Fiscal Year 2026-2029 Transportation Improvement Program Projects Denver Regional Council of Governments
Projects in order by Project Number
June 2025 Administrative Modifications
1997-084
RTD Preventive Maintenance: Transit Vehicle Overhaul and Maintenance
Amendment Reason: Correct prior funding amount following final Federal Transit Administration apportionments. Total project cost increases.
Existing Project
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Section 5307)
$87,400,000
$90,000,000
$92,700,000
$95,500,000
State (Section 5307)
$0
$0
$0
$0
Local
$29,100,000
$30,000,000
$30,900,000
$31,850,000
Total
$116,500,000
$120,000,000
$123,600,000
$127,350,000
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$279,413,000
$487,450,000
$0
$766,863,000
Revised Funding Table
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Section 5307)
$87,400,000
$90,000,000
$92,700,000
$95,500,000
State (Section 5307)
$0
$0
$0
$0
Local
$29,100,000
$30,000,000
$30,900,000
$31,850,000
Total
$116,500,000
$120,000,000
$123,600,000
$127,350,000
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$282,862,000
$487,450,000
$0
$770,312,000
1999-052
State of Good Repair
Amendment Reason: Correct prior funding following final Federal Transit Administration apportionments. Total project cost increases.
Existing Project
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Section 5337 State of Good Repair)
$28,900,000
$29,800,000
$30,694,000
$31,615,000
State (Section 5337 State of Good Repair)
$0
$0
$0
$0
Local
$7,200,000
$7,440,000
$7,674,000
$7,904,000
Total
$36,100,000
$37,240,000
$38,368,000
$39,519,000
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$78,445,000
$151,227,000
$0
$229,672,000
Revised Funding Table
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Section 5337 State of Good Repair)
$28,900,000
$29,800,000
$30,694,000
$31,615,000
State (Section 5337 State of Good Repair)
$0
$0
$0
$0
Local
$7,200,000
$7,440,000
$7,674,000
$7,904,000
Total
$36,100,000
$37,240,000
$38,368,000
$39,519,000
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$87,606,000
$151,227,000
$0
$238,833,000
2008-105
CDOT FASTER Transit Pool
Amendment Reason: Add $3,250,000 in local match funding to prior years. Total project cost increases.
Existing Project
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
State (FASTER Transit)
$3,000,000
$3,000,000
$3,000,000
$3,000,000
Local
$750,000
$750,000
$750,000
$750,000
Total
$3,750,000
$3,750,000
$3,750,000
$3,750,000
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$3,837,000
$15,000,000
$0
$18,837,000
Pool Project Listing
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name
Description
Notes
Cost
VIA
Maintenance Equipment (FY24)
$71,000
VIA
Facility Design (FY24)
$96,000
Via Mobility
Software Upgrades (Fiscal Year 2025)
$50,000
Boulder
Vehicles (Fiscal Year 2025)
$620,000
RTD
Vehicles (Fiscal Year 2025)
$3,000,000
Revised Funding Table
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
State (FASTER Transit)
$3,000,000
$3,000,000
$3,000,000
$3,000,000
Local
$750,000
$750,000
$750,000
$750,000
Total
$3,750,000
$3,750,000
$3,750,000
$3,750,000
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$7,087,000
$15,000,000
$0
$22,087,000
Revised Pool Project Listing
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name
Description
Notes
Cost
VIA
Maintenance Equipment (FY24)
$71,000
VIA
Facility Design (FY24)
$96,000
Via Mobility
Software Upgrades (Fiscal Year 2025)
$50,000
Boulder
Vehicles (Fiscal Year 2025)
$620,000
RTD
Vehicles (Fiscal Year 2025)
$3,000,000
2012-108
RTD Capital Improvements: Bus and Facilities Funding
Amendment Reason: Correct prior funding amount following final Federal Transit Administration apportionments. Total project cost decreases.
Existing Project
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Section 5339)
$7,140,000
$7,360,000
$7,581,000
$7,808,000
Local
$1,790,000
$1,840,000
$1,895,000
$1,952,000
Total
$8,930,000
$9,200,000
$9,476,000
$9,760,000
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$15,598,000
$37,366,000
$0
$52,964,000
Revised Funding Table
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Section 5339)
$7,140,000
$7,360,000
$7,581,000
$7,808,000
Local
$1,790,000
$1,840,000
$1,895,000
$1,952,000
Total
$8,930,000
$9,200,000
$9,476,000
$9,760,000
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$12,847,000
$37,366,000
$0
$50,213,000
2018-003
Region 4 ADA Projects
Amendment Reason: Add $500,000 in state ADA funding in 2026. Total project cost increases.
ADA (State) Changed from $4,450,000 to $4,950,000
Existing Project
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
State (ADA)
$3,700,000
$250,000
$250,000
$250,000
Local
$0
$0
$0
$0
Total
$3,700,000
$250,000
$250,000
$250,000
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$250,000
$4,450,000
$0
$4,700,000
Revised Funding Table
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
State (ADA)
$4,200,000
$250,000
$250,000
$250,000
Local
$0
$0
$0
$0
Total
$4,200,000
$250,000
$250,000
$250,000
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$250,000
$4,950,000
$0
$5,200,000
2020-040
CO42 Multimodal Improvements: Empire/Lock to CO7 - Precon
Amendment Reason: Add $870,000 in state Legislative funding in 2026 and correct prior year funding. Total project cost increases.
Legislative (State) Changed from $0 to $870,000
Existing Project
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
State (10 Year Plan-Capital Funds)
$0
$0
$0
$0
State (House Bill 1466 - MMOF)
$0
$0
$0
$0
State (Legislative)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$4,070,000
$0
$0
$4,070,000
Revised Funding Table
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
State (10 Year Plan-Capital Funds)
$0
$0
$0
$0
State (House Bill 1466 - MMOF)
$0
$0
$0
$0
State (Legislative)
$870,000
$0
$0
$0
Local
$0
$0
$0
$0
Total
$870,000
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$8,500,000
$870,000
$0
$9,370,000
2020-087
Safer Main Streets Pool
Amendment Reason: Transfer $2,000,000 in state Legislative funds from prior funds (CDOT Region 1 Urban Arterials Safety Study pool project) to 2022-074. Total project cost decreases.
Existing Project
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
State (Legislative)
$0
$0
$0
$0
State (Legislative-Transit)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$85,394,000
$0
$0
$85,394,000
Pool Project Listing
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name
Description
Notes
Cost
Arapahoe County
Arapahoe Road at Olathe St Intersection Improvements
$450,000
Arapahoe County
S. Federal Blvd. Sidewalk Improvements
$464,000
Boulder
Safer Signals, Safer Streets
$435,000
Boulder
28th St. (US 36) and Colorado Ave. Protected Intersection
$2,104,000
Boulder
30th Street – Separated Bike Lanes (SH-7/Arapahoe Avenue – Colorado Avenue)
Funding on TIP ID# 2022-008
$0
Boulder County
US 36 Intersections Improvements Project (Lyons to Boulder)
$240,000
Broomfield
US 287/ 120th Avenue Sidepath Infill & Transit Access Improvements
$2,000,000
Broomfield
CO 128 / US 36 Bikeway Connection
$296,000
Broomfield
112th/Uptown Ave. Complete Streets and Railroad Safety Improvements
$3,542,000
Centennial
Arapahoe and Clarkson Traffic Signal and Bike Lane Continuation
$400,000
Centennial
S Holly St HAWK Signal and Pedestrian Improvements
$250,000
Commerce City
Colorado Boulevard Bicycle and Pedestrian Improvements
$2,720,000
Denver
Mississippi Avenue Vision Zero Safety Project
$2,132,000
Denver
SH-88/Federal Boulevard Median Gaps
$3,600,000
Denver
West Colfax Pedestrian and Transit Improvements + Partial E. Colfax
US Highway 85 Shoulder Widening (Castle Rock Parkway to Daniels Park Road)
$880,000
Englewood
West Dartmouth Ave Multimodal Safety
$1,260,000
Erie
County Line Road Telleen to Evans
$2,360,000
Littleton
Mineral Station East Mobility-shed Improvements
$1,600,000
Littleton
Prince Street Link Project
$615,000
Lone Tree
Rapid Rectangular Flashing Beacons (RRFBs)
$248,000
Lone Tree and Douglas County
C-470 Trail Connector to RTD/Park Meadows LRT
$1,600,000
Longmont
SH-119 & Sunset St Intersection Multimodal Safety Improvements (SDR5000)
$1,200,000
Morrison
Morrison Main Street Revitalization
$426,000
Nederland
Nederland Crosswalk Improvements
$280,000
Northglenn
Connect Northglenn Multimodal Improvements
$560,000
Superior
US 36 Bikeway Extension - Rock Creek Parkway Segment
$320,000
Denver
Evans Ave Vision Zero Safety Project
$744,000
Douglas County
C-470 Trail & University Blvd Ped Grade Separation
$5,120,000
Parker
Parker Rd (SH-83) Multi-Use Trail/Sidewalk
$3,200,000
RTD
Improving ADA Accessibility in Metro Denver
$905,000
CDOT R1
Urban Arterials Safety Study
$500,000
Lakewood
West Colfax Pedestrian Safety and Infrastructure Project
Funding on TIP ID# 2024-048
$0
2022-074
Colorado Boulevard Bus Rapid Transit - Precon
Amendment Reason: Add $2,000,000 in state Legislative funding transferred from 2020-087. Total project cost increases.
Legislative (State) Changed from $10,000,000 to $12,000,000
Existing Project
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
State (Legislative)
$5,000,000
$5,000,000
$0
$0
State (Legislative-Transit)
$5,000,000
$5,000,000
$0
$0
Local
$0
$0
$0
$0
Total
$10,000,000
$10,000,000
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$31,651,000
$20,000,000
$0
$51,651,000
Revised Funding Table
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
State (Legislative)
$7,000,000
$5,000,000
$0
$0
State (Legislative-Transit)
$5,000,000
$5,000,000
$0
$0
Local
$0
$0
$0
$0
Total
$12,000,000
$10,000,000
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$31,651,000
$22,000,000
$0
$53,651,000
2024-029
Boulder Countywide Strategic Transit Plan
Amendment Reason: Adopted into the 2026-2029 TIP.
Existing Project
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
No Current Four-Year Funding
$0
$0
$0
$0
Total
$0
$0
$0
$0
Revised Funding Table
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$1,500,000
$0
$0
$1,500,000
2024-038
CO66 Multi-Use Trail: Hover to Main
Amendment Reason: Shift funding from 2026 to 2027 at the request of Longmont. Total project cost remains the same.
Existing Project
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality)
$2,240,000
$0
$0
$0
Local
$560,000
$0
$0
$0
Total
$2,800,000
$0
$0
$0
Project Phase to Initiate
Construction
None
None
None
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$0
$2,800,000
$0
$2,800,000
Revised Funding Table
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality)
$0
$2,240,000
$0
$0
Local
$0
$560,000
$0
$0
Total
$0
$2,800,000
$0
$0
Project Phase to Initiate
None
Construction
None
None
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$0
$2,800,000
$0
$2,800,000
2024-041
CO42 Bike/Ped Underpass at South St
Amendment Reason: Add $1,900,000 in state Legislative funding. Total project cost increases.
Added State Funding Legislative $1,900,000
Existing Project
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$3,000,000
$0
$0
$0
Local
$750,000
$0
$0
$0
Total
$3,750,000
$0
$0
$0
Project Phase to Initiate
Construction
None
None
None
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$0
$3,750,000
$0
$3,750,000
Revised Funding Table
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$3,000,000
$0
$0
$0
State (Legislative)
$1,900,000
$0
$0
$0
Local
$750,000
$0
$0
$0
Total
$5,650,000
$0
$0
$0
Project Phase to Initiate
Construction
None
None
None
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$0
$5,650,000
$0
$5,650,000
2024-085
Clean Transit Enterprise Pool
Amendment Reason: Add one pool project, $40,000 in state Clean Transit Enterprise funding and $10,000 local match in prior years. Total project cost increases.
Pool Added - Denver
Existing Project
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
State (Clean Transit Enterprise)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$2,642,000
$0
$0
$2,642,000
Pool Project Listing
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name
Description
Notes
Cost
Laradon Hall
Planning (Fiscal Year 2024)
$90,000
Via Mobility
Planning (FIscal Year 2024)
$68,000
Via Mobility
Facility (Fiscal Year 2025)
$1,500,000
Laradon Hall
Vehicles (Fiscal Year 2025)
$238,000
Developmental Disabilities Resource Center
Vehicles (Fiscal Year 2025)
$150,000
Boulder
Vehicles (Fiscal Year 2025)
$596,000
Revised Funding Table
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
State (Clean Transit Enterprise)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$2,692,000
$0
$0
$2,692,000
Revised Pool Project Listing
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name
Description
Notes
Cost
Laradon Hall
Planning (Fiscal Year 2024)
$90,000
Via Mobility
Planning (FIscal Year 2024)
$68,000
Via Mobility
Facility (Fiscal Year 2025)
$1,500,000
Laradon Hall
Vehicles (Fiscal Year 2025)
$238,000
Developmental Disabilities Resource Center
Vehicles (Fiscal Year 2025)
$150,000
Boulder
Vehicles (Fiscal Year 2025)
$596,000
Denver
Planning (Fiscal Year 2025)
$40,000
2024-100
Vasquez and BNSF Early Warning Detection System
Amendment Reason: Add $690,000 in federal Freight funding. Total project funding increases.
Freight (Federal) Changed from $0 to $690,000
Existing Project
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Freight)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$510,000
$0
$0
$510,000
Revised Funding Table
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Freight)
$690,000
$0
$0
$0
Local
$0
$0
$0
$0
Total
$690,000
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$510,000
$690,000
$0
$1,200,000
2024-101
US85 Steep Slope Repair
Amendment Reason: Add $4,800,000 in federal Freight funding. Total project cost increases.