Fiscal Year 2026-2029 Transportation Improvement Program Projects
Denver Regional Council of Governments

Projects in order by Project Number


June 2026 Administrative Modifications


2001-154
US85 Widening: Cook Ranch to Meadows

Amendment Reason: Add $500,000 in federal Congressionally Directed Spending funds. Total project cost increases.

Added Federal Funding Congressional Allocation $500,000

Existing Project


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
No Current Four-Year Funding $0 $0 $0 $0
Total $0 $0 $0 $0

Revised Funding Table


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congressional Allocation) $500,000 $0 $0 $0
Federal (Faster Safety) $0 $0 $0 $0
Federal (Freight) $0 $0 $0 $0
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
State (Faster Safety) $0 $0 $0 $0
State (Regional Priority Projects) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $500,000 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$94,702,000 $500,000 $37,300,000 $132,502,000



2007-073
Region 1 Hazard Elimination Pool

Amendment Reason: Add $1,000,000 in federal Strategic Safety Funds. Total project cost increases.

Added Federal Funding Corridor Operations and Bottleneck Reduction Assistance $1,050,000
Added State Funding Safety $40,200,000
Added Federal Funding Strategic Safety Funds $1,000,000

Existing Project


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
No Current Four-Year Funding $0 $0 $0 $0
Total $0 $0 $0 $0

Revised Funding Table


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Corridor Operations and Bottleneck Reduction Assistance) $1,050,000 $0 $0 $0
Federal (Strategic Safety Funds) $0 $1,000,000 $0 $0
State (Corridor Operations and Bottleneck Reduction Assistance) $0 $0 $0 $0
State (Safety) $16,400,000 $23,800,000 $0 $0
Local $0 $0 $0 $0
Total $17,450,000 $24,800,000 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$0 $42,250,000 $0 $42,250,000



2007-091
Region 4 Traffic Signal Pool

Amendment Reason: Add $2,526,000 in state Safety funds. Total project cost increases.

Added State Funding Safety $4,476,000

Existing Project


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
No Current Four-Year Funding $0 $0 $0 $0
Total $0 $0 $0 $0

Revised Funding Table


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
State (Planning and Research Initiatives) $0 $0 $0 $0
State (Safety) $1,156,000 $1,730,000 $250,000 $1,340,000
Local $0 $0 $0 $0
Total $1,156,000 $1,730,000 $250,000 $1,340,000


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$250,000 $4,476,000 $0 $4,726,000



2007-094
Region 4 Hazard Elimination Pool

Amendment Reason: Add $4,286,000 in federal Strategic Safety Funds and remove $800,000 in state Safety funds. Total project cost increases.

Added State Funding Safety $3,200,000
Added Local Funding Safety $3,694,000
Added Federal Funding Strategic Safety Funds $4,386,000

Existing Project


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
No Current Four-Year Funding $0 $0 $0 $0
Total $0 $0 $0 $0

Revised Funding Table


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Strategic Safety Funds) $1,800,000 $25,000 $25,000 $2,536,000
State (Safety) $200,000 $1,000,000 $1,000,000 $1,000,000
Local $415,000 $1,000,000 $1,000,000 $1,279,000
Total $2,415,000 $2,025,000 $2,025,000 $4,815,000


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$7,000,000 $11,280,000 $0 $18,280,000



2007-096
Region 1 Surface Treatment Pool

Amendment Reason: Add $615,000 in federal Strategic Safety funds and adjust two pool projects. Total project cost increases.

Added Federal Funding Strategic Safety Funds $615,000
Added State Funding Surface Treatment $170,409,000
Pool Added - CO88 (Federal Boulevard)
Pool Added - CO86
Pool Added - US40
Pool Added - SH-391
Pool Added - SH-265
Pool Added - CO8
Pool Added - Design
Pool Added - CO74
Pool Added - US285
Pool Added - CO83
Pool Added - US6
Pool Added - Alameda
Pool Added - CO88
Pool Added - CO72
Pool Added - CO121
Pool Added - Maintenance
Pool Added - US285
Pool Added - CO35
Pool Added - I76
Pool Added - C470
Pool Added - I70
Pool Added - CO46
Pool Added - CO79
Pool Added - CO8
Pool Added - CO22
Pool Added - I25 Ramp Resurfacing
Pool Added - CO224

Existing Project


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
No Current Four-Year Funding $0 $0 $0 $0
Total $0 $0 $0 $0

Revised Funding Table


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Strategic Safety Funds) $0 $615,000 $0 $0
State (Surface Treatment) $35,187,000 $57,164,000 $40,834,000 $37,224,000
Local $0 $0 $0 $0
Total $35,187,000 $57,779,000 $40,834,000 $37,224,000


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$61,121,000 $171,024,000 $0 $232,145,000

Revised Pool Project Listing

This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.


Agency/Project NameDescriptionNotesCost
CO88 (Federal Boulevard)Alameda to Louisiana$10,000,000
CO86Woodlands Blvd to IREA Access$3,000,000
US40MP 252 to I70$9,500,000
SH-391Hampden Ave to Jewell Ave$4,700,000
SH-265I-70 to US-6$4,600,000
CO8Soda Lakes Rd to McIntyre St$4,000,000
DesignVarious Locations$2,000,000
CO74Evergreen Downtown to Cold Springs Gulch$10,000,000
US285Federal to Dahlia$13,300,000
CO83MP 70.9 to Mississippi$6,300,000
US619th to ColfaxProject includes $265,000 in Strategic Safety Funds.$7,765,000
AlamedaBryant to S Lipan St$3,500,000
CO88West Asbury to South Prince$11,300,000
CO72I70 to W 52nd$10,000,000
CO1214th to 37th$7,000,000
MaintenanceVarious Locations$2,000,000
US285Pine Junction to Foxton Road$12,900,000
CO35I70 to I270$1,000,000
I76I70 to Federal Boulevard$8,000,000
C470Ken Caryl to Wadsworth$8,100,000
I70Chambers to E470$10,700,000
CO46CO119 to Golden Gate Canyon Road$5,800,000
CO79Mile Post 1.6 to 4.1$2,600,000
CO8Old Kipling to WadsworthProject includes $350,000 in Strategic Safety Funds.$2,050,000
CO22Mile Post 0 to 2.5$2,900,000
I25 Ramp ResurfacingCounty Line Road to Southbound I25 and Westbound 6th to Northbound I25$1,480,000
CO224I25 to US6$7,000,000 in Project# 2020-068$0



2020-032
88th Widening: I76 to CO2

Amendment Reason: Add $850,000 in federal Congressionally Directed Spending funds. Total project cost increases.

Added Federal Funding Congressional Allocation $850,000

Existing Project


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
No Current Four-Year Funding $0 $0 $0 $0
Total $0 $0 $0 $0

Revised Funding Table


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congressional Allocation) $850,000 $0 $0 $0
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
Federal (Transportation Alternatives-DRCOG) $0 $0 $0 $0
State (MMOF) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $850,000 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$34,450,000 $850,000 $0 $35,300,000



2020-040
CO42 Multimodal Improvements: Empire/Lock to CO7 - Precon

Amendment Reason: Change funding type from 10 Year Plan - Capital to state 10 Year Plan. Total project cost remains the same.

Added State Funding Legislative $870,000

Existing Project


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
No Current Four-Year Funding $0 $0 $0 $0
Total $0 $0 $0 $0

Revised Funding Table


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (10 Year Plan) $0 $0 $0 $0
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
State (10 Year Plan) $0 $0 $0 $0
State (House Bill 1466 - MMOF) $0 $0 $0 $0
State (Legislative) $870,000 $0 $0 $0
Local $0 $0 $0 $0
Total $870,000 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$8,500,000 $870,000 $0 $9,370,000



2020-060
Mineral/Santa Fe Operational Improvements

Amendment Reason: Add $850,000 in federal Congressionally Directed Spending funds. Total project cost increases.

Added Federal Funding Congressional Allocation $850,000
Added State Funding Faster Safety $1,700,000

Existing Project


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
No Current Four-Year Funding $0 $0 $0 $0
Total $0 $0 $0 $0

Revised Funding Table


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality) $0 $0 $0 $0
Federal (Congressional Allocation) $850,000 $0 $0 $0
Federal (Faster Safety) $0 $0 $0 $0
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
State (Faster Safety) $1,700,000 $0 $0 $0
Local $0 $0 $0 $0
Total $2,550,000 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$27,431,000 $2,550,000 $0 $29,981,000



2020-081
CO119 Operational Improvements: Boulder to Longmont

Amendment Reason: Change funding type from 10 Year Plan - Capital to state 10 Year Plan. Total project cost remains the same.

Added Federal Funding Critical Culvert $136,000
Added State Funding Faster Safety $15,000,000
Added State Funding Legislative $7,711,000
Added Federal Funding RAISE $15,000,000
Added Local Funding RAISE $2,000,000
Added State Funding Surface Treatment $850,000
Added Federal Funding Transportation Alternatives-CDOT $1,679,000
Added Local Funding Transportation Alternatives-CDOT $662,000

Existing Project


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
No Current Four-Year Funding $0 $0 $0 $0
Total $0 $0 $0 $0

Revised Funding Table


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (10 Year Plan) $0 $0 $0 $0
Federal (Critical Culvert) $136,000 $0 $0 $0
Federal (Faster Safety) $0 $0 $0 $0
Federal (MMOF - ARPA - DRCOG) $0 $0 $0 $0
Federal (RAISE) $15,000,000 $0 $0 $0
Federal (STBG-Pandemic) $0 $0 $0 $0
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
Federal (Transportation Alternatives-CDOT) $1,679,000 $0 $0 $0
State (10 Year Plan) $0 $0 $0 $0
State (Faster Safety) $15,000,000 $0 $0 $0
State (House Bill 1466 - MMOF) $0 $0 $0 $0
State (Intelligent Transportation System) $0 $0 $0 $0
State (Legislative) $4,719,000 $2,992,000 $0 $0
State (Planning and Research Initiatives) $0 $0 $0 $0
State (Regional Priority Projects) $0 $0 $0 $0
State (Surface Treatment) $850,000 $0 $0 $0
Local $1,662,000 $1,000,000 $0 $0
Local (RTD Funds Only) $0 $0 $0 $0
Total $39,046,000 $3,992,000 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$143,721,000 $43,038,000 $0 $186,759,000



2022-028
Region 1 Congressionally Directed Funding Pool

Amendment Reason: Add 11 new pool projects and $4,350,000 in federal Congressionally Directed Spending funds. Total project cost increases.

Added Federal Funding Congressional Allocation $4,350,000
Pool Added - Golden
Pool Added - Commerce City
Pool Added - Golden
Pool Added - Thornton
Pool Added - Douglas County
Pool Added - Aurora
Pool Added - Aurora
Pool Added - Littleton
Pool Added - Aurora
Pool Added - Arapahoe County
Pool Added - Commerce City
Pool Added - Brighton
Pool Added - Broomfield
Pool Added - Federal Heights

Existing Project


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
No Current Four-Year Funding $0 $0 $0 $0
Total $0 $0 $0 $0

Revised Funding Table


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congressional Allocation) $4,350,000 $0 $0 $0
Local $0 $0 $0 $0
Total $4,350,000 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$8,136,000 $4,350,000 $0 $12,486,000

Revised Pool Project Listing

This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.


Agency/Project NameDescriptionNotesCost
GoldenSH-93 Design$2,320,000
Commerce CityChambers Avenue Widening$4,116,000
GoldenCompactor/Roller Purchase$850,000
ThorntonQuebec Street Widening$850,000
Douglas CountyUS85 (Sedalia to Meadows Parkway)$500,000
AuroraHavana Street Corridor Multimodal Improvements Project$850,000
AuroraBox Elder Creek Roadway Improvements$500,000 included in TIP# 2024-103$0
LittletonSanta Fe Drive and Mineral Avenue Intersection Improvements$850,000 included in TIP# 2020-060$0
AuroraMontview Boulevard Complete Streets$250,000
Arapahoe CountyI70/Aerotropolis Parkway Interchange$250,000
Commerce City88th Avenue: I76 to CO2 Corridor Improvement$850,000 included in TIP# 2020-032$0
BrightonI76 and Bromley Lane Capital Improvements$900,000
Broomfield10th Avenue/Birch Elementary Safety Improvements$850,000
Federal HeightsNorth Pecos Street Culvert Replacement$1,250,000



2022-061
30th Street Complete Streets: CO119 to CO7

Amendment Reason: Change funding type from 10 Year Plan - Mobility to state 10 Year Plan. Total project cost remains the same.

Added State Funding 10 Year Plan $300,000

Existing Project


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
No Current Four-Year Funding $0 $0 $0 $0
Total $0 $0 $0 $0

Revised Funding Table


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (10 Year Plan) $0 $0 $0 $0
Federal (MMOF - ARPA - DRCOG) $0 $0 $0 $0
Federal (Transportation Alternatives-DRCOG) $0 $0 $0 $0
State (10 Year Plan) $300,000 $0 $0 $0
State (House Bill 1466 - MMOF) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $300,000 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$1,000,000 $300,000 $0 $1,300,000



2022-078
Central Corridor Rail Replacement: I25/Broadway Station to 30th/Downing Station

Amendment Reason: Add $850,000 in federal Congressionally Directed Spending funds. Total project cost increases.

Added Federal Funding Congressional Allocation-Transit $850,000

Existing Project


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
No Current Four-Year Funding $0 $0 $0 $0
Total $0 $0 $0 $0

Revised Funding Table


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congressional Allocation-Transit) $850,000 $0 $0 $0
Local $0 $0 $0 $0
Total $850,000 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$5,063,000 $850,000 $0 $5,913,000



2022-080
I25 Segment 5: CO66 to WCR38

Amendment Reason: Change funding type from 10 Year Plan - Capital to state 10 Year Plan. Total project cost remains the same.

Added State Funding 10 Year Plan $18,377,000
Added Federal Funding Bridge Formula Program $13,463,000
Added State Funding Faster Safety $1,605,000

Existing Project


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
No Current Four-Year Funding $0 $0 $0 $0
Total $0 $0 $0 $0

Revised Funding Table


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (10 Year Plan) $0 $0 $0 $0
Federal (Bridge Formula Program) $11,983,000 $1,480,000 $0 $0
Federal (Congressional Allocation) $0 $0 $0 $0
Federal (Faster Safety) $0 $0 $0 $0
Federal (TIFIA) $0 $0 $0 $0
State (10 Year Plan) $18,377,000 $0 $0 $0
State (Faster Safety) $1,605,000 $0 $0 $0
State (Legislative) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $31,965,000 $1,480,000 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$178,900,000 $33,445,000 $0 $212,345,000



2022-081
U85/168th Intersection Improvements

Amendment Reason: Change funding type from 10 Year Plan - Capital to state 10 Year Plan. Total project cost remains the same.

Existing Project


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
No Current Four-Year Funding $0 $0 $0 $0
Total $0 $0 $0 $0

Revised Funding Table


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (10 Year Plan) $0 $0 $0 $0
State (10 Year Plan) $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$300,000 $0 $0 $300,000



2022-082
Arapahoe Ave Multimodal Improvements: 28th to Foothills - Precon

Amendment Reason: Change funding type from 10 Year Plan - Mobility to state 10 Year Plan. Total project cost remains the same.

Existing Project


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
No Current Four-Year Funding $0 $0 $0 $0
Total $0 $0 $0 $0

Revised Funding Table


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (10 Year Plan) $0 $0 $0 $0
Federal (Congestion Mitigation / Air Quality) $0 $0 $0 $0
State (10 Year Plan) $0 $0 $0 $0
State (Legislative) $0 $0 $0 $0
State (MMOF) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$2,967,000 $0 $0 $2,967,000



2024-038
CO66 Multi-Use Trail: Hover to Main

Amendment Reason: Remove project funding at sponsor"s request. Total project cost decreases.

Existing Project


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
No Current Four-Year Funding $0 $0 $0 $0
Total $0 $0 $0 $0

Revised Funding Table


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$0 $0 $0 $0



2024-103
Box Elder Creek Erosion and Flood Protection

Amendment Reason: Add $500,000 in federal Congressionally Directed Spending funds. Total project cost increases.

Added Federal Funding Congressional Allocation $500,000

Existing Project


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
No Current Four-Year Funding $0 $0 $0 $0
Total $0 $0 $0 $0

Revised Funding Table


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congressional Allocation) $500,000 $0 $0 $0
Federal (PROTECT) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $500,000 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$14,300,000 $500,000 $0 $14,800,000



2026-005
CO66 and 75th Street Intersection Operational Improvements

Amendment Reason: Change funding type from 10 Year Plan - Capital to state 10 Year Plan. Total project cost remains the same.

Added State Funding 10 Year Plan $124,000
Added State Funding Legislative $1,876,000

Existing Project


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
No Current Four-Year Funding $0 $0 $0 $0
Total $0 $0 $0 $0

Revised Funding Table


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (10 Year Plan) $0 $0 $0 $0
State (10 Year Plan) $124,000 $0 $0 $0
State (Legislative) $1,876,000 $0 $0 $0
Local $0 $0 $0 $0
Total $2,000,000 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$0 $2,000,000 $0 $2,000,000



2026-021
I70 and Kipling Bridge Deck Repairs

Amendment Reason: Swap state Regional Priority Project funding for federal 10-Year Plan funding and add $550,000 federal 10-Year Plan funding. Total project cost increases.

Added Federal Funding 10 Year Plan $4,450,000
Added Federal Funding Freight $1,000,000

Existing Project


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
No Current Four-Year Funding $0 $0 $0 $0
Total $0 $0 $0 $0

Revised Funding Table


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (10 Year Plan) $0 $4,450,000 $0 $0
Federal (Freight) $1,000,000 $0 $0 $0
State (10 Year Plan) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $1,000,000 $4,450,000 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$0 $5,450,000 $0 $5,450,000



2026-030
Transit Oriented Communities Infrastructure Pool

Amendment Reason: Add new pool with three pool projects for the Transit Oriented Community Infrastructure Grants from the Colorado Department of Local Affairs.

Added State Funding Legislative $12,535,000
Added Local Funding Legislative $82,323,000
Added Local Funding RTD Funds Only $16,403,000
Pool Added - Longmont
Pool Added - Denver
Pool Added - Wheat Ridge

Existing Project


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
No Current Four-Year Funding $0 $0 $0 $0
Total $0 $0 $0 $0

Revised Funding Table


Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
State (Legislative) $12,535,000 $0 $0 $0
Local $82,323,000 $0 $0 $0
Local (RTD Funds Only) $16,403,000 $0 $0 $0
Total $111,261,000 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$0 $111,261,000 $0 $111,261,000

Revised Pool Project Listing

This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.


Agency/Project NameDescriptionNotesCost
LongmontDowntown Transit Hub at 1st and Main$4,000,000
DenverBroadway Station Pedestrian Bridge$4,000,000
Wheat RidgeRidge Road Public Infrastructure$4,535,000