
Freight Reliability, Travel Time Reliability
Affected Counties:
Denver
Affected Municipalities:
Denver
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
Preconstruction activities for the reconstruction of the I-25 interchange at Speer Blvd. and 23rd Ave.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
State (Legislative)
$11,500,000
$0
$0
$0
Local
$0
$0
$0
$0
Total
$11,500,000
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$3,500,000
$11,500,000
$0
$15,000,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
11/17/2022
Amended
Add new project for I-25 and Speer/23rd interchange reconstruction.
2024-2027 Transportation Improvement Program (Approved TIP)
I25 Improvements: 84th to 104th - Precon
Project Name:
I25 Improvements: 84th to 104th - Precon
Identification Number:
2022-076
Project Type:
Roadway Operational Improvements
Performance Measures:
Congestion, Safety, Travel Time Reliability
Affected Counties:
Adams
Affected Municipalities:
Northglenn, Thornton
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
Preconstruction activities for operational and safety improvements to I-25 between 84th Ave. and 104th Ave.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
State (Legislative)
$16,000,000
$0
$0
$0
Local
$0
$0
$0
$0
Total
$16,000,000
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$4,000,000
$16,000,000
$0
$20,000,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
11/17/2022
Amended
Add new project for operational and safety improvements to I-25 between 84th Ave. and 104th Ave.
2024-2027 Transportation Improvement Program (Approved TIP)
Region 4 Revitalizing Main Streets Pool
Project Name:
Region 4 Revitalizing Main Streets Pool
Identification Number:
2022-077
Project Type:
Multimodal
Performance Measures:
Congestion, Safety
Affected Counties:
Boulder, Weld
Affected Municipalities:
None
Subregion(s):
None
Open to Public:
None
STIP-ID:
SR47010
Project Scope:
In support of Colorado's state COVID-19 Recovery Plan, investments support local communities as they find innovative ways to reuse public spaces and help businesses reopen safely, while improving multimodal safety and accessibility along urban arterials.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
State (Legislative)
$250,000
$0
$0
$0
Local
$28,000
$0
$0
$0
Total
$278,000
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$2,400,000
$278,000
$0
$2,678,000
Amendment History
Date Status Description
11/26/2024
Proposed
Adopted into the 2026-2029 TIP.
02/22/2024
Amended
Add one pool project, $250,000 in state Legislative funding, and $28,000 in local match. Total project cost increases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
11/17/2022
Amended
Add new pool for Revitalizing Main Streets projects in CDOT R4.
Project Pools This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name Description Notes Cost
Boulder Colorado Ave. Multimodal Enhancements $1,120,000
Dacono Forest Ave. Street Improvements $800,000
Mead Town of Mead Regional Trail Extension Prior funding in TIP ID# 2007-144 $250,000
2024-2027 Transportation Improvement Program (Approved TIP)
Central Corridor Rail Replacement: I25/Broadway Station to 30th/Downing Station
Project Name:
Central Corridor Rail Replacement: I25/Broadway Station to 30th/Downing Station
Identification Number:
2022-078
Project Type:
Rapid Transit
Performance Measures:
Transit Assets, Transit Safety
Affected Counties:
Denver
Affected Municipalities:
Denver
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
Replace existing rail, switches, highblocks, concrete flatwork, and items associated with the rail alignment along the Central Corridor.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congressional Allocation-Transit)
$850,000
$0
$0
$0
Local
$213,000
$0
$0
$0
Total
$1,063,000
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$4,000,000
$1,063,000
$0
$5,063,000
Amendment History
Date Status Description
06/26/2024
Amended
Add $850,000 in federal Congressional Allocation funding. Total project cost increases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
02/16/2023
Amended
Add new project with $4,000,000 of (unmatched) FY 2023 Appropriations Act for Community Projects funding.
2024-2027 Transportation Improvement Program (Approved TIP)
Region 1 Vision Zero Pool
Project Name:
Region 1 Vision Zero Pool
Identification Number:
2022-079
Project Type:
Safety
Performance Measures:
Safety
Affected Counties:
Adams, Arapahoe, Broomfield, Denver, Douglas, Jefferson
Affected Municipalities:
None
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
CDOT Region 1 Vision Zero Pool. Funds improvements related to Vision Zero.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
State (Legislative)
$0
$5,000,000
$0
$0
Local
$0
$0
$0
$0
Total
$0
$5,000,000
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$10,000,000
$5,000,000
$0
$15,000,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
10/18/2023
Amended
Correct FY 2025 funding amount to $5,000,000. Overall project cost decreases.
09/21/2023
Amended
Add three new pool projects and correct FY2025 funding amount to $7,000,000. Overall project cost decreases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
02/16/2023
Amended
Create new pool for improvements related to Vision Zero in CDOT R1.
Project Pools This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name Description Notes Cost
Sheridan Blvd Multimodal Improvements 17th to 26th $6,000,000
S Federal Median/Signal Project Belleview to Hampden $6,000,000
Bike/Ped Safety Project 5 Locations in Aurora and Bennett $3,000,000
2024-2027 Transportation Improvement Program (Approved TIP)
I25 Segment 5: CO66 to WCR38
Project Name:
I25 Segment 5: CO66 to WCR38
Identification Number:
2022-080
Project Type:
Roadway Capacity
Performance Measures:
Bridge Condition, Freight Reliability, Pavement Condition, Travel Time Reliability
Affected Counties:
Weld
Affected Municipalities:
Mead
Subregion(s):
None
Open to Public:
None
STIP-ID:
SSP4428.017
Project Scope:
Design and construct one new express lane in each direction on the DRCOG portion of Segment 5 (SH-66 to WCR 38). Project also includes replacement/rehabilitation of key bridges, ITS, transit & safety components, multimodal options, replacement of portions of existing facility, and interchange improvements, as well as work on High Plains Boulevard from CO66 to WCR34 parallel to I25.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congressional Allocation)
$0
$1,000,000
$0
$0
Federal (TIFIA)
$185,282,000
$0
$0
$0
State (Legislative)
$19,200,000
$0
$0
$0
Local
$0
$1,258,000
$0
$0
Total
$204,482,000
$2,258,000
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$4,000,000
$206,740,000
$0
$210,740,000
Amendment History
Date Status Description
01/30/2025
Proposed
Adopted into the 2026-2029 TIP.
01/29/2025
Amended
Add $50,000 local match funding. Total project cost increases.
11/21/2024
Amended
Add scope and funding for High Plains Boulevard from 2024-090. Total project cost increases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
05/16/2023
Amended
Add $11,000,000 in state Legislative funding and $185,282,000 in federal TIFIA loans. Total project cost increases.
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
U85/168th Intersection Improvements
Project Name:
U85/168th Intersection Improvements
Identification Number:
2022-081
Project Type:
Roadway Operational Improvements
Performance Measures:
Congestion, Travel Time Reliability, Safety
Affected Counties:
Weld
Affected Municipalities:
Brighton
Subregion(s):
None
Open to Public:
None
STIP-ID:
SR46600.109
Project Scope:
Replace the signals on all four corners, add separate left turn lanes along 168th Ave. and an eastbound acceleration lane. Improvement of the radii for the right turning movements in the intersection.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
State (10 Year Plan-Capital Funds)
$300,000
$0
$0
$0
Total
$300,000
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$610,000
$300,000
$0
$910,000
Amendment History
Date Status Description
11/26/2024
Proposed
Adopted into the 2026-2029 TIP.
04/18/2024
Amended
Add $300,000 in state 10-Year Capital Plan funds. Total project cost increases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
03/16/2023
Amended
Add new project with 10C funding.
2024-2027 Transportation Improvement Program (Approved TIP)
Arapahoe Ave Multimodal Improvements: 28th to Foothills - Precon
Project Name:
Arapahoe Ave Multimodal Improvements: 28th to Foothills - Precon
Identification Number:
2022-082
Project Type:
Roadway Operational Improvements
Performance Measures:
Congestion, Freight Reliability, Pavement Condition, Safety, Transit Assets, Travel Time Reliability
Affected Counties:
Boulder
Affected Municipalities:
Boulder
Subregion(s):
Adams, Boulder, Broomfield
Open to Public:
None
STIP-ID:
None
Project Scope:
Develop preliminary and environmental engineering and identify ROW and utility needs on CO7 from 28th St to Foothills Pkwy in Boulder. Perform design and environmental work associated with passenger vehicle, transit, and active transportation improvements along the CO7 corridor. Note: work outside the City of Boulder included in TIP# 2020-007
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congestion Mitigation / Air Quality)
$206,000
$947,000
$0
$0
State (10 Year Plan-Mobility Funds)
$0
$281,000
$0
$0
State (Legislative)
$0
$59,000
$0
$0
State (MMOF)
$270,000
$1,034,000
$0
$0
Local
$69,000
$101,000
$0
$0
Total
$545,000
$2,422,000
$0
$0
Project Phase to Initiate
Design
Design
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$2,967,000
$0
$2,967,000
Amendment History
Date Status Description
12/20/2024
Proposed
Adopted into the 2026-2029 TIP.
12/20/2024
Amended
Switch $281,000 from state Legislative funding to state 10 Year Plan - Mobility funds. Total project cost remains the same.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/24/2023
Amended
Create new project split from TIP# 2020-007 for improvements within City of Boulder.
2024-2027 Transportation Improvement Program (Approved TIP)
I70/Harvest Interchange TDM Plan
Project Name:
I70/Harvest Interchange TDM Plan
Identification Number:
2022-083
Project Type:
Multimodal
Performance Measures:
Freight Reliability, Travel Time Reliability
Affected Counties:
Adams, Arapahoe
Affected Municipalities:
Aurora
Subregion(s):
None
Open to Public:
None
STIP-ID:
SST7080.028
Project Scope:
TDM improvements for new I70/Harvest Rd Interchange for CDOT Policy Directive 1601 compliance.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
State (Office of Innovative Mobility)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$2,000,000
$0
$0
$2,000,000
Amendment History
Date Status Description
08/17/2023
Amended
Add new project.
05/16/2023
Amended
Add new project.
2024-2027 Transportation Improvement Program (Approved TIP)
Mineral Multimodal Improvements: Santa Fe to Jackass Hill/Long Ave
Project Name:
Mineral Multimodal Improvements: Santa Fe to Jackass Hill/Long Ave
Identification Number:
2022-084
Project Type:
Multimodal
Performance Measures:
Congestion, Safety
Affected Counties:
Arapahoe
Affected Municipalities:
Littleton
Subregion(s):
None
Open to Public:
2025
STIP-ID:
None
Project Scope:
Reconstruct the Mineral Ave and Jackass Hill Rd/Long Ave intersection to improve safety for non-motorized users, and widen the Mineral Trail between Jackass Hill Rd/Long Ave and Mineral LRT station.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$2,089,000
$0
$0
$0
Local
$522,000
$0
$0
$0
Total
$2,611,000
$0
$0
$0
Project Phase to Initiate
Construction
None
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$2,611,000
$0
$2,611,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
05/16/2023
Amended
Transfer $2,089,000 in Surface Transportation Block Grant funding from TIP ID# 2012-010 for their Second Commitment in Principal amount to be applied toward multimodal access improvements to Mineral Station.
2024-2027 Transportation Improvement Program (Approved TIP)
I70/Harvest Interchange
Project Name:
I70/Harvest Interchange
Identification Number:
2022-085
Project Type:
Roadway Capacity
Performance Measures:
Freight Reliability, Travel Time Reliability
Affected Counties:
Adams, Arapahoe
Affected Municipalities:
Aurora
Subregion(s):
None
Open to Public:
2025
STIP-ID:
None
Project Scope:
Construct a new interchange at I70 and Harvest Rd
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Local
$26,000,000
$0
$0
$0
Total
$26,000,000
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$4,000,000
$26,000,000
$0
$30,000,000
Amendment History
Date Status Description
08/17/2023
Amended
Proposed for adoption into 2024-2027
06/05/2023
Amended
Add new locally funded project.
2024-2027 Transportation Improvement Program (Approved TIP)
Peoria St Bridge Replacement: Over Sand Creek - Precon
Project Name:
Peoria St Bridge Replacement: Over Sand Creek - Precon
Identification Number:
2024-001
Project Type:
Roadway - Bridge
Performance Measures:
Bridge Condition, Congestion, Pavement Condition, Safety, Travel Time Reliability
Affected Counties:
Adams
Affected Municipalities:
Aurora
Subregion(s):
Regional
Open to Public:
None
STIP-ID:
None
Project Scope:
Preconstruction activities for the replacement of the the Peoria St. bridge, which includes widening the roadway to six lanes, 10-14' multi-use paths on both sides, connections to Sand Creek Regional Trail under the bridge, and filling sidewalk gaps along Peoria between 30th Ave. and Fitzsimons Pkwy.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$1,080,000
$720,000
$0
$0
Local
$720,000
$480,000
$0
$0
Total
$1,800,000
$1,200,000
$0
$0
Project Phase to Initiate
Design
Design
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$3,000,000
$0
$3,000,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Add new project from 2024-2027 Regional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
DRCOG Transportation Corridor Planning Set Aside
Project Name:
DRCOG Transportation Corridor Planning Set Aside
Identification Number:
2024-002
Project Type:
Study
Performance Measures:
Congestion, Freight Reliability, Safety, Transit Safety
Affected Counties:
Regional
Affected Municipalities:
None
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
Transportation corridor studies as part of the Corridors, Community, Livability, and Innovative Planning (CCLIP) Set-Aside.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$250,000
$0
$1,500,000
$0
Local
$0
$0
$0
$0
Total
$250,000
$0
$1,500,000
$0
Project Phase to Initiate
Study
None
Study
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$1,750,000
$0
$1,750,000
Amendment History
Date Status Description
12/10/2024
Proposed
Adopted into the 2026-2029 TIP.
05/16/2024
Amended
Transfer all funding into 2024 and 2026. Total project cost remains the same.
10/18/2023
Amended
Remove $1,250,000 to program to individual corridor planning projects. Total project cost decreases.
08/17/2023
Amended
Adopt into the 24-27 TIP.
2024-2027 Transportation Improvement Program (Approved TIP)
DRCOG Community Mobility Planning Set-Aside - Community-Based Transportation Plans
Project Name:
DRCOG Community Mobility Planning Set-Aside - Community-Based Transportation Plans
Identification Number:
2024-003
Project Type:
Study
Performance Measures:
Congestion, Safety, Transit Safety, Travel Time Reliability
Affected Counties:
Regional
Affected Municipalities:
None
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
Community transportation plans as part of the Corridors, Community, Livability, and Innovative Planning (CCLIP) Set-Aside.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$50,000
$0
$1,250,000
$0
Local
$0
$0
$0
$0
Total
$50,000
$0
$1,250,000
$0
Project Phase to Initiate
Study
None
Study
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$1,300,000
$0
$1,300,000
Amendment History
Date Status Description
12/10/2024
Proposed
Adopted into the 2026-2029 TIP.
05/16/2024
Amended
Transfer all funding into 2024 and 2026. Total project cost remains the same.
04/18/2024
Amended
Remove $1,200,000 to program to individual community-based transportation planning projects. Total project cost decreases.
08/17/2023
Amended
Amended into the 24-27 TIP
2024-2027 Transportation Improvement Program (Approved TIP)
DRCOG Community Mobility Planning Set-Aside - Livable Centers Small-Area Planning
Project Name:
DRCOG Community Mobility Planning Set-Aside - Livable Centers Small-Area Planning
Identification Number:
2024-004
Project Type:
Study
Performance Measures:
Congestion, Safety, Travel Time Reliability
Affected Counties:
Regional
Affected Municipalities:
None
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
Livable centers small-area planning as part of the Corridors, Community, Livability, and Innovative Planning (CCLIP) Set-Aside.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$110,000
$0
$1,250,000
$0
Local
$0
$0
$0
$0
Total
$110,000
$0
$1,250,000
$0
Project Phase to Initiate
Study
None
Study
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$1,360,000
$0
$1,360,000
Amendment History
Date Status Description
12/20/2024
Proposed
Adopted into the 2026-2029 TIP.
12/20/2024
Amended
Remove $1,140,000 awarded to individual projects. Total project cost decreases.
05/16/2024
Amended
Shift all funding into 2024 and 2026. Total project cost remains the same.
08/17/2023
Amended
Amend into the 24-27 TIP.
2024-2027 Transportation Improvement Program (Approved TIP)
DRCOG Innovative Mobility Set Aside
Project Name:
DRCOG Innovative Mobility Set Aside
Identification Number:
2024-005
Project Type:
Multimodal
Performance Measures:
Congestion, Freight Reliability, Safety, Transit Safety, Travel Time Reliability
Affected Counties:
Regional
Affected Municipalities:
None
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
Innovative Mobility as part of the Corridors, Community, Livability, and Innovative Planning (CCLIP) Set-Aside.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$550,000
$0
$2,000,000
$0
Local
$0
$0
$0
$0
Total
$550,000
$0
$2,000,000
$0
Project Phase to Initiate
Other Phase
None
Other Phase
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$2,550,000
$0
$2,550,000
Amendment History
Date Status Description
12/20/2024
Proposed
Adopted into the 2026-2029 TIP.
12/20/2024
Amended
Reduce funding by $1,450,000, distributed to newly awarded set-aside projects. Total project cost decreases.
05/16/2024
Amended
Shift all funding into 2024 and 2026. Total project cost remains the same.
08/17/2023
Amended
Adopted into the 24-27 TIP.
2024-2027 Transportation Improvement Program (Approved TIP)
CO7 Transit Service: Boulder to Brighton
Project Name:
CO7 Transit Service: Boulder to Brighton
Identification Number:
2024-006
Project Type:
Transit Service
Performance Measures:
Congestion, Transit Assets
Affected Counties:
Adams, Boulder, Broomfield, Weld
Affected Municipalities:
Boulder, Brighton, Broomfield, Erie, Lafayette, Thornton, Unincorporated
Subregion(s):
Regional, Adams, Boulder, Broomfield, SW Weld
Open to Public:
None
STIP-ID:
None
Project Scope:
New transit service along SH-7 between Downtown Boulder and Downtown Brighton operating at 30-minute headways.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congestion Mitigation / Air Quality)
$0
$0
$2,561,000
$4,303,000
Federal (Congestion Mitigation/Air Quality - CDOT)
$0
$0
$375,000
$375,000
Local
$0
$0
$586,000
$1,014,000
Local (RTD Funds Only)
$0
$0
$50,000
$0
Total
$0
$0
$3,572,000
$5,692,000
Project Phase to Initiate
None
None
Bus Service - Year 1
Bus Service - Year 2
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$9,264,000
$0
$9,264,000
Amendment History
Date Status Description
12/19/2024
Proposed
Adopted into the 2026-2029 TIP.
12/19/2024
Amended
Switch state Legislative-Transit and Regional Priority Project funding for state-allocated federal Congestion Mitigation/Air Quality funds. Total project cost remains the same.
08/17/2023
Amended
Add new project from 2024-2027 Regional and Subregional Shares Calls for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
Federal Blvd Bus Rapid Transit: Englewood Station to Wagon Road Park-n-Ride - Precon
Project Name:
Federal Blvd Bus Rapid Transit: Englewood Station to Wagon Road Park-n-Ride - Precon
Identification Number:
2024-008
Project Type:
Rapid Transit
Performance Measures:
Congestion, Safety, Transit Assets, Transit Safety
Affected Counties:
Adams, Arapahoe, Denver
Affected Municipalities:
Denver, Englewood, Westminster, Unincorporated
Subregion(s):
Regional, Adams
Open to Public:
None
STIP-ID:
None
Project Scope:
Design, environmental, and early action projects associated with side-running BRT on Federal from Englewood Station to Wagon Road Park-n-Ride. Final project will involve enhanced bus stops, sidewalk improvements, transit lane striping, and operational improvements including transit signal priority.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Carbon Reduction Program)
$0
$340,000
$0
$0
Federal (Surface Transportation Block Grant)
$0
$4,512,000
$8,122,000
$4,017,000
State (House Bill 1466 - MMOF)
$0
$439,000
$0
$0
State (Legislative)
$5,336,000
$4,013,000
$2,000,000
$2,000,000
State (Legislative-Transit)
$6,000,000
$8,063,000
$5,453,000
$8,133,000
Local
$0
$3,050,000
$1,750,000
$0
Local (RTD Funds Only)
$0
$1,000,000
$0
$0
Total
$11,336,000
$21,417,000
$17,325,000
$14,150,000
Project Phase to Initiate
None
Design
Design
ROW
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$64,228,000
$0
$64,228,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
09/19/2024
Amended
Shift $439,000 from Multimodal Transportation and Mitigation Options Fund - American Rescue Plan Act funds to House Bill 1466 General Funds. Total project cost remains the same.
02/22/2024
Amended
Add $340,000 in federal Carbon Reduction Program funds and $439,000 in federal Multimodal Transportation and Mitigation Options Fund - American Rescue Plan Act fund transferred from TIP ID# 2022-053. Total project cost increases.
10/18/2023
Amended
Add $13,349,000 in state Legislative funding and $10,000,000 in state Legislative-Transit funding transferred from TIP ID# 2022-074. Total project cost increases.
08/17/2023
Amended
Add new project from 2024-2027 Regional and Subregional Shares Calls for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
South Platte River Trail Improvements: Bayaud to Phil Milstein Park
Project Name:
South Platte River Trail Improvements: Bayaud to Phil Milstein Park
Identification Number:
2024-009
Project Type:
Active Transportation
Performance Measures:
Congestion, Safety
Affected Counties:
Denver
Affected Municipalities:
Denver
Subregion(s):
Regional
Open to Public:
2028
STIP-ID:
None
Project Scope:
Widen existing 8' trail to 12' concrete trail with 4' crusher fine shoulder, and relocate 2500' feet of trail across the South Platte River to separate it from interstate traffic. Project also includes a pedestrian plaza and trail amenities.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Carbon Reduction Program)
$0
$0
$4,250,000
$4,250,000
State (Regional Priority Projects)
$0
$0
$500,000
$500,000
Local
$0
$0
$1,050,000
$1,050,000
Total
$0
$0
$5,800,000
$5,800,000
Project Phase to Initiate
None
None
Construction
Construction
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$11,600,000
$0
$11,600,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Add new project from 2024-2027 Regional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
SW Weld County Transit First and Last Mile Study
Project Name:
SW Weld County Transit First and Last Mile Study
Identification Number:
2024-010
Project Type:
Study
Performance Measures:
Congestion, Transit Safety
Affected Counties:
Weld
Affected Municipalities:
Erie, Dacono, Frederick
Subregion(s):
Regional
Open to Public:
None
STIP-ID:
None
Project Scope:
Needs analysis, alternatives identification, and funding strategies for future transit service, and prioritization of multimodal access to future mobility hubs in Southwest Weld County.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$0
$67,000
$0
$0
State (MMOF)
$0
$83,000
$0
$0
Local
$0
$17,000
$0
$0
Total
$0
$167,000
$0
$0
Project Phase to Initiate
None
Study
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$167,000
$0
$167,000
Amendment History
Date Status Description
12/10/2024
Proposed
Adopted into the 2026-2029 TIP.
12/19/2023
Amended
Swap federal Carbon Reduction Program funds for federal Surface Transportation Block Grant funds. Total project cost remains the same.
08/17/2023
Amended
Add new project from 2024-2027 Regional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
Light Rail Level Boarding Feasibility Study
Project Name:
Light Rail Level Boarding Feasibility Study
Identification Number:
2024-011
Project Type:
Study
Performance Measures:
Safety, Transit Assets, Transit Safety
Affected Counties:
Regional
Affected Municipalities:
None
Subregion(s):
Regional
Open to Public:
None
STIP-ID:
None
Project Scope:
Best practices review, existing conditions assessment, fleet transition plan, and implementation roadmap for transitioning to accessible level-boarding at light rail stations.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$1,200,000
$0
$0
$0
Local
$300,000
$0
$0
$0
Total
$1,500,000
$0
$0
$0
Project Phase to Initiate
Study
None
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$1,500,000
$0
$1,500,000
Amendment History
Date Status Description
11/15/2023
Amended
Shift all funding to Fiscal Year 2024. Total project cost remains the same.
08/17/2023
Amended
Add new project from 2024-2027 Regional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
Adams County Comprehensive Safety Action Plan
Project Name:
Adams County Comprehensive Safety Action Plan
Identification Number:
2024-012
Project Type:
Safety
Performance Measures:
Safety
Affected Counties:
Adams, Arapahoe, Jefferson, Weld
Affected Municipalities:
Arvada, Aurora, Bennett, Brighton, Commerce City, Federal Heights, Northglenn, Thornton, Westminster, Unincorporated, Lochbuie
Subregion(s):
Adams
Open to Public:
None
STIP-ID:
None
Project Scope:
Develop a comprehensive safety action plan for unincorporated Adams County, as well as each of the municipalities of Arvada, Aurora, Bennett, Brighton, Commerce City, Federal Heights, Lochbuie, Northglenn, Thornton, and Westminster.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$400,000
$800,000
$400,000
$0
Local
$100,000
$200,000
$100,000
$0
Total
$500,000
$1,000,000
$500,000
$0
Project Phase to Initiate
Study
Study
Study
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$2,000,000
$0
$2,000,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Add new project from 2024-2027 Subregional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
High Line Canal Trail Underpass at Colfax
Project Name:
High Line Canal Trail Underpass at Colfax
Identification Number:
2024-013
Project Type:
Active Transportation
Performance Measures:
Congestion, Safety
Affected Counties:
Adams, Arapahoe
Affected Municipalities:
Aurora
Subregion(s):
Arapahoe, Adams
Open to Public:
None
STIP-ID:
None
Project Scope:
Design and construct 16' wide, 12' tall underpass for the High Line Canal Trail under Colfax Ave just east of Laredo St
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congestion Mitigation / Air Quality)
$0
$1,400,000
$2,600,000
$4,800,000
Federal (Surface Transportation Block Grant)
$0
$600,000
$0
$0
Federal (Transportation Alternatives-DRCOG)
$0
$0
$200,000
$0
Local
$0
$500,000
$700,000
$1,200,000
Total
$0
$2,500,000
$3,500,000
$6,000,000
Project Phase to Initiate
None
Design
ROW
Construction
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$12,000,000
$0
$12,000,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Add new project from 2024-2027 Subregional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
McKay Operational Improvements: 104th to 96th - Precon
Project Name:
McKay Operational Improvements: 104th to 96th - Precon
Identification Number:
2024-014
Project Type:
Roadway Operational Improvements
Performance Measures:
Congestion, Safety, Travel Time Reliability
Affected Counties:
Adams
Affected Municipalities:
Thornton, Unincorporated
Subregion(s):
Adams
Open to Public:
None
STIP-ID:
None
Project Scope:
Design and environmental for operational improvements along McKay Rd. including intersection operational improvements and a grade separation of the Front Range Trail crossing.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$100,000
$700,000
$200,000
$0
Local
$100,000
$700,000
$200,000
$0
Total
$200,000
$1,400,000
$400,000
$0
Project Phase to Initiate
Design
Design
Environmental
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$2,000,000
$0
$2,000,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Add new project from 2024-2027 Subregional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
124th Multimodal Improvements: Claude to Colorado
Project Name:
124th Multimodal Improvements: Claude to Colorado
Identification Number:
2024-015
Project Type:
Active Transportation
Performance Measures:
Congestion, Safety
Affected Counties:
Adams
Affected Municipalities:
Thornton
Subregion(s):
Adams
Open to Public:
2028
STIP-ID:
None
Project Scope:
Design and environmental for bike/ped facilities and roadway traffic calming from Claude Ct to Colorado Blvd. The project will also fund right-of-way acquisition and construction from York St to Fillmore St, including the York St intersection.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congestion Mitigation / Air Quality)
$0
$644,000
$44,000
$1,844,000
State (MMOF)
$0
$804,000
$54,000
$2,304,000
Local
$0
$161,000
$11,000
$461,000
Total
$0
$1,609,000
$109,000
$4,609,000
Project Phase to Initiate
None
Design
ROW
Construction
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$6,327,000
$0
$6,327,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Add new project from 2024-2027 Subregional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
Big Dry Creek Trail: 136th to 144th
Project Name:
Big Dry Creek Trail: 136th to 144th
Identification Number:
2024-016
Project Type:
Active Transportation
Performance Measures:
Congestion, Safety
Affected Counties:
Adams
Affected Municipalities:
Thornton
Subregion(s):
Adams
Open to Public:
2028
STIP-ID:
None
Project Scope:
Construct a multi-use path with gravel shoulders along Big Dry Creek.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Carbon Reduction Program)
$0
$150,000
$1,125,000
$1,125,000
State (MMOF)
$0
$250,000
$1,375,000
$1,375,000
Local
$0
$100,000
$250,000
$250,000
Total
$0
$500,000
$2,750,000
$2,750,000
Project Phase to Initiate
None
Design
Construction
Construction
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$6,000,000
$0
$6,000,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Add new project from 2024-2027 Subregional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
Colorado Blvd Separated Bike Facility: 88th to E470 - Precon
Project Name:
Colorado Blvd Separated Bike Facility: 88th to E470 - Precon
Identification Number:
2024-017
Project Type:
Active Transportation
Performance Measures:
Congestion, Safety
Affected Counties:
Adams
Affected Municipalities:
Thornton
Subregion(s):
Adams
Open to Public:
None
STIP-ID:
None
Project Scope:
Design a separated bike facility along 8.25 miles of Colorado Blvd. including determining type of facility along different sections of the roadway.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Transportation Alternatives-DRCOG)
$0
$0
$0
$821,000
State (MMOF)
$0
$0
$0
$1,026,000
Local
$0
$0
$0
$206,000
Total
$0
$0
$0
$2,053,000
Project Phase to Initiate
None
None
None
Design
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$2,053,000
$0
$2,053,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Add new project from 2024-2027 Subregional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
Thornton Pkwy Multiuse Path: I25 to Grant
Project Name:
Thornton Pkwy Multiuse Path: I25 to Grant
Identification Number:
2024-018
Project Type:
Active Transportation
Performance Measures:
Congestion, Safety
Affected Counties:
Adams
Affected Municipalities:
Thornton
Subregion(s):
Adams
Open to Public:
2028
STIP-ID:
None
Project Scope:
Design and construct a multi-use path on the south side of Thornton Pkwy., including lighting, landscaping, and retaining wall.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congestion Mitigation / Air Quality)
$0
$0
$160,000
$636,000
State (MMOF)
$0
$0
$200,000
$796,000
Local
$0
$0
$40,000
$160,000
Total
$0
$0
$400,000
$1,592,000
Project Phase to Initiate
None
None
Design
Construction
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$1,992,000
$0
$1,992,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Add new project from 2024-2027 Subregional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
Easter Trail Study: Cherry Creek Trail to Parker Rd
Project Name:
Easter Trail Study: Cherry Creek Trail to Parker Rd
Identification Number:
2024-019
Project Type:
Study
Performance Measures:
Congestion, Safety
Affected Counties:
Arapahoe
Affected Municipalities:
Aurora, Foxfield
Subregion(s):
Arapahoe
Open to Public:
None
STIP-ID:
None
Project Scope:
Study the proposed Easter Trail to connect the Cherry Creek Trail with neighborhoods east of Parker Rd.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congestion Mitigation / Air Quality)
$0
$0
$160,000
$0
Local
$0
$0
$40,000
$0
Total
$0
$0
$200,000
$0
Project Phase to Initiate
None
None
Study
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$200,000
$0
$200,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Add new project from 2024-2027 Subregional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
13th Ave Multimodal Improvements: Yosemite to High Line Canal Trail - Precon
Project Name:
13th Ave Multimodal Improvements: Yosemite to High Line Canal Trail - Precon
Identification Number:
2024-020
Project Type:
Active Transportation
Performance Measures:
Congestion, Safety
Affected Counties:
Arapahoe
Affected Municipalities:
Aurora
Subregion(s):
Arapahoe
Open to Public:
None
STIP-ID:
None
Project Scope:
Design improvements along the corridor including: 8-10' wide shared-use path, 5-6' wide sidewalks, curb extensions, crosswalk and sharrow markings, roadway and pedestrian-scale lighting, 2 raised intersections, 6 raised crosswalks, and a mid-block crossing with an RRFB.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congestion Mitigation / Air Quality)
$0
$630,000
$270,000
$0
Local
$0
$420,000
$180,000
$0
Total
$0
$1,050,000
$450,000
$0
Project Phase to Initiate
None
Design
Design
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$1,500,000
$0
$1,500,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Add new project from 2024-2027 Subregional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
Gun Club Multimodal Capacity Improvements: Quincy to Aurora Pkwy - Precon
Project Name:
Gun Club Multimodal Capacity Improvements: Quincy to Aurora Pkwy - Precon
Identification Number:
2024-021
Project Type:
Roadway Capacity
Performance Measures:
Congestion, Freight Reliability, Pavement Condition, Travel Time Reliability
Affected Counties:
Arapahoe
Affected Municipalities:
Aurora, Unincorporated
Subregion(s):
Arapahoe
Open to Public:
None
STIP-ID:
None
Project Scope:
Preconstruction activities for capacity, operational, and multimodal improvements on Gun Club Rd between Quincy Ave and Aurora Pkwy.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$0
$600,000
$600,000
$300,000
Local
$0
$400,000
$400,000
$200,000
Total
$0
$1,000,000
$1,000,000
$500,000
Project Phase to Initiate
None
Environmental
Design
Design
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$2,500,000
$0
$2,500,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Add new project from 2024-2027 Subregional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
I225 & Alameda Bridge Replacement - Precon
Project Name:
I225 & Alameda Bridge Replacement - Precon
Identification Number:
2024-022
Project Type:
Roadway - Bridge
Performance Measures:
Bridge Condition, Pavement Condition
Affected Counties:
Arapahoe
Affected Municipalities:
Aurora
Subregion(s):
Arapahoe
Open to Public:
None
STIP-ID:
None
Project Scope:
Environmental and design to replace the Alameda Ave bridge over I225 to include intersection operational improvements, 10-14' wide separated multi-use paths on both sides, and lighting.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$900,000
$900,000
$0
$0
State (Regional Priority Projects)
$300,000
$300,000
$0
$0
Local
$300,000
$300,000
$0
$0
Total
$1,500,000
$1,500,000
$0
$0
Project Phase to Initiate
Environmental
Design
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$3,000,000
$0
$3,000,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Add new project from 2024-2027 Subregional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
Colorado Blvd Multimodal Improvements: Arapahoe to Dry Creek
Project Name:
Colorado Blvd Multimodal Improvements: Arapahoe to Dry Creek
Identification Number:
2024-023
Project Type:
Active Transportation
Performance Measures:
Congestion, Safety
Affected Counties:
Arapahoe
Affected Municipalities:
Centennial
Subregion(s):
Arapahoe
Open to Public:
2028
STIP-ID:
None
Project Scope:
Reduce roadway from 5-3 lanes, and construct a separated bike/ped facility.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Transportation Alternatives-DRCOG)
$0
$0
$1,866,000
$1,865,000
State (MMOF)
$0
$0
$2,340,000
$2,340,000
Local
$0
$0
$475,000
$475,000
Total
$0
$0
$4,681,000
$4,680,000
Project Phase to Initiate
None
None
Construction
Construction
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$9,361,000
$0
$9,361,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Add new project from 2024-2027 Subregional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
Havana/Easter Intersection Operational Improvements
Project Name:
Havana/Easter Intersection Operational Improvements
Identification Number:
2024-024
Project Type:
Roadway Operational Improvements
Performance Measures:
Congestion, Safety, Travel Time Reliability
Affected Counties:
Arapahoe
Affected Municipalities:
Centennial
Subregion(s):
Arapahoe
Open to Public:
2028
STIP-ID:
None
Project Scope:
Multimodal intersection operational improvements to improve traffic operations and multimodal travel.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$0
$0
$5,720,000
$5,720,000
Local
$0
$0
$2,452,000
$2,452,000
Total
$0
$0
$8,172,000
$8,172,000
Project Phase to Initiate
None
None
Construction
Construction
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$16,344,000
$0
$16,344,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Add new project from 2024-2027 Subregional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
Bowles Corridor Study: Sheridan to Santa Fe
Project Name:
Bowles Corridor Study: Sheridan to Santa Fe
Identification Number:
2024-025
Project Type:
Study
Performance Measures:
Congestion, Freight Reliability, Safety, Travel Time Reliability
Affected Counties:
Arapahoe
Affected Municipalities:
Littleton
Subregion(s):
Arapahoe
Open to Public:
None
STIP-ID:
None
Project Scope:
Multimodal corridor study evaluating safety, transit access, bike/ped, congestion, intersection operations, and land use and economic development.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$0
$0
$300,000
$299,000
Local
$0
$0
$76,000
$75,000
Total
$0
$0
$376,000
$374,000
Project Phase to Initiate
None
None
Study
Study
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$750,000
$0
$750,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Add new project from 2024-2027 Subregional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
30th St Multimodal Improvements: Colorado to Baseline
Project Name:
30th St Multimodal Improvements: Colorado to Baseline
Identification Number:
2024-026
Project Type:
Multimodal
Performance Measures:
Congestion, Safety
Affected Counties:
Boulder
Affected Municipalities:
Boulder
Subregion(s):
Boulder
Open to Public:
2028
STIP-ID:
None
Project Scope:
Design and construct multimodal improvements, including raised protected bicycle lanes, wider sidewalks, protected intersections, transit enhancements, and enhanced crossings.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congestion Mitigation / Air Quality)
$0
$0
$1,460,000
$1,540,000
Local
$0
$0
$365,000
$385,000
Total
$0
$0
$1,825,000
$1,925,000
Project Phase to Initiate
None
None
Design
Construction
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$3,750,000
$0
$3,750,000
Amendment History
Date Status Description
11/26/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Add new project from 2024-2027 Subregional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
Folsom Multimodal Study: Pine to Colorado
Project Name:
Folsom Multimodal Study: Pine to Colorado
Identification Number:
2024-027
Project Type:
Study
Performance Measures:
Congestion, Safety
Affected Counties:
Boulder
Affected Municipalities:
Boulder
Subregion(s):
Boulder
Open to Public:
None
STIP-ID:
None
Project Scope:
Corridor study to evaluate multimodal and safety improvements.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congestion Mitigation / Air Quality)
$0
$0
$1,000,000
$0
Local
$0
$0
$450,000
$0
Total
$0
$0
$1,450,000
$0
Project Phase to Initiate
None
None
Study
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$1,450,000
$0
$1,450,000
Amendment History
Date Status Description
11/26/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Add new project from 2024-2027 Subregional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
Boulder County Vision Zero SRTS Action Plan
Project Name:
Boulder County Vision Zero SRTS Action Plan
Identification Number:
2024-028
Project Type:
Study
Performance Measures:
Congestion, Safety
Affected Counties:
Boulder
Affected Municipalities:
None
Subregion(s):
Boulder
Open to Public:
None
STIP-ID:
None
Project Scope:
Vulnerable road user (school and youth) study to develop a Vision Zero Safe Routes to School 5-year action plan and school safety plans at 5-10 of the highest need schools.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$90,000
$149,000
$120,000
$0
Local
$20,000
$37,000
$34,000
$0
Total
$110,000
$186,000
$154,000
$0
Project Phase to Initiate
Study
Study
Study
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$450,000
$0
$450,000
Amendment History
Date Status Description
11/26/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Add new project from 2024-2027 Subregional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
Boulder Countywide Strategic Transit Plan
Project Name:
Boulder Countywide Strategic Transit Plan
Identification Number:
2024-029
Project Type:
Study
Performance Measures:
Congestion, Safety, Transit Assets, Transit Safety
Affected Counties:
Boulder
Affected Municipalities:
None
Subregion(s):
Boulder
Open to Public:
None
STIP-ID:
None
Project Scope:
Develop a countywide transit plan guiding transit funding and implementation strategies.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$1,198,000
$0
$0
$0
Local
$302,000
$0
$0
$0
Total
$1,500,000
$0
$0
$0
Project Phase to Initiate
Study
None
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$1,500,000
$0
$1,500,000
Amendment History
Date Status Description
08/17/2023
Amended
Add new project from 2024-2027 Subregional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
Mead Trails & Open Space Master Plan Update
Project Name:
Mead Trails & Open Space Master Plan Update
Identification Number:
2024-030
Project Type:
Study
Performance Measures:
Congestion, Safety
Affected Counties:
Weld
Affected Municipalities:
Mead
Subregion(s):
SW Weld
Open to Public:
2026
STIP-ID:
None
Project Scope:
Update existing plan to analyze current trail conditions, identify missing gaps, and prioritize connections.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congestion Mitigation / Air Quality)
$0
$225,000
$0
$0
Local
$0
$100,000
$0
$0
Total
$0
$325,000
$0
$0
Project Phase to Initiate
None
Study
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$325,000
$0
$325,000
Amendment History
Date Status Description
08/17/2023
Amended
Adopted into the 24-27 TIP.
2024-2027 Transportation Improvement Program (Approved TIP)
WCR26 Multi-Use Trail: Union Reservoir to St Vrain State Park
Project Name:
WCR26 Multi-Use Trail: Union Reservoir to St Vrain State Park
Identification Number:
2024-031
Project Type:
Active Transportation
Performance Measures:
Safety
Affected Counties:
Weld
Affected Municipalities:
Longmont, Unincorporated
Subregion(s):
SW Weld
Open to Public:
None
STIP-ID:
None
Project Scope:
Construct elements for a multiuse trail along WCR26 connecting Union Reservoir and St. Vrain State Park, including a crusher fine trail and some underpass work.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Transportation Alternatives-DRCOG)
$0
$0
$873,000
$0
State (MMOF)
$0
$0
$1,091,000
$0
Local
$0
$0
$219,000
$0
Total
$0
$0
$2,183,000
$0
Project Phase to Initiate
None
None
Construction
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$2,183,000
$0
$2,183,000
Amendment History
Date Status Description
11/26/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Adopt into the 24-27 TIP.
2024-2027 Transportation Improvement Program (Approved TIP)
Lafayette to Boulder Protected Bikeway Feasibility Study
Project Name:
Lafayette to Boulder Protected Bikeway Feasibility Study
Identification Number:
2024-032
Project Type:
Study
Performance Measures:
Congestion, Safety
Affected Counties:
Boulder
Affected Municipalities:
Boulder, Lafayette, Louisville, Unincorporated
Subregion(s):
Boulder
Open to Public:
None
STIP-ID:
None
Project Scope:
Feasibility study to determine the preferred alignment for a low-stress bikeway between Lafayette, Louisville, and Boulder.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Transportation Alternatives-DRCOG)
$0
$0
$170,000
$0
State (MMOF)
$0
$0
$212,000
$0
Local
$0
$0
$43,000
$0
Total
$0
$0
$425,000
$0
Project Phase to Initiate
None
None
Study
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$425,000
$0
$425,000
Amendment History
Date Status Description
11/26/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Add new project from 2024-2027 Subregional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
WCR13/WCR20 Intersection Operational Improvements
Project Name:
WCR13/WCR20 Intersection Operational Improvements
Identification Number:
2024-033
Project Type:
Roadway Operational Improvements
Performance Measures:
Congestion, Freight Reliability, Pavement Condition, Safety, Travel Time Reliability
Affected Counties:
Weld
Affected Municipalities:
Firestone, Frederick
Subregion(s):
SW Weld
Open to Public:
2027
STIP-ID:
None
Project Scope:
Roadway and multimodal operational improvements at Colorado and Bella Rosa/Pine Cone.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$187,000
$104,000
$1,768,000
$0
Local
$47,000
$26,000
$444,000
$0
Total
$234,000
$130,000
$2,212,000
$0
Project Phase to Initiate
Design
ROW
Construction
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$2,576,000
$0
$2,576,000
Amendment History
Date Status Description
11/26/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Adopted into the 24-27 TIP.
2024-2027 Transportation Improvement Program (Approved TIP)
S Boulder Rd BRT Study: Broadway/Table Mesa to CO7/119th
Project Name:
S Boulder Rd BRT Study: Broadway/Table Mesa to CO7/119th
Identification Number:
2024-034
Project Type:
Study
Performance Measures:
Congestion, Safety, Transit Assets, Transit Safety
Affected Counties:
Boulder
Affected Municipalities:
Boulder, Lafayette, Louisville, Unincorporated
Subregion(s):
Boulder
Open to Public:
None
STIP-ID:
None
Project Scope:
Study potential bus rapid transit enhancements and related bike/ped and safety measures for the corridor.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$0
$399,000
$0
$0
Local
$0
$101,000
$0
$0
Total
$0
$500,000
$0
$0
Project Phase to Initiate
None
Study
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$500,000
$0
$500,000
Amendment History
Date Status Description
11/26/2024
Proposed
Adopted into the 2026-2029 TIP.
12/19/2023
Amended
Swap federal Carbon Reduction Program funds with federal Surface Transportation Block Grant funds. Total project cost remains the same.
08/17/2023
Amended
Add new project from 2024-2027 Subregional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
I25 Interchange Study: CO52 to Erie Pkwy
Project Name:
I25 Interchange Study: CO52 to Erie Pkwy
Identification Number:
2024-035
Project Type:
Study
Performance Measures:
Congestion, Freight Reliability, Safety, Transit Safety, Travel Time Reliability
Affected Counties:
Weld
Affected Municipalities:
Erie, Dacono
Subregion(s):
SW Weld
Open to Public:
2026
STIP-ID:
None
Project Scope:
Analyze I-25 travel patterns at the CO52, Erie Pkwy., and anticipated new WCR10 interchanges, and evaluate multimodal connectivity options to future RTD, Bustang, and Front Range Passenger Rail stations.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$0
$370,000
$0
$0
Local
$0
$130,000
$0
$0
Total
$0
$500,000
$0
$0
Project Phase to Initiate
None
Study
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$500,000
$0
$500,000
Amendment History
Date Status Description
11/26/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Adopted into the 24-27 TIP.
2024-2027 Transportation Improvement Program (Approved TIP)
SE Boulder County SuperFlex
Project Name:
SE Boulder County SuperFlex
Identification Number:
2024-036
Project Type:
Transit Service
Performance Measures:
Congestion, Transit Assets, Transit Safety
Affected Counties:
Boulder
Affected Municipalities:
Erie, Lafayette, Louisville, Superior
Subregion(s):
Boulder
Open to Public:
None
STIP-ID:
None
Project Scope:
Pilot 1-2 vehicle demand-response service in southeast Boulder County to supplement RTD FlexRide and Ride Free Lafayette.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congestion Mitigation / Air Quality)
$0
$294,000
$1,176,000
$0
State (MMOF)
$0
$400,000
$1,455,000
$0
Local
$0
$107,000
$279,000
$0
Total
$0
$801,000
$2,910,000
$0
Project Phase to Initiate
None
Bus Service - Year 1
Bus Service - Year 2
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$3,711,000
$0
$3,711,000
Amendment History
Date Status Description
12/10/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Add new project from 2024-2027 Subregional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
Erie FlexRide
Project Name:
Erie FlexRide
Identification Number:
2024-037
Project Type:
Transit Service
Performance Measures:
Congestion, Transit Assets, Transit Safety
Affected Counties:
Boulder, Weld
Affected Municipalities:
Erie
Subregion(s):
Boulder, SW Weld
Open to Public:
None
STIP-ID:
None
Project Scope:
Two years of Flex ride services within the Town of Erie. The service will also provide connections to RTD services located outside the town boundaries.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congestion Mitigation / Air Quality)
$0
$240,000
$240,000
$0
State (MMOF)
$0
$300,000
$300,000
$0
Local
$0
$60,000
$60,000
$0
Total
$0
$600,000
$600,000
$0
Project Phase to Initiate
None
Bus Service - Year 1
Bus Service - Year 2
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$1,200,000
$0
$1,200,000
Amendment History
Date Status Description
12/10/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Add new project from 2024-2027 Subregional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
CO66 Multi-Use Path: Hover to Main
Project Name:
CO66 Multi-Use Path: Hover to Main
Identification Number:
2024-038
Project Type:
Active Transportation
Performance Measures:
Congestion, Safety
Affected Counties:
Boulder
Affected Municipalities:
Longmont
Subregion(s):
Boulder
Open to Public:
2027
STIP-ID:
None
Project Scope:
Construct a multi-use path on the south side of CO66 between Hover St and Main St, including multimodal crossing improvements at four intersections.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congestion Mitigation / Air Quality)
$0
$0
$2,240,000
$0
Local
$0
$0
$560,000
$0
Total
$0
$0
$2,800,000
$0
Project Phase to Initiate
None
None
Construction
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$2,800,000
$0
$2,800,000
Amendment History
Date Status Description
11/26/2024
Proposed
Adopted into the 2026-2029 TIP.
09/21/2023
Amended
Correct local match amount from $260,000 to $560,000. Total project cost increases.
08/17/2023
Amended
Add new project from 2024-2027 Subregional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
CO52 Intersection Safety Improvements: WCR5 to WCR7 - Precon
Project Name:
CO52 Intersection Safety Improvements: WCR5 to WCR7 - Precon
Identification Number:
2024-039
Project Type:
Roadway Operational Improvements
Performance Measures:
Congestion, Freight Reliability, Safety, Travel Time Reliability
Affected Counties:
Weld
Affected Municipalities:
Erie, Frederick
Subregion(s):
SW Weld
Open to Public:
None
STIP-ID:
None
Project Scope:
100% design and right-of-way for safety and multimodal features along CO52 at the intersections of WCR 5, WCR 7, and Meadow Boulevard/Summit Lane as well as right-of-way for a multi-use path on the north side of CO52 from County Line Road to I25.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$0
$134,000
$72,000
$74,000
Local
$0
$33,000
$19,000
$19,000
Total
$0
$167,000
$91,000
$93,000
Project Phase to Initiate
None
Design
Design
ROW
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$351,000
$0
$351,000
Amendment History
Date Status Description
12/20/2024
Proposed
Adopted into the 2026-2029 TIP.
12/20/2024
Amended
Modify scope to address change in intersections and addition of multi-use path right-of-way. Total project cost remains the same.
08/17/2023
Amended
Adopted into the 24-27 TIP.
2024-2027 Transportation Improvement Program (Approved TIP)
Tabor St Multimodal Improvements: Clear Creek Trail to I70 Frontage Rd N - Precon
Project Name:
Tabor St Multimodal Improvements: Clear Creek Trail to I70 Frontage Rd N - Precon
Identification Number:
2024-040
Project Type:
Active Transportation
Performance Measures:
Congestion, Safety
Affected Counties:
Jefferson
Affected Municipalities:
Wheat Ridge
Subregion(s):
Jefferson
Open to Public:
None
STIP-ID:
None
Project Scope:
Preconstruction activities for bike lanes and a pedestrian bridge that will
extend the Tabor St. bike lanes starting at the I-70 Frontage Rd. North south
over I-70 to the Clear Creek Trail.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Transportation Alternatives-DRCOG)
$0
$0
$1,596,000
$0
State (MMOF)
$0
$0
$2,000,000
$0
Local
$0
$0
$404,000
$0
Total
$0
$0
$4,000,000
$0
Project Phase to Initiate
None
None
Design
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$4,000,000
$0
$4,000,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Adopt into the 24-27 TIP.
2024-2027 Transportation Improvement Program (Approved TIP)
CO42 Bike/Ped Underpass at South St
Project Name:
CO42 Bike/Ped Underpass at South St
Identification Number:
2024-041
Project Type:
Active Transportation
Performance Measures:
Congestion, Safety
Affected Counties:
Boulder
Affected Municipalities:
Louisville
Subregion(s):
Boulder
Open to Public:
None
STIP-ID:
None
Project Scope:
Design and construct a bike/ped underpass of CO42 at South St.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$0
$334,000
$2,666,000
$0
Local
$0
$83,000
$667,000
$0
Total
$0
$417,000
$3,333,000
$0
Project Phase to Initiate
None
Design
Construction
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$3,750,000
$0
$3,750,000
Amendment History
Date Status Description
11/26/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Add new project from 2024-2027 Subregional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
35th Ave Multimodal Improvements: Sheridan to Wadsworth - Precon
Project Name:
35th Ave Multimodal Improvements: Sheridan to Wadsworth - Precon
Identification Number:
2024-042
Project Type:
Active Transportation
Performance Measures:
Congestion, Safety
Affected Counties:
Jefferson
Affected Municipalities:
Wheat Ridge
Subregion(s):
Jefferson
Open to Public:
None
STIP-ID:
None
Project Scope:
Preconstruction activities for multimodal improvements along 35th Ave. from Sheridan to Wadsworth.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Transportation Alternatives-DRCOG)
$0
$0
$399,000
$1,576,000
State (MMOF)
$0
$0
$500,000
$1,975,000
Local
$0
$0
$101,000
$399,000
Total
$0
$0
$1,000,000
$3,950,000
Project Phase to Initiate
None
None
Environmental
ROW
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$4,950,000
$0
$4,950,000
Amendment History
Date Status Description
12/05/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Adopted into the 24-27 TIP.
2024-2027 Transportation Improvement Program (Approved TIP)
McCaslin Boulevard Multiuse Path Crossing at Rock Creek Parkway
Project Name:
McCaslin Boulevard Multiuse Path Crossing at Rock Creek Parkway
Identification Number:
2024-043
Project Type:
Active Transportation
Performance Measures:
Congestion, Safety
Affected Counties:
Boulder
Affected Municipalities:
Superior
Subregion(s):
Boulder
Open to Public:
None
STIP-ID:
None
Project Scope:
Construct a multi-use trail at-grade crossing at McCaslin Blvd north of Rock Creek Pkwy including a pedestrian hybrid beacon, or HAWK.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Carbon Reduction Program)
$0
$0
$500,000
$0
Local
$0
$0
$125,000
$0
Total
$0
$0
$625,000
$0
Project Phase to Initiate
None
None
Construction
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$625,000
$0
$625,000
Amendment History
Date Status Description
01/15/2025
Proposed
Adopted into the 2026-2029 TIP.
01/15/2025
Amended
Revise scope from design of underpass to construction of at-grade hybrid beacon crossing. Total project cost remains the same.
08/17/2023
Amended
Add new project from 2024-2027 Subregional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
Midway Blvd Multimodal Improvements: Lake Link Trail to Zuni - Precon
Project Name:
Midway Blvd Multimodal Improvements: Lake Link Trail to Zuni - Precon
Identification Number:
2024-044
Project Type:
Multimodal
Performance Measures:
Congestion, Safety
Affected Counties:
Broomfield
Affected Municipalities:
Broomfield
Subregion(s):
Broomfield
Open to Public:
None
STIP-ID:
None
Project Scope:
Design and right-of-way acquisition for Complete Streets bike/ped improvements along the corridor.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congestion Mitigation / Air Quality)
$0
$0
$1,200,000
$2,400,000
Local
$0
$0
$300,000
$600,000
Total
$0
$0
$1,500,000
$3,000,000
Project Phase to Initiate
None
None
Design
ROW
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$4,500,000
$0
$4,500,000
Amendment History
Date Status Description
12/06/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Add new project from 2024-2027 Subregional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
Alameda Underpass Improvements: Kalamath to Cherokee - Precon
Project Name:
Alameda Underpass Improvements: Kalamath to Cherokee - Precon
Identification Number:
2024-045
Project Type:
Roadway Reconstruction
Performance Measures:
Congestion, Pavement Condition, Safety
Affected Counties:
Denver
Affected Municipalities:
Denver
Subregion(s):
Denver
Open to Public:
None
STIP-ID:
None
Project Scope:
Design and environmental for the reconstruction of the Alameda Ave. underpass, including new sidewalks, a multi-use path, and expanded capacity for rail transit.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$0
$0
$1,950,000
$5,850,000
Local
$0
$0
$488,000
$1,462,000
Total
$0
$0
$2,438,000
$7,312,000
Project Phase to Initiate
None
None
Environmental
Design
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$9,750,000
$0
$9,750,000
Amendment History
Date Status Description
12/06/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Add new project from 2024-2027 Subregional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
High Line Canal Trail Underpass at Yale
Project Name:
High Line Canal Trail Underpass at Yale
Identification Number:
2024-046
Project Type:
Active Transportation
Performance Measures:
Congestion, Safety
Affected Counties:
Denver
Affected Municipalities:
Denver
Subregion(s):
Denver
Open to Public:
2028
STIP-ID:
None
Project Scope:
Construct an underpass of the High Line Canal Trail under Yale Ave just west of Holly St.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congestion Mitigation / Air Quality)
$0
$0
$2,000,000
$9,000,000
Local
$0
$0
$2,500,000
$2,200,000
Total
$0
$0
$4,500,000
$11,200,000
Project Phase to Initiate
None
None
ROW
Construction
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$15,700,000
$0
$15,700,000
Amendment History
Date Status Description
12/06/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Add new project from 2024-2027 Subregional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
Wadsworth Path Improvements: Mansfield to Bear Creek
Project Name:
Wadsworth Path Improvements: Mansfield to Bear Creek
Identification Number:
2024-047
Project Type:
Active Transportation
Performance Measures:
Congestion, Safety
Affected Counties:
Jefferson
Affected Municipalities:
Lakewood, Unincorporated
Subregion(s):
Jefferson
Open to Public:
2027
STIP-ID:
None
Project Scope:
Construct a multi-use path along Wadsworth; east side between Mansfield and Jefferson, and on the west side between Eastman and Bear Creek.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congestion Mitigation / Air Quality)
$0
$0
$2,168,000
$0
Local
$0
$0
$542,000
$0
Total
$0
$0
$2,710,000
$0
Project Phase to Initiate
None
None
Construction
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$2,710,000
$0
$2,710,000
Amendment History
Date Status Description
12/06/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Adopted into the 24-27 TIP.
2024-2027 Transportation Improvement Program (Approved TIP)
W Colfax Safety Improvements: Teller to Sheridan
Project Name:
W Colfax Safety Improvements: Teller to Sheridan
Identification Number:
2024-048
Project Type:
Active Transportation
Performance Measures:
Safety
Affected Counties:
Jefferson
Affected Municipalities:
Lakewood
Subregion(s):
Jefferson
Open to Public:
2027
STIP-ID:
None
Project Scope:
Lighting and landscaping improvements to improve pedestrian safety along the
corridor.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$0
$0
$3,139,000
$1,046,000
State (Legislative)
$0
$0
$0
$0
State (Legislative-Transit)
$0
$0
$0
$0
Local
$0
$0
$1,101,000
$367,000
Total
$0
$0
$4,240,000
$1,413,000
Project Phase to Initiate
None
None
Construction
Construction
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$10,000,000
$5,653,000
$0
$15,653,000
Amendment History
Date Status Description
12/06/2024
Proposed
Adopted into the 2026-2029 TIP.
01/30/2024
Amended
Add $7,060,000 in prior year state Legislative-Transit funding and $2,940,000 in prior year state Legislative funding transferred from TIP ID# 2020-087. Total project cost increases.
08/17/2023
Amended
Adopt into the 24-27 TIP.
2024-2027 Transportation Improvement Program (Approved TIP)
Sheridan Blvd Multimodal Path: Jewell to Iowa
Project Name:
Sheridan Blvd Multimodal Path: Jewell to Iowa
Identification Number:
2024-049
Project Type:
Active Transportation
Performance Measures:
Safety
Affected Counties:
Jefferson
Affected Municipalities:
Lakewood
Subregion(s):
Jefferson
Open to Public:
2027
STIP-ID:
None
Project Scope:
Construct a multimodal path on the west side of Sheridan Blvd.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congestion Mitigation / Air Quality)
$0
$0
$1,936,000
$0
Local
$0
$0
$484,000
$0
Total
$0
$0
$2,420,000
$0
Project Phase to Initiate
None
None
Construction
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$2,420,000
$0
$2,420,000
Amendment History
Date Status Description
12/06/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Adopted into the 24-27 TIP.
2024-2027 Transportation Improvement Program (Approved TIP)
Golden Free Transit Program
Project Name:
Golden Free Transit Program
Identification Number:
2024-050
Project Type:
Transit Service
Performance Measures:
Congestion, Safety, Travel Time Reliability, Transit Assets
Affected Counties:
Jefferson
Affected Municipalities:
Golden
Subregion(s):
Jefferson
Open to Public:
2025
STIP-ID:
None
Project Scope:
Provide four routes of free transit service in the City of Golden connecting
Downtown Golden, Colorado School of Mines, RTD Jeffco Government Center
Station, and RTD Wheat Ridge-Ward Station.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congestion Mitigation / Air Quality)
$0
$334,000
$666,000
$0
Local
$0
$100,000
$200,000
$0
Total
$0
$434,000
$866,000
$0
Project Phase to Initiate
None
Bus Service - Year 1
Bus Service - Year 2
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$1,300,000
$0
$1,300,000
Amendment History
Date Status Description
12/10/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Adopted into the 24-27 TIP.
2024-2027 Transportation Improvement Program (Approved TIP)
64th Multimodal Improvements: CO93 to Virgil Way
Project Name:
64th Multimodal Improvements: CO93 to Virgil Way
Identification Number:
2024-051
Project Type:
Active Transportation
Performance Measures:
Safety
Affected Counties:
Jefferson
Affected Municipalities:
Arvada
Subregion(s):
Jefferson
Open to Public:
2028
STIP-ID:
None
Project Scope:
Multimodal improvements along 64th Pkwy.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$0
$0
$135,000
$865,000
Local
$0
$0
$105,000
$675,000
Total
$0
$0
$240,000
$1,540,000
Project Phase to Initiate
None
None
Design
Construction
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$1,780,000
$0
$1,780,000
Amendment History
Date Status Description
12/06/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Adopted into the 24-27 TIP.
2024-2027 Transportation Improvement Program (Approved TIP)
Parker Rd/Mainstreet Operational Improvements - Precon
Project Name:
Parker Rd/Mainstreet Operational Improvements - Precon
Identification Number:
2024-052
Project Type:
Roadway Operational Improvements
Performance Measures:
Congestion, Freight Reliability, Safety, Travel Time Reliability
Affected Counties:
Douglas
Affected Municipalities:
Parker
Subregion(s):
Douglas
Open to Public:
None
STIP-ID:
None
Project Scope:
Parker Rd and Main St. conceptual-level design (10%) for displaced
left turn continuous flow intersection (CFI) improvements based on the
completed Parker Road Corridor Plan.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$0
$500,000
$0
$0
Local
$0
$250,000
$0
$0
Total
$0
$750,000
$0
$0
Project Phase to Initiate
None
Design
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$750,000
$0
$750,000
Amendment History
Date Status Description
12/06/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Adopted into the 24-27 TIP.
2024-2027 Transportation Improvement Program (Approved TIP)
I25/Lincoln Multimodal Connections
Project Name:
I25/Lincoln Multimodal Connections
Identification Number:
2024-053
Project Type:
Active Transportation
Performance Measures:
Safety
Affected Counties:
Douglas
Affected Municipalities:
Lone Tree
Subregion(s):
Douglas
Open to Public:
2028
STIP-ID:
None
Project Scope:
Bicycle and pedestrian improvements in the vicinity of the I-25 and Lincoln
interchange based on study outcomes.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congestion Mitigation / Air Quality)
$0
$0
$0
$5,907,000
Local
$0
$0
$0
$4,093,000
Total
$0
$0
$0
$10,000,000
Project Phase to Initiate
None
None
None
Construction
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$10,000,000
$0
$10,000,000
Amendment History
Date Status Description
12/06/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Adopted into the 24-27 TIP.
2024-2027 Transportation Improvement Program (Approved TIP)
Douglas County Transit Pilot Projects
Project Name:
Douglas County Transit Pilot Projects
Identification Number:
2024-054
Project Type:
Transit Service
Performance Measures:
Congestion, Transit Assets, Transit Safety, Travel Time Reliability
Affected Counties:
Douglas
Affected Municipalities:
None
Subregion(s):
Douglas
Open to Public:
None
STIP-ID:
None
Project Scope:
Project will initiate pilot projects identified in the Douglas County Transit &
Multimodal Feasibility Study.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Carbon Reduction Program)
$0
$0
$500,000
$500,000
State (MMOF)
$0
$0
$625,000
$625,000
Local
$0
$0
$125,000
$125,000
Total
$0
$0
$1,250,000
$1,250,000
Project Phase to Initiate
None
None
Bus Service - Year 1
Bus Service - Year 2
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$2,500,000
$0
$2,500,000
Amendment History
Date Status Description
12/10/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Adopted into the 24-27 TIP.
2024-2027 Transportation Improvement Program (Approved TIP)
Colorado Blvd Bike/Ped Bridge over C470 - Precon
Project Name:
Colorado Blvd Bike/Ped Bridge over C470 - Precon
Identification Number:
2024-055
Project Type:
Active Transportation
Performance Measures:
Safety
Affected Counties:
Douglas
Affected Municipalities:
Unincorporated
Subregion(s):
Douglas
Open to Public:
None
STIP-ID:
None
Project Scope:
Design for a bike/pedestrian bridge over C-470 at Colorado Blvd.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Transportation Alternatives-DRCOG)
$0
$275,000
$275,000
$0
Local
$0
$75,000
$75,000
$0
Total
$0
$350,000
$350,000
$0
Project Phase to Initiate
None
Design
Design
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$700,000
$0
$700,000
Amendment History
Date Status Description
12/06/2024
Proposed
Adopted into the 2026-2029 TIP.
01/17/2024
Amended
Split funding equally between Fiscal Years 2025 and 2026. Total project cost remains the same.
08/17/2023
Amended
Adopted into the 24-27 TIP.
2024-2027 Transportation Improvement Program (Approved TIP)
North Central Denver Community Multimodal Improvements
Project Name:
North Central Denver Community Multimodal Improvements
Identification Number:
2024-056
Project Type:
Active Transportation
Performance Measures:
Congestion, Safety
Affected Counties:
Denver
Affected Municipalities:
Denver
Subregion(s):
Denver
Open to Public:
2027
STIP-ID:
None
Project Scope:
Construct multimodal improvements in the Globeville and Elyria-Swansea neighborhoods including high-comfort bike facilities and crosswalk safety enhancements.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congestion Mitigation / Air Quality)
$0
$0
$4,537,000
$0
Local
$0
$0
$1,134,000
$0
Total
$0
$0
$5,671,000
$0
Project Phase to Initiate
None
None
Construction
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$5,671,000
$0
$5,671,000
Amendment History
Date Status Description
12/06/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Add new project from 2024-2027 Subregional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
Peña Capacity Improvements: I70 to E470 - Precon
Project Name:
Peña Capacity Improvements: I70 to E470 - Precon
Identification Number:
2024-057
Project Type:
Roadway Capacity
Performance Measures:
Congestion, Freight Reliability, Travel Time Reliability
Affected Counties:
Denver
Affected Municipalities:
Denver
Subregion(s):
Denver
Open to Public:
None
STIP-ID:
None
Project Scope:
Design and environmental for the addition of one managed lane in each direction between I70 and E470 and the addition of multi-use trails. Also partially funds implementation of a TDM plan.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$500,000
$1,500,000
$1,500,000
$1,500,000
Local
$1,500,000
$4,000,000
$4,000,000
$4,000,000
Total
$2,000,000
$5,500,000
$5,500,000
$5,500,000
Project Phase to Initiate
Environmental
Environmental
Design
Design
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$18,500,000
$0
$18,500,000
Amendment History
Date Status Description
12/06/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Add new project from 2024-2027 Subregional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
South Platte River Trail Improvements: Mississippi to Florida
Project Name:
South Platte River Trail Improvements: Mississippi to Florida
Identification Number:
2024-058
Project Type:
Active Transportation
Performance Measures:
Congestion, Safety
Affected Counties:
Denver
Affected Municipalities:
Denver
Subregion(s):
Denver
Open to Public:
2028
STIP-ID:
None
Project Scope:
Replace existing 8' trail with 12' wide trail with 4' crusher fines and 3' shoulders on both sides and reconstructed 16' wide bike/ped bridge in Overland Park.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congestion Mitigation / Air Quality)
$0
$0
$2,400,000
$2,400,000
Local
$0
$0
$600,000
$600,000
Total
$0
$0
$3,000,000
$3,000,000
Project Phase to Initiate
None
None
Construction
Construction
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$6,000,000
$0
$6,000,000
Amendment History
Date Status Description
12/06/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Add new project from 2024-2027 Subregional Share Call for Projects.
2024-2027 Transportation Improvement Program (Approved TIP)
Federal Pkwy Multimodal Improvements: 120th to 122nd
Project Name:
Federal Pkwy Multimodal Improvements: 120th to 122nd
Identification Number:
2024-059
Project Type:
Roadway Operational Improvements
Performance Measures:
Congestion, Safety
Affected Counties:
Adams
Affected Municipalities:
Westminster
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
Multimodal improvements including bike lanes and an enhanced connection to Big Dry Creek.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congressional Allocation)
$3,000,000
$0
$0
$0
Local
$750,000
$0
$0
$0
Total
$3,750,000
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$3,750,000
$0
$3,750,000
Amendment History
Date Status Description
12/06/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Adopted into the 24-27 TIP.
2024-2027 Transportation Improvement Program (Approved TIP)
Peaks to Plains Trail - Downtown Golden
Project Name:
Peaks to Plains Trail - Downtown Golden
Identification Number:
2024-060
Project Type:
Active Transportation
Performance Measures:
Congestion, Safety
Affected Counties:
Jefferson
Affected Municipalities:
Golden
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
Conduct an Alternatives Analysis and conceptual design for a secondary multimodal route along the north side of Clear Creek to complement and alleviate overcrowding on the existing Clear Creek Trail and provide safe, direct access to downtown Golden.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congressional Allocation)
$400,000
$0
$0
$0
Local
$100,000
$0
$0
$0
Total
$500,000
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$500,000
$0
$500,000
Amendment History
Date Status Description
12/06/2024
Proposed
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Adopted into the 24-27 TIP.
2024-2027 Transportation Improvement Program (Approved TIP)
28th St Multi-use Path: Fourmile Canyon Creek to Jay
Project Name:
28th St Multi-use Path: Fourmile Canyon Creek to Jay
Identification Number:
2024-061
Project Type:
Active Transportation
Performance Measures:
Congestion, Safety
Affected Counties:
Boulder
Affected Municipalities:
Boulder
Subregion(s):
None
Open to Public:
2027
STIP-ID:
SR47020.048
Project Scope:
The project will build a separated multi-use path that completes the final northern segment of the US36/28th St multi-use path to extend off-street walking and bicycling facilities and create safer active transportation connections from the south end of the city to the north end, and to key east-west bicycle routes and regional transit via Jay Rd.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Transportation Alternatives-CDOT)
$0
$200,000
$736,000
$0
Local
$0
$50,000
$184,000
$0
Total
$0
$250,000
$920,000
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$1,170,000
$0
$1,170,000
Amendment History
Date Status Description
11/26/2024
Proposed
Adopted into the 2026-2029 TIP.
09/21/2023
Amended
Add new project from CDOT Transportation Alternatives awards.
2024-2027 Transportation Improvement Program (Approved TIP)
Coffman St Bikeway Extension: Boston to 1st
Project Name:
Coffman St Bikeway Extension: Boston to 1st
Identification Number:
2024-062
Project Type:
Active Transportation
Performance Measures:
Congestion, Safety
Affected Counties:
Boulder
Affected Municipalities:
Longmont
Subregion(s):
None
Open to Public:
2026
STIP-ID:
SR47020.046
Project Scope:
Completion of a new multimodal street which will be critical to connecting the planned Bus Rapid Transit for CO119 and US287and connecting people walking and on bikes from the St Vrain Greenway trail just south of the site to downtown Longmont just north of the project.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Transportation Alternatives-CDOT)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$0
$0
$0
Amendment History
Date Status Description
04/18/2024
Amended
Transfer all funding to Project #2020-083. Total project cost decreases.
09/21/2023
Amended
Add new project from CDOT Transportation Alternatives awards.
2024-2027 Transportation Improvement Program (Approved TIP)
R1 Safe Wildlife Crossings Pool
Project Name:
R1 Safe Wildlife Crossings Pool
Identification Number:
2024-063
Project Type:
Safety
Performance Measures:
Congestion, Safety
Affected Counties:
Regional
Affected Municipalities:
None
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
CDOT Region 1 Safe Wildlife Crossings Pool. Funds improvements related to wildlife crossings.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
State (Legislative)
$500,000
$0
$0
$0
Local
$0
$0
$0
$0
Total
$500,000
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$500,000
$0
$500,000
Amendment History
Date Status Description
12/06/2024
Proposed
Adopted into the 2026-2029 TIP.
07/22/2024
Amended
Transfer one pool project and $500,000 in state Legislative funding to new I25 Greenland Wildlife Crossing project.
09/21/2023
Amended
Add new pool for wildlife crossings in CDOT Region 1.
Project Pools This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name Description Notes Cost
US285 and I70 Wildlife Fencing $500,000
2024-2027 Transportation Improvement Program (Approved TIP)
E Colfax Mobility Benefits District
Project Name:
E Colfax Mobility Benefits District
Identification Number:
2024-064
Project Type:
Air Quality Improvement Projects
Performance Measures:
Congestion
Affected Counties:
Denver
Affected Municipalities:
Denver
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
Explore the development of a Mobility Benefits District along East Colfax with a goal of creating a coordinated approach to managing on- and off-streets parking demand. Sponsors will also explore opportunities for additional programs to increase awareness of mobility options, enabling commuters to travel through the corridor using BRT and other non-SOV modes.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$110,000
$55,000
$0
$0
Local
$23,000
$11,000
$0
$0
Total
$133,000
$66,000
$0
$0
Project Phase to Initiate
TDM
TDM
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$199,000
$0
$199,000
Amendment History
Date Status Description
12/17/2024
Proposed
Adopted into the 2026-2029 TIP.
09/21/2023
Amended
Create new project from FY2024-2025 TDM Set-Aside awards.
2024-2027 Transportation Improvement Program (Approved TIP)
Downtown Denver ¡Viva! Streets Year 2 Expansion
Project Name:
Downtown Denver ¡Viva! Streets Year 2 Expansion
Identification Number:
2024-065
Project Type:
Air Quality Improvement Projects
Performance Measures:
Congestion
Affected Counties:
Denver
Affected Municipalities:
Denver
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
Continue and enhance the ¡Viva! Streets initiative, a street closure to demonstrate to residents the connectivity of various neighborhoods within the Denver region, including better targeted marketing to members of the BIPOC community.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$0
$0
$0
Amendment History
Date Status Description
08/27/2024
Amended
Zero out funding. Funding returned to Transportation Demand Management set-aside. Total project funding decreases.
09/21/2023
Amended
Create new project from FY2024-2025 TDM Set-Aside awards.
2024-2027 Transportation Improvement Program (Approved TIP)
Welcome Kits for Sun Valley Residents
Project Name:
Welcome Kits for Sun Valley Residents
Identification Number:
2024-066
Project Type:
Air Quality Improvement Projects
Performance Measures:
Congestion
Affected Counties:
Denver
Affected Municipalities:
Denver
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
Work with Sun Valley residents to highlight what sustainable transportation options are available in the area. The marketing materials would be translated and made culturally relevant to speakers of Spanish and Vietnamese.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$70,000
$70,000
$0
$0
Local
$15,000
$15,000
$0
$0
Total
$85,000
$85,000
$0
$0
Project Phase to Initiate
TDM
TDM
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$170,000
$0
$170,000
Amendment History
Date Status Description
12/17/2024
Proposed
Adopted into the 2026-2029 TIP.
09/21/2023
Amended
Create new project from FY2024-2025 TDM Set-Aside awards.
2024-2027 Transportation Improvement Program (Approved TIP)
Using Data to Optimize FlexRide Services
Project Name:
Using Data to Optimize FlexRide Services
Identification Number:
2024-067
Project Type:
Air Quality Improvement Projects
Performance Measures:
Congestion
Affected Counties:
Regional
Affected Municipalities:
None
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
Study the feasibility of launching a FlexRide service by doing research to determine the level of transportation need. Smart Commute would work with RTD to collect data to determine FlexRide feasibility, route and service needs.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$104,000
$104,000
$0
$0
Local
$22,000
$22,000
$0
$0
Total
$126,000
$126,000
$0
$0
Project Phase to Initiate
TDM
TDM
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$252,000
$0
$252,000
Amendment History
Date Status Description
12/10/2024
Proposed
Adopted into the 2026-2029 TIP.
09/21/2023
Amended
Create new project from FY2024-2025 TDM Set-Aside awards.
2024-2027 Transportation Improvement Program (Approved TIP)
Gunbarrel On-Demand Microtransit Shuttle Service Marketing Campaign
Project Name:
Gunbarrel On-Demand Microtransit Shuttle Service Marketing Campaign
Identification Number:
2024-068
Project Type:
Air Quality Improvement Projects
Performance Measures:
Congestion
Affected Counties:
Boulder
Affected Municipalities:
Unincorporated
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
Develop and execute a marketing campaign to raise awareness of a proposed flex shuttle service in Gunbarrel.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$99,000
$25,000
$0
$0
Local
$21,000
$5,000
$0
$0
Total
$120,000
$30,000
$0
$0
Project Phase to Initiate
TDM
TDM
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$150,000
$0
$150,000
Amendment History
Date Status Description
12/10/2024
Proposed
Adopted into the 2026-2029 TIP.
09/21/2023
Amended
Create new project from FY2024-2025 TDM Set-Aside awards.
2024-2027 Transportation Improvement Program (Approved TIP)
Creating the Commerce City Connector
Project Name:
Creating the Commerce City Connector
Identification Number:
2024-069
Project Type:
Air Quality Improvement Projects
Performance Measures:
Congestion
Affected Counties:
Adams
Affected Municipalities:
Commerce City
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
Explore launching and sustaining a microtransit community connector serving the southwest corner of Commerce City. Tasks include evaluating route options, marketing and education, resulting in the blueprint for a free service similar to the Gobeville Elyria-Swansea and Montbello Connectors.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$63,000
$63,000
$0
$0
Local
$13,000
$13,000
$0
$0
Total
$76,000
$76,000
$0
$0
Project Phase to Initiate
TDM
TDM
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$152,000
$0
$152,000
Amendment History
Date Status Description
12/10/2024
Proposed
Adopted into the 2026-2029 TIP.
09/21/2023
Amended
Create new project from FY2024-2025 TDM Set-Aside awards.
2024-2027 Transportation Improvement Program (Approved TIP)
Sheridan Corridor Plan: 52nd to Hampden
Project Name:
Sheridan Corridor Plan: 52nd to Hampden
Identification Number:
2024-070
Project Type:
Study
Performance Measures:
Safety
Affected Counties:
Denver, Jefferson
Affected Municipalities:
Denver, Edgewater, Lakeside, Lakewood, Mountain View, Wheat Ridge
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
Corridor study highlighting Vision Zero safety improvements from 52nd to Hampden. Partners include Denver and Lakewood.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$250,000
$0
$0
$0
Local
$0
$0
$0
$0
Total
$250,000
$0
$0
$0
Project Phase to Initiate
Study
None
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$250,000
$0
$250,000
Amendment History
Date Status Description
12/10/2024
Proposed
Adopted into the 2026-2029 TIP.
05/16/2024
Amended
Transfer all funding into 2024. Total project cost remains the same.
10/18/2023
Amended
Add new project from the DRCOG Transportation Corridor Planning - CCLIP Set Aside. Toll credits to be used to remove match requirements.
2024-2027 Transportation Improvement Program (Approved TIP)
E Colfax BRT Extension Corridor Plan: I225 to E470
Project Name:
E Colfax BRT Extension Corridor Plan: I225 to E470
Identification Number:
2024-071
Project Type:
Study
Performance Measures:
Congestion, Safety, Transit Assets, Transit Safety
Affected Counties:
Adams, Arapahoe
Affected Municipalities:
Aurora
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
Corridor study highlighting bus rapid transit, safety, and multimodal improvements from I225 to E470. Partners include Aurora, CDOT, and RTD.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$1,000,000
$0
$0
$0
Local
$0
$0
$0
$0
Total
$1,000,000
$0
$0
$0
Project Phase to Initiate
Study
None
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$1,000,000
$0
$1,000,000
Amendment History
Date Status Description
12/10/2024
Proposed
Adopted into the 2026-2029 TIP.
05/16/2024
Amended
Transfer all funding into 2024. Total project cost remains the same.
10/18/2023
Amended
Add new project from the DRCOG Transportation Corridor Planning - CCLIP Set Aside. Toll credits to be used to remove match requirements.
2024-2027 Transportation Improvement Program (Approved TIP)
Aurora Traffic Management Center
Project Name:
Aurora Traffic Management Center
Identification Number:
2024-072
Project Type:
Traffic Signals/ITS
Performance Measures:
Congestion, Travel Time Reliability
Affected Counties:
Adams, Arapahoe, Douglas
Affected Municipalities:
Aurora
Subregion(s):
None
Open to Public:
2027
STIP-ID:
None
Project Scope:
Construction project to deploy a new traffic management center at the North Satellite facility. Development of a concept of operations will precede design and construction.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$0
$0
$1,101,000
$0
Local
$0
$0
$495,000
$0
Total
$0
$0
$1,596,000
$0
Project Phase to Initiate
None
None
Construction
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$1,596,000
$0
$1,596,000
Amendment History
Date Status Description
12/06/2024
Proposed
Adopted into the 2026-2029 TIP.
10/18/2023
Amended
Add new project from the Regional Transportation Operations and Technology Set-Aside.
2024-2027 Transportation Improvement Program (Approved TIP)
Louisville Signal Technology Upgrade
Project Name:
Louisville Signal Technology Upgrade
Identification Number:
2024-073
Project Type:
Traffic Signals/ITS
Performance Measures:
Congestion, Travel Time Reliability
Affected Counties:
Boulder
Affected Municipalities:
Louisville
Subregion(s):
None
Open to Public:
2025
STIP-ID:
None
Project Scope:
Procurement of upgraded traffic signal equipment at select intersections across Louisville.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$545,000
$0
$0
$0
Local
$200,000
$0
$0
$0
Total
$745,000
$0
$0
$0
Project Phase to Initiate
Procurement
None
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$745,000
$0
$745,000
Amendment History
Date Status Description
11/26/2024
Proposed
Adopted into the 2026-2029 TIP.
10/18/2023
Amended
Add new project from the Regional Transportation Operations and Technology Set-Aside.
2024-2027 Transportation Improvement Program (Approved TIP)
Longmont Smart Signals to Schools
Project Name:
Longmont Smart Signals to Schools
Identification Number:
2024-074
Project Type:
Traffic Signals/ITS
Performance Measures:
Congestion, Travel Time Reliability
Affected Counties:
Boulder, Weld
Affected Municipalities:
Longmont
Subregion(s):
None
Open to Public:
2026
STIP-ID:
None
Project Scope:
Procurement of video-based intersection detection and traffic cameras for 24 intersections. Longmont resources will deploy and configure these devices.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$446,000
$445,000
$0
$0
Local
$119,000
$118,000
$0
$0
Total
$565,000
$563,000
$0
$0
Project Phase to Initiate
Procurement
Procurement
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$1,128,000
$0
$1,128,000
Amendment History
Date Status Description
11/26/2024
Proposed
Adopted into the 2026-2029 TIP.
10/18/2023
Amended
Add new project from the Regional Transportation Operations and Technology Set-Aside.
2024-2027 Transportation Improvement Program (Approved TIP)
Jefferson County Traffic Camera System
Project Name:
Jefferson County Traffic Camera System
Identification Number:
2024-075
Project Type:
Traffic Signals/ITS
Performance Measures:
Congestion, Travel Time Reliability
Affected Counties:
Jefferson
Affected Municipalities:
None
Subregion(s):
None
Open to Public:
2026
STIP-ID:
None
Project Scope:
Procurement of combined traffic camera/intersection detection system for 12 intersections.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$0
$248,000
$0
$0
Local
$0
$52,000
$0
$0
Total
$0
$300,000
$0
$0
Project Phase to Initiate
None
Procurement
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$300,000
$0
$300,000
Amendment History
Date Status Description
12/06/2024
Proposed
Adopted into the 2026-2029 TIP.
10/18/2023
Amended
Add new project from the Regional Transportation Operations and Technology Set-Aside.
2024-2027 Transportation Improvement Program (Approved TIP)
US287 and CO7 Advance Detection Expansion
Project Name:
US287 and CO7 Advance Detection Expansion
Identification Number:
2024-076
Project Type:
Traffic Signals/ITS
Performance Measures:
Congestion, Travel Time Reliability
Affected Counties:
Regional
Affected Municipalities:
None
Subregion(s):
None
Open to Public:
2026
STIP-ID:
None
Project Scope:
Procurement of intersection detection for seven intersections on CO7 and five traffic cameras for locations on both corridors.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$0
$238,000
$0
$0
Local
$0
$140,000
$0
$0
Total
$0
$378,000
$0
$0
Project Phase to Initiate
None
Procurement
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$378,000
$0
$378,000
Amendment History
Date Status Description
11/26/2024
Proposed
Adopted into the 2026-2029 TIP.
10/18/2023
Amended
Add new project from the Regional Transportation Operations and Technology Set-Aside.
2024-2027 Transportation Improvement Program (Approved TIP)
Denver V2X Communications Devices
Project Name:
Denver V2X Communications Devices
Identification Number:
2024-077
Project Type:
Traffic Signals/ITS
Performance Measures:
Congestion, Travel Time Reliability
Affected Counties:
Denver
Affected Municipalities:
Denver
Subregion(s):
None
Open to Public:
2026
STIP-ID:
None
Project Scope:
Construction project to expand deployment of connected vehicle roadside units along Colfax and Sheridan. Additionally, data collected by these devices will be used for automated traffic signal performance measure-related (ATSPM) capabilities. Development of a concept of operations will precede design and construction.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$850,000
$850,000
$0
$0
Local
$0
$0
$0
$0
Total
$850,000
$850,000
$0
$0
Project Phase to Initiate
Design
Construction
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$1,700,000
$0
$1,700,000
Amendment History
Date Status Description
12/06/2024
Proposed
Adopted into the 2026-2029 TIP.
10/18/2023
Amended
Add new project from the Regional Transportation Operations and Technology Set-Aside.
2024-2027 Transportation Improvement Program (Approved TIP)
Boulder Communications Network and Signal System Performance Enhancement
Project Name:
Boulder Communications Network and Signal System Performance Enhancement
Identification Number:
2024-078
Project Type:
Traffic Signals/ITS
Performance Measures:
Congestion, Travel Time Reliability
Affected Counties:
Boulder
Affected Municipalities:
Boulder
Subregion(s):
None
Open to Public:
2026
STIP-ID:
None
Project Scope:
Procurement of upgraded signal equipment, communications, traffic cameras, and detection for 37 intersections. Deployment of automated traffic signal performance measure (ATSPM).
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$602,000
$602,000
$0
$0
Local
$151,000
$150,000
$0
$0
Total
$753,000
$752,000
$0
$0
Project Phase to Initiate
Procurement
Procurement
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$1,505,000
$0
$1,505,000
Amendment History
Date Status Description
11/26/2024
Proposed
Adopted into the 2026-2029 TIP.
10/18/2023
Amended
Add new project from the Regional Transportation Operations and Technology Set-Aside.
2024-2027 Transportation Improvement Program (Approved TIP)
Aurora Communications Infrastructure Improvements
Project Name:
Aurora Communications Infrastructure Improvements
Identification Number:
2024-079
Project Type:
Traffic Signals/ITS
Performance Measures:
Congestion, Travel Time Reliability
Affected Counties:
Adams, Arapahoe, Douglas
Affected Municipalities:
Aurora
Subregion(s):
None
Open to Public:
2027
STIP-ID:
None
Project Scope:
Construction project to deploy fiber backbone communications between Aurora Municipal Center and North Satellite facility that also interconnects 31 signals.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$0
$0
$736,000
$0
Local
$0
$0
$197,000
$0
Total
$0
$0
$933,000
$0
Project Phase to Initiate
None
None
Construction
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$933,000
$0
$933,000
Amendment History
Date Status Description
12/06/2024
Proposed
Adopted into the 2026-2029 TIP.
10/18/2023
Amended
Add new project from the Regional Transportation Operations and Technology Set-Aside.
2024-2027 Transportation Improvement Program (Approved TIP)
Broadway Signal Interconnect (Phase 2)
Project Name:
Broadway Signal Interconnect (Phase 2)
Identification Number:
2024-080
Project Type:
Traffic Signals/ITS
Performance Measures:
Congestion, Travel Time Reliability
Affected Counties:
Arapahoe, Douglas, Jefferson
Affected Municipalities:
Littleton
Subregion(s):
None
Open to Public:
2027
STIP-ID:
None
Project Scope:
Construction project to expand traffic signal interconnect (fiber) for 15 intersections on Broadway and select crossing streets.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$0
$328,000
$2,635,000
$0
Local
$0
$72,000
$575,000
$0
Total
$0
$400,000
$3,210,000
$0
Project Phase to Initiate
None
Design
Construction
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$3,610,000
$0
$3,610,000
Amendment History
Date Status Description
12/06/2024
Proposed
Adopted into the 2026-2029 TIP.
10/18/2023
Amended
Add new project from the Regional Transportation Operations and Technology Set-Aside.
2024-2027 Transportation Improvement Program (Approved TIP)
Thornton Travel Time Monitoring Expansion
Project Name:
Thornton Travel Time Monitoring Expansion
Identification Number:
2024-081
Project Type:
Traffic Signals/ITS
Performance Measures:
Congestion, Travel Time Reliability
Affected Counties:
Adams
Affected Municipalities:
Thornton
Subregion(s):
None
Open to Public:
2025
STIP-ID:
None
Project Scope:
Procurement of travel time monitoring devices for 23 intersections to expand existing travel time monitoring system.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$101,000
$0
$0
$0
Local
$25,000
$0
$0
$0
Total
$126,000
$0
$0
$0
Project Phase to Initiate
Procurement
None
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$126,000
$0
$126,000
Amendment History
Date Status Description
12/06/2024
Proposed
Adopted into the 2026-2029 TIP.
10/18/2023
Amended
Add new project from the Regional Transportation Operations and Technology Set-Aside.
2024-2027 Transportation Improvement Program (Approved TIP)
Superior Traffic Safety and Climate Resilience
Project Name:
Superior Traffic Safety and Climate Resilience
Identification Number:
2024-082
Project Type:
Traffic Signals/ITS
Performance Measures:
Congestion, Travel Time Reliability
Affected Counties:
Boulder
Affected Municipalities:
Superior
Subregion(s):
None
Open to Public:
2025
STIP-ID:
None
Project Scope:
Procurement and deployment of an upgraded traffic signal system shared by Superior and Louisville. This project also procures upgraded equipment for three intersections.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$99,000
$0
$0
$0
Local
$21,000
$0
$0
$0
Total
$120,000
$0
$0
$0
Project Phase to Initiate
Procurement
None
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$120,000
$0
$120,000
Amendment History
Date Status Description
11/26/2024
Proposed
Adopted into the 2026-2029 TIP.
10/18/2023
Amended
Add new project from the Regional Transportation Operations and Technology Set-Aside.
2024-2027 Transportation Improvement Program (Approved TIP)
Aurora Traffic Signal Equipment Upgrade
Project Name:
Aurora Traffic Signal Equipment Upgrade
Identification Number:
2024-083
Project Type:
Traffic Signals/ITS
Performance Measures:
Congestion, Travel Time Reliability
Affected Counties:
Adams, Arapahoe, Douglas
Affected Municipalities:
Aurora
Subregion(s):
None
Open to Public:
2026
STIP-ID:
None
Project Scope:
Procurement of 42 uninterruptible power supplies and intersection detection for 42 intersections.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$0
$1,021,000
$0
$0
Local
$0
$0
$0
$0
Total
$0
$1,021,000
$0
$0
Project Phase to Initiate
None
Procurement
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$1,021,000
$0
$1,021,000
Amendment History
Date Status Description
12/06/2024
Proposed
Adopted into the 2026-2029 TIP.
10/18/2023
Amended
Add new project from the Regional Transportation Operations and Technology Set-Aside.
2024-2027 Transportation Improvement Program (Approved TIP)
I70 Resurfacing: Chief Hosa to W Colfax
Project Name:
I70 Resurfacing: Chief Hosa to W Colfax
Identification Number:
2024-084
Project Type:
Roadway Reconstruction
Performance Measures:
Pavement Condition, Safety
Affected Counties:
Jefferson
Affected Municipalities:
Unincorporated
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
Resurfacing improvements on I70 from Chief Hosa to Mile Post 259 (W Colfax Ave) to include guardrail improvements and implementation of safety strategies defined in the I70 Eastbound Active Traffic Management Concept of Operations including Variable Message Signs, Microwave Vehicle Radar Detection, friction sensors, and sign installations.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Faster Safety)
$0
$0
$0
$0
Federal (Strategic Safety Funds)
$0
$3,000,000
$0
$0
State (Faster Safety)
$0
$12,800,000
$0
$0
State (Regional Priority Projects)
$0
$9,000,000
$0
$0
State (Surface Treatment)
$4,100,000
$9,500,000
$0
$0
State (TC Contingency)
$0
$6,392,000
$0
$0
Local
$0
$0
$0
$0
Total
$4,100,000
$40,692,000
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$44,792,000
$0
$44,792,000
Amendment History
Date Status Description
12/06/2024
Proposed
Adopted into the 2026-2029 TIP.
07/22/2024
Amended
Add $6,392,000 of state Transportation Commission Contingency funds. Total project cost increases.
02/22/2024
Amended
Add $4,100,000 in state Surface Treatment funds transferred from TIP ID# 2007-096. Total project cost increases.
01/17/2024
Amended
Add $3,000,000 in federal Strategic Safety Funds. Total project cost increases.
12/19/2023
Amended
Adjust scope and add $12,800,000 in state FASTER-Safety funding transferred from 2008-076. Total project cost increases.
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
Clean Transit Enterprise Pool
Project Name:
Clean Transit Enterprise Pool
Identification Number:
2024-085
Project Type:
Transit Operational Improvements
Performance Measures:
Transit Assets, Transit Safety, Congestion, Safety
Affected Counties:
Regional
Affected Municipalities:
None
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
The Clean Transit Enterprise supports public transit electrification planning efforts, facility upgrades, fleet motor vehicle replacement, as well as construction and development of electric motor vehicle charging and fueling infrastructure. The Colorado Department of Transportation Office of Innovative Mobility will award funds in this pool to grantees on an application basis.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
State (Clean Transit Enterprise)
$158,000
$2,485,000
$0
$0
Local
$18,000
$1,500,000
$0
$0
Total
$176,000
$3,985,000
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$4,161,000
$0
$4,161,000
Amendment History
Date Status Description
12/19/2024
Proposed
Adopted into the 2026-2029 TIP.
12/19/2024
Amended
Add four new pool projects and $2,485,000 in state Clean Transportation Enterprise funds. Total project cost increases.
12/19/2023
Amended
Add new pool for Colorado Department of Transportation Clean Transit Enterprise projects.
Project Pools This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name Description Notes Cost
Laradon Hall Planning (Fiscal Year 2024) $90,000
Via Mobility Planning (FIscal Year 2024) $68,000
Via Mobility Facility (Fiscal Year 2025) $1,500,000
Laradon Hall Vehicles (Fiscal Year 2025) $238,000
Developmental Disabilities Resource Center Vehicles (Fiscal Year 2025) $150,000
Boulder Vehicles (Fiscal Year 2025) $596,000
2024-2027 Transportation Improvement Program (Approved TIP)
303 Artway and Montbello Loop Implementation Plan
Project Name:
303 Artway and Montbello Loop Implementation Plan
Identification Number:
2024-086
Project Type:
Study
Performance Measures:
Congestion, Safety
Affected Counties:
Denver
Affected Municipalities:
Denver
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
Implementation plan that will take the 5+ years of community engagement, visioning and planning around the 303 Artway and Montbello Loop to identify implementable projects, outline ongoing efforts that align with their goals, and identify a pathway to implement the core elements in each project.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$250,000
$0
$0
$0
Local
$0
$0
$0
$0
Total
$250,000
$0
$0
$0
Project Phase to Initiate
Study
None
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$250,000
$0
$250,000
Amendment History
Date Status Description
12/10/2024
Proposed
Adopted into the 2026-2029 TIP.
05/16/2024
Amended
Transfer all funding to 2024. Total project cost remains the same.
04/18/2024
Amended
Add new project from the DRCOG Community Mobility Planning Set-Aside - Community-Based Transportation Plans. Toll credits to be used to remove match requirements.
2024-2027 Transportation Improvement Program (Approved TIP)
Brighton Core City Circulation Plan
Project Name:
Brighton Core City Circulation Plan
Identification Number:
2024-087
Project Type:
Study
Performance Measures:
Congestion, Safety
Affected Counties:
Adams
Affected Municipalities:
Brighton
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
Multimodal circulation and access plan looking at Bridge Street between the Platte River and 22nd Avenue and the half mile radius of surrounding communities.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$250,000
$0
$0
$0
Local
$0
$0
$0
$0
Total
$250,000
$0
$0
$0
Project Phase to Initiate
Study
None
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$250,000
$0
$250,000
Amendment History
Date Status Description
12/10/2024
Proposed
Adopted into the 2026-2029 TIP.
05/16/2024
Amended
Transfer all funding to 2024. Total project cost remains the same.
04/18/2024
Amended
Add new project from the DRCOG Community Mobility Planning Set-Aside - Community-Based Transportation Plans. Toll credits to be used to remove match requirements.
2024-2027 Transportation Improvement Program (Approved TIP)
92nd Avenue Corridor Study
Project Name:
92nd Avenue Corridor Study
Identification Number:
2024-088
Project Type:
Study
Performance Measures:
Congestion, Safety
Affected Counties:
Adams
Affected Municipalities:
Federal Heights
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
Multimodal corridor study of 92nd Avenue from Federal Boulevard to Pecos Street.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$250,000
$0
$0
$0
Local
$0
$0
$0
$0
Total
$250,000
$0
$0
$0
Project Phase to Initiate
Study
None
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$250,000
$0
$250,000
Amendment History
Date Status Description
12/10/2024
Proposed
Adopted into the 2026-2029 TIP.
05/16/2024
Amended
Transfer all funding to 2024. Total project cost remains the same.
04/18/2024
Amended
Add new project from the DRCOG Community Mobility Planning Set-Aside - Community-Based Transportation Plans. Toll credits to be used to remove match requirements.
2024-2027 Transportation Improvement Program (Approved TIP)
Pecos Street Corridor Study
Project Name:
Pecos Street Corridor Study
Identification Number:
2024-089
Project Type:
Study
Performance Measures:
Congestion, Safety
Affected Counties:
Adams
Affected Municipalities:
Unincorporated
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
Multimodal transportation study of Pecos Street between West 62nd Parkway and 84th Avenue.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$450,000
$0
$0
$0
Local
$0
$0
$0
$0
Total
$450,000
$0
$0
$0
Project Phase to Initiate
Study
None
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$450,000
$0
$450,000
Amendment History
Date Status Description
12/10/2024
Proposed
Adopted into the 2026-2029 TIP.
05/16/2024
Amended
Transfer all funding to 2024. Total project cost remains the same.
04/18/2024
Amended
Add new project from the DRCOG Community Mobility Planning Set-Aside - Community-Based Transportation Plans. Toll credits to be used to remove match requirements.
2024-2027 Transportation Improvement Program (Approved TIP)
Region 4 Congressionally Directed Funding Pool
Project Name:
Region 4 Congressionally Directed Funding Pool
Identification Number:
2024-090
Project Type:
Other
Performance Measures:
Affected Counties:
Boulder, Weld
Affected Municipalities:
None
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
Pool contains congressionally directed funds for projects selected in CDOT Region 4 (DRCOG TIP area only).
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congressional Allocation)
$0
$850,000
$0
$0
Local
$0
$177,000
$0
$0
Total
$0
$1,027,000
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$1,027,000
$0
$1,027,000
Amendment History
Date Status Description
11/26/2024
Proposed
Adopted into the 2026-2029 TIP.
11/21/2024
Amended
Transfer scope and funding for High Plains Boulevard into 2022-080. Total project cost decreases.
06/26/2024
Amended
Create new pool for congressionally directed funding in CDOT Region 4.
Project Pools This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name Description Notes Cost
Mead 3rd and Welker Funds in Project 2022-021 $0
Dacono CO52 - WCR7 to WCR15 $850,000
Lyons Saint Vrain Multimodal Trail Funds in Project 2022-013 $0
Weld County High Plains Boulevard - CO66 to WCR34 parallel to I25 Funds in Project 2022-080 $0
2024-2027 Transportation Improvement Program (Approved TIP)
Longmont Microtransit Vehicles
Project Name:
Longmont Microtransit Vehicles
Identification Number:
2024-091
Project Type:
Transit Vehicles
Performance Measures:
Congestion, Transit Assets, Transit Safety
Affected Counties:
Boulder, Weld
Affected Municipalities:
Longmont
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
Vehicles for new Longmont microtransit service.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congressional Allocation-Transit)
$0
$1,000,000
$0
$0
Local
$0
$209,000
$0
$0
Total
$0
$1,209,000
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$1,209,000
$0
$1,209,000
Amendment History
Date Status Description
12/10/2024
Proposed
Adopted into the 2026-2029 TIP.
06/26/2024
Amended
Add new project funded with Congressionally Allocated funding.
2024-2027 Transportation Improvement Program (Approved TIP)
CO7 Corridor Multimodal Improvements
Project Name:
CO7 Corridor Multimodal Improvements
Identification Number:
2024-092
Project Type:
Roadway Operational Improvements
Performance Measures:
Congestion, Freight Reliability, Pavement Condition, Safety, Transit Assets, Travel Time Reliability
Affected Counties:
Adams, Boulder, Broomfield, Weld
Affected Municipalities:
Boulder, Brighton, Broomfield, Erie, Lafayette, Thornton, Unincorporated
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
Improve multimodal safety and increase multimodal capacity at priority locations and intersections along CO7. This project is a packaged bundle of individual projects along the CO7 corridor identified by CDOT and community stakeholders, to benefit Erie, Frederick, and Dacono, and to improve travel and reduce crashes in Boulder, Weld, Adams, and Broomfield counties.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Congressional Allocation-Transit)
$0
$500,000
$0
$0
Local
$0
$104,000
$0
$0
Total
$0
$604,000
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$604,000
$0
$604,000
Amendment History
Date Status Description
11/26/2024
Proposed
Adopted into the 2026-2029 TIP.
06/26/2024
Amended
Add new project funded with Congressionally Allocated funding.
2024-2027 Transportation Improvement Program (Approved TIP)
Denver Area Hydrogen Fueling Stations: FHWA CFI Grant
Project Name:
Denver Area Hydrogen Fueling Stations: FHWA CFI Grant
Identification Number:
2024-093
Project Type:
Other
Performance Measures:
Affected Counties:
Regional
Affected Municipalities:
None
Subregion(s):
Regional
Open to Public:
2028
STIP-ID:
None
Project Scope:
Construct hydrogen fueling stations in Fort Collins, Denver, and Pueblo via federal CFI grant. This project is only showing the Denver metro area funding.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Charging and Fueling Infrastructure)
$3,647,000
$0
$0
$0
Local
$798,000
$0
$0
$0
Total
$4,445,000
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$4,445,000
$0
$4,445,000
Amendment History
Date Status Description
12/10/2024
Proposed
Adopted into the 2026-2029 TIP.
06/26/2024
Amended
Add new project funded with discretionary funds.
2024-2027 Transportation Improvement Program (Approved TIP)
I25 Greenland Wildlife Overpass
Project Name:
I25 Greenland Wildlife Overpass
Identification Number:
2024-094
Project Type:
Other
Performance Measures:
Safety
Affected Counties:
Douglas
Affected Municipalities:
Unincorporated
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
Construct a new wildlife crossing bridge over I25 at Greenland.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Faster Safety)
$0
$0
$0
$0
Federal (Wildlife Crossings Pilot Program)
$0
$22,000,000
$0
$0
State (Faster Safety)
$250,000
$3,250,000
$4,000,000
$0
State (Legislative)
$500,000
$0
$0
$0
Local
$0
$0
$0
$0
Total
$750,000
$25,250,000
$4,000,000
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$750,000
$30,000,000
$0
$30,750,000
Amendment History
Date Status Description
12/06/2024
Proposed
Adopted into the 2026-2029 TIP.
07/22/2024
Amended
Add new project with new Wildlife Crossing Pilot Program funding.
2024-2027 Transportation Improvement Program (Approved TIP)
I25/CO7 Interim Transit Improvements
Project Name:
I25/CO7 Interim Transit Improvements
Identification Number:
2024-095
Project Type:
Transit Operational Improvements
Performance Measures:
Congestion, Safety, Transit Assets, Transit Safety
Affected Counties:
Adams, Broomfield
Affected Municipalities:
Broomfield, Thornton
Subregion(s):
None
Open to Public:
2028
STIP-ID:
None
Project Scope:
Design and construct interim transit improvements at the I25 and CO7 interchange.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Faster Safety)
$0
$0
$0
$0
State (Faster Safety)
$2,000,000
$0
$0
$0
State (Legislative-Transit)
$0
$0
$0
$3,500,000
State (Permanent Water Quality)
$1,249,000
$0
$0
$4,800,000
Local
$0
$0
$0
$0
Total
$3,249,000
$0
$0
$8,300,000
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$14,000,000
$11,549,000
$0
$25,549,000
Amendment History
Date Status Description
12/06/2024
Proposed
Adopted into the 2026-2029 TIP.
07/22/2024
Amended
Create new project. Transfer $14,000,000 in prior year state Legislative-Transit funds from project 2020-100, $1,249,000 in state Permanent Water Quality funds from project 2018-011, and $2,000,000 in state FASTER-Safety funds from project 2008-076. Add $3,500,000 in state Legislative-Transit funds and $4,800,000 in state Permanent Water Quality funds.
2024-2027 Transportation Improvement Program (Approved TIP)
Boulder County Electric Vehicle Charging Infrastructure
Project Name:
Boulder County Electric Vehicle Charging Infrastructure
Identification Number:
2024-096
Project Type:
Other
Performance Measures:
Affected Counties:
Boulder
Affected Municipalities:
None
Subregion(s):
None
Open to Public:
2028
STIP-ID:
None
Project Scope:
Install publicly accessible electric vehicle charging infrastructure to increase access for communities with gaps in electric vehicle charging access; including low and moderate-income neighborhoods, rural areas, and neighborhoods with high densities of multifamily unit dwellings throughout Boulder County. This project is intended to expand and prioritize electric vehicle charging access to underserved communities.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Charging and Fueling Infrastructure)
$4,900,000
$0
$0
$0
Local
$2,100,000
$0
$0
$0
Total
$7,000,000
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$7,000,000
$0
$7,000,000
Amendment History
Date Status Description
11/26/2024
Proposed
Adopted into the 2026-2029 TIP.
07/22/2024
Amended
Add new project with $4,900,000 in federal Charging and Fueling Infrastructure discretionary funds.
2024-2027 Transportation Improvement Program (Approved TIP)
I25 Resurfacing: Mile Post 208 to 214
Project Name:
I25 Resurfacing: Mile Post 208 to 214
Identification Number:
2024-097
Project Type:
Roadway Reconstruction
Performance Measures:
Pavement Condition, Bridge Condition
Affected Counties:
Denver
Affected Municipalities:
Denver
Subregion(s):
None
Open to Public:
2026
STIP-ID:
None
Project Scope:
Resurfacing improvements on I25 from Mile Post 208 to 214.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Bridge On-System)
$0
$3,882,000
$0
$0
Federal (Strategic Safety Funds)
$0
$1,000,000
$0
$0
State (Bridge On-System)
$0
$0
$0
$0
State (Surface Treatment)
$0
$21,500,000
$0
$0
Local
$0
$0
$0
$0
Total
$0
$26,382,000
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$26,382,000
$0
$26,382,000
Amendment History
Date Status Description
12/06/2024
Proposed
Adopted into the 2026-2029 TIP.
09/19/2024
Amended
Add new project with funding from the Region 1 Surface Treatment Pool and Region 1 Bridge On-System Pool.
2024-2027 Transportation Improvement Program (Approved TIP)
Reunited Denver Project: Globeville Elyria-Swansea
Project Name:
Reunited Denver Project: Globeville Elyria-Swansea
Identification Number:
2024-098
Project Type:
Multimodal
Performance Measures:
Bridge Condition, Congestion, Safety
Affected Counties:
Denver
Affected Municipalities:
Denver
Subregion(s):
None
Open to Public:
2025
STIP-ID:
None
Project Scope:
The project will re-establish and improve internal urban connectivity and multimodal personal mobility choices in an area centered on the South Platte River, between Globeville and Elyria-Swansea. Specifically, the Project will include four elements: (1) a new multimodal bridge over the South Platte River with a connective greenway corridor, (2) a new pedestrian bridge over the BNSF, DRIR, and RTD tracks connecting to RTD’s transit station at Brighton Blvd, (3) construct at-grade railroad crossing safety improvements on National Western Drive, and (4) reclaim land for neighborhood uses.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Neighborhood Access and Equity)
$35,475,000
$0
$0
$0
Local
$32,436,000
$0
$0
$0
Total
$67,911,000
$0
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$67,911,000
$0
$67,911,000
Amendment History
Date Status Description
12/06/2024
Proposed
Adopted into the 2026-2029 TIP.
09/19/2024
Amended
Add new project for federal discretionary award through the Reconnecting Communities and Neighborhoods Program.
2024-2027 Transportation Improvement Program (Approved TIP)
Station Outreach for Transit Recovery
Project Name:
Station Outreach for Transit Recovery
Identification Number:
2024-099
Project Type:
Air Quality Improvement Projects
Performance Measures:
Congestion
Affected Counties:
Denver
Affected Municipalities:
Denver
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
Perform community-based social marketing strategies to help increase ridership at four station areas near the University of Denver.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$71,000
$70,000
$0
$0
Local
$15,000
$14,000
$0
$0
Total
$86,000
$84,000
$0
$0
Project Phase to Initiate
TDM
TDM
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$170,000
$0
$170,000
Amendment History
Date Status Description
12/10/2024
Proposed
Adopted into the 2026-2029 TIP.
08/27/2024
Amended
Add new project from Transportation Demand Management Set-Aside wait list.
2024-2027 Transportation Improvement Program (Approved TIP)
Vasquez and BNSF Early Warning Detection System
Project Name:
Vasquez and BNSF Early Warning Detection System
Identification Number:
2024-100
Project Type:
Traffic Signals/ITS
Performance Measures:
Freight Reliability, Safety
Affected Counties:
Adams
Affected Municipalities:
Commerce City
Subregion(s):
None
Open to Public:
2026
STIP-ID:
None
Project Scope:
Design and construction of an early warning detection system on both north and southbound Vasquez Boulevard approaching the bridges carrying BNSF and Union Pacific Railroad tracks due to substandard clearances.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Freight)
$0
$510,000
$0
$0
Local
$0
$0
$0
$0
Total
$0
$510,000
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$510,000
$0
$510,000
Amendment History
Date Status Description
12/06/2024
Proposed
Adopted into the 2026-2029 TIP.
10/17/2024
Amended
Add new project from CDOT Freight Investment Plan.
2024-2027 Transportation Improvement Program (Approved TIP)
US85 Steep Slope Repair
Project Name:
US85 Steep Slope Repair
Identification Number:
2024-101
Project Type:
Other
Performance Measures:
Safety
Affected Counties:
Douglas
Affected Municipalities:
Unincorporated
Subregion(s):
None
Open to Public:
2026
STIP-ID:
None
Project Scope:
Repair the failing slope on US85 just north of Sedalia.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Freight)
$0
$4,200,000
$0
$0
Local
$0
$0
$0
$0
Total
$0
$4,200,000
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$4,200,000
$0
$4,200,000
Amendment History
Date Status Description
12/06/2024
Proposed
Adopted into the 2026-2029 TIP.
10/17/2024
Amended
Add new project from CDOT"s Freight Investment Plan.
2024-2027 Transportation Improvement Program (Approved TIP)
Coordinated Adaptive Ramp Metering Expansion
Project Name:
Coordinated Adaptive Ramp Metering Expansion
Identification Number:
2024-102
Project Type:
Traffic Signals/ITS
Performance Measures:
Congestion, Freight Reliability, Safety, Travel Time Reliability
Affected Counties:
Arapahoe, Denver, Douglas
Affected Municipalities:
None
Subregion(s):
None
Open to Public:
2026
STIP-ID:
None
Project Scope:
Evaluate, plan and design to expand coordinated adaptive ramp metering to four priority Denver region corridors, dispersing the benefits of the single-corridor I25 pilot onto a multi-corridor, smart city network. CDOT will perform critical preliminary work including: systems planning for a comparative assessment of various technologies, meaningful and equitable stakeholder engagement, implementation and feasibility planning, and systems engineering analysis.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Strengthening Mobility and Revolutionizing Transportation)
$0
$1,473,000
$0
$0
Local
$0
$0
$0
$0
Total
$0
$1,473,000
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$1,473,000
$0
$1,473,000
Amendment History
Date Status Description
12/06/2024
Proposed
Adopted into the 2026-2029 TIP.
10/17/2024
Amended
Add new project for federal Strengthening Mobility and Revolutionizing Transportation discretionary award.
2024-2027 Transportation Improvement Program (Approved TIP)
Box Elder Creek Erosion and Flood Protection
Project Name:
Box Elder Creek Erosion and Flood Protection
Identification Number:
2024-103
Project Type:
Other
Performance Measures:
Pavement Condition
Affected Counties:
Adams
Affected Municipalities:
Aurora
Subregion(s):
None
Open to Public:
2026
STIP-ID:
None
Project Scope:
Reconstruct flood-damaged 56th Avenue and Hudson Road at their crossings with Box Elder Creek, providing resilient and adaptive infrastructure to counter future erosion and heavy rain-induced flooding characteristics of the creek's geography.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (PROTECT)
$0
$10,800,000
$0
$0
Local
$0
$3,500,000
$0
$0
Total
$0
$14,300,000
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$14,300,000
$0
$14,300,000
Amendment History
Date Status Description
12/06/2024
Proposed
Adopted into the 2026-2029 TIP.
11/21/2024
Amended
Add new project for federal Promoting Resilient Operations for Transformative, Efficient, and Cost-saving Transportation discretionary award.
2024-2027 Transportation Improvement Program (Approved TIP)
Safe Streets for Boulder
Project Name:
Safe Streets for Boulder
Identification Number:
2024-104
Project Type:
Safety
Performance Measures:
Safety
Affected Counties:
Boulder
Affected Municipalities:
Boulder
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
Implement safe-systems, vision zero infrastructure at locations throughout the city of Boulder on key arterials, such as 30th Street, Arapahoe Avenue, Pearl, 28th Street, Broadway, Table Mesa and Folsom. Improvements will include pedestrian crossing treatment upgrades, protected intersections, missing sidewalk links, protected bicycle facilities and traffic signal upgrades to improve safety operations.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Safe Streets and Roads for All)
$0
$2,000,000
$3,600,000
$8,000,000
Local
$0
$500,000
$900,000
$2,000,000
Total
$0
$2,500,000
$4,500,000
$10,000,000
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$17,000,000
$11,790,000
$28,790,000
Amendment History
Date Status Description
12/06/2024
Proposed
Adopted into the 2026-2029 TIP.
11/21/2024
Amended
Create new project for federal discretionary award.
2024-2027 Transportation Improvement Program (Approved TIP)
US287 Safety Median: Lafayette to Larimer County Line
Project Name:
US287 Safety Median: Lafayette to Larimer County Line
Identification Number:
2024-105
Project Type:
Safety
Performance Measures:
Safety
Affected Counties:
Boulder
Affected Municipalities:
Lafayette, Longmont, Unincorporated
Subregion(s):
None
Open to Public:
None
STIP-ID:
SR46666.114
Project Scope:
Install concrete barrier in the median from milepost 305 in Lafayette to milepost 325 which is south of Berthoud, outside the DRCOG region, to prevent vehicles from crossing over and to improve public safety in the US287 corridor.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Faster Safety)
$0
$0
$0
$0
Federal (INFRA)
$0
$11,539,000
$0
$0
State (Faster Safety)
$0
$1,700,000
$2,018,000
$0
State (Safety)
$0
$0
$1,354,000
$2,748,000
Local
$0
$0
$0
$0
Total
$0
$13,239,000
$3,372,000
$2,748,000
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$19,359,000
$0
$19,359,000
Amendment History
Date Status Description
01/15/2025
Proposed
Adopted into the 2026-2029 TIP.
01/15/2025
Amended
Add $4,102,000 in state Safety funding and $3,718,000 in state FASTER-Safety funding. Total project cost increases.
11/21/2024
Amended
Add new project for federal INFRA discretionary grant award.
2024-2027 Transportation Improvement Program (Approved TIP)
Lena Gulch
Identification Number:
2024-106
Project Type:
Other
Performance Measures:
Affected Counties:
Jefferson
Affected Municipalities:
Golden
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
Install culverts, construct a regional detention facility, stabilize eroding channels, add safety signage, and fill sections with rocks and natural materials to improve water flow during flooding events in Lena Gulch, which runs along US40.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (PROTECT)
$0
$23,800,000
$0
$0
Local
$0
$6,200,000
$0
$0
Total
$0
$30,000,000
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$30,000,000
$0
$30,000,000
Amendment History
Date Status Description
12/06/2024
Proposed
Adopted into the 2026-2029 TIP.
11/21/2024
Amended
Add new project for federal PROTECT discretionary grant award.
2024-2027 Transportation Improvement Program (Approved TIP)
Sanderson Gulch Resiliency
Project Name:
Sanderson Gulch Resiliency
Identification Number:
2024-107
Project Type:
Other
Performance Measures:
Congestion, Safety
Affected Counties:
Denver
Affected Municipalities:
Denver
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
Construct a realigned trail, lower the creek, replace culverts under roadways, add two accessible multiuse trail underpasses and make nature-based creek improvements to address flooding risks along Sanderson Gulch in Ruby Hill.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (PROTECT)
$0
$4,000,000
$0
$0
Local
$0
$16,607,000
$0
$0
Total
$0
$20,607,000
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$20,607,000
$0
$20,607,000
Amendment History
Date Status Description
12/06/2024
Proposed
Adopted into the 2026-2029 TIP.
11/21/2024
Amended
Add new federal PROTECT discretionary award.
2024-2027 Transportation Improvement Program (Approved TIP)
Equitably Restoring Colfax and Federal Mobility and Land Use
Project Name:
Equitably Restoring Colfax and Federal Mobility and Land Use
Identification Number:
2024-108
Project Type:
Roadway Operational Improvements
Performance Measures:
Congestion, Safety
Affected Counties:
Denver
Affected Municipalities:
Denver
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
Complete planning, design and public outreach work to remove a cloverleaf interchange barrier, reconnect neighborhoods and reimagine land use opportunities that reflect community needs and desires. Deliverables include preliminary engineering, completion of NEPA process and achieving 10% design.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Reconnecting Communities and Neighborhoods)
$0
$2,000,000
$0
$0
State (Colorado Transportation Investment Office)
$0
$400,000
$0
$0
Total
$0
$2,400,000
$0
$0
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$2,400,000
$0
$2,400,000
Amendment History
Date Status Description
12/06/2024
Proposed
Adopted into the 2026-2029 TIP.
11/21/2024
Amended
Add new federal discretionary project.
2024-2027 Transportation Improvement Program (Approved TIP)
Bike Plus Data Fusion
Project Name:
Bike Plus Data Fusion
Identification Number:
2024-109
Project Type:
Other
Performance Measures:
Congestion
Affected Counties:
Boulder, Denver
Affected Municipalities:
Boulder, Denver
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
The City and County of Denver and the City of Boulder will collaborate to pilot traditional and emerging data fusion techniques to estimate bike+ volumes.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$0
$400,000
$0
$0
Local
$0
$0
$0
$0
Total
$0
$400,000
$0
$0
Project Phase to Initiate
None
Other Phase
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$400,000
$0
$400,000
Amendment History
Date Status Description
12/30/2024
Proposed
Adopted into the 2026-2029 TIP.
12/20/2024
Amended
Add new Innovative Mobility Set-Aside project.
2024-2027 Transportation Improvement Program (Approved TIP)
Florida Corridor Improvements Study
Project Name:
Florida Corridor Improvements Study
Identification Number:
2024-110
Project Type:
Study
Performance Measures:
Congestion
Affected Counties:
Arapahoe
Affected Municipalities:
Unincorporated
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
DRCOG will partner with Arapahoe County to evaluate enhancing transportation options along the Florida Avenue Corridor in unincorporated Arapahoe County.
This project includes both the Florida Corridor Micromobility Hubs project funded through the Innovative Mobility Set-Aside and the Florida Corridor Multimodal Improvements project funded through the Livable Centers Small-Area Planning Set-Aside.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$0
$225,000
$0
$0
Local
$0
$0
$0
$0
Total
$0
$225,000
$0
$0
Project Phase to Initiate
None
Study
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$225,000
$0
$225,000
Amendment History
Date Status Description
12/30/2024
Proposed
Adopted into the 2026-2029 TIP.
12/20/2024
Amended
Add new Innovative Mobility Set-Aside and Livable Centers Small-Area Set-Aside project.
2024-2027 Transportation Improvement Program (Approved TIP)
Golden Docked Bike Share Feasibility Analysis
Project Name:
Golden Docked Bike Share Feasibility Analysis
Identification Number:
2024-111
Project Type:
Study
Performance Measures:
Congestion
Affected Counties:
Jefferson
Affected Municipalities:
Golden
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
The City of Golden will conduct a docked bike share feasibility analysis.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$0
$150,000
$0
$0
Local
$0
$0
$0
$0
Total
$0
$150,000
$0
$0
Project Phase to Initiate
None
Study
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$150,000
$0
$150,000
Amendment History
Date Status Description
12/30/2024
Proposed
Adopted into the 2026-2029 TIP.
12/20/2024
Amended
Add new Innovative Mobility Set-Aside project.
2024-2027 Transportation Improvement Program (Approved TIP)
Denver Curbside Digital Twin
Project Name:
Denver Curbside Digital Twin
Identification Number:
2024-112
Project Type:
Other
Performance Measures:
Congestion, Freight Reliability
Affected Counties:
Denver
Affected Municipalities:
Denver
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
The City and County of Denver will pilot the development of digital curb data in select areas of the city utilizing the Curb Data Specification.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$0
$250,000
$0
$0
Local
$0
$0
$0
$0
Total
$0
$250,000
$0
$0
Project Phase to Initiate
None
Other Phase
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$250,000
$0
$250,000
Amendment History
Date Status Description
12/30/2024
Proposed
Adopted into the 2026-2029 TIP.
12/20/2024
Amended
Add new Innovative Mobility Set-Aside project.
2024-2027 Transportation Improvement Program (Approved TIP)
Near Miss Analytics
Project Name:
Near Miss Analytics
Identification Number:
2024-113
Project Type:
Study
Performance Measures:
Safety
Affected Counties:
Adams
Affected Municipalities:
Thornton
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
The City of Thornton will use video analytics to assess near miss crashes at several intersections on the High Injury Network.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$0
$150,000
$0
$0
Local
$0
$0
$0
$0
Total
$0
$150,000
$0
$0
Project Phase to Initiate
None
Study
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$150,000
$0
$150,000
Amendment History
Date Status Description
12/30/2024
Proposed
Adopted into the 2026-2029 TIP.
12/20/2024
Amended
Add new Innovative Mobility Set-Aside project.
2024-2027 Transportation Improvement Program (Approved TIP)
Parker Mobility on Demand and Microtransit Feasibility Study
Project Name:
Parker Mobility on Demand and Microtransit Feasibility Study
Identification Number:
2024-114
Project Type:
Study
Performance Measures:
Congestion
Affected Counties:
Douglas
Affected Municipalities:
Parker
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
The Town of Parker will conduct a feasibility study to asess potential mobility on demand and microtransit solutions that provide transportation choices in their community.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$0
$150,000
$0
$0
Local
$0
$0
$0
$0
Total
$0
$150,000
$0
$0
Project Phase to Initiate
None
Study
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$150,000
$0
$150,000
Amendment History
Date Status Description
12/30/2024
Proposed
Adopted into the 2026-2029 TIP.
12/20/2024
Amended
Add new Innovative Mobility Set-Aside project.
2024-2027 Transportation Improvement Program (Approved TIP)
Downtown Boulder Garage Mobility Hub Concept Planning
Project Name:
Downtown Boulder Garage Mobility Hub Concept Planning
Identification Number:
2024-115
Project Type:
Study
Performance Measures:
Congestion
Affected Counties:
Boulder
Affected Municipalities:
Boulder
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
The City of Boulder will develop concept plans to implement multimodal mobility hubs in their Central Area General Improvement District area.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$0
$250,000
$0
$0
Local
$0
$0
$0
$0
Total
$0
$250,000
$0
$0
Project Phase to Initiate
None
Study
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$250,000
$0
$250,000
Amendment History
Date Status Description
12/30/2024
Proposed
Adopted into the 2026-2029 TIP.
12/20/2024
Amended
Add new Innovative Mobility Set-Aside project.
2024-2027 Transportation Improvement Program (Approved TIP)
Fitzsimons Innovative Transportation Solutions Study
Project Name:
Fitzsimons Innovative Transportation Solutions Study
Identification Number:
2024-116
Project Type:
Study
Performance Measures:
Congestion
Affected Counties:
Adams
Affected Municipalities:
Aurora
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
Assess current transportation conditions and explore strategies to enhance multimodal access to the Fitzsimons Urban Center. Stakeholders include City of Aurora.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$0
$300,000
$0
$0
Local
$0
$0
$0
$0
Total
$0
$300,000
$0
$0
Project Phase to Initiate
None
Study
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$300,000
$0
$300,000
Amendment History
Date Status Description
12/30/2024
Proposed
Adopted into the 2026-2029 TIP.
12/20/2024
Amended
Add new Livable Centers Small-Area Set-Aside project.
2024-2027 Transportation Improvement Program (Approved TIP)
Mobility Needs Assessment Framework for the Boulder County Housing Authority
Project Name:
Mobility Needs Assessment Framework for the Boulder County Housing Authority
Identification Number:
2024-117
Project Type:
Study
Performance Measures:
Congestion
Affected Counties:
Boulder
Affected Municipalities:
None
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
Develop a toolkit for evaluating multimodal transportation improvements to enhance connectivity and access to destinations for residents of Boulder County Housing Authority properties.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$0
$150,000
$0
$0
Local
$0
$0
$0
$0
Total
$0
$150,000
$0
$0
Project Phase to Initiate
None
Study
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$150,000
$0
$150,000
Amendment History
Date Status Description
12/30/2024
Proposed
Adopted into the 2026-2029 TIP.
12/20/2024
Amended
Add new Livable Centers Small-Area Set-Aside project.
2024-2027 Transportation Improvement Program (Approved TIP)
Transit Oriented Communities, Land Use, Housing Type Diversity Analysis and Housing Needs Assessment
Project Name:
Transit Oriented Communities, Land Use, Housing Type Diversity Analysis and Housing Needs Assessment
Identification Number:
2024-118
Project Type:
Study
Performance Measures:
Congestion
Affected Counties:
Adams, Jefferson
Affected Municipalities:
Arvada
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
Conduct a land use, housing type diversity and housing needs assessment in Arvada's transit areas to enhance housing options and connectivity.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$0
$140,000
$0
$0
Local
$0
$0
$0
$0
Total
$0
$140,000
$0
$0
Project Phase to Initiate
None
Study
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$140,000
$0
$140,000
Amendment History
Date Status Description
12/30/2024
Proposed
Adopted into the 2026-2029 TIP.
12/20/2024
Amended
Add new Livable Centers Small-Area Set-Aside project.
2024-2027 Transportation Improvement Program (Approved TIP)
East Midtown Centennial Small Area Plan
Project Name:
East Midtown Centennial Small Area Plan
Identification Number:
2024-119
Project Type:
Study
Performance Measures:
Congestion
Affected Counties:
Arapahoe
Affected Municipalities:
Centennial
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
Provide a framework for the evolution of the East Midtown area, guiding its development into a vibrant, mixed-use district with housing, commercial spaces and enhanced multimodal transportation options.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$0
$125,000
$0
$0
Local
$0
$0
$0
$0
Total
$0
$125,000
$0
$0
Project Phase to Initiate
None
Study
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$125,000
$0
$125,000
Amendment History
Date Status Description
12/30/2024
Proposed
Adopted into the 2026-2029 TIP.
12/20/2024
Amended
Add new Livable Centers Small-Area Set-Aside project.
2024-2027 Transportation Improvement Program (Approved TIP)
City of Sheridan Housing and Transportation Strategies Study
Project Name:
City of Sheridan Housing and Transportation Strategies Study
Identification Number:
2024-120
Project Type:
Study
Performance Measures:
Congestion
Affected Counties:
Arapahoe
Affected Municipalities:
Sheridan
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
Develop policies and strategies to enhance housing opportunities and transportation access in the City of Sheridan.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$0
$100,000
$0
$0
Local
$0
$0
$0
$0
Total
$0
$100,000
$0
$0
Project Phase to Initiate
None
Study
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$100,000
$0
$100,000
Amendment History
Date Status Description
12/30/2024
Proposed
Adopted into the 2026-2029 TIP.
12/20/2024
Amended
Add new Livable Centers Small-Area Set-Aside project.
2024-2027 Transportation Improvement Program (Approved TIP)
Edgewater Sheridan Corridor Livable Center
Project Name:
Edgewater Sheridan Corridor Livable Center
Identification Number:
2024-121
Project Type:
Study
Performance Measures:
Congestion
Affected Counties:
Jefferson
Affected Municipalities:
Edgewater
Subregion(s):
None
Open to Public:
None
STIP-ID:
None
Project Scope:
Enhance land use, housing and transportation strategies to improve livability and multimodal connections within the Sheridan Corridor in the City of Edgewater.
Four Year Funding by Funding Types
Funding Type Federal Fiscal Year 2024 Federal Fiscal Year 2025 Federal Fiscal Year 2026 Federal Fiscal Year 2027
Federal (Surface Transportation Block Grant)
$0
$100,000
$0
$0
Local
$0
$0
$0
$0
Total
$0
$100,000
$0
$0
Project Phase to Initiate
None
Study
None
None
Overall Funding
Prior Funding Four Year Period Future Funding Total Funding
$0
$100,000
$0
$100,000
Amendment History
Date Status Description
12/30/2024
Proposed
Adopted into the 2026-2029 TIP.
12/20/2024
Amended
Add new Livable Centers Small-Area Set-Aside project.