Transportation Improvement Program Report - Denver Regional Council of Governments

Doctor Cog Logo

2026-2029 Transportation Improvement Program (Pending TIP)

Pending Projects as of 2/14/2025

Table of Contents

Projects in order by TIP Year

RTD Preventive Maintenance: Transit Vehicle Overhaul and Maintenance
State of Good Repair
Regional TDM Set-Aside: TMA Partnerships
US85 Widening: Cook Ranch to Meadows
US6/Wadsworth Interchange Reconstruction
FasTracks Northwest Rail Corridor: Downtown Longmont Station
Region 1 Hazard Elimination Pool
Region 1 Hot Spot Pool
Region 1 Traffic Signal Pool
Region 1 Bridge On-System Pool
Region 1 Bridge Off-System Pool
Region 4 Traffic Signal Pool
Region 4 Hot Spot Pool
Region 4 Hazard Elimination Pool
Region 4 Surface Treatment Pool
Region 1 Surface Treatment Pool
Region 4 Bridge On-System Pool
Safe Routes to School Pool
Region 4 Bridge Off-System Pool
Region 1 FASTER Pool
Region 4 FASTER Pool
Region 1 FASTER Bridge and Tunnel Enterprise Pool
CDOT FASTER Transit Pool
DRCOG Second Commitment to FasTracks
Way to Go: Regional TDM Program
Enhanced Mobility of Seniors and Individuals with Disabilities (FTA 5310 - CDOT)
RTD Capital Improvements: Bus and Facilities Funding
Region 4 Non-Regionally Significant RPP Pool
Air Quality Improvements Set-Aside
Regional Transportation Operations and Technology Set-Aside
Wadsworth Operations and Widening: 35th to I70
I25/Broadway Station Interchange Improvements
Region 1 ITS Pool
Region 1 RPP Pool
Ozone State Implementation Plan (SIP) Modeling
Transit Operating and Capital (FTA 5311)
Region 1 ADA Projects
Region 1 Transportation Alternatives (TA) Pool
Region 4 ADA Projects
Transit Capital Program (FTA 5339)
Vasquez Operational Improvements: 52nd to 64th
Region 1 Permanent Water Quality Pool
Westminster Quiet Zones: BNSF Railway and Lowell, W 72nd, and Bradburn
I25/CO119 Transit Facility Improvements
Transit Capital Program (State SB 228)
CO119 BRT Enhancements in Boulder and Longmont
Peaks to Plains Trail: CO6 from Tunnel 1 to Big Easy Trailhead
CO7 Corridor Multimodal Improvements: Foothills Pkwy to Brighton - Precon
Aurora Missing Sidewalk Program
Nine Mile Station Bicycle and Pedestrian Bridge over Parker Rd.
Oxford Station Pedestrian Bridge: Over Oxford Ave
Downtown ADA Sidewalk Connections: Jackson, 1st, Jefferson
Industrial Ln. Bikeway Phase 2: Bike/Ped Bridge over BNSF to US36/Flatiron Station
Colfax Complete Streets: Violet to I70
St Vrain Greenway, Phase 13: CO119 to St Vrain State Park
CO66/WCR7 Pedestrian Underpass
120th/US85 Interchange Improvements - Precon
88th Widening: I76 to CO2
104th Widening: Colorado to US85 - Precon
County Line Capacity Improvements: Broadway to University
US6/Heritage Interchange - Precon
CO42 Multimodal Improvements: Empire/Lock to CO7 - Precon
Federal Blvd Transit Improvements: Floyd to 54th
Industrial and Nickel/Commerce Intersection Operational Improvements
CO86/5th and Founders/Ridge Intersection Operational Improvements
I70/CO79 Eastbound Ramp Improvements
Parker/Quincy/Smoky Hill Intersection Operational Improvements
Dry Creek Operational Improvements: I25 to Inverness Dr East
Mineral/Santa Fe Operational Improvements
I25/Lincoln Traffic and Mobility Improvements
Parker Rd Operational Improvements: Lincoln to Pine
CO83 Safety Improvements: Bayou Gulch to El Paso County
JC73: CO74 to Buffalo Park Operational Improvements
I270 Corridor Improvements: I70 to I25
Parker Rd Multimodal Transportation and Safety Study: Mississippi to Hampden
Broomfield Transit Needs Assessment & Pilot Project
Broomfield FlexRide
Human Services Transportation/FASTER Set-Aside
CDOT Trust Settlement Pool
CO119 Operational Improvements: Boulder to Longmont
Safer Main Streets Pool
47th/BNSF Missing Sidewalks
I70/Picadilly New Interchange
State Vulnerable and Senior Transportation Funds
I25/Crystal Valley New Interchange
I70 Region 1 Noise Walls
I70 West Metro Bridges: I25 to C470
Region 1 Mobility Hub Pool
E470 Widening: I70 to 104th
E470/I70 Interchange Improvements
E470 Widening: 104th to US85
E470/88th New Interchange
County Line/WCR 1 Buffered Bike Lanes: 17th to CO66
5th St Operational Improvements: Woodlands to Ridge
South Platte River Trail Improvements: West Virginia to W Bayaud
St Vrain Trail Extension: CO66 from McConnell to US36
Wadsworth Operational Improvements: Vassar to Woodard
Region 1 Revitalizing Main Streets Pool
CO7/95th Intersection Improvements
I70 Floyd Hill Improvements: JC65 to Genesee Park
I25/Happy Canyon Interchange - Precon
Enhanced Mobility of Seniors and Individuals with Disabilities (FTA 5310 - DRCOG)
Washington St Improvements: 47th to 52nd
Region 1 Congressionally Directed Funding Pool
East Colfax Bus Rapid Transit: Civic Center Station to Yosemite
Lone Tree Mobility Hub at Sky Ridge Station
Mineral Station Area Multimodal Improvements
Buchtel Complete Street/Evans Intersection Improvements: University to Colorado
Bike/Ped Bridge over Santa Fe: Jewell to Evans Station
South Platte River Trail Improvements: Mississippi to Dartmouth - Precon
Airport Creek Trail Underpass at BNSF
Jefferson County Bicycle Plan Implementation
Wadsworth Shared-Use Path: 32nd to 35th
Ward Station Multimodal Access Improvements
Smith Rd Multimodal Improvements: Peoria to Powhaton - Precon
Aurora Multimodal Access Improvements
Bennett Kiowa Creek Trail
64th Corridor Study: CO2 to Quebec
88th Ave Multimodal Improvements: I76 to CO2
Thornton Multimodal Trail Study and Precon
100th Ave Multi-Use Path: Riverdale to Forest Circle
Thornton Protected Bike Facility Study
High Line Canal Trail Underpass at Broadway - Precon
Arapahoe County Transit and Micromobility Study
Aurora Multimodal Transportation Master Plan
Lone Tree Creek Trail Underpass of Arapahoe
Arapahoe Sidepath Improvements: I25 to Parker Rd
Hampden Complete Streets: Broadway to Lafayette
Broadway Complete Streets Improvements: Hampden to Belleview
Baseline Multimodal Improvements: 30th to Foothills
CO93/Table Mesa and Regent Intersection Improvements
Longmont Main/21st Bike/Ped Improvements - Precon
I25/Castle Pines Pkwy Bike/Ped Overpass - Precon
Castle Rock Industrial Tributary Trail: Plum Creek to Plum Creek Trail
Douglas County Transit & Multimodal Feasibility Study
County Line Shared Use Path: Broadway to High Line Canal Trail
S Havana Bikeway: RidgeGate Station to Lone Tree City Limits
Parker Rd Multi-Use Path East Side Gaps: Pine to Stroh
32nd/I-70 Bike Lanes: Wright to Zinnia
Colorado Boulevard Bus Rapid Transit - Precon
I25/Speer and 23rd Interchange Reconstructions
I25 Improvements: 84th to 104th - Precon
Region 4 Revitalizing Main Streets Pool
Region 1 Vision Zero Pool
I25 Segment 5: CO66 to WCR38
U85/168th Intersection Improvements
Arapahoe Ave Multimodal Improvements: 28th to Foothills - Precon
Mineral Multimodal Improvements: Santa Fe to Jackass Hill/Long Ave
Peoria St Bridge Replacement: Over Sand Creek - Precon
DRCOG Transportation Corridor Planning Set Aside
DRCOG Community Mobility Planning Set-Aside - Community-Based Transportation Plans
DRCOG Community Mobility Planning Set-Aside - Livable Centers Small-Area Planning
DRCOG Innovative Mobility Set Aside
CO7 Transit Service: Boulder to Brighton
Federal Blvd Bus Rapid Transit: Englewood Station to Wagon Road Park-n-Ride - Precon
South Platte River Trail Improvements: Bayaud to Phil Milstein Park
SW Weld County Transit First and Last Mile Study
Adams County Comprehensive Safety Action Plan
High Line Canal Trail Underpass at Colfax
McKay Operational Improvements: 104th to 96th - Precon
124th Multimodal Improvements: Claude to Colorado
Big Dry Creek Trail: 136th to 144th
Colorado Blvd Separated Bike Facility: 88th to E470 - Precon
Thornton Pkwy Multiuse Path: I25 to Grant
Easter Trail Study: Cherry Creek Trail to Parker Rd
13th Ave Multimodal Improvements: Yosemite to High Line Canal Trail - Precon
Gun Club Multimodal Capacity Improvements: Quincy to Aurora Pkwy - Precon
I225 & Alameda Bridge Replacement - Precon
Colorado Blvd Multimodal Improvements: Arapahoe to Dry Creek
Havana/Easter Intersection Operational Improvements
Bowles Corridor Study: Sheridan to Santa Fe
30th St Multimodal Improvements: Colorado to Baseline
Folsom Multimodal Study: Pine to Colorado
Boulder County Vision Zero SRTS Action Plan
WCR26 Multi-Use Trail: Union Reservoir to St Vrain State Park
Lafayette to Boulder Protected Bikeway Feasibility Study
WCR13/WCR20 Intersection Operational Improvements
S Boulder Rd BRT Study: Broadway/Table Mesa to CO7/119th
I25 Interchange Study: CO52 to Erie Pkwy
SE Boulder County SuperFlex
Erie FlexRide
CO66 Multi-Use Path: Hover to Main
CO52 Intersection Safety Improvements: WCR5 to WCR7 - Precon
Tabor St Multimodal Improvements: Clear Creek Trail to I70 Frontage Rd N - Precon
CO42 Bike/Ped Underpass at South St
35th Ave Multimodal Improvements: Sheridan to Wadsworth - Precon
McCaslin Boulevard Multiuse Path Crossing at Rock Creek Parkway
Midway Blvd Multimodal Improvements: Lake Link Trail to Zuni - Precon
Alameda Underpass Improvements: Kalamath to Cherokee - Precon
High Line Canal Trail Underpass at Yale
Wadsworth Path Improvements: Mansfield to Bear Creek
W Colfax Safety Improvements: Teller to Sheridan
Sheridan Blvd Multimodal Path: Jewell to Iowa
Golden Free Transit Program
64th Multimodal Improvements: CO93 to Virgil Way
Parker Rd/Mainstreet Operational Improvements - Precon
I25/Lincoln Multimodal Connections
Douglas County Transit Pilot Projects
Colorado Blvd Bike/Ped Bridge over C470 - Precon
North Central Denver Community Multimodal Improvements
Peña Capacity Improvements: I70 to E470 - Precon
South Platte River Trail Improvements: Mississippi to Florida
Federal Pkwy Multimodal Improvements: 120th to 122nd
Peaks to Plains Trail - Downtown Golden
28th St Multi-use Path: Fourmile Canyon Creek to Jay
R1 Safe Wildlife Crossings Pool
E Colfax Mobility Benefits District
Welcome Kits for Sun Valley Residents
Using Data to Optimize FlexRide Services
Gunbarrel On-Demand Microtransit Shuttle Service Marketing Campaign
Creating the Commerce City Connector
Sheridan Corridor Plan: 52nd to Hampden
E Colfax BRT Extension Corridor Plan: I225 to E470
Aurora Traffic Management Center
Louisville Signal Technology Upgrade
Longmont Smart Signals to Schools
Jefferson County Traffic Camera System
US287 and CO7 Advance Detection Expansion
Denver V2X Communications Devices
Boulder Communications Network and Signal System Performance Enhancement
Aurora Communications Infrastructure Improvements
Broadway Signal Interconnect (Phase 2)
Thornton Travel Time Monitoring Expansion
Superior Traffic Safety and Climate Resilience
Aurora Traffic Signal Equipment Upgrade
I70 Resurfacing: Chief Hosa to W Colfax
Clean Transit Enterprise Pool
303 Artway and Montbello Loop Implementation Plan
Brighton Core City Circulation Plan
92nd Avenue Corridor Study
Pecos Street Corridor Study
Region 4 Congressionally Directed Funding Pool
Longmont Microtransit Vehicles
CO7 Corridor Multimodal Improvements
Denver Area Hydrogen Fueling Stations: FHWA CFI Grant
I25 Greenland Wildlife Overpass
I25/CO7 Interim Transit Improvements
Boulder County Electric Vehicle Charging Infrastructure
I25 Resurfacing: Mile Post 208 to 214
Reunited Denver Project: Globeville Elyria-Swansea
Station Outreach for Transit Recovery
Vasquez and BNSF Early Warning Detection System
US85 Steep Slope Repair
Coordinated Adaptive Ramp Metering Expansion
Box Elder Creek Erosion and Flood Protection
Safe Streets for Boulder
US287 Safety Median: Lafayette to Larimer County Line
Lena Gulch
Sanderson Gulch Resiliency
Equitably Restoring Colfax and Federal Mobility and Land Use
Bike Plus Data Fusion
Florida Corridor Improvements Study
Golden Docked Bike Share Feasibility Analysis
Denver Curbside Digital Twin
Near Miss Analytics
Parker Mobility on Demand and Microtransit Feasibility Study
Downtown Boulder Garage Mobility Hub Concept Planning
Fitzsimons Innovative Transportation Solutions Study
Mobility Needs Assessment Framework for the Boulder County Housing Authority
Transit Oriented Communities, Land Use, Housing Type Diversity Analysis and Housing Needs Assessment
East Midtown Centennial Small Area Plan
City of Sheridan Housing and Transportation Strategies Study
Edgewater Sheridan Corridor Livable Center

- Project Listings -


2026-2029 Transportation Improvement Program (Pending TIP)

RTD Preventive Maintenance: Transit Vehicle Overhaul and Maintenance



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Section 5307) $87,400,000 $90,000,000 $92,700,000 $95,500,000
State (Section 5307) $0 $0 $0 $0
Local $29,100,000 $30,000,000 $30,900,000 $31,850,000
Total $116,500,000 $120,000,000 $123,600,000 $127,350,000


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$124,100,000 $487,450,000 $0 $611,550,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
02/16/2023 Amended Add $43,800,000 in federal Section 5307 funding. Total project cost increases.
04/22/2021 Amended Proposed for adoption into 2022-2025
08/22/2019 Amended Proposed for adoption into 2020-2023

Additional project amendment details can be found under this project in the TRIPS database.


2026-2029 Transportation Improvement Program (Pending TIP)

State of Good Repair



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Section 5337 State of Good Repair) $28,900,000 $29,800,000 $30,694,000 $31,615,000
State (Section 5337 State of Good Repair) $0 $0 $0 $0
Local $7,200,000 $7,440,000 $7,674,000 $7,904,000
Total $36,100,000 $37,240,000 $38,368,000 $39,519,000


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$69,430,000 $151,227,000 $0 $220,657,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
02/16/2023 Amended Add $32,010,000 in federal Section 5337 funds. Total project cost increases.
04/22/2021 Amended Proposed for adoption into 2022-2025
08/22/2019 Amended Proposed for adoption into 2020-2023

Additional project amendment details can be found under this project in the TRIPS database.


2026-2029 Transportation Improvement Program (Pending TIP)

Regional TDM Set-Aside: TMA Partnerships



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality) $960,000 $960,000 $0 $0
Federal (Surface Transportation Block Grant) $500,000 $500,000 $0 $0
Local $365,000 $365,000 $0 $0
Total $1,825,000 $1,825,000 $0 $0
Project Phase to Initiate TDM TDM None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$2,015,000 $3,650,000 $0 $5,665,000


Project Pools

This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.


Agency/Project NameDescriptionNotesCost
Unallocated 2024/2025 non-infrastructure$95,000
Commuting SolutionsPartnership (Fiscal Years 2024-2025)$240,000
Boulder Transportation ConnectionsPartnership (Fiscal Years 2024-2025)$240,000
Denver SouthPartnership (Fiscal Years 2024-2025)$240,000
Downtown Denver PartnershipPartnership (Fiscal Years 2024-2025)$240,000
Northeast Transportation ConnectionsPartnership (Fiscal Years 2024-2025)$240,000
Smart CommutePartnership (Fiscal Years 2024-2025)$240,000
Transportation SolutionsPartnership (Fiscal Years 2024-2025)$240,000
West Corridor Transportation Management AssociationPartnership (Fiscal Years 2024-2025)$240,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/27/2024 Amended Add unprogrammed funding from returned project. Total project cost increases.
05/16/2024 Amended Add Fiscal Year 2024 and 2024 Transportation Management Association partnerships. Total project cost remains the same.
09/21/2023 Amended Remove FY 2024 and FY 2025 Surface Transportation Block Grant funding programmed to individual projects in FY 2024/2025 Call for Projects.
08/17/2023 Amended Proposed for adoption into 2024-2027

Additional project amendment details can be found under this project in the TRIPS database.


2026-2029 Transportation Improvement Program (Pending TIP)

US85 Widening: Cook Ranch to Meadows



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Faster Safety) $0 $0 $0 $0
Federal (Freight) $0 $0 $0 $0
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
State (Faster Safety) $0 $0 $0 $0
State (Regional Priority Projects) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$94,702,000 $0 $37,300,000 $132,002,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
04/22/2021 Amended Proposed for adoption into 2022-2025
08/22/2019 Amended Proposed for adoption into 2020-2023
10/18/2018 Amended Add $850,000 in state RPP in FY 2019. Total project cost increases.

Additional project amendment details can be found under this project in the TRIPS database.


2026-2029 Transportation Improvement Program (Pending TIP)

US6/Wadsworth Interchange Reconstruction



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
State (FASTER Bridge and Tunnel Enterprise) $3,650,000 $13,500,000 $7,850,000 $0
State (Legislative) $0 $0 $0 $0
State (Regional Priority Projects) $0 $0 $0 $0
State (TC Contingency) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $3,650,000 $13,500,000 $7,850,000 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$107,070,000 $25,000,000 $0 $132,070,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
04/18/2024 Amended Add $2,209,000 in state Regional Priority Project funds. Total project cost increases.
11/15/2023 Amended Add $2,898,000 in state Transportation Commission Contingency funds. Total project cost increases.
08/17/2023 Amended Proposed for adoption into 2024-2027
11/17/2022 Amended Add $5,000,000 in state FASTER-Safety funding and $60,000,000 in state Legislative funding. Total project cost increases.

Additional project amendment details can be found under this project in the TRIPS database.


2026-2029 Transportation Improvement Program (Pending TIP)

FasTracks Northwest Rail Corridor: Downtown Longmont Station



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Local (RTD Funds Only) $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$17,945,000 $0 $0 $17,945,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
04/22/2021 Amended Proposed for adoption into 2022-2025
08/22/2019 Amended Proposed for adoption into 2020-2023
04/20/2017 Amended Proposed for adoption into 2018-2021

Additional project amendment details can be found under this project in the TRIPS database.


2026-2029 Transportation Improvement Program (Pending TIP)

Region 1 Hazard Elimination Pool



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Strategic Safety Funds) $0 $0 $0 $0
State (Safety) $21,000,000 $23,800,000 $0 $0
Local $0 $0 $0 $0
Total $21,000,000 $23,800,000 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$0 $44,800,000 $0 $44,800,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
06/26/2024 Amended Add $3,650,000 in federal Strategic Safety Funds. Total project cost increases.
10/18/2023 Amended Add $371,000 in federal SAE funds. Total project cost increases.
08/17/2023 Amended Proposed for adoption into 2024-2027
11/17/2022 Amended Remove $8,500,000 in state Safety funding that will be programmed to a separate project. Total project cost decreases.

Additional project amendment details can be found under this project in the TRIPS database.


2026-2029 Transportation Improvement Program (Pending TIP)

Region 1 Hot Spot Pool



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
State (Safety) $433,000 $433,000 $433,000 $433,000
Local $0 $0 $0 $0
Total $433,000 $433,000 $433,000 $433,000


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$0 $1,732,000 $0 $1,732,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
04/22/2021 Amended Proposed for adoption into 2022-2025
08/22/2019 Amended Proposed for adoption into 2020-2023
04/20/2017 Amended Proposed for adoption into 2018-2021

Additional project amendment details can be found under this project in the TRIPS database.


2026-2029 Transportation Improvement Program (Pending TIP)

Region 1 Traffic Signal Pool



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
State (Safety) $3,190,000 $3,190,000 $3,190,000 $3,190,000
Local $0 $0 $0 $0
Total $3,190,000 $3,190,000 $3,190,000 $3,190,000


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$0 $12,760,000 $0 $12,760,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
04/22/2021 Amended Proposed for adoption into 2022-2025
08/22/2019 Amended Proposed for adoption into 2020-2023
10/18/2018 Amended Remove $1,100,000 of funding in FY 2019 and transfer to 2016-020 in order to move funding into one location.

Additional project amendment details can be found under this project in the TRIPS database.


2026-2029 Transportation Improvement Program (Pending TIP)

Region 1 Bridge On-System Pool



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Bridge On-System) $10,588,000 $7,833,000 $7,833,000 $7,833,000
State (Bridge On-System) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $10,588,000 $7,833,000 $7,833,000 $7,833,000


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$0 $34,087,000 $0 $34,087,000


Project Pools

This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.


Agency/Project NameDescriptionNotesCost
Essential Culvert Repairs $9,600,000
Essential Wall Repairs$3,850,000
Preventative Bridge MaintenanceProactive work, including scour work, fiber wrap$6,200,000
Joint Treatments$4,900,000
Deck TreatmentsResurfacing/overlays$5,000,000
Bridge Essential RepairsGenerally reactive; girder cleanouts$4,400,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
09/19/2024 Amended Transfer $3,882,000 in federal Bridge On-System funds to new I25 Resurfacing project. Total project cost decreases.
05/16/2024 Amended Add $8,000,000 in federal Bridge On-System funds and adjust one pool project. Total project cost increases.
08/17/2023 Amended Proposed for adoption into 2024-2027
04/22/2021 Amended Proposed for adoption into 2022-2025

Additional project amendment details can be found under this project in the TRIPS database.


2026-2029 Transportation Improvement Program (Pending TIP)

Region 1 Bridge Off-System Pool



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Bridge Off-System) $0 $0 $0 $0
State (Bridge Off-System) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$8,518,000 $0 $0 $8,518,000


Project Pools

This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.


Agency/Project NameDescriptionNotesCost
Dartmouth Ave@ S Platte River$1,392,000
Potomac St@ O'Brien Canal (partial replacement)$760,000
Community Center Dr.Northglenn$524,000
West Dartmouth Ave.Englewood$229,000
Laredo St Bridge RehabAurora$1,779,000
Tower RoadAt 3rd Creek$720,000
88thAt Wolf Creek$1,410,000


Amendment History
DateStatusDescription
01/30/2025 Proposed Adopted into the 2026-2029 TIP.
01/29/2025 Amended Remove one pool project and $1,241,000 in prior funding. Total project cost decreases.
04/18/2024 Amended Add two pool projects and $2,131,000 in federal Bridge Off-System funds. Total project cost increases.
08/17/2023 Amended Proposed for adoption into 2024-2027
07/11/2023 Amended Add $1,779,000 in federal Bridge Off-System funds, local match, and one new pool project. Total project cost increases.

Additional project amendment details can be found under this project in the TRIPS database.


2026-2029 Transportation Improvement Program (Pending TIP)

Region 4 Traffic Signal Pool



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
State (Planning and Research Initiatives) $0 $0 $0 $0
State (Safety) $250,000 $250,000 $250,000 $250,000
Local $0 $0 $0 $0
Total $250,000 $250,000 $250,000 $250,000


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$250,000 $1,000,000 $0 $1,250,000


Amendment History
DateStatusDescription
11/25/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
04/22/2021 Amended Proposed for adoption into 2022-2025
03/18/2021 Amended Remove PRI funding. Total project cost decreases.
06/17/2020 Amended Add funding to FY 2021, 2022, and 2023. Total project cost increases.

Additional project amendment details can be found under this project in the TRIPS database.


2026-2029 Transportation Improvement Program (Pending TIP)

Region 4 Hot Spot Pool



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
State (Safety) $100,000 $100,000 $100,000 $100,000
Local $0 $0 $0 $0
Total $100,000 $100,000 $100,000 $100,000


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$200,000 $400,000 $0 $600,000


Amendment History
DateStatusDescription
11/25/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
04/22/2021 Amended Proposed for adoption into 2022-2025
08/22/2019 Amended Proposed for adoption into 2020-2023
04/20/2017 Amended Proposed for adoption into 2018-2021

Additional project amendment details can be found under this project in the TRIPS database.


2026-2029 Transportation Improvement Program (Pending TIP)

Region 4 Hazard Elimination Pool



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Strategic Safety Funds) $25,000 $25,000 $25,000 $25,000
State (Safety) $1,000,000 $1,000,000 $1,000,000 $1,000,000
Local $1,000,000 $1,000,000 $1,000,000 $1,000,000
Total $2,025,000 $2,025,000 $2,025,000 $2,025,000


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$7,000,000 $8,100,000 $0 $15,100,000


Amendment History
DateStatusDescription
11/25/2024 Proposed Adopted into the 2026-2029 TIP.
09/19/2024 Amended Add $2,000,000 in federal Strategic Safety Funds and $1,000,000 in state Safety funds, as well as $1,000,000 local match. Total project cost increases.
06/26/2024 Amended Add $1,000,000 in federal Strategic Safety Funds. Total project cost increases.
08/17/2023 Amended Proposed for adoption into 2024-2027
08/19/2021 Amended Remove individually listed pool projects. Total project cost remains the same.

Additional project amendment details can be found under this project in the TRIPS database.


2026-2029 Transportation Improvement Program (Pending TIP)

Region 4 Surface Treatment Pool



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
State (Cost Escalation Fund) $0 $0 $0 $0
State (Surface Treatment) $18,861,000 $10,404,000 $12,684,000 $2,000,000
Local $0 $0 $0 $0
Total $18,861,000 $10,404,000 $12,684,000 $2,000,000


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$23,511,000 $43,949,000 $0 $67,460,000


Project Pools

This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.


Agency/Project NameDescriptionNotesCost
SH-119Nederland West to Roundabout$6,025,000
CO728th to US287Project also has $2,000,000 in 2018-003$9,559,000
CO157A: Pearl NorthDiamond Grind and Slabs$7,245,000
LongmontDiamond Grind and Slabs$5,198,000
CO119 and CO7US36 to Boulder Canyon$5,148,000
CO52I25 to US85$7,765,000
CO66East of I25$4,027,000


Amendment History
DateStatusDescription
12/19/2024 Proposed Adopted into the 2026-2029 TIP.
12/19/2024 Amended Adjust one pool project and add $239,000 in state Cost Escalation Funds. Total project cost increases.
11/21/2024 Amended Add $10,030,000 in state Surface Treatment funds, $1,761,000 in state Cost Escalation Funds, and local match. Also add three pool projects. Total project cost increases.
08/17/2023 Amended Proposed for adoption into 2024-2027
05/19/2021 Amended Add FASTER funding to existing pool project. Total project cost increases.

Additional project amendment details can be found under this project in the TRIPS database.


2026-2029 Transportation Improvement Program (Pending TIP)

Region 1 Surface Treatment Pool



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
State (Surface Treatment) $42,187,000 $42,684,000 $40,834,000 $37,224,000
Local $0 $0 $0 $0
Total $42,187,000 $42,684,000 $40,834,000 $37,224,000


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$61,121,000 $162,929,000 $0 $224,050,000


Project Pools

This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.


Agency/Project NameDescriptionNotesCost
CO88 (Federal Blvd)Alameda Ave to Louisiana Ave$9,000,000
CO86Woodlands Blvd to IREA Access$3,000,000
US85I76 to 124th Ave$10,500,000
SH-224I-25 to US-6$5,800,000
US40MP 252 to I70$9,000,000
SH-391Hampden Ave to Jewell Ave$4,700,000
US287I70 to 92nd Ave$12,200,000
SH-265I-70 to US-6$4,600,000
CO8Soda Lakes Rd to McIntyre St$4,000,000
DesignVarious Locations$2,000,000
US85Florida to I25$4,400,000
CO74Evergreen DT to Cold Springs Gulch$8,800,000
US285Federal to Dahlia$13,300,000
CO83MP 70.9 to Mississippi$6,300,000
US619th to Colfax$7,500,000
AlamedaBryant to S Lipan St$3,500,000
CO88West Asbury to South Prince$11,300,000
CO72I70 to W 52nd$10,000,000
CO1214th to 37th$7,000,000
MaintenanceVarious Locations$2,000,000
US285Pine Junction to Foxton Road$10,000,000
CO35I70 to I270$1,000,000
I76I70 to Federal Boulevard$6,900,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
09/19/2024 Amended Update pool projects and transfer $21,500,000 to new I25 Resurfacing project. Total project cost decreases.
02/22/2024 Amended Transfer $4,100,000 in state Surface Treatment funds to TIP ID# 2024-084. Total project cost decreases.
11/15/2023 Amended Remove five completed pool projects, modify descriptions and costs for thirteen pool projects, and add one new pool project. Total project cost decreases.
10/18/2023 Amended Remove one completed pool project, remove one pool project split into own TIP project, add four new pool projects, and transfer $9,500,000 in state Surface Treatment funds to new I70: Chief Hosa to W Colfax project. Total project cost decreases.

Additional project amendment details can be found under this project in the TRIPS database.


2026-2029 Transportation Improvement Program (Pending TIP)

Region 4 Bridge On-System Pool



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Bridge On-System) $0 $0 $0 $0
State (Bridge On-System) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$522,000 $0 $0 $522,000


Project Pools

This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.


Agency/Project NameDescriptionNotesCost
CO7 and Boulder Creek$522,000


Amendment History
DateStatusDescription
12/19/2024 Proposed Adopted into the 2026-2029 TIP.
12/19/2024 Amended Adjust one pool project. Total project cost remains the same.
08/17/2023 Amended Proposed for adoption into 2024-2027
05/16/2023 Amended Add one new pool project and $350,000 of federal Bridge On-System funds. Total project cost increases.
04/22/2021 Amended Proposed for adoption into 2022-2025

Additional project amendment details can be found under this project in the TRIPS database.


2026-2029 Transportation Improvement Program (Pending TIP)

Safe Routes to School Pool



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Safe Routes to School) $0 $0 $0 $0
State (Safe Routes to School) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$1,171,000 $0 $0 $1,171,000


Project Pools

This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.


Agency/Project NameDescriptionNotesCost
Adams CountyLowell Blvd & 54th Ave Crossing Improvements (FY24)$121,000
Columbine ValleyWilder Walk and Bike Way (FY24)$342,000
BoulderSafe Routes for Manhattan Middle School (FY24)$708,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
05/16/2023 Amended Add three new pool projects and $1,171,000 in federal Safe Routes to School funding. Total project cost increases.
07/22/2021 Amended Edit funding source to reflect federal Safe Routes to School funding is used. Total project cost remains the same.
05/19/2021 Amended Add four pool projects. Total project cost increases.

Additional project amendment details can be found under this project in the TRIPS database.


2026-2029 Transportation Improvement Program (Pending TIP)

Region 4 Bridge Off-System Pool



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Bridge Off-System) $0 $0 $0 $0
State (Bridge Off-System) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$11,994,000 $0 $0 $11,994,000


Project Pools

This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.


Agency/Project NameDescriptionNotesCost
WCR34 - Mead (Fiscal Year 2022/2024)$1,746,000
120th St over Coal Creek (FY23)$513,000
WCR20 (FY23)$730,000
WCR3 north of WCR12 (FY23)$1,036,000
Rock Creek Pkwy Rehab (Fiscal Year 2024)$1,077,000
WCR26 - Firestone (Fiscal Year 2024)$1,438,000
WCR4 - Lochbuie (Fiscal Year 2024/2025)$2,231,000


Amendment History
DateStatusDescription
01/30/2025 Proposed Adopted into the 2026-2029 TIP.
01/29/2025 Amended Adjust one pool project and add $1,923,000 in federal Bridge Off-System funds and local match. Total project cost increases.
03/21/2024 Amended Add one new pool project and $308,000 in federal Bridge Off-System funding. Total project cost increases.
01/17/2024 Amended Add two pool projects and adjust one existing pool project. Add $4,100,000 in federal Bridge Off-System funds. Total project cost increases.
08/17/2023 Amended Proposed for adoption into 2024-2027

Additional project amendment details can be found under this project in the TRIPS database.


2026-2029 Transportation Improvement Program (Pending TIP)

Region 1 FASTER Pool



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Faster Safety) $0 $0 $0 $0
State (Faster Safety) $24,500,000 $27,300,000 $0 $0
Local $0 $0 $0 $0
Total $24,500,000 $27,300,000 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$0 $51,800,000 $0 $51,800,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
07/22/2024 Amended Transfer $2,000,000 in state FASTER-Safety funding to new I25/CO7 Interim Transit Improvements project, and $7,500,000 to new I25 Greenland Wildlife Overpass project. Total project cost decreases.
12/19/2023 Amended Remove $12,800,000 in prior funding transferred to 2024-084. Total project cost decreases.
08/17/2023 Amended Proposed for adoption into 2024-2027
12/21/2022 Amended Add one new pool project. Total project cost remains the same.

Additional project amendment details can be found under this project in the TRIPS database.


2026-2029 Transportation Improvement Program (Pending TIP)

Region 4 FASTER Pool



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Faster Safety) $0 $0 $0 $0
State (Faster Safety) $1,000,000 $1,000,000 $1,000,000 $1,000,000
Local $0 $0 $0 $0
Total $1,000,000 $1,000,000 $1,000,000 $1,000,000


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$5,000,000 $4,000,000 $0 $9,000,000


Project Pools

This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.


Agency/Project NameDescriptionNotesCost
SH-66 and WCR 13Radii Widening$36,000
SH-119Nederland West to Roundabout$2,500,000
US-287 Bike/Ped Safety ImprovementsFour Intersections in Longmont$1,521,000


Amendment History
DateStatusDescription
11/25/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
03/16/2023 Amended Add one new pool project for bike/ped safety improvements along US-287 at four intersections in Longmont (9th Ave., Mountain View Ave., 17th Ave., & 23rd Ave.). Total project cost remains the same.
05/19/2021 Amended Add new pool project. Total project cost remains the same.
04/22/2021 Amended Proposed for adoption into 2022-2025

Additional project amendment details can be found under this project in the TRIPS database.


2026-2029 Transportation Improvement Program (Pending TIP)

Region 1 FASTER Bridge and Tunnel Enterprise Pool



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
State (FASTER Bridge and Tunnel Enterprise) $0 $0 $0 $0
State (Legislative) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$6,200,000 $0 $0 $6,200,000


Project Pools

This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.


Agency/Project NameDescriptionNotesCost
I-70 WB Over US 6Clear Creek (Floyd Hill)$5,700,000
Several Bridges in Region 1Bridge Prescoping$500,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
10/17/2024 Amended Add $500,000 in state FASTER Bridge Enterprise funds and add one pool project. Total project cost increases.
08/17/2023 Amended Proposed for adoption into 2024-2027
04/22/2021 Amended Proposed for adoption into 2022-2025
06/17/2020 Amended Add funding and 3 new pool projects. Total funding amount increases.

Additional project amendment details can be found under this project in the TRIPS database.


2026-2029 Transportation Improvement Program (Pending TIP)

CDOT FASTER Transit Pool



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
State (FASTER Transit) $3,000,000 $3,000,000 $3,000,000 $3,000,000
Local $750,000 $750,000 $750,000 $750,000
Total $3,750,000 $3,750,000 $3,750,000 $3,750,000


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$3,837,000 $15,000,000 $0 $18,837,000


Project Pools

This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.


Agency/Project NameDescriptionNotesCost
VIAMaintenance Equipment (FY24)$71,000
VIAFacility Design (FY24)$96,000
Via MobilitySoftware Upgrades (Fiscal Year 2025)$50,000
BoulderVehicles (Fiscal Year 2025)$620,000
RTDVehicles (Fiscal Year 2025)$3,000,000


Amendment History
DateStatusDescription
12/19/2024 Proposed Adopted into the 2026-2029 TIP.
12/19/2024 Amended Add three pool projects and $670,000 in state FASTER funding. Total project funding increases.
11/15/2023 Amended Transfer one pool project to 2018-004 and update one pool project funding. Total project cost decreases.
09/21/2023 Amended Add three new pool projects, and add $374,000 in state FASTER-Transit funds and $94,000 in local match. Total project cost increases.
08/17/2023 Amended Proposed for adoption into 2024-2027

Additional project amendment details can be found under this project in the TRIPS database.


2026-2029 Transportation Improvement Program (Pending TIP)

DRCOG Second Commitment to FasTracks



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $771,000 $0 $0 $0
Local $193,000 $0 $0 $0
Total $964,000 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$74,036,000 $964,000 $0 $75,000,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
05/16/2023 Amended Transfer $2,089,000 in federal Surface Transportation Block Grant funding to TIP ID# 2022-033 for their Second Commitment in Principal amount to be applied toward multimodal access improvements to Mineral Station. Pool total decreases.
04/22/2021 Amended Proposed for adoption into 2022-2025
08/22/2019 Amended Proposed for adoption into 2020-2023

Additional project amendment details can be found under this project in the TRIPS database.


2026-2029 Transportation Improvement Program (Pending TIP)

Way to Go: Regional TDM Program



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality) $4,800,000 $0 $0 $0
Local $100,000 $0 $0 $0
Total $4,900,000 $0 $0 $0
Project Phase to Initiate TDM None None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$5,224,000 $4,900,000 $0 $10,124,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
06/16/2022 Amended Add $417,000 in CMAQ funds to FY2022. Total project cost increases.
04/22/2021 Amended Proposed for adoption into 2022-2025
08/22/2019 Amended Proposed for adoption into 2020-2023

Additional project amendment details can be found under this project in the TRIPS database.


2026-2029 Transportation Improvement Program (Pending TIP)

Enhanced Mobility of Seniors and Individuals with Disabilities (FTA 5310 - CDOT)



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Section 5310) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$1,110,000 $0 $0 $1,110,000


Project Pools

This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.


Agency/Project NameDescriptionNotesCost
ViaOperating (Fiscal Year 2024 Small Urban)$510,000
ViaMobility Management (Fiscal Year 2024 Small Urban)$600,000


Amendment History
DateStatusDescription
12/10/2024 Proposed Adopted into the 2026-2029 TIP.
06/26/2024 Amended Increase cost of one pool project and add $17,000 in federal Section 5310 funds. Total project cost increases.
12/19/2023 Amended Add two new pool projects and $1,110,000 in federal Section 5310 funding. Total project cost increases.
08/17/2023 Amended Proposed for adoption into 2024-2027
04/24/2023 Amended Remove two pool projects and add one new FY 2023 Small Urban pool projects. Total project cost decreases.

Additional project amendment details can be found under this project in the TRIPS database.


2026-2029 Transportation Improvement Program (Pending TIP)

RTD Capital Improvements: Bus and Facilities Funding



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Section 5339) $7,140,000 $7,360,000 $7,581,000 $7,808,000
Local $1,790,000 $1,840,000 $1,895,000 $1,952,000
Total $8,930,000 $9,200,000 $9,476,000 $9,760,000


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$17,100,000 $37,366,000 $0 $54,466,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
05/16/2024 Amended Add $18,244,000 in prior year funding incorrectly not carried forward to new TIP. Total project cost increases.
08/17/2023 Amended Proposed for adoption into 2024-2027
04/22/2021 Amended Proposed for adoption into 2022-2025
08/22/2019 Amended Proposed for adoption into 2020-2023

Additional project amendment details can be found under this project in the TRIPS database.


2026-2029 Transportation Improvement Program (Pending TIP)

Region 4 Non-Regionally Significant RPP Pool



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
State (Regional Priority Projects) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$6,392,000 $0 $0 $6,392,000


Project Pools

This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.


Agency/Project NameDescriptionNotesCost
SH-119/SH-52 Transit Bypass Lanes$470,000 in RPP in TIP# 2020-081$0
Coffman St. Busway$1,230,000 in RPP in TIP# 2020-083$0
SH-119/Hover Intersection$7,300,000 in RPP in TIP# 2020-081$0


Amendment History
DateStatusDescription
11/25/2024 Proposed Adopted into the 2026-2029 TIP.
10/18/2023 Amended Move $7,300,000 in RPP funds to TIP ID# 2020-081. Total project cost decreases.
08/17/2023 Amended Proposed for adoption into 2024-2027
02/16/2023 Amended Remove eight pool projects incorrectly programmed with RPP funds.
11/17/2022 Amended Add six new pool projects. Total project cost remains the same.

Additional project amendment details can be found under this project in the TRIPS database.


2026-2029 Transportation Improvement Program (Pending TIP)

Air Quality Improvements Set-Aside



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality) $1,626,000 $1,378,000 $0 $0
Local $406,000 $344,000 $0 $0
Total $2,032,000 $1,722,000 $0 $0
Project Phase to Initiate Other Phase Other Phase None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$7,745,000 $3,754,000 $0 $11,499,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
09/19/2024 Amended Roll $2,000,000 in unspent funds from prior years into current set-aside program. Total project cost increases.
08/17/2023 Amended Proposed for adoption into 2024-2027
04/22/2021 Amended Proposed for adoption into 2022-2025
08/22/2019 Amended Proposed for adoption into 2020-2023

Additional project amendment details can be found under this project in the TRIPS database.


2026-2029 Transportation Improvement Program (Pending TIP)

Regional Transportation Operations and Technology Set-Aside



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $528,000 $5,000,000 $5,000,000 $0
Local $132,000 $1,250,000 $1,250,000 $0
Total $660,000 $6,250,000 $6,250,000 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$14,910,000 $13,160,000 $0 $28,070,000


Project Pools

This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.


Agency/Project NameDescriptionNotesCost
CentennialS2S Communication (FY21-23)$800,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
10/18/2023 Amended Remove $10,847,000 to program to individual set-aside projects. Total project cost decreases.
08/17/2023 Amended Proposed for adoption into 2024-2027
04/22/2021 Amended Proposed for adoption into 2022-2025
09/17/2020 Amended Add pool projects from recent call and adjust funding. Total project cost increases.

Additional project amendment details can be found under this project in the TRIPS database.


2026-2029 Transportation Improvement Program (Pending TIP)

Wadsworth Operations and Widening: 35th to I70



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality) $0 $0 $0 $0
Federal (Congressional Allocation) $0 $0 $0 $0
Federal (STBG-Pandemic DRCOG Region) $0 $0 $0 $0
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
State (Legislative) $0 $0 $0 $0
State (Safety) $0 $0 $0 $0
State (Surface Treatment) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$65,201,000 $0 $0 $65,201,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
05/16/2023 Amended Add $4,000,000 in federal Congressional funding. Total project cost increases.
03/16/2023 Amended Add $1,360,000 in state Legislative funding from the Region 1 Revitalizing Main Streets Pool. Total project cost increases.
12/21/2022 Amended Add $1,100,000 in state Safety funds. Total project cost increases.

Additional project amendment details can be found under this project in the TRIPS database.


2026-2029 Transportation Improvement Program (Pending TIP)

I25/Broadway Station Interchange Improvements



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (STBG-Pandemic DRCOG Region) $0 $0 $0 $0
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$89,922,000 $0 $0 $89,922,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
04/22/2021 Amended Proposed for adoption into 2022-2025
08/22/2019 Amended Proposed for adoption into 2020-2023
11/16/2017 Amended Add $1,221,000 of state Permanent Water Quality funding in FY 2018. Total project cost increases.

Additional project amendment details can be found under this project in the TRIPS database.


2026-2029 Transportation Improvement Program (Pending TIP)

Region 1 ITS Pool



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
State (Intelligent Transportation System) $100,000 $100,000 $100,000 $100,000
Local $0 $0 $0 $0
Total $100,000 $100,000 $100,000 $100,000


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$0 $400,000 $0 $400,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
04/22/2021 Amended Proposed for adoption into 2022-2025
08/22/2019 Amended Proposed for adoption into 2020-2023
04/20/2017 Amended Proposed for adoption into 2018-2021

Additional project amendment details can be found under this project in the TRIPS database.


2026-2029 Transportation Improvement Program (Pending TIP)

Region 1 RPP Pool



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
State (Regional Priority Projects) $17,955,000 $17,966,000 $17,966,000 $17,966,000
Local $0 $0 $0 $0
Total $17,955,000 $17,966,000 $17,966,000 $17,966,000


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$0 $71,853,000 $0 $71,853,000


Project Pools

This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.


Agency/Project NameDescriptionNotesCost
Small projects/consultants/closeouts$8,000,000
local agency contributionsIncluded in various TIP pages$5,000,000
Design$2,000,000
Steel Bridge Girders CleanoutRegionwide$1,000,000
Maintenance Paving Support IDIQRegionwide$5,000,000
C470/I70 Emergency Bridge Repair$1,780,000
Expansion Device ReplacementI76 and I225$5,000,000
C470/Quincy Ramp Roundabouts$1,363,000
I76 and Dahlia Bridge Repair$1,657,000
I225 at 2nd and 6th$4,000,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
06/26/2024 Amended Add $1,657,000 of Transportation Commission Contingency funds and one pool project. Total project cost increases.
03/21/2024 Amended Add two new pool projects and $1,363,000 in state Transportation Commission Contingency funds. Total project cost increases.
02/22/2024 Amended Add one pool project, adjust one pool project funding using existing unallocated funding, and add $1,780,000 in state Transportation Commission Contingency funds. Total project cost increases.
10/18/2023 Amended Transfer $9,000,000 in state Regional Priority Project funds to new I70: Chief Hosa to W Colfax project. Total project cost decreases.

Additional project amendment details can be found under this project in the TRIPS database.


2026-2029 Transportation Improvement Program (Pending TIP)

Ozone State Implementation Plan (SIP) Modeling



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $180,000 $0 $0 $0
Local $45,000 $0 $0 $0
Total $225,000 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$675,000 $225,000 $0 $900,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
04/22/2021 Amended Proposed for adoption into 2022-2025
08/22/2019 Amended Proposed for adoption into 2020-2023
04/18/2019 Amended Add $120,000 transferred from 2016-002. Total project cost increases.

Additional project amendment details can be found under this project in the TRIPS database.


2026-2029 Transportation Improvement Program (Pending TIP)

Transit Operating and Capital (FTA 5311)



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Section 5311) $800,000 $800,000 $830,000 $850,000
State (Section 5311) $0 $0 $0 $0
Local $600,000 $600,000 $620,000 $650,000
Total $1,400,000 $1,400,000 $1,450,000 $1,500,000


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$2,099,000 $5,750,000 $0 $7,849,000


Amendment History
DateStatusDescription
12/10/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
04/22/2021 Amended Proposed for adoption into 2022-2025
06/17/2020 Amended Adjust funding for one pool project. Total funding amount decreases.
04/16/2020 Amended Add one project from recent call for projects. Total project cost increases.

Additional project amendment details can be found under this project in the TRIPS database.


2026-2029 Transportation Improvement Program (Pending TIP)

Region 1 ADA Projects



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
State (ADA) $2,800,000 $2,800,000 $2,800,000 $2,800,000
Local $0 $0 $0 $0
Total $2,800,000 $2,800,000 $2,800,000 $2,800,000


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$44,972,000 $11,200,000 $0 $56,172,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
04/22/2021 Amended Proposed for adoption into 2022-2025
10/17/2019 Amended Add funding to FY 2020 and 2021. Total project cost increases.
08/22/2019 Amended Proposed for adoption into 2020-2023

Additional project amendment details can be found under this project in the TRIPS database.


2026-2029 Transportation Improvement Program (Pending TIP)

Region 1 Transportation Alternatives (TA) Pool



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Transportation Alternatives-CDOT) $3,345,000 $0 $0 $0
Local $696,000 $0 $0 $0
Total $4,041,000 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$18,933,000 $4,041,000 $0 $22,974,000


Project Pools

This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.


Agency/Project NameDescriptionNotesCost
Jefferson CountyPeaks and Plains: Mouth of Clear Creek Canyon Segment$852,000
EvergreenNorth Lake Trail$200,000
Denver47th and York Safe Crossing Project$2,500,000
GoldenUS-6 Wildlife Crossing and Multi-use Trail Improvements$400,000
GoldenWest Colfax Ave Sidewalk/Connectivity Project$530,000
Jefferson CountyPeaks to Plains - Huntsman Gulch to Rigor Mortis Rapids$1,653,000
WestminsterCitywide Multimodal Transportation Safety, Access, and Connections Improvem$199,000
ArvadaAlkire St Sidepath$1,200,000
DenverNE Trails to Transit Connectivity Project$1,150,000
Broomfield120th Ave Complete Streets$2,335,000
GoldenFord St$1,200,000
Wheat RidgePeaks to Plains Trail$952,000
Jefferson County Open SpaceI70 Trail Geological Point of Interest$1,804,000
SheridanMary Carter Greenway - US285 Underpass$752,000
DenverSouth Platte River Trail ImprovementsSee Project 2022-012$0


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
09/19/2024 Amended Remove one pool project and $2,500,000 in federal Transportation Alternatives funds and $625,000 in local match. Funds transferred to project 2022-012. Total project cost decreases.
08/17/2023 Amended Proposed for adoption into 2024-2027
03/16/2023 Amended Remove one pool project and $2,505,000 in prior year funding. Total project cost decreases.
04/22/2021 Amended Proposed for adoption into 2022-2025

Additional project amendment details can be found under this project in the TRIPS database.


2026-2029 Transportation Improvement Program (Pending TIP)

Region 4 ADA Projects



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
State (ADA) $200,000 $200,000 $200,000 $200,000
Local $0 $0 $0 $0
Total $200,000 $200,000 $200,000 $200,000


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$250,000 $800,000 $0 $1,050,000


Amendment History
DateStatusDescription
11/25/2024 Proposed Adopted into the 2026-2029 TIP.
11/21/2024 Amended Add $2,000,000 in state Americans with Disabilities Act funding. Total project cost increases.
08/17/2023 Amended Proposed for adoption into 2024-2027
04/22/2021 Amended Proposed for adoption into 2022-2025
06/17/2020 Amended Reduce funding to align with actual revenues. Total project cost decreases.

Additional project amendment details can be found under this project in the TRIPS database.


2026-2029 Transportation Improvement Program (Pending TIP)

Transit Capital Program (FTA 5339)



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Section 5339) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$1,238,000 $0 $0 $1,238,000


Project Pools

This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.


Agency/Project NameDescriptionNotesCost
VIA9 Van Replacements (FY24)$610,000
VIADiesel Bus Replacement (FY24)$118,000
VIA2 Bus Expansion (FY24)$303,000
VIASoftware Improvements (FY24)$207,000


Amendment History
DateStatusDescription
12/10/2024 Proposed Adopted into the 2026-2029 TIP.
11/15/2023 Amended Add one new pool project. Total project cost increases.
09/21/2023 Amended Add three new pool projects, and add $1,031,000 in federal Section 5339 funds and $258,000 in local match. Total project cost increases.
08/17/2023 Amended Proposed for adoption into 2024-2027
04/24/2023 Amended Add two new pool projects. Total project cost increases.

Additional project amendment details can be found under this project in the TRIPS database.


2026-2029 Transportation Improvement Program (Pending TIP)

Vasquez Operational Improvements: 52nd to 64th



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality) $0 $0 $0 $0
Federal (Congressional Allocation) $0 $0 $0 $0
Federal (Freight) $0 $0 $0 $0
State (Legislative) $8,560,000 $0 $0 $0
State (Regional Priority Projects) $0 $0 $0 $0
State (Safety) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $8,560,000 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$26,832,000 $8,560,000 $0 $35,392,000


Amendment History
DateStatusDescription
01/15/2025 Proposed Adopted into the 2026-2029 TIP.
01/15/2025 Amended Add $8,560,000 in state Legislative funding. Total project cost increases.
08/17/2023 Amended Proposed for adoption into 2024-2027
05/16/2023 Amended Add $4,000,000 in federal Congressional funding. Total project cost increases.
04/22/2021 Amended Proposed for adoption into 2022-2025

Additional project amendment details can be found under this project in the TRIPS database.


2026-2029 Transportation Improvement Program (Pending TIP)

Region 1 Permanent Water Quality Pool



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
State (Permanent Water Quality) $0 $2,199,000 $0 $0
Local $0 $0 $0 $0
Total $0 $2,199,000 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$9,201,000 $2,199,000 $0 $11,400,000


Project Pools

This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.


Agency/Project NameDescriptionNotesCost
Federal BlvdGreen infrastructure/Water Quality Facilities$1,995,000
I-76 Water Quality FacilitiesYork St. to Dahlia St.$1,640,000
12th and Wadsworth Boulevard Water Quality Pond$1,800,000
CO7 Bike Path Widening$1,203,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
07/22/2024 Amended Remove one pool project, transfer $1,249,000 in state Permanent Water Quality funds to new I25/CO7 Interim Transit Improvement project, adjust funding of two pool projects, and add $2,239,000 in state Permanent Water Quality funds. Total project cost increases.
03/21/2024 Amended Adjust one pool project and add $110,000 in state Permanent Water Quality funds. Total project cost increases.
08/17/2023 Amended Proposed for adoption into 2024-2027
04/24/2023 Amended Add two new pool projects and $654,000 of Permanent Water Quality funds. Total project cost increases.

Additional project amendment details can be found under this project in the TRIPS database.


2026-2029 Transportation Improvement Program (Pending TIP)

Westminster Quiet Zones: BNSF Railway and Lowell, W 72nd, and Bradburn



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$1,455,000 $0 $0 $1,455,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
04/24/2023 Amended Proposed for adoption into 2022-2025
10/19/2017 Amended Add new project with funding from the Northwest Corridor SCIP funding.



2026-2029 Transportation Improvement Program (Pending TIP)

I25/CO119 Transit Facility Improvements



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (MMOF - ARPA - CDOT) $0 $0 $0 $0
State (Legislative) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$640,000 $0 $0 $640,000


Amendment History
DateStatusDescription
12/19/2024 Proposed Adopted into the 2026-2029 TIP.
12/19/2024 Amended Add $140,000 in state Legislative funding. Total project cost increases.
04/18/2024 Amended Add $1,000 in previous state Legislative funding and $500,000 in federal Multimodal Transportation and Mitigation Options Fund - American Rescue Plan Act - CDOT funds. Total project cost increases.
08/17/2023 Amended Proposed for adoption into 2024-2027
05/23/2022 Amended Reduce state Legislative funding by $373,000. Total project cost decreases.

Additional project amendment details can be found under this project in the TRIPS database.


2026-2029 Transportation Improvement Program (Pending TIP)

Transit Capital Program (State SB 228)



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
State (Legislative-Transit) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$1,582,000 $0 $0 $1,582,000


Project Pools

This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.


Agency/Project NameDescriptionNotesCost
Laradon Hall1 Vehicle Purchase (FY24)$392,000
Via MobilityOperating (Fiscal Year 2025)$510,000
Via MobilityMobility Management (Fiscal Year 2025)$600,000
Easterseals ColoradoVehicle (Fiscal Year 2025)$80,000


Amendment History
DateStatusDescription
12/19/2024 Proposed Adopted into the 2026-2029 TIP.
12/19/2024 Amended Add three new pool projects and $635,000 in state Legislative-Transit funding. Total project cost increases.
11/21/2024 Amended Add two pool projects and $555,000 in state Legislative funding. Total project cost increases.
09/21/2023 Amended Add one new pool project, and add $392,000 in state Legislative-Transit funding and $98,000 in local match. Total project cost increases.
08/17/2023 Amended Proposed for adoption into 2024-2027

Additional project amendment details can be found under this project in the TRIPS database.


2026-2029 Transportation Improvement Program (Pending TIP)

CO119 BRT Enhancements in Boulder and Longmont



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Local (RTD Funds Only) $8,000,000 $0 $0 $0
Total $8,000,000 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$8,000,000 $8,000,000 $0 $16,000,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
10/18/2023 Amended Remove funding and scope from 2022-2025 Regional and Subregional Share Calls for Projects. Funding and scope moved to TIP ID# 2020-081. Project funding decreases.
08/17/2023 Amended Proposed for adoption into 2024-2027, add new funding from 2024-2027 Regional and Subregional Shares Calls for Projects.
02/16/2023 Amended Replace $350,000 in RPP funding with $350,000 in Legislative funding per CDOT R4.
09/22/2022 Amended Add new scope from 2022-2025 Regional and Subregional Shares Calls for Projects.

Additional project amendment details can be found under this project in the TRIPS database.


2026-2029 Transportation Improvement Program (Pending TIP)

Peaks to Plains Trail: CO6 from Tunnel 1 to Big Easy Trailhead



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $2,777,000 $13,994,000 $0 $0
State (MMOF) $0 $0 $0 $0
Local $9,200,000 $43,100,000 $0 $0
Total $11,977,000 $57,094,000 $0 $0
Project Phase to Initiate Construction Construction None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$33,929,000 $69,071,000 $0 $103,000,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027 and add new funding and scope from 2024-2027 Regional and Subregional Shares Calls for Projects.
04/22/2021 Amended Proposed for adoption into 2022-2025
08/22/2019 Amended Proposed for adoption into the 20-23 TIP.



2026-2029 Transportation Improvement Program (Pending TIP)

CO7 Corridor Multimodal Improvements: Foothills Pkwy to Brighton - Precon



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality) $0 $0 $0 $0
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
State (Legislative) $0 $0 $0 $0
State (MMOF) $0 $0 $0 $0
State (Regional Priority Projects) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$17,408,000 $0 $0 $17,408,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
04/24/2023 Amended Reduce project by $1,153,000 in federal CMAQ funds, $340,000 in state Legislative funds, and $1,304,000 in state MMOF funds. City of Boulder elements broken into separate project.
02/16/2023 Amended Replace $570,000 in RPP funding with $570,000 in Legislative funding per CDOT R4 and add $328,000 in local match.
09/22/2022 Amended Add new scope from 2022-2025 Regional and Subregional Shares Calls for Projects.

Additional project amendment details can be found under this project in the TRIPS database.


2026-2029 Transportation Improvement Program (Pending TIP)

Aurora Missing Sidewalk Program



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Transportation Alternatives-DRCOG) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$2,885,000 $0 $0 $2,885,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
04/22/2021 Amended Proposed for adoption into 2022-2025
08/22/2019 Amended Adopted in the 2020-2023 TIP.



2026-2029 Transportation Improvement Program (Pending TIP)

Nine Mile Station Bicycle and Pedestrian Bridge over Parker Rd.



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congressional Allocation) $0 $0 $0 $0
Federal (STBG-Pandemic DRCOG Region) $0 $0 $0 $0
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$8,463,000 $0 $0 $8,463,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
06/26/2024 Amended Add $850,000 in federal Congressional Allocation funding. Total project cost increases.
08/17/2023 Amended Proposed for adoption into 2024-2027
04/22/2021 Amended Proposed for adoption into 2022-2025
08/22/2019 Amended Adopted in the 2020-2023 TIP.



2026-2029 Transportation Improvement Program (Pending TIP)

Oxford Station Pedestrian Bridge: Over Oxford Ave



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
Federal (Transportation Alternatives-DRCOG) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$2,000,000 $0 $0 $2,000,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
04/22/2021 Amended Proposed for adoption into 2022-2025
08/22/2019 Amended Adopted in the 2020-2023 TIP.



2026-2029 Transportation Improvement Program (Pending TIP)

Downtown ADA Sidewalk Connections: Jackson, 1st, Jefferson



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
State (MMOF) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$1,306,000 $0 $0 $1,306,000


Amendment History
DateStatusDescription
11/25/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
04/22/2021 Amended Proposed for adoption into 2022-2025
08/22/2019 Amended Adopted in the 2020-2023 TIP.



2026-2029 Transportation Improvement Program (Pending TIP)

Industrial Ln. Bikeway Phase 2: Bike/Ped Bridge over BNSF to US36/Flatiron Station



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Carbon Reduction Program) $0 $0 $0 $0
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$3,501,000 $0 $0 $3,501,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
03/17/2022 Amended Add $2,186,000 in CRP funding in FY23 and add $547,000 in local match as part of Spring 2022 Wait List Process. Total project cost increases.
04/22/2021 Amended Proposed for adoption into 2022-2025
02/19/2020 Amended Move funding from FY 2020 to FY 2021 and switch funding type from TA to STP-Metro. Total project costs remain the same.

Additional project amendment details can be found under this project in the TRIPS database.


2026-2029 Transportation Improvement Program (Pending TIP)

Colfax Complete Streets: Violet to I70



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality) $0 $0 $0 $0
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
State (MMOF) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$18,600,000 $0 $0 $18,600,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
09/22/2022 Amended Add new scope from 2022-2025 Subregional Share Call for Projects.
03/17/2022 Amended Add $1,360,000 in STBG funds and $340,000 in local match as part of Spring 2022 Wait List process. Total project cost increases.
04/22/2021 Amended Proposed for adoption into 2022-2025

Additional project amendment details can be found under this project in the TRIPS database.


2026-2029 Transportation Improvement Program (Pending TIP)

St Vrain Greenway, Phase 13: CO119 to St Vrain State Park



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
State (MMOF) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$2,500,000 $0 $0 $2,500,000


Amendment History
DateStatusDescription
11/25/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
04/22/2021 Amended Proposed for adoption into 2022-2025
08/22/2019 Amended Adopted in the 2020-2023 TIP.



2026-2029 Transportation Improvement Program (Pending TIP)

CO66/WCR7 Pedestrian Underpass



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Transportation Alternatives-DRCOG) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$2,600,000 $0 $0 $2,600,000


Amendment History
DateStatusDescription
11/25/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
04/22/2021 Amended Proposed for adoption into 2022-2025
08/22/2019 Amended Adopted in the 2020-2023 TIP.



2026-2029 Transportation Improvement Program (Pending TIP)

120th/US85 Interchange Improvements - Precon



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
State (Regional Priority Projects) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$12,600,000 $0 $0 $12,600,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
04/22/2021 Amended Proposed for adoption into 2022-2025
08/22/2019 Amended Adopted in the 2020-2023 TIP.



2026-2029 Transportation Improvement Program (Pending TIP)

88th Widening: I76 to CO2



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
Federal (Transportation Alternatives-DRCOG) $0 $0 $0 $0
State (MMOF) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$34,450,000 $0 $0 $34,450,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
05/16/2024 Amended Add active transportation scope and funding from Project# 2022-049. Total project cost increases.
08/17/2023 Amended Proposed for adoption into 2024-2027
04/22/2021 Amended Proposed for adoption into 2022-2025
08/22/2019 Amended Adopted in the 2020-2023 TIP.



2026-2029 Transportation Improvement Program (Pending TIP)

104th Widening: Colorado to US85 - Precon



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
State (Regional Priority Projects) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$5,750,000 $0 $0 $5,750,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
04/22/2021 Amended Proposed for adoption into 2022-2025
08/22/2019 Amended Adopted in the 2020-2023 TIP.



2026-2029 Transportation Improvement Program (Pending TIP)

County Line Capacity Improvements: Broadway to University



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$20,000,000 $0 $0 $20,000,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
02/16/2023 Amended Change sponsor from Centennial to Douglas County. No change to total project cost.
04/22/2021 Amended Proposed for adoption into 2022-2025
08/22/2019 Amended Adopted in the 2020-2023 TIP.



2026-2029 Transportation Improvement Program (Pending TIP)

US6/Heritage Interchange - Precon



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $1,960,000 $0 $0 $0
State (Legislative) $0 $0 $0 $0
Local $490,000 $0 $0 $0
Total $2,450,000 $0 $0 $0
Project Phase to Initiate ROW None None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$7,050,000 $2,450,000 $0 $9,500,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
07/22/2021 Amended Add $1,000,000 in state Legislative funding in FY 23. Total project cost increases.
04/22/2021 Amended Proposed for adoption into 2022-2025
08/22/2019 Amended Adopted in the 2020-2023 TIP.



2026-2029 Transportation Improvement Program (Pending TIP)

CO42 Multimodal Improvements: Empire/Lock to CO7 - Precon



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
State (10 Year Plan-Capital Funds) $0 $0 $0 $0
State (House Bill 1466 - MMOF) $0 $0 $0 $0
State (Legislative) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$4,070,000 $0 $0 $4,070,000


Amendment History
DateStatusDescription
11/25/2024 Proposed Adopted into the 2026-2029 TIP.
09/19/2024 Amended Shift $800,000 in Fiscal Year 2024 funds and $2,400,000 in prior year funds from Multimodal Transportation and Mitigation Options Fund - American Rescue Plan Act funds to House Bill 1466 General Funds. Total project cost remains the same.
08/17/2023 Amended Proposed for adoption into 2024-2027
02/16/2023 Amended Replace $4,000,000 in RPP funding with $3,000,000 in Legislative and $1,000,000 in 10C funding per CDOT R4.
09/22/2022 Amended Add new scope from 2022-2025 Subregional Share Call for Projects.

Additional project amendment details can be found under this project in the TRIPS database.


2026-2029 Transportation Improvement Program (Pending TIP)

Federal Blvd Transit Improvements: Floyd to 54th



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
Local $0 $0 $0 $0
Local (RTD Funds Only) $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$4,000,000 $0 $0 $4,000,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
04/22/2021 Amended Proposed for adoption into 2022-2025
08/22/2019 Amended Adopted in the 2020-2023 TIP.



2026-2029 Transportation Improvement Program (Pending TIP)

Industrial and Nickel/Commerce Intersection Operational Improvements



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$1,619,000 $0 $0 $1,619,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
04/22/2021 Amended Proposed for adoption into 2022-2025
08/22/2019 Amended Adopted in the 2020-2023 TIP.



2026-2029 Transportation Improvement Program (Pending TIP)

CO86/5th and Founders/Ridge Intersection Operational Improvements



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$6,500,000 $0 $0 $6,500,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
04/22/2021 Amended Proposed for adoption into 2022-2025
08/22/2019 Amended Adopted in the 2020-2023 TIP.



2026-2029 Transportation Improvement Program (Pending TIP)

I70/CO79 Eastbound Ramp Improvements



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality) $0 $0 $0 $0
Federal (STBG-Pandemic DRCOG Region) $0 $0 $0 $0
State (Regional Priority Projects) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$2,200,000 $0 $0 $2,200,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
04/22/2021 Amended Proposed for adoption into 2022-2025
08/22/2019 Amended Adopted in the 2020-2023 TIP.



2026-2029 Transportation Improvement Program (Pending TIP)

Parker/Quincy/Smoky Hill Intersection Operational Improvements



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$9,171,000 $0 $0 $9,171,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
04/22/2021 Amended Proposed for adoption into 2022-2025
08/22/2019 Amended Adopted in the 2020-2023 TIP.



2026-2029 Transportation Improvement Program (Pending TIP)

Dry Creek Operational Improvements: I25 to Inverness Dr East



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$5,140,000 $0 $0 $5,140,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
06/26/2024 Amended Add funding from the closeout of project 2020-058. The Arapahoe Forum has approved. Total funding has increased.
08/17/2023 Amended Proposed for adoption into 2024-2027
05/23/2022 Amended Adjust project scope. Project cost remains the same.
04/22/2021 Amended Proposed for adoption into 2022-2025

Additional project amendment details can be found under this project in the TRIPS database.


2026-2029 Transportation Improvement Program (Pending TIP)

Mineral/Santa Fe Operational Improvements



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality) $0 $0 $0 $0
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$27,431,000 $0 $0 $27,431,000


Amendment History
DateStatusDescription
01/30/2025 Proposed Adopted into the 2026-2029 TIP.
01/30/2025 Amended Correct error in funding amount by adding $1,000,000 in federal Surface Transportation Block Grant funds. Total project cost increases.
11/21/2024 Amended Add $3,390,000 in federal Surface Transportation Block Grant funds returned from Project 2020-059 and reallocated by the Arapahoe County Subregional Forum. Total project cost increases.
08/17/2023 Amended Proposed for adoption into 2024-2027
04/22/2021 Amended Proposed for adoption into 2022-2025

Additional project amendment details can be found under this project in the TRIPS database.


2026-2029 Transportation Improvement Program (Pending TIP)

I25/Lincoln Traffic and Mobility Improvements



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$8,500,000 $0 $0 $8,500,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
03/17/2022 Amended Add $2,000,000 in STBG funds in FY23 and add $2,750,000 in local match as part of the Spring 2022 Wait List Process. Overall funding increases.
04/22/2021 Amended Proposed for adoption into 2022-2025
05/20/2020 Amended Adjust funding per Step 1 funding advancements of the Spring 2020 Waiting List Protocol. Overall funding remains the same.

Additional project amendment details can be found under this project in the TRIPS database.


2026-2029 Transportation Improvement Program (Pending TIP)

Parker Rd Operational Improvements: Lincoln to Pine



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality) $0 $0 $0 $0
Federal (Faster Safety) $0 $0 $0 $0
State (Faster Safety) $0 $0 $0 $0
State (MMOF) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$4,000,000 $0 $0 $4,000,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
04/22/2021 Amended Proposed for adoption into 2022-2025
08/22/2019 Amended Adopted in the 2020-2023 TIP.



2026-2029 Transportation Improvement Program (Pending TIP)

CO83 Safety Improvements: Bayou Gulch to El Paso County



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality) $0 $0 $0 $0
Federal (Faster Safety) $0 $0 $0 $0
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
State (Faster Safety) $3,980,000 $0 $0 $0
State (Regional Priority Projects) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $3,980,000 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$21,865,000 $3,980,000 $0 $25,845,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
02/16/2023 Amended Remove $1,567,000 in state FASTER-Safety funding and add $1,567,000 in federal Hazard Elimination funding. No change to total project cost
11/17/2022 Amended Add $13,845,000 in state FASTER-Safety funding. Total project cost increases.
04/24/2022 Amended Add $400,000 in STBG transferred from 2020-022. Reduce local match by $400,000. Total project cost remains the same.

Additional project amendment details can be found under this project in the TRIPS database.


2026-2029 Transportation Improvement Program (Pending TIP)

JC73: CO74 to Buffalo Park Operational Improvements



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$12,500,000 $0 $0 $12,500,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
04/22/2021 Amended Proposed for adoption into 2022-2025
08/22/2019 Amended Adopted in the 2020-2023 TIP.



2026-2029 Transportation Improvement Program (Pending TIP)

I270 Corridor Improvements: I70 to I25



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (RAISE) $0 $0 $0 $0
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
State (FASTER Bridge and Tunnel Enterprise) $100,000,000 $10,000,000 $40,000,000 $20,000,000
State (Legislative) $70,000,000 $0 $0 $0
Local $0 $0 $0 $0
Total $170,000,000 $10,000,000 $40,000,000 $20,000,000


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$119,900,000 $240,000,000 $0 $359,900,000


Amendment History
DateStatusDescription
12/19/2024 Proposed Adopted into the 2026-2029 TIP.
12/19/2024 Amended Add $4,800,000 in federal RAISE funds. Total project cost increases.
08/17/2023 Amended Proposed for adoption into 2024-2027
02/16/2023 Amended Add $10,100,000 in state FASTER-Bridge Enterprise funding. Total project cost increases.
02/17/2022 Amended Add $30,000,000 in state Legislative funding. Add preconstruction and early action projects to project scope. Total project cost increases.

Additional project amendment details can be found under this project in the TRIPS database.


2026-2029 Transportation Improvement Program (Pending TIP)

Parker Rd Multimodal Transportation and Safety Study: Mississippi to Hampden



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
State (Regional Priority Projects) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$1,735,000 $0 $0 $1,735,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
04/24/2022 Amended Adjust scope and title. Decrease STBG funds by $155,000. Decrease match by $110,000. Total project cost decreases.
04/22/2021 Amended Proposed for adoption into 2022-2025
08/22/2019 Amended Adopted in the 2020-2023 TIP.



2026-2029 Transportation Improvement Program (Pending TIP)

Broomfield Transit Needs Assessment & Pilot Project



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$350,000 $0 $0 $350,000


Amendment History
DateStatusDescription
12/10/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
05/19/2021 Amended Adjust funding per year per FTA guidance. Total project cost stays the same.
04/22/2021 Amended Per FY20 Project Delays report, shift FY20-23 funding to FY21-24. Proposed for adoption into 2022-2025.
08/22/2019 Amended Adopted in the 2020-2023 TIP.



2026-2029 Transportation Improvement Program (Pending TIP)

Broomfield FlexRide



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$450,000 $0 $0 $450,000


Amendment History
DateStatusDescription
12/10/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
04/22/2021 Amended Proposed for adoption into 2022-2025
08/22/2019 Amended Proposed for adoption in 2020-2023 TIP.



2026-2029 Transportation Improvement Program (Pending TIP)

Human Services Transportation/FASTER Set-Aside



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality) $1,266,000 $2,000,000 $2,000,000 $2,000,000
State (FASTER Transit) $0 $0 $0 $0
State (MMOF) $734,000 $0 $0 $0
Local $500,000 $500,000 $500,000 $500,000
Total $2,500,000 $2,500,000 $2,500,000 $2,500,000


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$2,246,000 $10,000,000 $0 $12,246,000


Project Pools

This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.


Agency/Project NameDescriptionNotesCost
A Little Help - Capital - Software (FY24) - $25Funded with CMAQ, FASTER$0
A Little Help - Mobility Management (FY24) - $40Funded with MMOF, FASTER$0
AbleLight - Capital 2 Vehicle Replacements (FY24) - $170Funded with CMAQ$0
Boulder County - Mobility Management (FY24) - $40Funded with FASTER$0
Douglas County - Capital 1 Vehicle Expansion (FY24) - $124Funded with CMAQ$0
Douglas County - Capital EV Charging Station (FY24) - $44Funded with CMAQ$0
Douglas County - Mobility Management (FY24) - $162Funded with FASTER and also 5310$0
DRCOG - Mobility Management (FY24) - $55Funded with MMOF$0
DRMAC - Mobility Management (FY24) - $74Funded with FASTER and also 5310$0
Jewish Family Service - Capital 1 Vehicle Expansion (FY24) - $54Funded with CMAQ$0
Lakewood - Capital 2 Vehicle Replacements (FY24) - $247Funded with CMAQ$0
Laradon Hall - Capital 2 Vehicle Replacements (FY24) - $153Funded with CMAQ$0
Erie - Operating (FY24) - $200Funded with CMAQ$0
VIA - Operating (FY24) - $515Funded with MMOF, FASTER, and also 5310$0
DRCOG - Program Administration (FY24) - $254
Douglas County - Mobility Management (Fiscal Year 2025) - $51,000Funded with FASTER and also 5310$0
Via - Operating (Fiscal Year 2025) - $38,000Funded with FASTER and also with 5310$0
Capital Projects$817,000
Mobility Management Projects$422,000
Operating Projects$753,000
Program Administration$254,000


Amendment History
DateStatusDescription
12/20/2024 Proposed Adopted into the 2026-2029 TIP.
12/20/2024 Amended Swap $2,734,000 in federal Congestion Mitigation/Air Quality funds for state Multimodal Transportation and Mitigation Options Funds available from 2020-021. Total project cost remains the same.
05/16/2024 Amended Add two new pool projects and local match funds from recent Section 5310 solicitation. Total project cost increases.
12/19/2023 Amended Shift $210,000 in unallocated state FASTER funding from prior years to Fiscal Year 2024. Total project cost remains the same.
08/17/2023 Amended Proposed for adoption into 2024-2027

Additional project amendment details can be found under this project in the TRIPS database.


2026-2029 Transportation Improvement Program (Pending TIP)

CDOT Trust Settlement Pool



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
State (Settlement Fund) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$212,000 $0 $0 $212,000


Project Pools

This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.


Agency/Project NameDescriptionNotesCost
VIAVehicle Replacment (FY24)$162,000
VIACharging Equipment (FY24)$50,000


Amendment History
DateStatusDescription
12/10/2024 Proposed Adopted into the 2026-2029 TIP.
09/21/2023 Amended Add two new pool projects and $212,000 in state Settlement funds. Total project cost increases.
08/17/2023 Amended Proposed for adoption into 2024-2027
07/11/2023 Amended Add $745,000 in state Settlement funds. Total project cost increases.
04/24/2023 Amended Add one new pool project. Total project cost increases.

Additional project amendment details can be found under this project in the TRIPS database.


2026-2029 Transportation Improvement Program (Pending TIP)

CO119 Operational Improvements: Boulder to Longmont



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (MMOF - ARPA - DRCOG) $0 $0 $0 $0
Federal (RAISE) $0 $0 $0 $0
Federal (STBG-Pandemic) $0 $0 $0 $0
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
Federal (Transportation Alternatives-CDOT) $1,679,000 $0 $0 $0
State (10 Year Plan-Capital Funds) $0 $0 $0 $0
State (House Bill 1466 - MMOF) $0 $0 $0 $0
State (Intelligent Transportation System) $0 $0 $0 $0
State (Legislative) $0 $0 $0 $0
State (Planning and Research Initiatives) $0 $0 $0 $0
State (Regional Priority Projects) $0 $0 $0 $0
Local $1,662,000 $1,000,000 $0 $0
Local (RTD Funds Only) $0 $0 $0 $0
Total $3,341,000 $1,000,000 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$158,721,000 $4,341,000 $0 $163,062,000


Amendment History
DateStatusDescription
11/25/2024 Proposed Adopted into the 2026-2029 TIP.
09/19/2024 Amended Shift $29,811,000 from Multimodal Transportation and Mitigation Options Fund - American Rescue Plan Act and $502,000 in federal Surface Transportation Block Grant funds to House Bill 1466 General Funds, add $2,153,000 in Regional Transportation District funds and $38,000 in local funds. Total project cost increases.
08/27/2024 Amended Swap $23,080,000 in state Legislative funding to state 10-Year Plan funding and shift funding to Fiscal Year 2025. Swap $5,000,000 in state Legislative-Transit funding to state Legislative funding. Decrease state Legislative funding by $99,000. Correct Regional Priority Project funding from local to state. Total project cost decreases.
04/18/2024 Amended Reduce state Legislative funding by $99,000. Total project cost decreases.
02/22/2024 Amended Replace $2,272,000 in federal Surface Transportation Block Grant funding with $2,272,000 in federal Multimodal Transportation and Mitigation Options Funds-American Rescue Plan Act funds. Total project cost remains the same.

Additional project amendment details can be found under this project in the TRIPS database.


2026-2029 Transportation Improvement Program (Pending TIP)

Safer Main Streets Pool



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
State (Legislative) $0 $0 $0 $0
State (Legislative-Transit) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$85,394,000 $0 $0 $85,394,000


Project Pools

This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.


Agency/Project NameDescriptionNotesCost
Arapahoe CountyArapahoe Road at Olathe St Intersection Improvements$450,000
Arapahoe CountyS. Federal Blvd. Sidewalk Improvements$464,000
BoulderSafer Signals, Safer Streets$435,000
Boulder28th St. (US 36) and Colorado Ave. Protected Intersection$2,104,000
Boulder30th Street – Separated Bike Lanes (SH-7/Arapahoe Avenue – Colorado Avenue)Funding on TIP ID# 2022-008$0
Boulder CountyUS 36 Intersections Improvements Project (Lyons to Boulder)$240,000
BroomfieldUS 287/ 120th Avenue Sidepath Infill & Transit Access Improvements$2,000,000
BroomfieldCO 128 / US 36 Bikeway Connection$296,000
Broomfield112th/Uptown Ave. Complete Streets and Railroad Safety Improvements$3,542,000
CentennialArapahoe and Clarkson Traffic Signal and Bike Lane Continuation$400,000
CentennialS Holly St HAWK Signal and Pedestrian Improvements$250,000
Commerce CityColorado Boulevard Bicycle and Pedestrian Improvements$2,720,000
DenverMississippi Avenue Vision Zero Safety Project$2,132,000
DenverSH-88/Federal Boulevard Median Gaps$3,600,000
DenverWest Colfax Pedestrian and Transit Improvements + Partial E. Colfax$10,000,000
DenverBroadway Corridor Multi-Modal Improvements (Elevate Project)$9,600,000
DenverFederal Blvd Pedestrian Improvement Project$3,812,000
Douglas CountyUS Highway 85 Shoulder Widening (Castle Rock Parkway to Daniels Park Road)$880,000
EnglewoodWest Dartmouth Ave Multimodal Safety$1,260,000
ErieCounty Line Road Telleen to Evans$2,360,000
LittletonMineral Station East Mobility-shed Improvements$1,600,000
LittletonPrince Street Link Project$615,000
Lone TreeRapid Rectangular Flashing Beacons (RRFBs)$248,000
Lone Tree and Douglas CountyC-470 Trail Connector to RTD/Park Meadows LRT$1,600,000
LongmontSH-119 & Sunset St Intersection Multimodal Safety Improvements (SDR5000)$1,200,000
MorrisonMorrison Main Street Revitalization$426,000
NederlandNederland Crosswalk Improvements$280,000
NorthglennConnect Northglenn Multimodal Improvements$560,000
SuperiorUS 36 Bikeway Extension - Rock Creek Parkway Segment$320,000
DenverEvans Ave Vision Zero Safety Project$744,000
Douglas CountyC-470 Trail & University Blvd Ped Grade Separation$5,120,000
ParkerParker Rd (SH-83) Multi-Use Trail/Sidewalk$3,200,000
RTDImproving ADA Accessibility in Metro Denver$905,000
CDOT R1Urban Arterials Safety Study$2,500,000
LakewoodWest Colfax Pedestrian Safety and Infrastructure ProjectFunding on TIP ID# 2024-048$0


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
02/22/2024 Amended Remove one pool project and move $2,300,000 in prior year state Legislative funding to TIP ID# 2022-008. Total project cost decreases.
01/30/2024 Amended Remove one pool project and move $7,060,000 in prior year state Legislative-Transit funding and $2,940,000 in prior year state Legislative funding to TIP ID# 2024-048. Total project cost decreases.
08/17/2023 Amended Proposed for adoption into 2024-2027
08/19/2021 Amended Add one new pool project. Add $2,500,000 in state legislative funding. Total project cost increases.

Additional project amendment details can be found under this project in the TRIPS database.


2026-2029 Transportation Improvement Program (Pending TIP)

47th/BNSF Missing Sidewalks



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Transportation Alternatives-CDOT) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$499,000 $0 $0 $499,000


Amendment History
DateStatusDescription
11/25/2024 Proposed Adopted into the 2026-2029 TIP.
11/15/2023 Amended Correct Denver Regional Council of Governments - Transportation Alternatives funding to Colorado Department of Transportation - Transportation Alternatives funding. Total project cost remains the same.
08/17/2023 Amended Proposed for adoption into 2024-2027
04/22/2021 Amended Proposed for adoption into 2022-2025
04/16/2020 Amended New project.



2026-2029 Transportation Improvement Program (Pending TIP)

I70/Picadilly New Interchange



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (BUILD) $0 $0 $0 $0
Federal (Faster Safety) $0 $0 $0 $0
State (Faster Safety) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$67,215,000 $0 $0 $67,215,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
07/21/2022 Amended Add $8,500,000 in FASTER Safety funding. Total project cost increases.
04/22/2021 Amended Proposed for adoption into 2022-2025
05/20/2020 Amended New Project.



2026-2029 Transportation Improvement Program (Pending TIP)

State Vulnerable and Senior Transportation Funds



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Vulnerable ) $0 $0 $0 $0
State (Vulnerable ) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$375,000 $0 $0 $375,000


Amendment History
DateStatusDescription
12/10/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
04/22/2021 Amended Proposed for adoption into 2022-2025
12/17/2020 Amended Add pool projects. Total project cost remains the same.
10/22/2020 Amended New Project.



2026-2029 Transportation Improvement Program (Pending TIP)

I25/Crystal Valley New Interchange



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (BUILD) $0 $0 $0 $0
Federal (Surface Transportation Block Grant) $2,431,000 $0 $0 $0
Local $505,000 $0 $0 $0
Total $2,936,000 $0 $0 $0
Project Phase to Initiate Construction None None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$95,064,000 $2,936,000 $0 $98,000,000


Amendment History
DateStatusDescription
12/20/2024 Proposed Adopted into the 2026-2029 TIP.
12/20/2024 Amended Add $431,000 in federal Surface Transportation Block Grant funding made available by closeout of 2020-021. Total project cost remains the same.
08/17/2023 Amended Proposed for adoption into 2024-2027
04/22/2021 Amended Proposed for adoption into 2022-2025
01/14/2021 Amended New project.



2026-2029 Transportation Improvement Program (Pending TIP)

I70 Region 1 Noise Walls



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (STBG-Pandemic) $0 $0 $0 $0
State (Legislative) $0 $0 $0 $0
State (Regional Priority Projects) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$35,800,000 $0 $0 $35,800,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
09/27/2021 Amended Add $20,000,000 in state Legislative funding for phases 3-6. Total project cost increases.
06/21/2021 Amended Add funding for Phase 2. Total project cost increases.
04/22/2021 Amended Proposed for adoption into 2022-2025

Additional project amendment details can be found under this project in the TRIPS database.


2026-2029 Transportation Improvement Program (Pending TIP)

I70 West Metro Bridges: I25 to C470



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
State (Legislative) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$37,200,000 $0 $0 $37,200,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
08/19/2021 Amended Add $2,000,000 in legislative funding. Total project cost increases
04/22/2021 Amended Proposed for adoption into 2022-2025
01/25/2021 Amended New project.



2026-2029 Transportation Improvement Program (Pending TIP)

Region 1 Mobility Hub Pool



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
State (Legislative-Transit) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$17,070,000 $0 $0 $17,070,000


Project Pools

This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.


Agency/Project NameDescriptionNotesCost
Bustang Maintenance Facility$4,000,000
Castle Rock Mobility Hub$11,070,000
Lone Tree Mobility Hub$14,600 in Leg-T funding in TIP# 2022-032$0


Amendment History
DateStatusDescription
01/30/2025 Proposed Adopted into the 2026-2029 TIP.
01/29/2025 Amended Adjust one pool project, remove $2,100,000 in state Legislative-Transit funding transferred to Project 2022-032. Total project cost decreases.
07/22/2024 Amended Remove one pool project and transfer $14,000,000 in prior year state Legislative-Transit funding to new I25/CO7 Interim Transit Improvement project. Total project cost decreases.
08/17/2023 Amended Proposed for adoption into 2024-2027
11/17/2022 Amended Add $6,130,000 in state Legislative-Transit funding, remove one pool project, and adjust cost on two pool projects. Total project cost increases.

Additional project amendment details can be found under this project in the TRIPS database.


2026-2029 Transportation Improvement Program (Pending TIP)

E470 Widening: I70 to 104th



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$111,400,000 $0 $0 $111,400,000


Amendment History
DateStatusDescription
12/03/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
04/22/2021 Amended Proposed for adoption into 2022-2025



2026-2029 Transportation Improvement Program (Pending TIP)

E470/I70 Interchange Improvements



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Local $0 $1,000,000 $5,000,000 $15,000,000
Total $0 $1,000,000 $5,000,000 $15,000,000


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$55,911,000 $21,000,000 $15,000,000 $91,911,000


Amendment History
DateStatusDescription
12/03/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
04/22/2021 Amended



2026-2029 Transportation Improvement Program (Pending TIP)

E470 Widening: 104th to US85



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Local $25,000,000 $45,000,000 $45,000,000 $0
Total $25,000,000 $45,000,000 $45,000,000 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$1,500,000 $115,000,000 $0 $116,500,000


Amendment History
DateStatusDescription
12/03/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
04/22/2021 Amended



2026-2029 Transportation Improvement Program (Pending TIP)

E470/88th New Interchange



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Local $10,000,000 $5,000,000 $0 $0
Total $10,000,000 $5,000,000 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$17,086,000 $15,000,000 $0 $32,086,000


Amendment History
DateStatusDescription
12/03/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
04/22/2021 Amended Proposed for adoption into 2022-2025



2026-2029 Transportation Improvement Program (Pending TIP)

County Line/WCR 1 Buffered Bike Lanes: 17th to CO66



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Transportation Alternatives-DRCOG) $0 $0 $0 $0
State (MMOF) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$3,400,000 $0 $0 $3,400,000


Amendment History
DateStatusDescription
11/25/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
09/22/2022 Amended Add scope from 2022-2025 Subregional Share Call for Projects.
04/22/2021 Amended Add new waitlist project



2026-2029 Transportation Improvement Program (Pending TIP)

5th St Operational Improvements: Woodlands to Ridge



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$7,000,000 $0 $0 $7,000,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
04/22/2021 Amended Add new waitlist project



2026-2029 Transportation Improvement Program (Pending TIP)

South Platte River Trail Improvements: West Virginia to W Bayaud



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
Federal (Transportation Alternatives-CDOT) $0 $0 $0 $0
Federal (Transportation Alternatives-DRCOG) $0 $0 $0 $0
State (MMOF) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$10,467,000 $0 $0 $10,467,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
09/19/2024 Amended Swap $2,500,000 in prior year local match for federal Transportation Alternatives-CDOT funding and add $467,000 in prior year local match. Total project cost increases.
08/17/2023 Amended Proposed for adoption into 2024-2027
05/19/2021 Amended Revise limits. Total project cost remains the same.
04/22/2021 Amended Add new waitlist project



2026-2029 Transportation Improvement Program (Pending TIP)

St Vrain Trail Extension: CO66 from McConnell to US36



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congressional Allocation) $0 $0 $0 $0
Federal (STBG-Pandemic DRCOG Region) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$966,000 $0 $0 $966,000


Amendment History
DateStatusDescription
11/25/2024 Proposed Adopted into the 2026-2029 TIP.
06/26/2024 Amended Add $800,000 in federal Congressional Allocation funding. Total project cost increases.
08/17/2023 Amended Proposed for adoption into 2024-2027
04/22/2021 Amended Add new waitlist project



2026-2029 Transportation Improvement Program (Pending TIP)

Wadsworth Operational Improvements: Vassar to Woodard



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality) $0 $0 $0 $0
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
Federal (Transportation Alternatives-DRCOG) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$8,644,000 $0 $0 $8,644,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
05/16/2023 Amended Swap $1,920,000 in federal CRP for $1,920,000 in federal CMAQ funding. No change to total project cost.
03/16/2023 Amended Add $2,004,000 in federal TAP funding and $501,000 in local match transferred from Region 1 TAP Pool, and adjust scope. Total project cost increases.
09/22/2022 Amended Add new scope from 2022-2025 Subregional Share Call for Projects.

Additional project amendment details can be found under this project in the TRIPS database.


2026-2029 Transportation Improvement Program (Pending TIP)

Region 1 Revitalizing Main Streets Pool



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
State (Legislative) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$5,101,000 $0 $0 $5,101,000


Project Pools

This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.


Agency/Project NameDescriptionNotesCost
AuroraNorthwest Aurora Intersection Pedestrian Safety Enhancement$1,600,000
Edgewater25th Avenue Streetscape Project$841,000
Commerce City68th Ave. Multimodal Safety Improvements$1,420,000
EnglewoodSouth Broadway HAWK Signal$316,000
Lakewood40 West ArtLine Bike Path Lighting and Safety$424,000
Wheat RidgeMain Street Plaza, Event, and Park Space$250,000
ParkerPilgrim's Place Walkway$250,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
10/17/2024 Amended Add $250,000 in state Legislative funding and add one pool project. Total project cost increases.
05/16/2024 Amended Add one pool project and $250,000 of state Legislative funding. Total project cost increases.
08/17/2023 Amended Proposed for adoption into 2024-2027
03/16/2023 Amended Remove one pool project and $1,360,000 in state Legislative funding. Project is transferred to 2016-020. Total project cost decreases.

Additional project amendment details can be found under this project in the TRIPS database.


2026-2029 Transportation Improvement Program (Pending TIP)

CO7/95th Intersection Improvements



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Faster Safety) $0 $0 $0 $0
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
State (Faster Safety) $0 $0 $0 $0
State (House Bill 1466 - MMOF) $0 $0 $0 $0
State (Legislative-Transit) $0 $0 $0 $0
State (MMOF) $0 $0 $0 $0
Local $95,000 $95,000 $0 $0
Total $95,000 $95,000 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$26,586,000 $190,000 $0 $26,776,000


Amendment History
DateStatusDescription
12/20/2024 Proposed Adopted into the 2026-2029 TIP.
12/20/2024 Amended Add $200,000 in state FASTER-Safety funding. Total project cost increases.
10/17/2024 Amended Remove $300,000 in state Legislative-Transit funding transferred to Project 2022-061. Total project cost decreases.
09/19/2024 Amended Shift $128,000 in prior year funds from Multimodal Transportation and Mitigation Options Fund - American Rescue Plan Act funds to House Bill 1466 General Funds. Total project cost remains the same.
02/22/2024 Amended Replace $2,272,000 in federal Multimodal Transportation and Mitigation Options Fund-American Rescue Plan Act funds with $2,272,000 in federal Surface Transportation Block Grant funds. Total project cost remains the same.

Additional project amendment details can be found under this project in the TRIPS database.


2026-2029 Transportation Improvement Program (Pending TIP)

I70 Floyd Hill Improvements: JC65 to Genesee Park



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
State (Legislative) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$17,300,000 $0 $0 $17,300,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
07/21/2022 Amended Add parking at El Rancho to project scope. Increase Legislative funding by $6,300,000. Total project cost increases.
02/17/2022 Amended Add new project.



2026-2029 Transportation Improvement Program (Pending TIP)

I25/Happy Canyon Interchange - Precon



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$4,800,000 $0 $0 $4,800,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
09/21/2023 Amended Correct funding amounts to include previously awarded FY24 funds (additional $200,000 in federal Surface Transportation Block Grant and $200,000 in local match). Total project cost increases.
08/17/2023 Amended Proposed for adoption into 2024-2027
03/17/2022 Amended Add new project as part of Spring 2022 Wait List Process.



2026-2029 Transportation Improvement Program (Pending TIP)

Enhanced Mobility of Seniors and Individuals with Disabilities (FTA 5310 - DRCOG)



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Section 5310) $2,900,000 $2,900,000 $2,900,000 $2,900,000
Local $1,511,000 $450,000 $450,000 $450,000
Total $4,411,000 $3,350,000 $3,350,000 $3,350,000


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$5,023,000 $14,461,000 $0 $19,484,000


Project Pools

This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.


Agency/Project NameDescriptionNotesCost
DRCOGProgram Administration (FY24)$293,000
VIAMobility Management (FY24)$472,000
VIAOperating (FY24)Funded also with HST$969,000
Laradon HallOperating (FY24)$139,000
DRCOGMobility Management (FY24)Funded also with HST$845,000
Douglas CountyMobility Management (FY24)Funded also with HST$301,000
DRMACMobility Management (FY24)Funded also with HST$297,000
LakewoodOperating (FY24)$60,000
A Little HelpMobility Management (Fiscal Year 2025)$20,000
Denver Regional Mobility and Access CouncilMobility Management (Fiscal Year 2025)$297,000
Douglas CountyMobility Management (Fiscal Year 2025)Funded also with Human Services Transportation Set-Aside$250,000
DRCOGMobility Management (Fiscal Year 2025)$516,000
Easter Seals1 Replacement Vehicle (Fiscal Year 2025)$94,000
LakewoodOperating (Fiscal Year 2025)$70,000
Laradon Hall SocietyOperating (Fiscal Year 2025)$140,000
Laradon Hall Society1 Vehicle Replacement (Fiscal Year 2025)$102,000
Support Management1 Vehicle Replacement (Fiscal Year 2025)$144,000
ViaOperating (Fiscal Year 2025)Funded also with Human Services Transportation Set-Aside$945,000
ViaMobility Management (Fiscal Year 2025)$479,000


Amendment History
DateStatusDescription
12/10/2024 Proposed Adopted into the 2026-2029 TIP.
05/16/2024 Amended Remove completed prior awards, add 11 newly awarded projects and required local match, and update annual allotment based on new projections. Total project cost decreases.
08/17/2023 Amended Proposed for adoption into 2024-2027
04/24/2023 Amended Add 14 new pool projects from recent FY 24 Call for Projects and correct prior funding amounts. Total project cost increases.
05/23/2022 Amended Create new project for DRCOG sponsored FTA 5310 projects.



2026-2029 Transportation Improvement Program (Pending TIP)

Washington St Improvements: 47th to 52nd



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (RAISE) $7,631,000 $0 $0 $0
Local $15,344,000 $0 $0 $0
Total $22,975,000 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$13,820,000 $22,975,000 $0 $36,795,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
07/21/2022 Amended Create new project for RAISE Grant award.



2026-2029 Transportation Improvement Program (Pending TIP)

Region 1 Congressionally Directed Funding Pool



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congressional Allocation) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$8,136,000 $0 $0 $8,136,000


Project Pools

This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.


Agency/Project NameDescriptionNotesCost
GoldenSH-93 Design$2,320,000
Commerce CityChambers Avenue Widening$4,116,000
GoldenCompactor/Roller Purchase$850,000
ThorntonQuebec Street Widening$850,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
07/22/2024 Amended Add three pool projects and $5,362,000 in federal Congressional Allocation funds. Total project cost increases.
08/17/2023 Amended Proposed for adoption into 2024-2027
05/16/2023 Amended Add two pool projects and $3,400,000 in federal Congressional funding. Total project cost increases.
09/08/2022 Amended Create new pool for congressionally directed funding in CDOT Region 1.



2026-2029 Transportation Improvement Program (Pending TIP)

East Colfax Bus Rapid Transit: Civic Center Station to Yosemite



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Capital Investment Grant) $0 $0 $0 $0
Federal (Carbon Reduction Program) $0 $0 $0 $0
Federal (Congestion Mitigation / Air Quality) $0 $0 $0 $0
Federal (Surface Transportation Block Grant) $2,685,000 $0 $0 $0
Local $2,305,000 $0 $0 $0
Total $4,990,000 $0 $0 $0
Project Phase to Initiate CM/GC Construction None None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$275,489,000 $4,990,000 $0 $280,479,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
09/19/2024 Amended Add $23,111,000 in federal Capital Investment Grant funds. Total project cost increases.
05/16/2024 Amended Add $126,889,000 in federal Capital Investment Grant funds and local match. Total project cost increases.
12/19/2023 Amended Swap $13,249,000 in federal Multimodal Transportation and Mitigation Options Fund - American Rescue Plan Act funds for $10,988,000 in federal Congestion Mitigation/Air Quality funds and $2,261,000 in federal Surface Transportation Block Grant funds. Total project cost remains the same.
08/17/2023 Amended Proposed for adoption into 2024-2027, add funds from 2024-2027 Subregional Share Call for Projects.

Additional project amendment details can be found under this project in the TRIPS database.


2026-2029 Transportation Improvement Program (Pending TIP)

Lone Tree Mobility Hub at Sky Ridge Station



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality) $0 $0 $0 $0
State (House Bill 1466 - MMOF) $0 $0 $0 $0
State (Legislative-Transit) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$26,600,000 $0 $0 $26,600,000


Amendment History
DateStatusDescription
01/30/2025 Proposed Adopted into the 2026-2029 TIP.
01/29/2025 Amended Add $2,100,000 in state Legislative-Transit funding transferred from Project 2020-100. Total project cost increases.
09/19/2024 Amended Shift $3,339,000 from Multimodal Transportation and Mitigation Options Fund - American Rescue Plan Act funds to House Bill 1466 General Funds. Add $4,500,000 in state Legislative funding. Total project cost increases.
08/17/2023 Amended Proposed for adoption into 2024-2027
11/17/2022 Amended Increase state Legislative-Transit funding by $10,000,000 to capture funds previously included in Region 1 Mobility Hub pool (TIP ID# 2020-100). Total project cost increases.

Additional project amendment details can be found under this project in the TRIPS database.


2026-2029 Transportation Improvement Program (Pending TIP)

Mineral Station Area Multimodal Improvements



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Carbon Reduction Program) $0 $0 $0 $0
State (MMOF) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$2,395,000 $0 $0 $2,395,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
09/22/2022 Amended Add new project from 2022-2025 Regional Share Call for Projects.



2026-2029 Transportation Improvement Program (Pending TIP)

Buchtel Complete Street/Evans Intersection Improvements: University to Colorado



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality) $0 $0 $0 $0
State (MMOF) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$24,240,000 $0 $0 $24,240,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
09/22/2022 Amended Add new project from 2022-2025 Subregional Share Call for Projects.



2026-2029 Transportation Improvement Program (Pending TIP)

Bike/Ped Bridge over Santa Fe: Jewell to Evans Station



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality) $0 $0 $0 $0
State (MMOF) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$15,002,000 $0 $0 $15,002,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
09/22/2022 Amended Add new project from 2022-2025 Subregional Share Call for Projects.



2026-2029 Transportation Improvement Program (Pending TIP)

South Platte River Trail Improvements: Mississippi to Dartmouth - Precon



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality) $0 $0 $0 $0
State (MMOF) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$5,000,000 $0 $0 $5,000,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
09/22/2022 Amended Add new project from 2022-2025 Subregional Share Call for Projects.



2026-2029 Transportation Improvement Program (Pending TIP)

Airport Creek Trail Underpass at BNSF



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality) $0 $0 $0 $0
State (MMOF) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$5,063,000 $0 $0 $5,063,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
09/22/2022 Amended Add new project from 2022-2025 Subregional Share Call for Projects.



2026-2029 Transportation Improvement Program (Pending TIP)

Jefferson County Bicycle Plan Implementation



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Carbon Reduction Program) $0 $0 $0 $0
State (MMOF) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$1,250,000 $0 $0 $1,250,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
09/22/2022 Amended Add new project from 2022-2025 Subregional Share Call for Projects.



2026-2029 Transportation Improvement Program (Pending TIP)

Wadsworth Shared-Use Path: 32nd to 35th



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality) $0 $0 $0 $0
State (MMOF) $0 $0 $0 $0
State (Regional Priority Projects) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$7,500,000 $0 $0 $7,500,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
04/24/2023 Amended Replace $700,000 in Safety funding with $700,000 in RPP funding. Total project cost remains the same.
09/22/2022 Amended Add new project from 2022-2025 Subregional Share Call for Projects.



2026-2029 Transportation Improvement Program (Pending TIP)

Ward Station Multimodal Access Improvements



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality) $0 $0 $0 $0
State (House Bill 1466 - MMOF) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$9,650,000 $0 $0 $9,650,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
09/19/2024 Amended Shift $4,825,000 from Multimodal Transportation and Mitigation Options Fund - American Rescue Plan Act funds to House Bill 1466 General Funds. Total project cost remains the same.
08/17/2023 Amended Proposed for adoption into 2024-2027
09/22/2022 Amended Add new project from 2022-2025 Subregional Share Call for Projects.



2026-2029 Transportation Improvement Program (Pending TIP)

Smith Rd Multimodal Improvements: Peoria to Powhaton - Precon



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Carbon Reduction Program) $0 $0 $0 $0
State (House Bill 1466 - MMOF) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$5,000,000 $0 $0 $5,000,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
09/19/2024 Amended Shift $1,250,000 in Fiscal Year 2024 and $1,250,000 in prior years funding from Multimodal Transportation and Mitigation Options Fund - American Rescue Plan Act funds to House Bill 1466 General Funds. Total project cost remains the same.
08/17/2023 Amended Proposed for adoption into 2024-2027
09/22/2022 Amended Add new project from 2022-2025 Subregional Share Call for Projects.



2026-2029 Transportation Improvement Program (Pending TIP)

Aurora Multimodal Access Improvements



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Carbon Reduction Program) $0 $0 $0 $0
State (MMOF) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$6,640,000 $0 $0 $6,640,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
09/22/2022 Amended Add new project from 2022-2025 Subregional Share Call for Projects.



2026-2029 Transportation Improvement Program (Pending TIP)

Bennett Kiowa Creek Trail



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality) $0 $0 $0 $0
Federal (Transportation Alternatives-DRCOG) $0 $0 $0 $0
State (MMOF) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$5,871,000 $0 $0 $5,871,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
09/22/2022 Amended Add new project from 2022-2025 Subregional Share Call for Projects.



2026-2029 Transportation Improvement Program (Pending TIP)

64th Corridor Study: CO2 to Quebec



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Carbon Reduction Program) $0 $0 $0 $0
State (House Bill 1466 - MMOF) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$250,000 $0 $0 $250,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
09/19/2024 Amended Shift $62,000 in Fiscal Year 2024 and $62,000 in prior years funding from Multimodal Transportation and Mitigation Options Fund - American Rescue Plan Act funds to House Bill 1466 General Funds. Total project cost remains the same.
08/17/2023 Amended Proposed for adoption into 2024-2027
09/22/2022 Amended Add new project from 2022-2025 Subregional Share Call for Projects.



2026-2029 Transportation Improvement Program (Pending TIP)

88th Ave Multimodal Improvements: I76 to CO2



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Transportation Alternatives-DRCOG) $0 $0 $0 $0
State (MMOF) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$0 $0 $0 $0


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
05/16/2024 Amended Zero out funding to combine with Project# 2020-032. Total project cost decreases.
08/17/2023 Amended Proposed for adoption into 2024-2027
09/22/2022 Amended Add new project from 2022-2025 Subregional Share Call for Projects.



2026-2029 Transportation Improvement Program (Pending TIP)

Thornton Multimodal Trail Study and Precon



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality) $0 $0 $0 $0
Federal (STBG-Pandemic DRCOG Region) $0 $0 $0 $0
State (House Bill 1466 - MMOF) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$1,710,000 $0 $0 $1,710,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
09/19/2024 Amended Shift $655,000 in Fiscal Year 2024 and $200,000 in prior years funding from Multimodal Transportation and Mitigation Options Fund - American Rescue Plan Act funds to House Bill 1466 General Funds. Total project cost remains the same.
08/17/2023 Amended Proposed for adoption into 2024-2027
12/21/2022 Amended Swap $385,000 in CMAQ for $385,000 in STBG-PDR. Total project cost remains the same.
09/22/2022 Amended Add new project from 2022-2025 Subregional Share Call for Projects.



2026-2029 Transportation Improvement Program (Pending TIP)

100th Ave Multi-Use Path: Riverdale to Forest Circle



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Transportation Alternatives-DRCOG) $0 $0 $0 $0
State (MMOF) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$946,000 $0 $0 $946,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
09/22/2022 Amended Add new project from 2022-2025 Subregional Share Call for Projects.



2026-2029 Transportation Improvement Program (Pending TIP)

Thornton Protected Bike Facility Study



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Carbon Reduction Program) $0 $0 $0 $0
Federal (MMOF - ARPA - DRCOG) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$510,000 $0 $0 $510,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
09/22/2022 Amended Add new project from 2022-2025 Subregional Share Call for Projects.



2026-2029 Transportation Improvement Program (Pending TIP)

High Line Canal Trail Underpass at Broadway - Precon



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $1,342,000 $1,341,000 $0 $0
Federal (Transportation Alternatives-DRCOG) $0 $0 $0 $0
State (MMOF) $0 $0 $0 $0
Local $336,000 $335,000 $0 $0
Total $1,678,000 $1,676,000 $0 $0
Project Phase to Initiate Design ROW None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$1,800,000 $3,354,000 $0 $5,154,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
09/22/2022 Amended Add new project from 2022-2025 Subregional Share Call for Projects.



2026-2029 Transportation Improvement Program (Pending TIP)

Arapahoe County Transit and Micromobility Study



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (MMOF - ARPA - DRCOG) $0 $0 $0 $0
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$1,455,000 $0 $0 $1,455,000


Amendment History
DateStatusDescription
12/10/2024 Proposed Adopted into the 2026-2029 TIP.
12/19/2023 Amended Swap federal Carbon Reduction Program funds for federal Surface Transportation Block Grant funds. Total project cost remains the same.
08/17/2023 Amended Proposed for adoption into 2024-2027
09/22/2022 Amended Add new project from 2022-2025 Subregional Share Call for Projects.



2026-2029 Transportation Improvement Program (Pending TIP)

Aurora Multimodal Transportation Master Plan



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
State (MMOF) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$3,225,000 $0 $0 $3,225,000


Amendment History
DateStatusDescription
12/17/2024 Proposed Adopted into the 2026-2029 TIP.
12/19/2023 Amended Swap federal Carbon Reduction Program funds for federal Surface Transportation Block Grant funds. Total project cost remains the same.
08/17/2023 Amended Proposed for adoption into 2024-2027
09/22/2022 Amended Add new project from 2022-2025 Subregional Share Call for Projects.



2026-2029 Transportation Improvement Program (Pending TIP)

Lone Tree Creek Trail Underpass of Arapahoe



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality) $0 $0 $0 $0
State (House Bill 1466 - MMOF) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$4,312,000 $0 $0 $4,312,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
09/19/2024 Amended Shift $2,156,000 from Multimodal Transportation and Mitigation Options Fund - American Rescue Plan Act funds to House Bill 1466 General Funds. Total project cost remains the same.
08/17/2023 Amended Proposed for adoption into 2024-2027
09/22/2022 Amended Add new project from 2022-2025 Subregional Share Call for Projects.



2026-2029 Transportation Improvement Program (Pending TIP)

Arapahoe Sidepath Improvements: I25 to Parker Rd



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality) $0 $0 $0 $0
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
State (MMOF) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$6,818,000 $0 $0 $6,818,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
11/21/2024 Amended Add $2,000,000 in federal Surface Transportation Block Grant funds returned from Project 2020-059 and reallocated by the Arapahoe County Subregional Forum. Total project cost increases.
08/17/2023 Amended Proposed for adoption into 2024-2027
09/22/2022 Amended Add new project from 2022-2025 Subregional Share Call for Projects.



2026-2029 Transportation Improvement Program (Pending TIP)

Hampden Complete Streets: Broadway to Lafayette



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Transportation Alternatives-DRCOG) $0 $0 $0 $0
State (House Bill 1466 - MMOF) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$9,125,000 $0 $0 $9,125,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
09/19/2024 Amended Shift $3,285,000 in Fiscal Year 2024 and $1,140,000 in prior years funding from Multimodal Transportation and Mitigation Options Fund - American Rescue Plan Act funds to House Bill 1466 General Funds. Total project cost remains the same.
08/17/2023 Amended Proposed for adoption into 2024-2027
09/22/2022 Amended Add new project from 2022-2025 Subregional Share Call for Projects.



2026-2029 Transportation Improvement Program (Pending TIP)

Broadway Complete Streets Improvements: Hampden to Belleview



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (MMOF - ARPA - DRCOG) $0 $0 $0 $0
Federal (Transportation Alternatives-DRCOG) $0 $0 $0 $0
State (House Bill 1466 - MMOF) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$7,540,000 $0 $0 $7,540,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
09/19/2024 Amended Shift $2,450,000 in Fiscal Year 2024 and $1,050,000 in prior years funding from Multimodal Transportation and Mitigation Options Fund - American Rescue Plan Act funds to House Bill 1466 General Funds. Total project cost remains the same.
08/17/2023 Amended Proposed for adoption into 2024-2027
09/22/2022 Amended Add new project from 2022-2025 Subregional Share Call for Projects.



2026-2029 Transportation Improvement Program (Pending TIP)

Baseline Multimodal Improvements: 30th to Foothills



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Carbon Reduction Program) $0 $0 $0 $0
State (MMOF) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$3,066,000 $0 $0 $3,066,000


Amendment History
DateStatusDescription
11/25/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
09/22/2022 Amended Add new project from 2022-2025 Subregional Share Call for Projects.



2026-2029 Transportation Improvement Program (Pending TIP)

CO93/Table Mesa and Regent Intersection Improvements



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality) $0 $0 $0 $0
State (Legislative) $0 $0 $0 $0
State (MMOF) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$4,600,000 $0 $0 $4,600,000


Amendment History
DateStatusDescription
11/25/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
02/16/2023 Amended Replace $1,500,000 in RPP funding with $1,500,000 in Legislative funding per CDOT R4.
09/22/2022 Amended Add new project from 2022-2025 Subregional Share Call for Projects.



2026-2029 Transportation Improvement Program (Pending TIP)

Longmont Main/21st Bike/Ped Improvements - Precon



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality) $0 $0 $0 $0
State (MMOF) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$805,000 $0 $0 $805,000


Amendment History
DateStatusDescription
11/25/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
09/22/2022 Amended Add new project from 2022-2025 Subregional Share Call for Projects.



2026-2029 Transportation Improvement Program (Pending TIP)

I25/Castle Pines Pkwy Bike/Ped Overpass - Precon



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality) $0 $0 $0 $0
Federal (MMOF - ARPA - DRCOG) $0 $0 $0 $0
State (House Bill 1466 - MMOF) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$1,500,000 $0 $0 $1,500,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
11/21/2024 Amended Adjust scope per Douglas County Subregional Forum action. No change to overall project cost.
09/19/2024 Amended Shift $500,000 from Multimodal Transportation and Mitigation Options Fund - American Rescue Plan Act funds to House Bill 1466 General Funds. Total project cost remains the same.
08/17/2023 Amended Proposed for adoption into 2024-2027
09/22/2022 Amended Add new project from 2022-2025 Subregional Share Call for Projects.



2026-2029 Transportation Improvement Program (Pending TIP)

Castle Rock Industrial Tributary Trail: Plum Creek to Plum Creek Trail



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality) $0 $0 $0 $0
State (MMOF) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$9,165,000 $0 $0 $9,165,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
09/22/2022 Amended Add new project from 2022-2025 Subregional Share Call for Projects.



2026-2029 Transportation Improvement Program (Pending TIP)

Douglas County Transit & Multimodal Feasibility Study



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Carbon Reduction Program) $0 $0 $0 $0
Federal (MMOF - ARPA - DRCOG) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$600,000 $0 $0 $600,000


Amendment History
DateStatusDescription
12/10/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
09/22/2022 Amended Add new project from 2022-2025 Subregional Share Call for Projects.



2026-2029 Transportation Improvement Program (Pending TIP)

County Line Shared Use Path: Broadway to High Line Canal Trail



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Transportation Alternatives-DRCOG) $0 $0 $0 $0
State (MMOF) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$3,330,000 $0 $0 $3,330,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
09/22/2022 Amended Add new project from 2022-2025 Subregional Share Call for Projects.



2026-2029 Transportation Improvement Program (Pending TIP)

S Havana Bikeway: RidgeGate Station to Lone Tree City Limits



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality) $0 $0 $0 $0
State (MMOF) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$1,600,000 $0 $0 $1,600,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
05/16/2023 Amended Swap $300,000 in federal CRP funding for $300,000 in federal CMAQ funding. No change in total project cost.
09/22/2022 Amended Add new project from 2022-2025 Subregional Share Call for Projects.



2026-2029 Transportation Improvement Program (Pending TIP)

Parker Rd Multi-Use Path East Side Gaps: Pine to Stroh



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Carbon Reduction Program) $0 $0 $0 $0
State (MMOF) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$5,000,000 $0 $0 $5,000,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
09/22/2022 Amended Add new project from 2022-2025 Subregional Share Call for Projects.



2026-2029 Transportation Improvement Program (Pending TIP)

32nd/I-70 Bike Lanes: Wright to Zinnia



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality) $0 $0 $0 $0
State (House Bill 1466 - MMOF) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$1,000,000 $0 $0 $1,000,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
09/19/2024 Amended Shift $500,000 from Multimodal Transportation and Mitigation Options Fund - American Rescue Plan Act funds to House Bill 1466 General Funds. Total project cost remains the same.
08/17/2023 Amended Proposed for adoption into 2024-2027
09/22/2022 Amended Add new project from 2022-2025 Subregional Share Call for Projects.



2026-2029 Transportation Improvement Program (Pending TIP)

Colorado Boulevard Bus Rapid Transit - Precon



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
State (Legislative) $5,000,000 $5,000,000 $0 $0
State (Legislative-Transit) $5,000,000 $5,000,000 $0 $0
Local $0 $0 $0 $0
Total $10,000,000 $10,000,000 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$31,651,000 $20,000,000 $0 $51,651,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
10/18/2023 Amended Add one pool project, transfer $13,349,000 in state Legislative funding and $10,000,000 in state Legislative-Transit funding to TIP ID# 2024-008. Total project cost decreases.
08/17/2023 Amended Proposed for adoption into 2024-2027
11/17/2022 Amended Create new pool for design and preconstruction activities for arterial BRT in CDOT R1.



2026-2029 Transportation Improvement Program (Pending TIP)

I25/Speer and 23rd Interchange Reconstructions



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
State (FASTER Bridge and Tunnel Enterprise) $0 $8,000,000 $30,000,000 $0
State (Legislative) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $8,000,000 $30,000,000 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$15,000,000 $38,000,000 $22,000,000 $75,000,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
11/17/2022 Amended Add new project for I-25 and Speer/23rd interchange reconstruction.



2026-2029 Transportation Improvement Program (Pending TIP)

I25 Improvements: 84th to 104th - Precon



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
State (Legislative) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$20,000,000 $0 $0 $20,000,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
11/17/2022 Amended Add new project for operational and safety improvements to I-25 between 84th Ave. and 104th Ave.



2026-2029 Transportation Improvement Program (Pending TIP)

Region 4 Revitalizing Main Streets Pool



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
State (Legislative) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$278,000 $0 $0 $278,000


Project Pools

This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.


Agency/Project NameDescriptionNotesCost
MeadTown of Mead Regional Trail ExtensionPrior funding in TIP ID# 2007-144$250,000


Amendment History
DateStatusDescription
11/26/2024 Proposed Adopted into the 2026-2029 TIP.
02/22/2024 Amended Add one pool project, $250,000 in state Legislative funding, and $28,000 in local match. Total project cost increases.
08/17/2023 Amended Proposed for adoption into 2024-2027
11/17/2022 Amended Add new pool for Revitalizing Main Streets projects in CDOT R4.



2026-2029 Transportation Improvement Program (Pending TIP)

Region 1 Vision Zero Pool



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
State (Legislative) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$15,000,000 $0 $0 $15,000,000


Project Pools

This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.


Agency/Project NameDescriptionNotesCost
Sheridan Blvd Multimodal Improvements17th to 26th$6,000,000
S Federal Median/Signal ProjectBelleview to Hampden$6,000,000
Bike/Ped Safety Project5 Locations in Aurora and Bennett$3,000,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
10/18/2023 Amended Correct FY 2025 funding amount to $5,000,000. Overall project cost decreases.
09/21/2023 Amended Add three new pool projects and correct FY2025 funding amount to $7,000,000. Overall project cost decreases.
08/17/2023 Amended Proposed for adoption into 2024-2027
02/16/2023 Amended Create new pool for improvements related to Vision Zero in CDOT R1.



2026-2029 Transportation Improvement Program (Pending TIP)

I25 Segment 5: CO66 to WCR38



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congressional Allocation) $0 $0 $0 $0
Federal (TIFIA) $0 $0 $0 $0
State (Legislative) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$210,740,000 $0 $0 $210,740,000


Amendment History
DateStatusDescription
01/30/2025 Proposed Adopted into the 2026-2029 TIP.
01/29/2025 Amended Add $50,000 local match funding. Total project cost increases.
11/21/2024 Amended Add scope and funding for High Plains Boulevard from 2024-090. Total project cost increases.
08/17/2023 Amended Proposed for adoption into 2024-2027
05/16/2023 Amended Add $11,000,000 in state Legislative funding and $185,282,000 in federal TIFIA loans. Total project cost increases.

Additional project amendment details can be found under this project in the TRIPS database.


2026-2029 Transportation Improvement Program (Pending TIP)

U85/168th Intersection Improvements



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
State (10 Year Plan-Capital Funds) $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$300,000 $0 $0 $300,000


Amendment History
DateStatusDescription
11/26/2024 Proposed Adopted into the 2026-2029 TIP.
04/18/2024 Amended Add $300,000 in state 10-Year Capital Plan funds. Total project cost increases.
08/17/2023 Amended Proposed for adoption into 2024-2027
03/16/2023 Amended Add new project with 10C funding.



2026-2029 Transportation Improvement Program (Pending TIP)

Arapahoe Ave Multimodal Improvements: 28th to Foothills - Precon



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality) $0 $0 $0 $0
State (10 Year Plan-Mobility Funds) $0 $0 $0 $0
State (Legislative) $0 $0 $0 $0
State (MMOF) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$2,967,000 $0 $0 $2,967,000


Amendment History
DateStatusDescription
12/20/2024 Proposed Adopted into the 2026-2029 TIP.
12/20/2024 Amended Switch $281,000 from state Legislative funding to state 10 Year Plan - Mobility funds. Total project cost remains the same.
08/17/2023 Amended Proposed for adoption into 2024-2027
04/24/2023 Amended Create new project split from TIP# 2020-007 for improvements within City of Boulder.



2026-2029 Transportation Improvement Program (Pending TIP)

Mineral Multimodal Improvements: Santa Fe to Jackass Hill/Long Ave



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$2,611,000 $0 $0 $2,611,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Proposed for adoption into 2024-2027
05/16/2023 Amended Transfer $2,089,000 in Surface Transportation Block Grant funding from TIP ID# 2012-010 for their Second Commitment in Principal amount to be applied toward multimodal access improvements to Mineral Station.



2026-2029 Transportation Improvement Program (Pending TIP)

Peoria St Bridge Replacement: Over Sand Creek - Precon



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$3,000,000 $0 $0 $3,000,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Add new project from 2024-2027 Regional Share Call for Projects.



2026-2029 Transportation Improvement Program (Pending TIP)

DRCOG Transportation Corridor Planning Set Aside



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $1,500,000 $0 $0 $0
Local $0 $0 $0 $0
Total $1,500,000 $0 $0 $0
Project Phase to Initiate Study None None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$250,000 $1,500,000 $0 $1,750,000


Amendment History
DateStatusDescription
12/10/2024 Proposed Adopted into the 2026-2029 TIP.
05/16/2024 Amended Transfer all funding into 2024 and 2026. Total project cost remains the same.
10/18/2023 Amended Remove $1,250,000 to program to individual corridor planning projects. Total project cost decreases.
08/17/2023 Amended Adopt into the 24-27 TIP.



2026-2029 Transportation Improvement Program (Pending TIP)

DRCOG Community Mobility Planning Set-Aside - Community-Based Transportation Plans



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $1,250,000 $0 $0 $0
Local $0 $0 $0 $0
Total $1,250,000 $0 $0 $0
Project Phase to Initiate Study None None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$50,000 $1,250,000 $0 $1,300,000


Amendment History
DateStatusDescription
12/10/2024 Proposed Adopted into the 2026-2029 TIP.
05/16/2024 Amended Transfer all funding into 2024 and 2026. Total project cost remains the same.
04/18/2024 Amended Remove $1,200,000 to program to individual community-based transportation planning projects. Total project cost decreases.
08/17/2023 Amended Amended into the 24-27 TIP



2026-2029 Transportation Improvement Program (Pending TIP)

DRCOG Community Mobility Planning Set-Aside - Livable Centers Small-Area Planning



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $1,250,000 $0 $0 $0
Local $0 $0 $0 $0
Total $1,250,000 $0 $0 $0
Project Phase to Initiate Study None None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$110,000 $1,250,000 $0 $1,360,000


Amendment History
DateStatusDescription
12/20/2024 Proposed Adopted into the 2026-2029 TIP.
12/20/2024 Amended Remove $1,140,000 awarded to individual projects. Total project cost decreases.
05/16/2024 Amended Shift all funding into 2024 and 2026. Total project cost remains the same.
08/17/2023 Amended Amend into the 24-27 TIP.



2026-2029 Transportation Improvement Program (Pending TIP)

DRCOG Innovative Mobility Set Aside



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $2,000,000 $0 $0 $0
Local $0 $0 $0 $0
Total $2,000,000 $0 $0 $0
Project Phase to Initiate Other Phase None None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$550,000 $2,000,000 $0 $2,550,000


Amendment History
DateStatusDescription
12/20/2024 Proposed Adopted into the 2026-2029 TIP.
12/20/2024 Amended Reduce funding by $1,450,000, distributed to newly awarded set-aside projects. Total project cost decreases.
05/16/2024 Amended Shift all funding into 2024 and 2026. Total project cost remains the same.
08/17/2023 Amended Adopted into the 24-27 TIP.



2026-2029 Transportation Improvement Program (Pending TIP)

CO7 Transit Service: Boulder to Brighton



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality) $2,561,000 $4,303,000 $0 $0
Federal (Congestion Mitigation/Air Quality - CDOT) $375,000 $375,000 $0 $0
Local $586,000 $1,014,000 $0 $0
Local (RTD Funds Only) $50,000 $0 $0 $0
Total $3,572,000 $5,692,000 $0 $0
Project Phase to Initiate Bus Service Bus Service None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$0 $9,264,000 $0 $9,264,000


Amendment History
DateStatusDescription
12/19/2024 Proposed Adopted into the 2026-2029 TIP.
12/19/2024 Amended Switch state Legislative-Transit and Regional Priority Project funding for state-allocated federal Congestion Mitigation/Air Quality funds. Total project cost remains the same.
08/17/2023 Amended Add new project from 2024-2027 Regional and Subregional Shares Calls for Projects.



2026-2029 Transportation Improvement Program (Pending TIP)

Federal Blvd Bus Rapid Transit: Englewood Station to Wagon Road Park-n-Ride - Precon



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Carbon Reduction Program) $0 $0 $0 $0
Federal (Surface Transportation Block Grant) $8,122,000 $4,017,000 $0 $0
State (House Bill 1466 - MMOF) $0 $0 $0 $0
State (Legislative) $2,000,000 $2,000,000 $0 $0
State (Legislative-Transit) $5,453,000 $8,133,000 $0 $0
Local $1,750,000 $0 $0 $0
Local (RTD Funds Only) $0 $0 $0 $0
Total $17,325,000 $14,150,000 $0 $0
Project Phase to Initiate Design ROW None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$32,753,000 $31,475,000 $0 $64,228,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
09/19/2024 Amended Shift $439,000 from Multimodal Transportation and Mitigation Options Fund - American Rescue Plan Act funds to House Bill 1466 General Funds. Total project cost remains the same.
02/22/2024 Amended Add $340,000 in federal Carbon Reduction Program funds and $439,000 in federal Multimodal Transportation and Mitigation Options Fund - American Rescue Plan Act fund transferred from TIP ID# 2022-053. Total project cost increases.
10/18/2023 Amended Add $13,349,000 in state Legislative funding and $10,000,000 in state Legislative-Transit funding transferred from TIP ID# 2022-074. Total project cost increases.
08/17/2023 Amended Add new project from 2024-2027 Regional and Subregional Shares Calls for Projects.



2026-2029 Transportation Improvement Program (Pending TIP)

South Platte River Trail Improvements: Bayaud to Phil Milstein Park



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Carbon Reduction Program) $4,250,000 $4,250,000 $0 $0
State (Regional Priority Projects) $500,000 $500,000 $0 $0
Local $1,050,000 $1,050,000 $0 $0
Total $5,800,000 $5,800,000 $0 $0
Project Phase to Initiate Construction Construction None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$0 $11,600,000 $0 $11,600,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Add new project from 2024-2027 Regional Share Call for Projects.



2026-2029 Transportation Improvement Program (Pending TIP)

SW Weld County Transit First and Last Mile Study



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
State (MMOF) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$167,000 $0 $0 $167,000


Amendment History
DateStatusDescription
12/10/2024 Proposed Adopted into the 2026-2029 TIP.
12/19/2023 Amended Swap federal Carbon Reduction Program funds for federal Surface Transportation Block Grant funds. Total project cost remains the same.
08/17/2023 Amended Add new project from 2024-2027 Regional Share Call for Projects.



2026-2029 Transportation Improvement Program (Pending TIP)

Adams County Comprehensive Safety Action Plan



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $400,000 $0 $0 $0
Local $100,000 $0 $0 $0
Total $500,000 $0 $0 $0
Project Phase to Initiate Study None None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$1,500,000 $500,000 $0 $2,000,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Add new project from 2024-2027 Subregional Share Call for Projects.



2026-2029 Transportation Improvement Program (Pending TIP)

High Line Canal Trail Underpass at Colfax



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality) $2,600,000 $4,800,000 $0 $0
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
Federal (Transportation Alternatives-DRCOG) $200,000 $0 $0 $0
Local $700,000 $1,200,000 $0 $0
Total $3,500,000 $6,000,000 $0 $0
Project Phase to Initiate ROW Construction None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$2,500,000 $9,500,000 $0 $12,000,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Add new project from 2024-2027 Subregional Share Call for Projects.



2026-2029 Transportation Improvement Program (Pending TIP)

McKay Operational Improvements: 104th to 96th - Precon



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $200,000 $0 $0 $0
Local $200,000 $0 $0 $0
Total $400,000 $0 $0 $0
Project Phase to Initiate Environmental None None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$1,600,000 $400,000 $0 $2,000,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Add new project from 2024-2027 Subregional Share Call for Projects.



2026-2029 Transportation Improvement Program (Pending TIP)

124th Multimodal Improvements: Claude to Colorado



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality) $44,000 $1,844,000 $0 $0
State (MMOF) $54,000 $2,304,000 $0 $0
Local $11,000 $461,000 $0 $0
Total $109,000 $4,609,000 $0 $0
Project Phase to Initiate ROW Construction None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$1,609,000 $4,718,000 $0 $6,327,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Add new project from 2024-2027 Subregional Share Call for Projects.



2026-2029 Transportation Improvement Program (Pending TIP)

Big Dry Creek Trail: 136th to 144th



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Carbon Reduction Program) $1,125,000 $1,125,000 $0 $0
State (MMOF) $1,375,000 $1,375,000 $0 $0
Local $250,000 $250,000 $0 $0
Total $2,750,000 $2,750,000 $0 $0
Project Phase to Initiate Construction Construction None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$500,000 $5,500,000 $0 $6,000,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Add new project from 2024-2027 Subregional Share Call for Projects.



2026-2029 Transportation Improvement Program (Pending TIP)

Colorado Blvd Separated Bike Facility: 88th to E470 - Precon



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Transportation Alternatives-DRCOG) $0 $821,000 $0 $0
State (MMOF) $0 $1,026,000 $0 $0
Local $0 $206,000 $0 $0
Total $0 $2,053,000 $0 $0
Project Phase to Initiate None Design None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$0 $2,053,000 $0 $2,053,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Add new project from 2024-2027 Subregional Share Call for Projects.



2026-2029 Transportation Improvement Program (Pending TIP)

Thornton Pkwy Multiuse Path: I25 to Grant



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality) $160,000 $636,000 $0 $0
State (MMOF) $200,000 $796,000 $0 $0
Local $40,000 $160,000 $0 $0
Total $400,000 $1,592,000 $0 $0
Project Phase to Initiate Design Construction None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$0 $1,992,000 $0 $1,992,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Add new project from 2024-2027 Subregional Share Call for Projects.



2026-2029 Transportation Improvement Program (Pending TIP)

Easter Trail Study: Cherry Creek Trail to Parker Rd



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality) $160,000 $0 $0 $0
Local $40,000 $0 $0 $0
Total $200,000 $0 $0 $0
Project Phase to Initiate Study None None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$0 $200,000 $0 $200,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Add new project from 2024-2027 Subregional Share Call for Projects.



2026-2029 Transportation Improvement Program (Pending TIP)

13th Ave Multimodal Improvements: Yosemite to High Line Canal Trail - Precon



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality) $270,000 $0 $0 $0
Local $180,000 $0 $0 $0
Total $450,000 $0 $0 $0
Project Phase to Initiate Design None None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$1,050,000 $450,000 $0 $1,500,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Add new project from 2024-2027 Subregional Share Call for Projects.



2026-2029 Transportation Improvement Program (Pending TIP)

Gun Club Multimodal Capacity Improvements: Quincy to Aurora Pkwy - Precon



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $600,000 $300,000 $0 $0
Local $400,000 $200,000 $0 $0
Total $1,000,000 $500,000 $0 $0
Project Phase to Initiate Design Design None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$1,000,000 $1,500,000 $0 $2,500,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Add new project from 2024-2027 Subregional Share Call for Projects.



2026-2029 Transportation Improvement Program (Pending TIP)

I225 & Alameda Bridge Replacement - Precon



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
State (Regional Priority Projects) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$3,000,000 $0 $0 $3,000,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Add new project from 2024-2027 Subregional Share Call for Projects.



2026-2029 Transportation Improvement Program (Pending TIP)

Colorado Blvd Multimodal Improvements: Arapahoe to Dry Creek



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Transportation Alternatives-DRCOG) $1,866,000 $1,865,000 $0 $0
State (MMOF) $2,340,000 $2,340,000 $0 $0
Local $475,000 $475,000 $0 $0
Total $4,681,000 $4,680,000 $0 $0
Project Phase to Initiate Construction Construction None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$0 $9,361,000 $0 $9,361,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Add new project from 2024-2027 Subregional Share Call for Projects.



2026-2029 Transportation Improvement Program (Pending TIP)

Havana/Easter Intersection Operational Improvements



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $5,720,000 $5,720,000 $0 $0
Local $2,452,000 $2,452,000 $0 $0
Total $8,172,000 $8,172,000 $0 $0
Project Phase to Initiate Construction Construction None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$0 $16,344,000 $0 $16,344,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Add new project from 2024-2027 Subregional Share Call for Projects.



2026-2029 Transportation Improvement Program (Pending TIP)

Bowles Corridor Study: Sheridan to Santa Fe



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $300,000 $299,000 $0 $0
Local $76,000 $75,000 $0 $0
Total $376,000 $374,000 $0 $0
Project Phase to Initiate Study Study None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$0 $750,000 $0 $750,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Add new project from 2024-2027 Subregional Share Call for Projects.



2026-2029 Transportation Improvement Program (Pending TIP)

30th St Multimodal Improvements: Colorado to Baseline



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality) $1,460,000 $1,540,000 $0 $0
Local $365,000 $385,000 $0 $0
Total $1,825,000 $1,925,000 $0 $0
Project Phase to Initiate Design Construction None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$0 $3,750,000 $0 $3,750,000


Amendment History
DateStatusDescription
11/26/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Add new project from 2024-2027 Subregional Share Call for Projects.



2026-2029 Transportation Improvement Program (Pending TIP)

Folsom Multimodal Study: Pine to Colorado



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality) $1,000,000 $0 $0 $0
Local $450,000 $0 $0 $0
Total $1,450,000 $0 $0 $0
Project Phase to Initiate Study None None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$0 $1,450,000 $0 $1,450,000


Amendment History
DateStatusDescription
11/26/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Add new project from 2024-2027 Subregional Share Call for Projects.



2026-2029 Transportation Improvement Program (Pending TIP)

Boulder County Vision Zero SRTS Action Plan



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $120,000 $0 $0 $0
Local $34,000 $0 $0 $0
Total $154,000 $0 $0 $0
Project Phase to Initiate Study None None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$296,000 $154,000 $0 $450,000


Amendment History
DateStatusDescription
11/26/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Add new project from 2024-2027 Subregional Share Call for Projects.



2026-2029 Transportation Improvement Program (Pending TIP)

WCR26 Multi-Use Trail: Union Reservoir to St Vrain State Park



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Transportation Alternatives-DRCOG) $873,000 $0 $0 $0
State (MMOF) $1,091,000 $0 $0 $0
Local $219,000 $0 $0 $0
Total $2,183,000 $0 $0 $0
Project Phase to Initiate Construction None None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$0 $2,183,000 $0 $2,183,000


Amendment History
DateStatusDescription
11/26/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Adopt into the 24-27 TIP.



2026-2029 Transportation Improvement Program (Pending TIP)

Lafayette to Boulder Protected Bikeway Feasibility Study



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Transportation Alternatives-DRCOG) $170,000 $0 $0 $0
State (MMOF) $212,000 $0 $0 $0
Local $43,000 $0 $0 $0
Total $425,000 $0 $0 $0
Project Phase to Initiate Study None None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$0 $425,000 $0 $425,000


Amendment History
DateStatusDescription
11/26/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Add new project from 2024-2027 Subregional Share Call for Projects.



2026-2029 Transportation Improvement Program (Pending TIP)

WCR13/WCR20 Intersection Operational Improvements



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $1,768,000 $0 $0 $0
Local $444,000 $0 $0 $0
Total $2,212,000 $0 $0 $0
Project Phase to Initiate Construction None None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$364,000 $2,212,000 $0 $2,576,000


Amendment History
DateStatusDescription
11/26/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Adopted into the 24-27 TIP.



2026-2029 Transportation Improvement Program (Pending TIP)

S Boulder Rd BRT Study: Broadway/Table Mesa to CO7/119th



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$500,000 $0 $0 $500,000


Amendment History
DateStatusDescription
11/26/2024 Proposed Adopted into the 2026-2029 TIP.
12/19/2023 Amended Swap federal Carbon Reduction Program funds with federal Surface Transportation Block Grant funds. Total project cost remains the same.
08/17/2023 Amended Add new project from 2024-2027 Subregional Share Call for Projects.



2026-2029 Transportation Improvement Program (Pending TIP)

I25 Interchange Study: CO52 to Erie Pkwy



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$500,000 $0 $0 $500,000


Amendment History
DateStatusDescription
11/26/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Adopted into the 24-27 TIP.



2026-2029 Transportation Improvement Program (Pending TIP)

SE Boulder County SuperFlex



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality) $1,176,000 $0 $0 $0
State (MMOF) $1,455,000 $0 $0 $0
Local $279,000 $0 $0 $0
Total $2,910,000 $0 $0 $0
Project Phase to Initiate Bus Service None None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$801,000 $2,910,000 $0 $3,711,000


Amendment History
DateStatusDescription
12/10/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Add new project from 2024-2027 Subregional Share Call for Projects.



2026-2029 Transportation Improvement Program (Pending TIP)

Erie FlexRide



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality) $240,000 $0 $0 $0
State (MMOF) $300,000 $0 $0 $0
Local $60,000 $0 $0 $0
Total $600,000 $0 $0 $0
Project Phase to Initiate Bus Service None None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$600,000 $600,000 $0 $1,200,000


Amendment History
DateStatusDescription
12/10/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Add new project from 2024-2027 Subregional Share Call for Projects.



2026-2029 Transportation Improvement Program (Pending TIP)

CO66 Multi-Use Path: Hover to Main



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality) $2,240,000 $0 $0 $0
Local $560,000 $0 $0 $0
Total $2,800,000 $0 $0 $0
Project Phase to Initiate Construction None None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$0 $2,800,000 $0 $2,800,000


Amendment History
DateStatusDescription
11/26/2024 Proposed Adopted into the 2026-2029 TIP.
09/21/2023 Amended Correct local match amount from $260,000 to $560,000. Total project cost increases.
08/17/2023 Amended Add new project from 2024-2027 Subregional Share Call for Projects.



2026-2029 Transportation Improvement Program (Pending TIP)

CO52 Intersection Safety Improvements: WCR5 to WCR7 - Precon



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $72,000 $74,000 $0 $0
Local $19,000 $19,000 $0 $0
Total $91,000 $93,000 $0 $0
Project Phase to Initiate Design ROW None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$167,000 $184,000 $0 $351,000


Amendment History
DateStatusDescription
12/20/2024 Proposed Adopted into the 2026-2029 TIP.
12/20/2024 Amended Modify scope to address change in intersections and addition of multi-use path right-of-way. Total project cost remains the same.
08/17/2023 Amended Adopted into the 24-27 TIP.



2026-2029 Transportation Improvement Program (Pending TIP)

Tabor St Multimodal Improvements: Clear Creek Trail to I70 Frontage Rd N - Precon



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Transportation Alternatives-DRCOG) $1,596,000 $0 $0 $0
State (MMOF) $2,000,000 $0 $0 $0
Local $404,000 $0 $0 $0
Total $4,000,000 $0 $0 $0
Project Phase to Initiate Design None None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$0 $4,000,000 $0 $4,000,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Adopt into the 24-27 TIP.



2026-2029 Transportation Improvement Program (Pending TIP)

CO42 Bike/Ped Underpass at South St



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $3,000,000 $0 $0 $0
Local $750,000 $0 $0 $0
Total $3,750,000 $0 $0 $0
Project Phase to Initiate Construction None None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$0 $3,750,000 $0 $3,750,000


Amendment History
DateStatusDescription
11/26/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Add new project from 2024-2027 Subregional Share Call for Projects.



2026-2029 Transportation Improvement Program (Pending TIP)

35th Ave Multimodal Improvements: Sheridan to Wadsworth - Precon



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Transportation Alternatives-DRCOG) $399,000 $1,576,000 $0 $0
State (MMOF) $500,000 $1,975,000 $0 $0
Local $101,000 $399,000 $0 $0
Total $1,000,000 $3,950,000 $0 $0
Project Phase to Initiate Environmental ROW None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$0 $4,950,000 $0 $4,950,000


Amendment History
DateStatusDescription
12/05/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Adopted into the 24-27 TIP.



2026-2029 Transportation Improvement Program (Pending TIP)

McCaslin Boulevard Multiuse Path Crossing at Rock Creek Parkway



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Carbon Reduction Program) $500,000 $0 $0 $0
Local $125,000 $0 $0 $0
Total $625,000 $0 $0 $0
Project Phase to Initiate Construction None None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$0 $625,000 $0 $625,000


Amendment History
DateStatusDescription
01/15/2025 Proposed Adopted into the 2026-2029 TIP.
01/15/2025 Amended Revise scope from design of underpass to construction of at-grade hybrid beacon crossing. Total project cost remains the same.
08/17/2023 Amended Add new project from 2024-2027 Subregional Share Call for Projects.



2026-2029 Transportation Improvement Program (Pending TIP)

Midway Blvd Multimodal Improvements: Lake Link Trail to Zuni - Precon



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality) $1,200,000 $2,400,000 $0 $0
Local $300,000 $600,000 $0 $0
Total $1,500,000 $3,000,000 $0 $0
Project Phase to Initiate Design ROW None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$0 $4,500,000 $0 $4,500,000


Amendment History
DateStatusDescription
12/06/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Add new project from 2024-2027 Subregional Share Call for Projects.



2026-2029 Transportation Improvement Program (Pending TIP)

Alameda Underpass Improvements: Kalamath to Cherokee - Precon



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $1,950,000 $5,850,000 $0 $0
Local $488,000 $1,462,000 $0 $0
Total $2,438,000 $7,312,000 $0 $0
Project Phase to Initiate Environmental Design None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$0 $9,750,000 $0 $9,750,000


Amendment History
DateStatusDescription
12/06/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Add new project from 2024-2027 Subregional Share Call for Projects.



2026-2029 Transportation Improvement Program (Pending TIP)

High Line Canal Trail Underpass at Yale



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality) $2,000,000 $9,000,000 $0 $0
Local $2,500,000 $2,200,000 $0 $0
Total $4,500,000 $11,200,000 $0 $0
Project Phase to Initiate ROW Construction None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$0 $15,700,000 $0 $15,700,000


Amendment History
DateStatusDescription
12/06/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Add new project from 2024-2027 Subregional Share Call for Projects.



2026-2029 Transportation Improvement Program (Pending TIP)

Wadsworth Path Improvements: Mansfield to Bear Creek



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality) $2,168,000 $0 $0 $0
Local $542,000 $0 $0 $0
Total $2,710,000 $0 $0 $0
Project Phase to Initiate Construction None None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$0 $2,710,000 $0 $2,710,000


Amendment History
DateStatusDescription
12/06/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Adopted into the 24-27 TIP.



2026-2029 Transportation Improvement Program (Pending TIP)

W Colfax Safety Improvements: Teller to Sheridan



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $3,139,000 $1,046,000 $0 $0
State (Legislative) $0 $0 $0 $0
State (Legislative-Transit) $0 $0 $0 $0
Local $1,101,000 $367,000 $0 $0
Total $4,240,000 $1,413,000 $0 $0
Project Phase to Initiate Construction Construction None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$10,000,000 $5,653,000 $0 $15,653,000


Amendment History
DateStatusDescription
12/06/2024 Proposed Adopted into the 2026-2029 TIP.
01/30/2024 Amended Add $7,060,000 in prior year state Legislative-Transit funding and $2,940,000 in prior year state Legislative funding transferred from TIP ID# 2020-087. Total project cost increases.
08/17/2023 Amended Adopt into the 24-27 TIP.



2026-2029 Transportation Improvement Program (Pending TIP)

Sheridan Blvd Multimodal Path: Jewell to Iowa



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality) $1,936,000 $0 $0 $0
Local $484,000 $0 $0 $0
Total $2,420,000 $0 $0 $0
Project Phase to Initiate Construction None None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$0 $2,420,000 $0 $2,420,000


Amendment History
DateStatusDescription
12/06/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Adopted into the 24-27 TIP.



2026-2029 Transportation Improvement Program (Pending TIP)

Golden Free Transit Program



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality) $666,000 $0 $0 $0
Local $200,000 $0 $0 $0
Total $866,000 $0 $0 $0
Project Phase to Initiate Bus Service None None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$434,000 $866,000 $0 $1,300,000


Amendment History
DateStatusDescription
12/10/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Adopted into the 24-27 TIP.



2026-2029 Transportation Improvement Program (Pending TIP)

64th Multimodal Improvements: CO93 to Virgil Way



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $135,000 $865,000 $0 $0
Local $105,000 $675,000 $0 $0
Total $240,000 $1,540,000 $0 $0
Project Phase to Initiate Design Construction None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$0 $1,780,000 $0 $1,780,000


Amendment History
DateStatusDescription
12/06/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Adopted into the 24-27 TIP.



2026-2029 Transportation Improvement Program (Pending TIP)

Parker Rd/Mainstreet Operational Improvements - Precon



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$750,000 $0 $0 $750,000


Amendment History
DateStatusDescription
12/06/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Adopted into the 24-27 TIP.



2026-2029 Transportation Improvement Program (Pending TIP)

I25/Lincoln Multimodal Connections



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality) $0 $5,907,000 $0 $0
Local $0 $4,093,000 $0 $0
Total $0 $10,000,000 $0 $0
Project Phase to Initiate None Construction None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$0 $10,000,000 $0 $10,000,000


Amendment History
DateStatusDescription
12/06/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Adopted into the 24-27 TIP.



2026-2029 Transportation Improvement Program (Pending TIP)

Douglas County Transit Pilot Projects



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Carbon Reduction Program) $500,000 $500,000 $0 $0
State (MMOF) $625,000 $625,000 $0 $0
Local $125,000 $125,000 $0 $0
Total $1,250,000 $1,250,000 $0 $0
Project Phase to Initiate Bus Service Bus Service None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$0 $2,500,000 $0 $2,500,000


Amendment History
DateStatusDescription
12/10/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Adopted into the 24-27 TIP.



2026-2029 Transportation Improvement Program (Pending TIP)

Colorado Blvd Bike/Ped Bridge over C470 - Precon



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Transportation Alternatives-DRCOG) $275,000 $0 $0 $0
Local $75,000 $0 $0 $0
Total $350,000 $0 $0 $0
Project Phase to Initiate Design None None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$350,000 $350,000 $0 $700,000


Amendment History
DateStatusDescription
12/06/2024 Proposed Adopted into the 2026-2029 TIP.
01/17/2024 Amended Split funding equally between Fiscal Years 2025 and 2026. Total project cost remains the same.
08/17/2023 Amended Adopted into the 24-27 TIP.



2026-2029 Transportation Improvement Program (Pending TIP)

North Central Denver Community Multimodal Improvements



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality) $4,537,000 $0 $0 $0
Local $1,134,000 $0 $0 $0
Total $5,671,000 $0 $0 $0
Project Phase to Initiate Construction None None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$0 $5,671,000 $0 $5,671,000


Amendment History
DateStatusDescription
12/06/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Add new project from 2024-2027 Subregional Share Call for Projects.



2026-2029 Transportation Improvement Program (Pending TIP)

Peña Capacity Improvements: I70 to E470 - Precon



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $1,500,000 $1,500,000 $0 $0
Local $4,000,000 $4,000,000 $0 $0
Total $5,500,000 $5,500,000 $0 $0
Project Phase to Initiate Design Design None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$7,500,000 $11,000,000 $0 $18,500,000


Amendment History
DateStatusDescription
12/06/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Add new project from 2024-2027 Subregional Share Call for Projects.



2026-2029 Transportation Improvement Program (Pending TIP)

South Platte River Trail Improvements: Mississippi to Florida



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality) $2,400,000 $2,400,000 $0 $0
Local $600,000 $600,000 $0 $0
Total $3,000,000 $3,000,000 $0 $0
Project Phase to Initiate Construction Construction None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$0 $6,000,000 $0 $6,000,000


Amendment History
DateStatusDescription
12/06/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Add new project from 2024-2027 Subregional Share Call for Projects.



2026-2029 Transportation Improvement Program (Pending TIP)

Federal Pkwy Multimodal Improvements: 120th to 122nd



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congressional Allocation) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$3,750,000 $0 $0 $3,750,000


Amendment History
DateStatusDescription
12/06/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Adopted into the 24-27 TIP.



2026-2029 Transportation Improvement Program (Pending TIP)

Peaks to Plains Trail - Downtown Golden



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congressional Allocation) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$500,000 $0 $0 $500,000


Amendment History
DateStatusDescription
12/06/2024 Proposed Adopted into the 2026-2029 TIP.
08/17/2023 Amended Adopted into the 24-27 TIP.



2026-2029 Transportation Improvement Program (Pending TIP)

28th St Multi-use Path: Fourmile Canyon Creek to Jay



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Transportation Alternatives-CDOT) $736,000 $0 $0 $0
Local $184,000 $0 $0 $0
Total $920,000 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$250,000 $920,000 $0 $1,170,000


Amendment History
DateStatusDescription
11/26/2024 Proposed Adopted into the 2026-2029 TIP.
09/21/2023 Amended Add new project from CDOT Transportation Alternatives awards.



2026-2029 Transportation Improvement Program (Pending TIP)

R1 Safe Wildlife Crossings Pool



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
State (Legislative) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$500,000 $0 $0 $500,000


Project Pools

This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.


Agency/Project NameDescriptionNotesCost
US285 and I70 Wildlife Fencing$500,000


Amendment History
DateStatusDescription
12/06/2024 Proposed Adopted into the 2026-2029 TIP.
07/22/2024 Amended Transfer one pool project and $500,000 in state Legislative funding to new I25 Greenland Wildlife Crossing project.
09/21/2023 Amended Add new pool for wildlife crossings in CDOT Region 1.



2026-2029 Transportation Improvement Program (Pending TIP)

E Colfax Mobility Benefits District



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$199,000 $0 $0 $199,000


Amendment History
DateStatusDescription
12/17/2024 Proposed Adopted into the 2026-2029 TIP.
09/21/2023 Amended Create new project from FY2024-2025 TDM Set-Aside awards.



2026-2029 Transportation Improvement Program (Pending TIP)

Welcome Kits for Sun Valley Residents



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$170,000 $0 $0 $170,000


Amendment History
DateStatusDescription
12/17/2024 Proposed Adopted into the 2026-2029 TIP.
09/21/2023 Amended Create new project from FY2024-2025 TDM Set-Aside awards.



2026-2029 Transportation Improvement Program (Pending TIP)

Using Data to Optimize FlexRide Services



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$252,000 $0 $0 $252,000


Amendment History
DateStatusDescription
12/10/2024 Proposed Adopted into the 2026-2029 TIP.
09/21/2023 Amended Create new project from FY2024-2025 TDM Set-Aside awards.



2026-2029 Transportation Improvement Program (Pending TIP)

Gunbarrel On-Demand Microtransit Shuttle Service Marketing Campaign



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$150,000 $0 $0 $150,000


Amendment History
DateStatusDescription
12/10/2024 Proposed Adopted into the 2026-2029 TIP.
09/21/2023 Amended Create new project from FY2024-2025 TDM Set-Aside awards.



2026-2029 Transportation Improvement Program (Pending TIP)

Creating the Commerce City Connector



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$152,000 $0 $0 $152,000


Amendment History
DateStatusDescription
12/10/2024 Proposed Adopted into the 2026-2029 TIP.
09/21/2023 Amended Create new project from FY2024-2025 TDM Set-Aside awards.



2026-2029 Transportation Improvement Program (Pending TIP)

Sheridan Corridor Plan: 52nd to Hampden



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$250,000 $0 $0 $250,000


Amendment History
DateStatusDescription
12/10/2024 Proposed Adopted into the 2026-2029 TIP.
05/16/2024 Amended Transfer all funding into 2024. Total project cost remains the same.
10/18/2023 Amended Add new project from the DRCOG Transportation Corridor Planning - CCLIP Set Aside. Toll credits to be used to remove match requirements.



2026-2029 Transportation Improvement Program (Pending TIP)

E Colfax BRT Extension Corridor Plan: I225 to E470



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$1,000,000 $0 $0 $1,000,000


Amendment History
DateStatusDescription
12/10/2024 Proposed Adopted into the 2026-2029 TIP.
05/16/2024 Amended Transfer all funding into 2024. Total project cost remains the same.
10/18/2023 Amended Add new project from the DRCOG Transportation Corridor Planning - CCLIP Set Aside. Toll credits to be used to remove match requirements.



2026-2029 Transportation Improvement Program (Pending TIP)

Aurora Traffic Management Center



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $1,101,000 $0 $0 $0
Local $495,000 $0 $0 $0
Total $1,596,000 $0 $0 $0
Project Phase to Initiate Construction None None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$0 $1,596,000 $0 $1,596,000


Amendment History
DateStatusDescription
12/06/2024 Proposed Adopted into the 2026-2029 TIP.
10/18/2023 Amended Add new project from the Regional Transportation Operations and Technology Set-Aside.



2026-2029 Transportation Improvement Program (Pending TIP)

Louisville Signal Technology Upgrade



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$745,000 $0 $0 $745,000


Amendment History
DateStatusDescription
11/26/2024 Proposed Adopted into the 2026-2029 TIP.
10/18/2023 Amended Add new project from the Regional Transportation Operations and Technology Set-Aside.



2026-2029 Transportation Improvement Program (Pending TIP)

Longmont Smart Signals to Schools



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$1,128,000 $0 $0 $1,128,000


Amendment History
DateStatusDescription
11/26/2024 Proposed Adopted into the 2026-2029 TIP.
10/18/2023 Amended Add new project from the Regional Transportation Operations and Technology Set-Aside.



2026-2029 Transportation Improvement Program (Pending TIP)

Jefferson County Traffic Camera System



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$300,000 $0 $0 $300,000


Amendment History
DateStatusDescription
12/06/2024 Proposed Adopted into the 2026-2029 TIP.
10/18/2023 Amended Add new project from the Regional Transportation Operations and Technology Set-Aside.



2026-2029 Transportation Improvement Program (Pending TIP)

US287 and CO7 Advance Detection Expansion



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$378,000 $0 $0 $378,000


Amendment History
DateStatusDescription
11/26/2024 Proposed Adopted into the 2026-2029 TIP.
10/18/2023 Amended Add new project from the Regional Transportation Operations and Technology Set-Aside.



2026-2029 Transportation Improvement Program (Pending TIP)

Denver V2X Communications Devices



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$1,700,000 $0 $0 $1,700,000


Amendment History
DateStatusDescription
12/06/2024 Proposed Adopted into the 2026-2029 TIP.
10/18/2023 Amended Add new project from the Regional Transportation Operations and Technology Set-Aside.



2026-2029 Transportation Improvement Program (Pending TIP)

Boulder Communications Network and Signal System Performance Enhancement



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$1,505,000 $0 $0 $1,505,000


Amendment History
DateStatusDescription
11/26/2024 Proposed Adopted into the 2026-2029 TIP.
10/18/2023 Amended Add new project from the Regional Transportation Operations and Technology Set-Aside.



2026-2029 Transportation Improvement Program (Pending TIP)

Aurora Communications Infrastructure Improvements



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $736,000 $0 $0 $0
Local $197,000 $0 $0 $0
Total $933,000 $0 $0 $0
Project Phase to Initiate Construction None None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$0 $933,000 $0 $933,000


Amendment History
DateStatusDescription
12/06/2024 Proposed Adopted into the 2026-2029 TIP.
10/18/2023 Amended Add new project from the Regional Transportation Operations and Technology Set-Aside.



2026-2029 Transportation Improvement Program (Pending TIP)

Broadway Signal Interconnect (Phase 2)



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $2,635,000 $0 $0 $0
Local $575,000 $0 $0 $0
Total $3,210,000 $0 $0 $0
Project Phase to Initiate Construction None None None


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$400,000 $3,210,000 $0 $3,610,000


Amendment History
DateStatusDescription
12/06/2024 Proposed Adopted into the 2026-2029 TIP.
10/18/2023 Amended Add new project from the Regional Transportation Operations and Technology Set-Aside.



2026-2029 Transportation Improvement Program (Pending TIP)

Thornton Travel Time Monitoring Expansion



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$126,000 $0 $0 $126,000


Amendment History
DateStatusDescription
12/06/2024 Proposed Adopted into the 2026-2029 TIP.
10/18/2023 Amended Add new project from the Regional Transportation Operations and Technology Set-Aside.



2026-2029 Transportation Improvement Program (Pending TIP)

Superior Traffic Safety and Climate Resilience



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$120,000 $0 $0 $120,000


Amendment History
DateStatusDescription
11/26/2024 Proposed Adopted into the 2026-2029 TIP.
10/18/2023 Amended Add new project from the Regional Transportation Operations and Technology Set-Aside.



2026-2029 Transportation Improvement Program (Pending TIP)

Aurora Traffic Signal Equipment Upgrade



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$1,021,000 $0 $0 $1,021,000


Amendment History
DateStatusDescription
12/06/2024 Proposed Adopted into the 2026-2029 TIP.
10/18/2023 Amended Add new project from the Regional Transportation Operations and Technology Set-Aside.



2026-2029 Transportation Improvement Program (Pending TIP)

I70 Resurfacing: Chief Hosa to W Colfax



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Faster Safety) $0 $0 $0 $0
Federal (Strategic Safety Funds) $0 $0 $0 $0
State (Faster Safety) $0 $0 $0 $0
State (Regional Priority Projects) $0 $0 $0 $0
State (Surface Treatment) $0 $0 $0 $0
State (TC Contingency) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$44,792,000 $0 $0 $44,792,000


Amendment History
DateStatusDescription
12/06/2024 Proposed Adopted into the 2026-2029 TIP.
07/22/2024 Amended Add $6,392,000 of state Transportation Commission Contingency funds. Total project cost increases.
02/22/2024 Amended Add $4,100,000 in state Surface Treatment funds transferred from TIP ID# 2007-096. Total project cost increases.
01/17/2024 Amended Add $3,000,000 in federal Strategic Safety Funds. Total project cost increases.
12/19/2023 Amended Adjust scope and add $12,800,000 in state FASTER-Safety funding transferred from 2008-076. Total project cost increases.

Additional project amendment details can be found under this project in the TRIPS database.


2026-2029 Transportation Improvement Program (Pending TIP)

Clean Transit Enterprise Pool



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
State (Clean Transit Enterprise) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$2,642,000 $0 $0 $2,642,000


Project Pools

This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.


Agency/Project NameDescriptionNotesCost
Laradon HallPlanning (Fiscal Year 2024)$90,000
Via MobilityPlanning (FIscal Year 2024)$68,000
Via MobilityFacility (Fiscal Year 2025)$1,500,000
Laradon HallVehicles (Fiscal Year 2025)$238,000
Developmental Disabilities Resource CenterVehicles (Fiscal Year 2025)$150,000
BoulderVehicles (Fiscal Year 2025)$596,000


Amendment History
DateStatusDescription
12/19/2024 Proposed Adopted into the 2026-2029 TIP.
12/19/2024 Amended Add four new pool projects and $2,485,000 in state Clean Transportation Enterprise funds. Total project cost increases.
12/19/2023 Amended Add new pool for Colorado Department of Transportation Clean Transit Enterprise projects.



2026-2029 Transportation Improvement Program (Pending TIP)

303 Artway and Montbello Loop Implementation Plan



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$250,000 $0 $0 $250,000


Amendment History
DateStatusDescription
12/10/2024 Proposed Adopted into the 2026-2029 TIP.
05/16/2024 Amended Transfer all funding to 2024. Total project cost remains the same.
04/18/2024 Amended Add new project from the DRCOG Community Mobility Planning Set-Aside - Community-Based Transportation Plans. Toll credits to be used to remove match requirements.



2026-2029 Transportation Improvement Program (Pending TIP)

Brighton Core City Circulation Plan



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$300,000 $0 $0 $300,000


Amendment History
DateStatusDescription
12/10/2024 Proposed Adopted into the 2026-2029 TIP.
05/16/2024 Amended Transfer all funding to 2024. Total project cost remains the same.
04/18/2024 Amended Add new project from the DRCOG Community Mobility Planning Set-Aside - Community-Based Transportation Plans. Toll credits to be used to remove match requirements.



2026-2029 Transportation Improvement Program (Pending TIP)

92nd Avenue Corridor Study



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$200,000 $0 $0 $200,000


Amendment History
DateStatusDescription
12/10/2024 Proposed Adopted into the 2026-2029 TIP.
05/16/2024 Amended Transfer all funding to 2024. Total project cost remains the same.
04/18/2024 Amended Add new project from the DRCOG Community Mobility Planning Set-Aside - Community-Based Transportation Plans. Toll credits to be used to remove match requirements.



2026-2029 Transportation Improvement Program (Pending TIP)

Pecos Street Corridor Study



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$450,000 $0 $0 $450,000


Amendment History
DateStatusDescription
12/10/2024 Proposed Adopted into the 2026-2029 TIP.
05/16/2024 Amended Transfer all funding to 2024. Total project cost remains the same.
04/18/2024 Amended Add new project from the DRCOG Community Mobility Planning Set-Aside - Community-Based Transportation Plans. Toll credits to be used to remove match requirements.



2026-2029 Transportation Improvement Program (Pending TIP)

Region 4 Congressionally Directed Funding Pool



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congressional Allocation) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$2,235,000 $0 $0 $2,235,000


Project Pools

This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.


Agency/Project NameDescriptionNotesCost
DaconoCO52 - WCR7 to WCR15$850,000
LyonsSaint Vrain Multimodal TrailFunds in Project 2022-013$0
Weld CountyHigh Plains Boulevard - CO66 to WCR34 parallel to I25Funds in Project 2022-080$1,000,000


Amendment History
DateStatusDescription
11/26/2024 Proposed Adopted into the 2026-2029 TIP.
11/21/2024 Amended Transfer scope and funding for High Plains Boulevard into 2022-080. Total project cost decreases.
06/26/2024 Amended Create new pool for congressionally directed funding in CDOT Region 4.



2026-2029 Transportation Improvement Program (Pending TIP)

Longmont Microtransit Vehicles



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congressional Allocation-Transit) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$1,209,000 $0 $0 $1,209,000


Amendment History
DateStatusDescription
12/10/2024 Proposed Adopted into the 2026-2029 TIP.
06/26/2024 Amended Add new project funded with Congressionally Allocated funding.



2026-2029 Transportation Improvement Program (Pending TIP)

CO7 Corridor Multimodal Improvements



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Congressional Allocation-Transit) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$604,000 $0 $0 $604,000


Amendment History
DateStatusDescription
11/26/2024 Proposed Adopted into the 2026-2029 TIP.
06/26/2024 Amended Add new project funded with Congressionally Allocated funding.



2026-2029 Transportation Improvement Program (Pending TIP)

Denver Area Hydrogen Fueling Stations: FHWA CFI Grant



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Charging and Fueling Infrastructure) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$4,445,000 $0 $0 $4,445,000


Amendment History
DateStatusDescription
12/10/2024 Proposed Adopted into the 2026-2029 TIP.
06/26/2024 Amended Add new project funded with discretionary funds.



2026-2029 Transportation Improvement Program (Pending TIP)

I25 Greenland Wildlife Overpass



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Faster Safety) $0 $0 $0 $0
Federal (Wildlife Crossings Pilot Program) $0 $0 $0 $0
State (Faster Safety) $4,000,000 $0 $0 $0
State (Legislative) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $4,000,000 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$26,750,000 $4,000,000 $0 $30,750,000


Amendment History
DateStatusDescription
12/06/2024 Proposed Adopted into the 2026-2029 TIP.
07/22/2024 Amended Add new project with new Wildlife Crossing Pilot Program funding.



2026-2029 Transportation Improvement Program (Pending TIP)

I25/CO7 Interim Transit Improvements



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Faster Safety) $0 $0 $0 $0
State (Faster Safety) $0 $0 $0 $0
State (Legislative-Transit) $0 $3,500,000 $0 $0
State (Permanent Water Quality) $0 $4,800,000 $0 $0
Local $0 $0 $0 $0
Total $0 $8,300,000 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$17,249,000 $8,300,000 $0 $25,549,000


Amendment History
DateStatusDescription
12/06/2024 Proposed Adopted into the 2026-2029 TIP.
07/22/2024 Amended Create new project. Transfer $14,000,000 in prior year state Legislative-Transit funds from project 2020-100, $1,249,000 in state Permanent Water Quality funds from project 2018-011, and $2,000,000 in state FASTER-Safety funds from project 2008-076. Add $3,500,000 in state Legislative-Transit funds and $4,800,000 in state Permanent Water Quality funds.



2026-2029 Transportation Improvement Program (Pending TIP)

Boulder County Electric Vehicle Charging Infrastructure



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Charging and Fueling Infrastructure) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$7,000,000 $0 $0 $7,000,000


Amendment History
DateStatusDescription
11/26/2024 Proposed Adopted into the 2026-2029 TIP.
07/22/2024 Amended Add new project with $4,900,000 in federal Charging and Fueling Infrastructure discretionary funds.



2026-2029 Transportation Improvement Program (Pending TIP)

I25 Resurfacing: Mile Post 208 to 214



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Bridge On-System) $0 $0 $0 $0
Federal (Strategic Safety Funds) $0 $0 $0 $0
State (Bridge On-System) $0 $0 $0 $0
State (Surface Treatment) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$26,382,000 $0 $0 $26,382,000


Amendment History
DateStatusDescription
12/06/2024 Proposed Adopted into the 2026-2029 TIP.
09/19/2024 Amended Add new project with funding from the Region 1 Surface Treatment Pool and Region 1 Bridge On-System Pool.



2026-2029 Transportation Improvement Program (Pending TIP)

Reunited Denver Project: Globeville Elyria-Swansea



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Neighborhood Access and Equity) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$67,911,000 $0 $0 $67,911,000


Amendment History
DateStatusDescription
12/06/2024 Proposed Adopted into the 2026-2029 TIP.
09/19/2024 Amended Add new project for federal discretionary award through the Reconnecting Communities and Neighborhoods Program.



2026-2029 Transportation Improvement Program (Pending TIP)

Station Outreach for Transit Recovery



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$170,000 $0 $0 $170,000


Amendment History
DateStatusDescription
12/10/2024 Proposed Adopted into the 2026-2029 TIP.
08/27/2024 Amended Add new project from Transportation Demand Management Set-Aside wait list.



2026-2029 Transportation Improvement Program (Pending TIP)

Vasquez and BNSF Early Warning Detection System



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Freight) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$510,000 $0 $0 $510,000


Amendment History
DateStatusDescription
12/06/2024 Proposed Adopted into the 2026-2029 TIP.
10/17/2024 Amended Add new project from CDOT Freight Investment Plan.



2026-2029 Transportation Improvement Program (Pending TIP)

US85 Steep Slope Repair



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Freight) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$4,200,000 $0 $0 $4,200,000


Amendment History
DateStatusDescription
12/06/2024 Proposed Adopted into the 2026-2029 TIP.
10/17/2024 Amended Add new project from CDOT"s Freight Investment Plan.



2026-2029 Transportation Improvement Program (Pending TIP)

Coordinated Adaptive Ramp Metering Expansion



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Strengthening Mobility and Revolutionizing Transportation) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$1,473,000 $0 $0 $1,473,000


Amendment History
DateStatusDescription
12/06/2024 Proposed Adopted into the 2026-2029 TIP.
10/17/2024 Amended Add new project for federal Strengthening Mobility and Revolutionizing Transportation discretionary award.



2026-2029 Transportation Improvement Program (Pending TIP)

Box Elder Creek Erosion and Flood Protection



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (PROTECT) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$14,300,000 $0 $0 $14,300,000


Amendment History
DateStatusDescription
12/06/2024 Proposed Adopted into the 2026-2029 TIP.
11/21/2024 Amended Add new project for federal Promoting Resilient Operations for Transformative, Efficient, and Cost-saving Transportation discretionary award.



2026-2029 Transportation Improvement Program (Pending TIP)

Safe Streets for Boulder



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Safe Streets and Roads for All) $3,600,000 $8,000,000 $7,074,000 $2,358,000
Local $900,000 $2,000,000 $1,769,000 $589,000
Total $4,500,000 $10,000,000 $8,843,000 $2,947,000


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$2,500,000 $26,290,000 $0 $28,790,000


Amendment History
DateStatusDescription
12/06/2024 Proposed Adopted into the 2026-2029 TIP.
11/21/2024 Amended Create new project for federal discretionary award.



2026-2029 Transportation Improvement Program (Pending TIP)

US287 Safety Median: Lafayette to Larimer County Line



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Faster Safety) $0 $0 $0 $0
Federal (INFRA) $0 $0 $0 $0
State (Faster Safety) $2,018,000 $0 $0 $0
State (Safety) $1,354,000 $2,748,000 $0 $0
Local $0 $0 $0 $0
Total $3,372,000 $2,748,000 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$13,239,000 $6,120,000 $0 $19,359,000


Amendment History
DateStatusDescription
01/15/2025 Proposed Adopted into the 2026-2029 TIP.
01/15/2025 Amended Add $4,102,000 in state Safety funding and $3,718,000 in state FASTER-Safety funding. Total project cost increases.
11/21/2024 Amended Add new project for federal INFRA discretionary grant award.



2026-2029 Transportation Improvement Program (Pending TIP)

Lena Gulch



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (PROTECT) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$30,000,000 $0 $0 $30,000,000


Amendment History
DateStatusDescription
12/06/2024 Proposed Adopted into the 2026-2029 TIP.
11/21/2024 Amended Add new project for federal PROTECT discretionary grant award.



2026-2029 Transportation Improvement Program (Pending TIP)

Sanderson Gulch Resiliency



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (PROTECT) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$20,607,000 $0 $0 $20,607,000


Amendment History
DateStatusDescription
12/06/2024 Proposed Adopted into the 2026-2029 TIP.
11/21/2024 Amended Add new federal PROTECT discretionary award.



2026-2029 Transportation Improvement Program (Pending TIP)

Equitably Restoring Colfax and Federal Mobility and Land Use



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Reconnecting Communities and Neighborhoods) $0 $0 $0 $0
State (Colorado Transportation Investment Office) $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$2,400,000 $0 $0 $2,400,000


Amendment History
DateStatusDescription
12/06/2024 Proposed Adopted into the 2026-2029 TIP.
11/21/2024 Amended Add new federal discretionary project.



2026-2029 Transportation Improvement Program (Pending TIP)

Bike Plus Data Fusion



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$400,000 $0 $0 $400,000


Amendment History
DateStatusDescription
12/30/2024 Proposed Adopted into the 2026-2029 TIP.
12/20/2024 Amended Add new Innovative Mobility Set-Aside project.



2026-2029 Transportation Improvement Program (Pending TIP)

Florida Corridor Improvements Study



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$225,000 $0 $0 $225,000


Amendment History
DateStatusDescription
12/30/2024 Proposed Adopted into the 2026-2029 TIP.
12/20/2024 Amended Add new Innovative Mobility Set-Aside and Livable Centers Small-Area Set-Aside project.



2026-2029 Transportation Improvement Program (Pending TIP)

Golden Docked Bike Share Feasibility Analysis



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$150,000 $0 $0 $150,000


Amendment History
DateStatusDescription
12/30/2024 Proposed Adopted into the 2026-2029 TIP.
12/20/2024 Amended Add new Innovative Mobility Set-Aside project.



2026-2029 Transportation Improvement Program (Pending TIP)

Denver Curbside Digital Twin



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$250,000 $0 $0 $250,000


Amendment History
DateStatusDescription
12/30/2024 Proposed Adopted into the 2026-2029 TIP.
12/20/2024 Amended Add new Innovative Mobility Set-Aside project.



2026-2029 Transportation Improvement Program (Pending TIP)

Near Miss Analytics



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$150,000 $0 $0 $150,000


Amendment History
DateStatusDescription
12/30/2024 Proposed Adopted into the 2026-2029 TIP.
12/20/2024 Amended Add new Innovative Mobility Set-Aside project.



2026-2029 Transportation Improvement Program (Pending TIP)

Parker Mobility on Demand and Microtransit Feasibility Study



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$150,000 $0 $0 $150,000


Amendment History
DateStatusDescription
12/30/2024 Proposed Adopted into the 2026-2029 TIP.
12/20/2024 Amended Add new Innovative Mobility Set-Aside project.



2026-2029 Transportation Improvement Program (Pending TIP)

Downtown Boulder Garage Mobility Hub Concept Planning



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$250,000 $0 $0 $250,000


Amendment History
DateStatusDescription
12/30/2024 Proposed Adopted into the 2026-2029 TIP.
12/20/2024 Amended Add new Innovative Mobility Set-Aside project.



2026-2029 Transportation Improvement Program (Pending TIP)

Fitzsimons Innovative Transportation Solutions Study



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$300,000 $0 $0 $300,000


Amendment History
DateStatusDescription
12/30/2024 Proposed Adopted into the 2026-2029 TIP.
12/20/2024 Amended Add new Livable Centers Small-Area Set-Aside project.



2026-2029 Transportation Improvement Program (Pending TIP)

Mobility Needs Assessment Framework for the Boulder County Housing Authority



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$150,000 $0 $0 $150,000


Amendment History
DateStatusDescription
12/30/2024 Proposed Adopted into the 2026-2029 TIP.
12/20/2024 Amended Add new Livable Centers Small-Area Set-Aside project.



2026-2029 Transportation Improvement Program (Pending TIP)

Transit Oriented Communities, Land Use, Housing Type Diversity Analysis and Housing Needs Assessment



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$140,000 $0 $0 $140,000


Amendment History
DateStatusDescription
12/30/2024 Proposed Adopted into the 2026-2029 TIP.
12/20/2024 Amended Add new Livable Centers Small-Area Set-Aside project.



2026-2029 Transportation Improvement Program (Pending TIP)

East Midtown Centennial Small Area Plan



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$125,000 $0 $0 $125,000


Amendment History
DateStatusDescription
12/30/2024 Proposed Adopted into the 2026-2029 TIP.
12/20/2024 Amended Add new Livable Centers Small-Area Set-Aside project.



2026-2029 Transportation Improvement Program (Pending TIP)

City of Sheridan Housing and Transportation Strategies Study



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$100,000 $0 $0 $100,000


Amendment History
DateStatusDescription
12/30/2024 Proposed Adopted into the 2026-2029 TIP.
12/20/2024 Amended Add new Livable Centers Small-Area Set-Aside project.



2026-2029 Transportation Improvement Program (Pending TIP)

Edgewater Sheridan Corridor Livable Center



Four Year Funding by Funding Types
Funding TypeFederal Fiscal Year 2026Federal Fiscal Year 2027Federal Fiscal Year 2028Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant) $0 $0 $0 $0
Local $0 $0 $0 $0
Total $0 $0 $0 $0


Overall Funding
Prior FundingFour Year PeriodFuture FundingTotal Funding
$100,000 $0 $0 $100,000


Amendment History
DateStatusDescription
12/30/2024 Proposed Adopted into the 2026-2029 TIP.
12/20/2024 Amended Add new Livable Centers Small-Area Set-Aside project.