2026-2029 Transportation Improvement Program (Approved TIP)
RTD Preventive Maintenance: Transit Vehicle Overhaul and Maintenance
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Section 5307)
$87,400,000
$90,000,000
$92,700,000
$95,500,000
State (Section 5307)
$0
$0
$0
$0
Local
$29,100,000
$30,000,000
$30,900,000
$31,850,000
Total
$116,500,000
$120,000,000
$123,600,000
$127,350,000
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$282,862,000
$487,450,000
$0
$770,312,000
Amendment History
Date
Status
Description
06/18/2025
Amended
Correct prior funding amount following final Federal Transit Administration apportionments. Total project cost increases.
05/29/2025
Amended
Add $155,313,000 in prior year funds to correct the carryover and adjust scope to reflect rail preventive maintenance. Total project cost increases.
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
02/16/2023
Amended
Add $43,800,000 in federal Section 5307 funding. Total project cost increases.
Additional project amendment details can be found under this project in the TRIPS database.
2026-2029 Transportation Improvement Program (Approved TIP)
State of Good Repair
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Section 5337 State of Good Repair)
$28,900,000
$29,800,000
$30,694,000
$31,615,000
State (Section 5337 State of Good Repair)
$0
$0
$0
$0
Local
$7,200,000
$7,440,000
$7,674,000
$7,904,000
Total
$36,100,000
$37,240,000
$38,368,000
$39,519,000
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$87,606,000
$151,227,000
$0
$238,833,000
Amendment History
Date
Status
Description
06/18/2025
Amended
Correct prior funding following final Federal Transit Administration apportionments. Total project cost increases.
05/29/2025
Amended
Correct prior funding by adding $9,015,000 to prior years. Total project cost increases.
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
02/16/2023
Amended
Add $32,010,000 in federal Section 5337 funds. Total project cost increases.
Additional project amendment details can be found under this project in the TRIPS database.
2026-2029 Transportation Improvement Program (Approved TIP)
Regional TDM Set-Aside: TMA Partnerships
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality)
$960,000
$960,000
$0
$0
Federal (Surface Transportation Block Grant)
$500,000
$500,000
$0
$0
Local
$365,000
$365,000
$0
$0
Total
$1,825,000
$1,825,000
$0
$0
Project Phase to Initiate
TDM
TDM
None
None
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$2,015,000
$3,650,000
$0
$5,665,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/27/2024
Amended
Add unprogrammed funding from returned project. Total project cost increases.
05/16/2024
Amended
Add Fiscal Year 2024 and 2024 Transportation Management Association partnerships. Total project cost remains the same.
09/21/2023
Amended
Remove FY 2024 and FY 2025 Surface Transportation Block Grant funding programmed to individual projects in FY 2024/2025 Call for Projects.
08/17/2023
Amended
Proposed for adoption into 2024-2027
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name
Description
Notes
Cost
Unallocated 2024/2025 non-infrastructure
$95,000
Commuting Solutions
Partnership (Fiscal Years 2024-2025)
$240,000
Boulder Transportation Connections
Partnership (Fiscal Years 2024-2025)
$240,000
Denver South
Partnership (Fiscal Years 2024-2025)
$240,000
Downtown Denver Partnership
Partnership (Fiscal Years 2024-2025)
$240,000
Northeast Transportation Connections
Partnership (Fiscal Years 2024-2025)
$240,000
Smart Commute
Partnership (Fiscal Years 2024-2025)
$240,000
Transportation Solutions
Partnership (Fiscal Years 2024-2025)
$240,000
West Corridor Transportation Management Association
Partnership (Fiscal Years 2024-2025)
$240,000
2026-2029 Transportation Improvement Program (Approved TIP)
US85 Widening: Cook Ranch to Meadows
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Faster Safety)
$0
$0
$0
$0
Federal (Freight)
$0
$0
$0
$0
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
State (Faster Safety)
$0
$0
$0
$0
State (Regional Priority Projects)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$94,702,000
$0
$37,300,000
$132,002,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Proposed for adoption into 2020-2023
10/18/2018
Amended
Add $850,000 in state RPP in FY 2019. Total project cost increases.
Additional project amendment details can be found under this project in the TRIPS database.
2026-2029 Transportation Improvement Program (Approved TIP)
US6/Wadsworth Interchange Reconstruction
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
State (FASTER Bridge and Tunnel Enterprise)
$3,650,000
$13,500,000
$7,850,000
$0
State (Legislative)
$0
$0
$0
$0
State (Permanent Water Quality)
$1,800,000
$0
$0
$0
State (Regional Priority Projects)
$0
$0
$0
$0
State (TC Contingency)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$5,450,000
$13,500,000
$7,850,000
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$107,070,000
$26,800,000
$0
$133,870,000
Amendment History
Date
Status
Description
08/20/2025
Amended
Add $1,800,000 in state Permanent Water Quality funds. Update scope to reflect timing of work. Total project cost increases.
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
04/18/2024
Amended
Add $2,209,000 in state Regional Priority Project funds. Total project cost increases.
11/15/2023
Amended
Add $2,898,000 in state Transportation Commission Contingency funds. Total project cost increases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
Additional project amendment details can be found under this project in the TRIPS database.
2026-2029 Transportation Improvement Program (Approved TIP)
FasTracks Northwest Rail Corridor: Downtown Longmont Station
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Local (RTD Funds Only)
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$17,945,000
$0
$0
$17,945,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Proposed for adoption into 2020-2023
04/20/2017
Amended
Proposed for adoption into 2018-2021
Additional project amendment details can be found under this project in the TRIPS database.
2026-2029 Transportation Improvement Program (Approved TIP)
Region 1 Hazard Elimination Pool
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Corridor Operations and Bottleneck Reduction Assistance)
$1,050,000
$0
$0
$0
Federal (Strategic Safety Funds)
$0
$0
$0
$0
State (Corridor Operations and Bottleneck Reduction Assistance)
$0
$0
$0
$0
State (Safety)
$21,000,000
$23,800,000
$0
$0
Local
$0
$0
$0
$0
Total
$22,050,000
$23,800,000
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$0
$45,850,000
$0
$45,850,000
Amendment History
Date
Status
Description
08/20/2025
Amended
Add $1,050,000 of COBRA funding. Total project cost increases.
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
06/26/2024
Amended
Add $3,650,000 in federal Strategic Safety Funds. Total project cost increases.
10/18/2023
Amended
Add $371,000 in federal SAE funds. Total project cost increases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
Additional project amendment details can be found under this project in the TRIPS database.
2026-2029 Transportation Improvement Program (Approved TIP)
Region 1 Hot Spot Pool
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
State (Safety)
$433,000
$433,000
$433,000
$433,000
Local
$0
$0
$0
$0
Total
$433,000
$433,000
$433,000
$433,000
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$0
$1,732,000
$0
$1,732,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Proposed for adoption into 2020-2023
04/20/2017
Amended
Proposed for adoption into 2018-2021
Additional project amendment details can be found under this project in the TRIPS database.
2026-2029 Transportation Improvement Program (Approved TIP)
Region 1 Traffic Signal Pool
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
State (Safety)
$3,190,000
$3,190,000
$3,190,000
$3,190,000
Local
$0
$0
$0
$0
Total
$3,190,000
$3,190,000
$3,190,000
$3,190,000
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$0
$12,760,000
$0
$12,760,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Proposed for adoption into 2020-2023
10/18/2018
Amended
Remove $1,100,000 of funding in FY 2019 and transfer to 2016-020 in order to move funding into one location.
Additional project amendment details can be found under this project in the TRIPS database.
2026-2029 Transportation Improvement Program (Approved TIP)
Region 1 Bridge On-System Pool
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Bridge On-System)
$10,588,000
$7,833,000
$7,833,000
$7,833,000
State (Bridge On-System)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$10,588,000
$7,833,000
$7,833,000
$7,833,000
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$0
$34,087,000
$0
$34,087,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
09/19/2024
Amended
Transfer $3,882,000 in federal Bridge On-System funds to new I25 Resurfacing project. Total project cost decreases.
05/16/2024
Amended
Add $8,000,000 in federal Bridge On-System funds and adjust one pool project. Total project cost increases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name
Description
Notes
Cost
Essential Culvert Repairs
$9,600,000
Essential Wall Repairs
$3,850,000
Preventative Bridge Maintenance
Proactive work, including scour work, fiber wrap
$6,200,000
Joint Treatments
$4,900,000
Deck Treatments
Resurfacing/overlays
$5,000,000
Bridge Essential Repairs
Generally reactive; girder cleanouts
$4,400,000
2026-2029 Transportation Improvement Program (Approved TIP)
Region 1 Bridge Off-System Pool
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Bridge Off-System)
$0
$0
$0
$0
State (Bridge Off-System)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$8,518,000
$0
$0
$8,518,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
01/29/2025
Amended
Remove one pool project and $1,241,000 in prior funding. Total project cost decreases.
04/18/2024
Amended
Add two pool projects and $2,131,000 in federal Bridge Off-System funds. Total project cost increases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
07/11/2023
Amended
Add $1,779,000 in federal Bridge Off-System funds, local match, and one new pool project. Total project cost increases.
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name
Description
Notes
Cost
Dartmouth Ave
@ S Platte River
$1,392,000
Potomac St
@ O'Brien Canal (partial replacement)
$760,000
Community Center Dr.
Northglenn
$524,000
West Dartmouth Ave.
Englewood
$229,000
Laredo St Bridge Rehab
Aurora
$1,779,000
Tower Road
At 3rd Creek
$720,000
88th
At Wolf Creek
$1,410,000
2026-2029 Transportation Improvement Program (Approved TIP)
Region 4 Traffic Signal Pool
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
State (Planning and Research Initiatives)
$0
$0
$0
$0
State (Safety)
$250,000
$250,000
$250,000
$250,000
Local
$0
$0
$0
$0
Total
$250,000
$250,000
$250,000
$250,000
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$250,000
$1,000,000
$0
$1,250,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
03/18/2021
Amended
Remove PRI funding. Total project cost decreases.
06/17/2020
Amended
Add funding to FY 2021, 2022, and 2023. Total project cost increases.
Additional project amendment details can be found under this project in the TRIPS database.
2026-2029 Transportation Improvement Program (Approved TIP)
Region 4 Hot Spot Pool
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
State (Safety)
$100,000
$100,000
$100,000
$100,000
Local
$0
$0
$0
$0
Total
$100,000
$100,000
$100,000
$100,000
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$200,000
$400,000
$0
$600,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Proposed for adoption into 2020-2023
04/20/2017
Amended
Proposed for adoption into 2018-2021
Additional project amendment details can be found under this project in the TRIPS database.
2026-2029 Transportation Improvement Program (Approved TIP)
Region 4 Hazard Elimination Pool
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Strategic Safety Funds)
$25,000
$25,000
$25,000
$25,000
State (Safety)
$1,000,000
$1,000,000
$1,000,000
$1,000,000
Local
$1,000,000
$1,000,000
$1,000,000
$1,000,000
Total
$2,025,000
$2,025,000
$2,025,000
$2,025,000
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$7,000,000
$8,100,000
$0
$15,100,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
09/19/2024
Amended
Add $2,000,000 in federal Strategic Safety Funds and $1,000,000 in state Safety funds, as well as $1,000,000 local match. Total project cost increases.
06/26/2024
Amended
Add $1,000,000 in federal Strategic Safety Funds. Total project cost increases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
08/19/2021
Amended
Remove individually listed pool projects. Total project cost remains the same.
Additional project amendment details can be found under this project in the TRIPS database.
2026-2029 Transportation Improvement Program (Approved TIP)
Region 4 Surface Treatment Pool
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Strategic Safety Funds)
$1,000,000
$0
$0
$0
State (Cost Escalation Fund)
$0
$0
$0
$0
State (Surface Treatment)
$18,861,000
$12,604,000
$12,684,000
$2,000,000
Local
$0
$0
$0
$0
Total
$19,861,000
$12,604,000
$12,684,000
$2,000,000
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$23,511,000
$47,149,000
$0
$70,660,000
Amendment History
Date
Status
Description
08/20/2025
Amended
Adjust one pool project. Total project cost remains the same.
07/16/2025
Amended
Add $1,000,000 in federal Strategic Safety Funds and adjust one pool project. Total project cost increases.
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
03/04/2025
Amended
Add one pool project and $2,936,000 in state Surface Treatment funds. Total project cost increases.
12/19/2024
Amended
Adjust one pool project and add $239,000 in state Cost Escalation Funds. Total project cost increases.
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name
Description
Notes
Cost
SH-119
Nederland West to Roundabout
$6,025,000
CO7
28th to US287
Project also has $2,000,000 in 2018-003
$9,559,000
Longmont
Diamond Grind and Slabs
$5,198,000
CO157A: Pearl North
Diamond Grind and Slabs
$8,245,000
CO119 and CO7
US36 to Boulder Canyon
$7,200,000
CO52
I25 to US85
Also has funding in 2007-133
$13,590,000
CO66
East of I25
$4,027,000
2026-2029 Transportation Improvement Program (Approved TIP)
Region 1 Surface Treatment Pool
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
State (Surface Treatment)
$42,187,000
$42,684,000
$40,834,000
$37,224,000
Local
$0
$0
$0
$0
Total
$42,187,000
$42,684,000
$40,834,000
$37,224,000
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$61,121,000
$162,929,000
$0
$224,050,000
Amendment History
Date
Status
Description
07/16/2025
Amended
Add one pool project, remove one pool project, adjust funding for seven pool projects. Total project cost remains the same.
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
09/19/2024
Amended
Update pool projects and transfer $21,500,000 to new I25 Resurfacing project. Total project cost decreases.
02/22/2024
Amended
Transfer $4,100,000 in state Surface Treatment funds to TIP ID# 2024-084. Total project cost decreases.
11/15/2023
Amended
Remove five completed pool projects, modify descriptions and costs for thirteen pool projects, and add one new pool project. Total project cost decreases.
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name
Description
Notes
Cost
CO88 (Federal Boulevard)
Alameda to Louisiana
$10,000,000
CO86
Woodlands Blvd to IREA Access
$3,000,000
CO224
I25 to US6
$7,000,000
US40
MP 252 to I70
$9,500,000
SH-391
Hampden Ave to Jewell Ave
$4,700,000
US287
I70 to 92nd
$12,900,000
SH-265
I-70 to US-6
$4,600,000
CO8
Soda Lakes Rd to McIntyre St
$4,000,000
Design
Various Locations
$2,000,000
US85
Florida to I25
$4,200,000
CO74
Evergreen Downtown to Cold Springs Gulch
$10,000,000
US285
Federal to Dahlia
$13,300,000
CO83
MP 70.9 to Mississippi
$6,300,000
US6
19th to Colfax
$7,500,000
Alameda
Bryant to S Lipan St
$3,500,000
CO88
West Asbury to South Prince
$11,300,000
CO72
I70 to W 52nd
$10,000,000
CO121
4th to 37th
$7,000,000
Maintenance
Various Locations
$2,000,000
US285
Pine Junction to Foxton Road
$12,900,000
CO35
I70 to I270
$1,000,000
I76
I70 to Federal Boulevard
$6,900,000
C470
Ken Caryl to Wadsworth
$8,100,000
2026-2029 Transportation Improvement Program (Approved TIP)
Region 4 Bridge On-System Pool
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Bridge On-System)
$179,000
$0
$0
$0
State (Bridge On-System)
$37,000
$0
$0
$0
Local
$0
$0
$0
$0
Total
$216,000
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$522,000
$216,000
$0
$738,000
Amendment History
Date
Status
Description
08/20/2025
Amended
Add one pool project and $179,000 in federal Bridge On-System funds. Total project cost increases.
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
12/19/2024
Amended
Adjust one pool project. Total project cost remains the same.
08/17/2023
Amended
Proposed for adoption into 2024-2027
05/16/2023
Amended
Add one new pool project and $350,000 of federal Bridge On-System funds. Total project cost increases.
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name
Description
Notes
Cost
CO7 and Boulder Creek
$522,000
CO52
I25 to US85
Also has funding in 2007-095
$216,000
2026-2029 Transportation Improvement Program (Approved TIP)
Safe Routes to School Pool
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Safe Routes to School)
$3,241,000
$0
$0
$0
State (Safe Routes to School)
$0
$0
$0
$0
Local
$810,000
$0
$0
$0
Total
$4,051,000
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$7,175,000
$4,051,000
$0
$11,226,000
Amendment History
Date
Status
Description
05/22/2025
Amended
Correct prior funding amount, roll forward the Mead pool project, add $3,241,000 in federal Safe Routes to School funding, and add 5 newly awarded projects. Total project cost increases.
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
05/16/2023
Amended
Add three new pool projects and $1,171,000 in federal Safe Routes to School funding. Total project cost increases.
07/22/2021
Amended
Edit funding source to reflect federal Safe Routes to School funding is used. Total project cost remains the same.
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Stanley British Primary School Pedestrian Safety (Fiscal year 2026)
$838,000
Lakewood
Stober Elementary Sidewalk Project (Fiscal Year 2026)
$793,000
Lyons
3rd Avenue and Stickney (Fiscal year 2026)
$758,000
Englewood
Walkin and Rollin to Clayton (Fiscal year 2026)
$593,000
Denver
Walk Bike Roll Lead (Fiscal year 2026)
$259,000
2026-2029 Transportation Improvement Program (Approved TIP)
Region 4 Bridge Off-System Pool
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Bridge Off-System)
$0
$0
$0
$0
State (Bridge Off-System)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$11,994,000
$0
$0
$11,994,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
01/29/2025
Amended
Adjust one pool project and add $1,923,000 in federal Bridge Off-System funds and local match. Total project cost increases.
03/21/2024
Amended
Add one new pool project and $308,000 in federal Bridge Off-System funding. Total project cost increases.
01/17/2024
Amended
Add two pool projects and adjust one existing pool project. Add $4,100,000 in federal Bridge Off-System funds. Total project cost increases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name
Description
Notes
Cost
WCR34 - Mead (Fiscal Year 2022/2024)
$1,746,000
120th St over Coal Creek (FY23)
$513,000
WCR20 (FY23)
$730,000
WCR3 north of WCR12 (FY23)
$1,036,000
Rock Creek Pkwy Rehab (Fiscal Year 2024)
$1,077,000
WCR26 - Firestone (Fiscal Year 2024)
$1,438,000
WCR4 - Lochbuie (Fiscal Year 2024/2025)
$2,231,000
2026-2029 Transportation Improvement Program (Approved TIP)
Region 1 FASTER Pool
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Faster Safety)
$0
$0
$0
$0
State (Faster Safety)
$27,992,000
$26,267,000
$0
$0
Local
$0
$0
$0
$0
Total
$27,992,000
$26,267,000
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$0
$54,259,000
$0
$54,259,000
Amendment History
Date
Status
Description
07/16/2025
Amended
Add $2,459,000 in state FASTER Safety funding based on the latest allocations. Total project cost increases.
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
07/22/2024
Amended
Transfer $2,000,000 in state FASTER-Safety funding to new I25/CO7 Interim Transit Improvements project, and $7,500,000 to new I25 Greenland Wildlife Overpass project. Total project cost decreases.
12/19/2023
Amended
Remove $12,800,000 in prior funding transferred to 2024-084. Total project cost decreases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
Additional project amendment details can be found under this project in the TRIPS database.
2026-2029 Transportation Improvement Program (Approved TIP)
Region 4 FASTER Pool
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Faster Safety)
$0
$0
$0
$0
State (Faster Safety)
$2,035,000
$1,000,000
$1,000,000
$1,000,000
Local
$0
$0
$0
$0
Total
$2,035,000
$1,000,000
$1,000,000
$1,000,000
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$5,000,000
$5,035,000
$0
$10,035,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
03/16/2023
Amended
Add one new pool project for bike/ped safety improvements along US-287 at four intersections in Longmont (9th Ave., Mountain View Ave., 17th Ave., & 23rd Ave.). Total project cost remains the same.
05/19/2021
Amended
Add new pool project. Total project cost remains the same.
04/22/2021
Amended
Proposed for adoption into 2022-2025
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name
Description
Notes
Cost
SH-66 and WCR 13
Radii Widening
$36,000
SH-119
Nederland West to Roundabout
$2,500,000
US-287 Bike/Ped Safety Improvements
Four Intersections in Longmont
$1,521,000
CO52
I25 to US85
Project also has funding in Project# 2007-095
$1,035,000
2026-2029 Transportation Improvement Program (Approved TIP)
Region 1 FASTER Bridge and Tunnel Enterprise Pool
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
State (FASTER Bridge and Tunnel Enterprise)
$0
$0
$0
$0
State (Legislative)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$6,200,000
$0
$0
$6,200,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
10/17/2024
Amended
Add $500,000 in state FASTER Bridge Enterprise funds and add one pool project. Total project cost increases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
06/17/2020
Amended
Add funding and 3 new pool projects. Total funding amount increases.
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name
Description
Notes
Cost
I-70 WB Over US 6
Clear Creek (Floyd Hill)
$5,700,000
Several Bridges in Region 1
Bridge Prescoping
$500,000
2026-2029 Transportation Improvement Program (Approved TIP)
CDOT FASTER Transit Pool
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
State (FASTER Transit)
$3,000,000
$3,000,000
$3,000,000
$3,000,000
Local
$750,000
$750,000
$750,000
$750,000
Total
$3,750,000
$3,750,000
$3,750,000
$3,750,000
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$7,087,000
$15,000,000
$0
$22,087,000
Amendment History
Date
Status
Description
06/18/2025
Amended
Add $3,250,000 in local match funding to prior years. Total project cost increases.
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
12/19/2024
Amended
Add three pool projects and $670,000 in state FASTER funding. Total project funding increases.
11/15/2023
Amended
Transfer one pool project to 2018-004 and update one pool project funding. Total project cost decreases.
09/21/2023
Amended
Add three new pool projects, and add $374,000 in state FASTER-Transit funds and $94,000 in local match. Total project cost increases.
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name
Description
Notes
Cost
VIA
Maintenance Equipment (FY24)
$71,000
VIA
Facility Design (FY24)
$96,000
Via Mobility
Software Upgrades (Fiscal Year 2025)
$50,000
Boulder
Vehicles (Fiscal Year 2025)
$620,000
RTD
Vehicles (Fiscal Year 2025)
$3,000,000
2026-2029 Transportation Improvement Program (Approved TIP)
DRCOG Second Commitment to FasTracks
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$771,000
$0
$0
$0
Local
$193,000
$0
$0
$0
Total
$964,000
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$74,036,000
$964,000
$0
$75,000,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
05/16/2023
Amended
Transfer $2,089,000 in federal Surface Transportation Block Grant funding to TIP ID# 2022-033 for their Second Commitment in Principal amount to be applied toward multimodal access improvements to Mineral Station. Pool total decreases.
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Proposed for adoption into 2020-2023
Additional project amendment details can be found under this project in the TRIPS database.
2026-2029 Transportation Improvement Program (Approved TIP)
Way to Go: Regional TDM Program
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality)
$4,800,000
$0
$0
$0
Local
$100,000
$0
$0
$0
Total
$4,900,000
$0
$0
$0
Project Phase to Initiate
TDM
None
None
None
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$5,224,000
$4,900,000
$0
$10,124,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
06/16/2022
Amended
Add $417,000 in CMAQ funds to FY2022. Total project cost increases.
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Proposed for adoption into 2020-2023
Additional project amendment details can be found under this project in the TRIPS database.
2026-2029 Transportation Improvement Program (Approved TIP)
Enhanced Mobility of Seniors and Individuals with Disabilities (FTA 5310 - CDOT)
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Section 5310)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$1,110,000
$0
$0
$1,110,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
06/26/2024
Amended
Increase cost of one pool project and add $17,000 in federal Section 5310 funds. Total project cost increases.
12/19/2023
Amended
Add two new pool projects and $1,110,000 in federal Section 5310 funding. Total project cost increases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/24/2023
Amended
Remove two pool projects and add one new FY 2023 Small Urban pool projects. Total project cost decreases.
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name
Description
Notes
Cost
Via
Operating (Fiscal Year 2024 Small Urban)
$510,000
Via
Mobility Management (Fiscal Year 2024 Small Urban)
$600,000
2026-2029 Transportation Improvement Program (Approved TIP)
RTD Capital Improvements: Bus and Facilities Funding
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Section 5339)
$7,140,000
$7,360,000
$7,581,000
$7,808,000
Local
$1,790,000
$1,840,000
$1,895,000
$1,952,000
Total
$8,930,000
$9,200,000
$9,476,000
$9,760,000
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$12,847,000
$37,366,000
$0
$50,213,000
Amendment History
Date
Status
Description
06/18/2025
Amended
Correct prior funding amount following final Federal Transit Administration apportionments. Total project cost decreases.
05/22/2025
Amended
Reduce prior funding by $1,502,000. Total project cost decreases.
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
05/16/2024
Amended
Add $18,244,000 in prior year funding incorrectly not carried forward to new TIP. Total project cost increases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
Additional project amendment details can be found under this project in the TRIPS database.
2026-2029 Transportation Improvement Program (Approved TIP)
Region 4 Non-Regionally Significant RPP Pool
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
State (Regional Priority Projects)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$6,392,000
$0
$0
$6,392,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
10/18/2023
Amended
Move $7,300,000 in RPP funds to TIP ID# 2020-081. Total project cost decreases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
02/16/2023
Amended
Remove eight pool projects incorrectly programmed with RPP funds.
11/17/2022
Amended
Add six new pool projects. Total project cost remains the same.
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name
Description
Notes
Cost
SH-119/SH-52 Transit Bypass Lanes
$470,000 in RPP in TIP# 2020-081
$0
Coffman St. Busway
$1,230,000 in RPP in TIP# 2020-083
$0
SH-119/Hover Intersection
$7,300,000 in RPP in TIP# 2020-081
$0
2026-2029 Transportation Improvement Program (Approved TIP)
Air Quality Improvements Set-Aside
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality)
$1,626,000
$1,378,000
$0
$0
Local
$406,000
$344,000
$0
$0
Total
$2,032,000
$1,722,000
$0
$0
Project Phase to Initiate
Other Phase
Other Phase
None
None
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$7,745,000
$3,754,000
$0
$11,499,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
09/19/2024
Amended
Roll $2,000,000 in unspent funds from prior years into current set-aside program. Total project cost increases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Proposed for adoption into 2020-2023
Additional project amendment details can be found under this project in the TRIPS database.
2026-2029 Transportation Improvement Program (Approved TIP)
Regional Transportation Operations and Technology Set-Aside
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$2,228,000
$5,000,000
$5,000,000
$0
Local
$557,000
$1,250,000
$1,250,000
$0
Total
$2,785,000
$6,250,000
$6,250,000
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$14,910,000
$15,285,000
$0
$30,195,000
Amendment History
Date
Status
Description
07/16/2025
Amended
Add $1,700,000 from canceled project# 2024-077. Total project cost increases.
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
10/18/2023
Amended
Remove $10,847,000 to program to individual set-aside projects. Total project cost decreases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name
Description
Notes
Cost
Centennial
S2S Communication (FY21-23)
$800,000
2026-2029 Transportation Improvement Program (Approved TIP)
Wadsworth Operations and Widening: 35th to I70
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality)
$0
$0
$0
$0
Federal (Congressional Allocation)
$0
$0
$0
$0
Federal (STBG-Pandemic DRCOG Region)
$0
$0
$0
$0
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
State (Legislative)
$0
$0
$0
$0
State (Safety)
$0
$0
$0
$0
State (Surface Treatment)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$65,201,000
$0
$0
$65,201,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
05/16/2023
Amended
Add $4,000,000 in federal Congressional funding. Total project cost increases.
03/16/2023
Amended
Add $1,360,000 in state Legislative funding from the Region 1 Revitalizing Main Streets Pool. Total project cost increases.
12/21/2022
Amended
Add $1,100,000 in state Safety funds. Total project cost increases.
Additional project amendment details can be found under this project in the TRIPS database.
2026-2029 Transportation Improvement Program (Approved TIP)
I25/Broadway Station Interchange Improvements
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (STBG-Pandemic DRCOG Region)
$0
$0
$0
$0
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$89,922,000
$0
$0
$89,922,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Proposed for adoption into 2020-2023
11/16/2017
Amended
Add $1,221,000 of state Permanent Water Quality funding in FY 2018. Total project cost increases.
Additional project amendment details can be found under this project in the TRIPS database.
2026-2029 Transportation Improvement Program (Approved TIP)
Region 1 ITS Pool
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
State (Intelligent Transportation System)
$100,000
$100,000
$100,000
$100,000
Local
$0
$0
$0
$0
Total
$100,000
$100,000
$100,000
$100,000
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$0
$400,000
$0
$400,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Proposed for adoption into 2020-2023
04/20/2017
Amended
Proposed for adoption into 2018-2021
Additional project amendment details can be found under this project in the TRIPS database.
2026-2029 Transportation Improvement Program (Approved TIP)
Region 1 RPP Pool
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
State (Regional Priority Projects)
$17,966,000
$17,966,000
$17,966,000
$17,966,000
Local
$0
$0
$0
$0
Total
$17,966,000
$17,966,000
$17,966,000
$17,966,000
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$0
$71,864,000
$0
$71,864,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
06/26/2024
Amended
Add $1,657,000 of Transportation Commission Contingency funds and one pool project. Total project cost increases.
03/21/2024
Amended
Add two new pool projects and $1,363,000 in state Transportation Commission Contingency funds. Total project cost increases.
02/22/2024
Amended
Add one pool project, adjust one pool project funding using existing unallocated funding, and add $1,780,000 in state Transportation Commission Contingency funds. Total project cost increases.
10/18/2023
Amended
Transfer $9,000,000 in state Regional Priority Project funds to new I70: Chief Hosa to W Colfax project. Total project cost decreases.
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name
Description
Notes
Cost
Small projects/consultants/closeouts
$8,000,000
local agency contributions
Included in various TIP pages
$5,000,000
Design
$2,000,000
Steel Bridge Girders Cleanout
Regionwide
$1,000,000
Maintenance Paving Support IDIQ
Regionwide
$5,000,000
C470/I70 Emergency Bridge Repair
$1,780,000
Expansion Device Replacement
I76 and I225
$5,000,000
C470/Quincy Ramp Roundabouts
$1,363,000
I76 and Dahlia Bridge Repair
$1,657,000
I225 at 2nd and 6th
$4,000,000
2026-2029 Transportation Improvement Program (Approved TIP)
Ozone State Implementation Plan (SIP) Modeling
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$180,000
$0
$0
$0
Local
$45,000
$0
$0
$0
Total
$225,000
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$675,000
$225,000
$0
$900,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Proposed for adoption into 2020-2023
04/18/2019
Amended
Add $120,000 transferred from 2016-002. Total project cost increases.
Additional project amendment details can be found under this project in the TRIPS database.
2026-2029 Transportation Improvement Program (Approved TIP)
Transit Operating and Capital (FTA 5311)
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Section 5311)
$800,000
$800,000
$830,000
$850,000
State (Section 5311)
$0
$0
$0
$0
Local
$600,000
$600,000
$620,000
$650,000
Total
$1,400,000
$1,400,000
$1,450,000
$1,500,000
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$2,099,000
$5,750,000
$0
$7,849,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
06/17/2020
Amended
Adjust funding for one pool project. Total funding amount decreases.
04/16/2020
Amended
Add one project from recent call for projects. Total project cost increases.
Additional project amendment details can be found under this project in the TRIPS database.
2026-2029 Transportation Improvement Program (Approved TIP)
Region 1 ADA Projects
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
State (ADA)
$2,800,000
$2,800,000
$2,800,000
$2,800,000
Local
$0
$0
$0
$0
Total
$2,800,000
$2,800,000
$2,800,000
$2,800,000
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$44,972,000
$11,200,000
$0
$56,172,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
10/17/2019
Amended
Add funding to FY 2020 and 2021. Total project cost increases.
08/22/2019
Amended
Proposed for adoption into 2020-2023
Additional project amendment details can be found under this project in the TRIPS database.
2026-2029 Transportation Improvement Program (Approved TIP)
Region 1 Transportation Alternatives (TA) Pool
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Transportation Alternatives-CDOT)
$3,345,000
$0
$0
$0
Local
$696,000
$0
$0
$0
Total
$4,041,000
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$18,933,000
$4,041,000
$0
$22,974,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
09/19/2024
Amended
Remove one pool project and $2,500,000 in federal Transportation Alternatives funds and $625,000 in local match. Funds transferred to project 2022-012. Total project cost decreases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
03/16/2023
Amended
Remove one pool project and $2,505,000 in prior year funding. Total project cost decreases.
04/22/2021
Amended
Proposed for adoption into 2022-2025
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name
Description
Notes
Cost
Jefferson County
Peaks and Plains: Mouth of Clear Creek Canyon Segment
$852,000
Evergreen
North Lake Trail
$200,000
Denver
47th and York Safe Crossing Project
$2,500,000
Golden
US-6 Wildlife Crossing and Multi-use Trail Improvements
$400,000
Golden
West Colfax Ave Sidewalk/Connectivity Project
$530,000
Jefferson County
Peaks to Plains - Huntsman Gulch to Rigor Mortis Rapids
$1,653,000
Westminster
Citywide Multimodal Transportation Safety, Access, and Connections Improvem
$199,000
Arvada
Alkire St Sidepath
$1,200,000
Denver
NE Trails to Transit Connectivity Project
$1,150,000
Broomfield
120th Ave Complete Streets
$2,335,000
Golden
Ford St
$1,200,000
Wheat Ridge
Peaks to Plains Trail
$952,000
Jefferson County Open Space
I70 Trail Geological Point of Interest
$1,804,000
Sheridan
Mary Carter Greenway - US285 Underpass
$752,000
Denver
South Platte River Trail Improvements
See Project 2022-012
$0
2026-2029 Transportation Improvement Program (Approved TIP)
Region 4 ADA Projects
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
State (ADA)
$4,200,000
$250,000
$250,000
$250,000
Local
$0
$0
$0
$0
Total
$4,200,000
$250,000
$250,000
$250,000
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$250,000
$4,950,000
$0
$5,200,000
Amendment History
Date
Status
Description
06/18/2025
Amended
Add $500,000 in state ADA funding in 2026. Total project cost increases.
05/22/2025
Amended
Add $3,500,000 in state ADA funding in 2026 and $50,000 in each of the other TIP years. Total project cost increases.
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
11/21/2024
Amended
Add $2,000,000 in state Americans with Disabilities Act funding. Total project cost increases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
Additional project amendment details can be found under this project in the TRIPS database.
2026-2029 Transportation Improvement Program (Approved TIP)
Transit Capital Program (FTA 5339)
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Section 5339)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$1,238,000
$0
$0
$1,238,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
11/15/2023
Amended
Add one new pool project. Total project cost increases.
09/21/2023
Amended
Add three new pool projects, and add $1,031,000 in federal Section 5339 funds and $258,000 in local match. Total project cost increases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/24/2023
Amended
Add two new pool projects. Total project cost increases.
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name
Description
Notes
Cost
VIA
9 Van Replacements (FY24)
$610,000
VIA
Diesel Bus Replacement (FY24)
$118,000
VIA
2 Bus Expansion (FY24)
$303,000
VIA
Software Improvements (FY24)
$207,000
2026-2029 Transportation Improvement Program (Approved TIP)
Vasquez Operational Improvements: 52nd to 64th
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality)
$0
$0
$0
$0
Federal (Congressional Allocation)
$0
$0
$0
$0
Federal (Freight)
$0
$0
$0
$0
State (Legislative)
$8,560,000
$0
$0
$0
State (Regional Priority Projects)
$0
$0
$0
$0
State (Safety)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$8,560,000
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$26,832,000
$8,560,000
$0
$35,392,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
01/15/2025
Amended
Add $8,560,000 in state Legislative funding. Total project cost increases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
05/16/2023
Amended
Add $4,000,000 in federal Congressional funding. Total project cost increases.
04/22/2021
Amended
Proposed for adoption into 2022-2025
Additional project amendment details can be found under this project in the TRIPS database.
2026-2029 Transportation Improvement Program (Approved TIP)
Region 1 Permanent Water Quality Pool
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
State (Permanent Water Quality)
$0
$2,199,000
$0
$0
Local
$0
$0
$0
$0
Total
$0
$2,199,000
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$7,206,000
$2,199,000
$0
$9,405,000
Amendment History
Date
Status
Description
07/16/2025
Amended
Add one pool project. Total project cost remains the same.
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
03/04/2025
Amended
Remove one pool project and $1,995,000 in prior funds. Total project cost decreases.
07/22/2024
Amended
Remove one pool project, transfer $1,249,000 in state Permanent Water Quality funds to new I25/CO7 Interim Transit Improvement project, adjust funding of two pool projects, and add $2,239,000 in state Permanent Water Quality funds. Total project cost increases.
03/21/2024
Amended
Adjust one pool project and add $110,000 in state Permanent Water Quality funds. Total project cost increases.
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name
Description
Notes
Cost
I-76 Water Quality Facilities
York St. to Dahlia St.
$1,640,000
12th and Wadsworth Boulevard Water Quality Pond
$1,800,000
CO7 Bike Path Widening
$1,203,000
CO83 Safety Improvements
Bayou Gulch to El Paso County
$1,931,000 included in Project# 2020-064
$0
2026-2029 Transportation Improvement Program (Approved TIP)
Westminster Quiet Zones: BNSF Railway and Lowell, W 72nd, and Bradburn
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$1,455,000
$0
$0
$1,455,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/24/2023
Amended
Proposed for adoption into 2022-2025
10/19/2017
Amended
Add new project with funding from the Northwest Corridor SCIP funding.
2026-2029 Transportation Improvement Program (Approved TIP)
I25/CO119 Transit Facility Improvements
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (MMOF - ARPA - CDOT)
$0
$0
$0
$0
State (Legislative)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$640,000
$0
$0
$640,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
12/19/2024
Amended
Add $140,000 in state Legislative funding. Total project cost increases.
04/18/2024
Amended
Add $1,000 in previous state Legislative funding and $500,000 in federal Multimodal Transportation and Mitigation Options Fund - American Rescue Plan Act - CDOT funds. Total project cost increases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
05/23/2022
Amended
Reduce state Legislative funding by $373,000. Total project cost decreases.
Additional project amendment details can be found under this project in the TRIPS database.
2026-2029 Transportation Improvement Program (Approved TIP)
Transit Capital Program (State SB 228)
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
State (Legislative-Transit)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$1,582,000
$0
$0
$1,582,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
12/19/2024
Amended
Add three new pool projects and $635,000 in state Legislative-Transit funding. Total project cost increases.
11/21/2024
Amended
Add two pool projects and $555,000 in state Legislative funding. Total project cost increases.
09/21/2023
Amended
Add one new pool project, and add $392,000 in state Legislative-Transit funding and $98,000 in local match. Total project cost increases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name
Description
Notes
Cost
Laradon Hall
1 Vehicle Purchase (FY24)
$392,000
Via Mobility
Operating (Fiscal Year 2025)
$510,000
Via Mobility
Mobility Management (Fiscal Year 2025)
$600,000
Easterseals Colorado
Vehicle (Fiscal Year 2025)
$80,000
2026-2029 Transportation Improvement Program (Approved TIP)
CO119 BRT Enhancements in Boulder and Longmont
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Local (RTD Funds Only)
$8,000,000
$0
$0
$0
Total
$8,000,000
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$8,000,000
$8,000,000
$0
$16,000,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
10/18/2023
Amended
Remove funding and scope from 2022-2025 Regional and Subregional Share Calls for Projects. Funding and scope moved to TIP ID# 2020-081. Project funding decreases.
08/17/2023
Amended
Proposed for adoption into 2024-2027, add new funding from 2024-2027 Regional and Subregional Shares Calls for Projects.
02/16/2023
Amended
Replace $350,000 in RPP funding with $350,000 in Legislative funding per CDOT R4.
09/22/2022
Amended
Add new scope from 2022-2025 Regional and Subregional Shares Calls for Projects.
Additional project amendment details can be found under this project in the TRIPS database.
2026-2029 Transportation Improvement Program (Approved TIP)
Peaks to Plains Trail: CO6 from Tunnel 1 to Big Easy Trailhead
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$2,777,000
$13,994,000
$0
$0
State (MMOF)
$0
$0
$0
$0
Local
$9,200,000
$43,100,000
$0
$0
Total
$11,977,000
$57,094,000
$0
$0
Project Phase to Initiate
Construction
Construction
None
None
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$33,929,000
$69,071,000
$0
$103,000,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027 and add new funding and scope from 2024-2027 Regional and Subregional Shares Calls for Projects.
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Proposed for adoption into the 20-23 TIP.
2026-2029 Transportation Improvement Program (Approved TIP)
CO7 Corridor Multimodal Improvements: Foothills Pkwy to Brighton - Precon
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality)
$0
$0
$0
$0
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
State (Legislative)
$0
$0
$0
$0
State (MMOF)
$0
$0
$0
$0
State (Regional Priority Projects)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$17,408,000
$0
$0
$17,408,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/24/2023
Amended
Reduce project by $1,153,000 in federal CMAQ funds, $340,000 in state Legislative funds, and $1,304,000 in state MMOF funds. City of Boulder elements broken into separate project.
02/16/2023
Amended
Replace $570,000 in RPP funding with $570,000 in Legislative funding per CDOT R4 and add $328,000 in local match.
09/22/2022
Amended
Add new scope from 2022-2025 Regional and Subregional Shares Calls for Projects.
Additional project amendment details can be found under this project in the TRIPS database.
2026-2029 Transportation Improvement Program (Approved TIP)
Aurora Missing Sidewalk Program
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Transportation Alternatives-DRCOG)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$2,885,000
$0
$0
$2,885,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Adopted in the 2020-2023 TIP.
2026-2029 Transportation Improvement Program (Approved TIP)
Nine Mile Station Bicycle and Pedestrian Bridge over Parker Rd.
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Congressional Allocation)
$0
$0
$0
$0
Federal (STBG-Pandemic DRCOG Region)
$0
$0
$0
$0
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$8,463,000
$0
$0
$8,463,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
06/26/2024
Amended
Add $850,000 in federal Congressional Allocation funding. Total project cost increases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Adopted in the 2020-2023 TIP.
2026-2029 Transportation Improvement Program (Approved TIP)
Oxford Station Pedestrian Bridge: Over Oxford Ave
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
Federal (Transportation Alternatives-DRCOG)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$2,000,000
$0
$0
$2,000,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Adopted in the 2020-2023 TIP.
2026-2029 Transportation Improvement Program (Approved TIP)
Downtown ADA Sidewalk Connections: Jackson, 1st, Jefferson
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
State (MMOF)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$1,306,000
$0
$0
$1,306,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Adopted in the 2020-2023 TIP.
2026-2029 Transportation Improvement Program (Approved TIP)
Industrial Ln. Bikeway Phase 2: Bike/Ped Bridge over BNSF to US36/Flatiron Station
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Carbon Reduction Program)
$0
$0
$0
$0
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$3,501,000
$0
$0
$3,501,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
03/17/2022
Amended
Add $2,186,000 in CRP funding in FY23 and add $547,000 in local match as part of Spring 2022 Wait List Process. Total project cost increases.
04/22/2021
Amended
Proposed for adoption into 2022-2025
02/19/2020
Amended
Move funding from FY 2020 to FY 2021 and switch funding type from TA to STP-Metro. Total project costs remain the same.
Additional project amendment details can be found under this project in the TRIPS database.
2026-2029 Transportation Improvement Program (Approved TIP)
Colfax Complete Streets: Violet to I70
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality)
$0
$0
$0
$0
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
State (MMOF)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$18,600,000
$0
$0
$18,600,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/22/2022
Amended
Add new scope from 2022-2025 Subregional Share Call for Projects.
03/17/2022
Amended
Add $1,360,000 in STBG funds and $340,000 in local match as part of Spring 2022 Wait List process. Total project cost increases.
04/22/2021
Amended
Proposed for adoption into 2022-2025
Additional project amendment details can be found under this project in the TRIPS database.
2026-2029 Transportation Improvement Program (Approved TIP)
St Vrain Greenway, Phase 13: CO119 to St Vrain State Park
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
State (MMOF)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$2,500,000
$0
$0
$2,500,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Adopted in the 2020-2023 TIP.
2026-2029 Transportation Improvement Program (Approved TIP)
CO66/WCR7 Pedestrian Underpass
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Transportation Alternatives-DRCOG)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$2,600,000
$0
$0
$2,600,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Adopted in the 2020-2023 TIP.
2026-2029 Transportation Improvement Program (Approved TIP)
120th/US85 Interchange Improvements - Precon
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
State (Regional Priority Projects)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$12,600,000
$0
$0
$12,600,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Adopted in the 2020-2023 TIP.
2026-2029 Transportation Improvement Program (Approved TIP)
88th Widening: I76 to CO2
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
Federal (Transportation Alternatives-DRCOG)
$0
$0
$0
$0
State (MMOF)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$34,450,000
$0
$0
$34,450,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
05/16/2024
Amended
Add active transportation scope and funding from Project# 2022-049. Total project cost increases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Adopted in the 2020-2023 TIP.
2026-2029 Transportation Improvement Program (Approved TIP)
104th Widening: Colorado to US85 - Precon
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
State (Regional Priority Projects)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$5,750,000
$0
$0
$5,750,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Adopted in the 2020-2023 TIP.
2026-2029 Transportation Improvement Program (Approved TIP)
County Line Capacity Improvements: Broadway to University
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$20,000,000
$0
$0
$20,000,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
02/16/2023
Amended
Change sponsor from Centennial to Douglas County. No change to total project cost.
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Adopted in the 2020-2023 TIP.
2026-2029 Transportation Improvement Program (Approved TIP)
US6/Heritage Interchange - Precon
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$1,960,000
$0
$0
$0
State (Legislative)
$0
$0
$0
$0
Local
$490,000
$0
$0
$0
Total
$2,450,000
$0
$0
$0
Project Phase to Initiate
ROW
None
None
None
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$7,050,000
$2,450,000
$0
$9,500,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
07/22/2021
Amended
Add $1,000,000 in state Legislative funding in FY 23. Total project cost increases.
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Adopted in the 2020-2023 TIP.
2026-2029 Transportation Improvement Program (Approved TIP)
CO42 Multimodal Improvements: Empire/Lock to CO7 - Precon
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
State (10 Year Plan-Capital Funds)
$0
$0
$0
$0
State (House Bill 1466 - MMOF)
$0
$0
$0
$0
State (Legislative)
$870,000
$0
$0
$0
Local
$0
$0
$0
$0
Total
$870,000
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$8,500,000
$870,000
$0
$9,370,000
Amendment History
Date
Status
Description
06/18/2025
Amended
Add $870,000 in state Legislative funding in 2026 and correct prior year funding. Total project cost increases.
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
09/19/2024
Amended
Shift $800,000 in Fiscal Year 2024 funds and $2,400,000 in prior year funds from Multimodal Transportation and Mitigation Options Fund - American Rescue Plan Act funds to House Bill 1466 General Funds. Total project cost remains the same.
08/17/2023
Amended
Proposed for adoption into 2024-2027
02/16/2023
Amended
Replace $4,000,000 in RPP funding with $3,000,000 in Legislative and $1,000,000 in 10C funding per CDOT R4.
Additional project amendment details can be found under this project in the TRIPS database.
2026-2029 Transportation Improvement Program (Approved TIP)
Micro Transit Service & Mobility Options: North I-25 Area
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Local (RTD Funds Only)
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$954,000
$0
$0
$954,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
09/18/2019
Amended
Adjust years of funding. Total project cost remains the same.
08/22/2019
Amended
Adopted in the 2020-2023 TIP.
2026-2029 Transportation Improvement Program (Approved TIP)
Federal Blvd Transit Improvements: Floyd to 54th
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Local (RTD Funds Only)
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$1,157,000
$0
$0
$1,157,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Adopted in the 2020-2023 TIP.
2026-2029 Transportation Improvement Program (Approved TIP)
Industrial and Nickel/Commerce Intersection Operational Improvements
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$1,619,000
$0
$0
$1,619,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Adopted in the 2020-2023 TIP.
2026-2029 Transportation Improvement Program (Approved TIP)
CO86/5th and Founders/Ridge Intersection Operational Improvements
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$6,500,000
$0
$0
$6,500,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Adopted in the 2020-2023 TIP.
2026-2029 Transportation Improvement Program (Approved TIP)
I70/CO79 Eastbound Ramp Improvements
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality)
$0
$0
$0
$0
Federal (STBG-Pandemic DRCOG Region)
$0
$0
$0
$0
State (Regional Priority Projects)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$2,200,000
$0
$0
$2,200,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Adopted in the 2020-2023 TIP.
2026-2029 Transportation Improvement Program (Approved TIP)
Parker/Quincy/Smoky Hill Intersection Operational Improvements
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$9,171,000
$0
$0
$9,171,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Adopted in the 2020-2023 TIP.
2026-2029 Transportation Improvement Program (Approved TIP)
Dry Creek Operational Improvements: I25 to Inverness Dr East
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$5,140,000
$0
$0
$5,140,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
06/26/2024
Amended
Add funding from the closeout of project 2020-058. The Arapahoe Forum has approved. Total funding has increased.
08/17/2023
Amended
Proposed for adoption into 2024-2027
05/23/2022
Amended
Adjust project scope. Project cost remains the same.
04/22/2021
Amended
Proposed for adoption into 2022-2025
Additional project amendment details can be found under this project in the TRIPS database.
2026-2029 Transportation Improvement Program (Approved TIP)
Mineral/Santa Fe Operational Improvements
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality)
$0
$0
$0
$0
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$27,431,000
$0
$0
$27,431,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
01/30/2025
Amended
Correct error in funding amount by adding $1,000,000 in federal Surface Transportation Block Grant funds. Total project cost increases.
11/21/2024
Amended
Add $3,390,000 in federal Surface Transportation Block Grant funds returned from Project 2020-059 and reallocated by the Arapahoe County Subregional Forum. Total project cost increases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
Additional project amendment details can be found under this project in the TRIPS database.
2026-2029 Transportation Improvement Program (Approved TIP)
I25/Lincoln Traffic and Mobility Improvements
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$8,500,000
$0
$0
$8,500,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
03/17/2022
Amended
Add $2,000,000 in STBG funds in FY23 and add $2,750,000 in local match as part of the Spring 2022 Wait List Process. Overall funding increases.
04/22/2021
Amended
Proposed for adoption into 2022-2025
05/20/2020
Amended
Adjust funding per Step 1 funding advancements of the Spring 2020 Waiting List Protocol. Overall funding remains the same.
Additional project amendment details can be found under this project in the TRIPS database.
2026-2029 Transportation Improvement Program (Approved TIP)
Parker Rd Operational Improvements: Lincoln to Pine
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality)
$0
$0
$0
$0
Federal (Faster Safety)
$0
$0
$0
$0
State (Faster Safety)
$0
$0
$0
$0
State (MMOF)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$4,000,000
$0
$0
$4,000,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Adopted in the 2020-2023 TIP.
2026-2029 Transportation Improvement Program (Approved TIP)
CO83 Safety Improvements: Bayou Gulch to El Paso County
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality)
$0
$0
$0
$0
Federal (Faster Safety)
$0
$0
$0
$0
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
State (Faster Safety)
$3,980,000
$0
$0
$0
State (Permanent Water Quality)
$950,000
$0
$0
$0
State (Regional Priority Projects)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$4,930,000
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$22,846,000
$4,930,000
$0
$27,776,000
Amendment History
Date
Status
Description
07/16/2025
Amended
Add $950,000 in state Permanent Water Quality funding. Total project cost increases.
05/22/2025
Amended
Add $981,000 in state Permanent Water Quality funds in prior years. Total project cost increases.
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
02/16/2023
Amended
Remove $1,567,000 in state FASTER-Safety funding and add $1,567,000 in federal Hazard Elimination funding. No change to total project cost
Additional project amendment details can be found under this project in the TRIPS database.
2026-2029 Transportation Improvement Program (Approved TIP)
JC73: CO74 to Buffalo Park Operational Improvements
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$12,500,000
$0
$0
$12,500,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Adopted in the 2020-2023 TIP.
2026-2029 Transportation Improvement Program (Approved TIP)
I270 Corridor Improvements: I70 to I25
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (RAISE)
$0
$0
$0
$0
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
State (FASTER Bridge and Tunnel Enterprise)
$100,000,000
$10,000,000
$40,000,000
$20,000,000
State (Legislative)
$70,000,000
$0
$0
$0
Local
$0
$0
$0
$0
Total
$170,000,000
$10,000,000
$40,000,000
$20,000,000
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$119,900,000
$240,000,000
$0
$359,900,000
Amendment History
Date
Status
Description
05/22/2025
Amended
Revise scope from environmental assessment to environmental impact statement. Total project cost remains the same.
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
12/19/2024
Amended
Add $4,800,000 in federal RAISE funds. Total project cost increases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
02/16/2023
Amended
Add $10,100,000 in state FASTER-Bridge Enterprise funding. Total project cost increases.
Additional project amendment details can be found under this project in the TRIPS database.
2026-2029 Transportation Improvement Program (Approved TIP)
Parker Rd Multimodal Transportation and Safety Study: Mississippi to Hampden
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
State (Regional Priority Projects)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$1,735,000
$0
$0
$1,735,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/24/2022
Amended
Adjust scope and title. Decrease STBG funds by $155,000. Decrease match by $110,000. Total project cost decreases.
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Adopted in the 2020-2023 TIP.
2026-2029 Transportation Improvement Program (Approved TIP)
Broomfield Transit Needs Assessment & Pilot Project
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality)
$0
$0
$0
$0
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$800,000
$0
$0
$800,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
05/19/2021
Amended
Adjust funding per year per FTA guidance. Total project cost stays the same.
04/22/2021
Amended
Per FY20 Project Delays report, shift FY20-23 funding to FY21-24.
Proposed for adoption into 2022-2025.
08/22/2019
Amended
Adopted in the 2020-2023 TIP.
2026-2029 Transportation Improvement Program (Approved TIP)
Broomfield FlexRide
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$900,000
$0
$0
$900,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
08/22/2019
Amended
Proposed for adoption in 2020-2023 TIP.
2026-2029 Transportation Improvement Program (Approved TIP)
Human Services Transportation/FASTER Set-Aside
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality)
$2,000,000
$2,000,000
$2,000,000
$2,000,000
State (FASTER Transit)
$0
$0
$0
$0
State (MMOF)
$0
$0
$0
$0
Local
$500,000
$500,000
$500,000
$500,000
Total
$2,500,000
$2,500,000
$2,500,000
$2,500,000
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$2,910,000
$10,000,000
$0
$12,910,000
Amendment History
Date
Status
Description
08/20/2025
Amended
Change two 2025 projects from MMOF funded to CMAQ. Change remaining unprogrammed MMOF to CMAQ. Total project cost remains the same.
05/22/2025
Amended
Remove three complete projects, add ten new pool projects, and adjust local match. Total project cost increases.
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
12/20/2024
Amended
Swap $2,734,000 in federal Congestion Mitigation/Air Quality funds for state Multimodal Transportation and Mitigation Options Funds available from 2020-021. Total project cost remains the same.
05/16/2024
Amended
Add two new pool projects and local match funds from recent Section 5310 solicitation. Total project cost increases.
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name
Description
Notes
Cost
A Little Help - Capital - Software (FY24) - $25
Funded with CMAQ, FASTER
$0
A Little Help - Mobility Management (FY24) - $40
Funded with MMOF, FASTER
$0
AbleLight - Capital 2 Vehicle Replacements (FY24) - $170
Funded with CMAQ
$0
Boulder County - Mobility Management (FY24) - $40
Funded with FASTER
$0
Douglas County - Capital 1 Vehicle Expansion (FY24) - $124
Funded with CMAQ
$0
Douglas County - Capital EV Charging Station (FY24) - $44
Funded with CMAQ
$0
DRCOG - Mobility Management (FY24) - $55
Funded with MMOF
$0
Jewish Family Service - Capital 1 Vehicle Expansion (FY24) - $54
Funded with CMAQ
$0
Lakewood - Capital 2 Vehicle Replacements (FY24) - $247
Funded with CMAQ
$0
Laradon Hall - Capital 2 Vehicle Replacements (FY24) - $153
Funded with CMAQ
$0
Erie - Operating (FY24) - $200
Funded with CMAQ
$0
DRCOG - Program Administration (FY24) - $254
Douglas County - Mobility Management (Fiscal Year 2025) - $51,000
Funded with FASTER and also 5310
$0
Via - Operating (Fiscal Year 2025) - $38,000
Funded with FASTER and also with 5310
$0
Capital Projects
$1,417,000
Mobility Management Projects
$1,088,000
Operating Projects
$1,046,000
Program Administration
$254,000
A Little Help - Capital 2 Software Projects (Fiscal year 2025) - $55,000
Funded with CMAQ
$0
AbleLight - Capital Replace 2 Vehicles (Fiscal year 2025) - $128,000
Funded with CMAQ and also 5310
$0
DRCOG - Mobility Management (Fiscal year 2025) - $500,000
Funded with MMOF and also 5310
$0
DRMAC - Mobility Management (Fiscal year 2025) - $74,000
Funded with MMOF and also 5310
$0
Douglas County - Mobility Management (Fiscal year 2025) - $328,000
Funded with MMOF and also 5310
$0
Douglas County - Capital Replace 1 Vehicle (Fiscal year 2025) - $66,000
Funded with CMAQ
Douglas County - Capital 1 Expansion Van (Fiscal year 2025) - $71,000
Funded with CMAQ
Evergreen PRD - Operating (Fiscal year 2025) - $105,000
Funded with CMAQ
Via - Operating (Fiscal year 2025) - $703,000
Funded with MMOF and also 5310
$0
Via - Capital EV Infrastructure (Fiscal year 2025) - $104,000
Funded with CMAQ
Via - Capital 2 Servers, Rack, AI Software (Fiscal year 2025) - $175,000
Funded with CMAQ
$0
2026-2029 Transportation Improvement Program (Approved TIP)
CDOT Trust Settlement Pool
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
State (Settlement Fund)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$212,000
$0
$0
$212,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
09/21/2023
Amended
Add two new pool projects and $212,000 in state Settlement funds. Total project cost increases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
07/11/2023
Amended
Add $745,000 in state Settlement funds. Total project cost increases.
04/24/2023
Amended
Add one new pool project. Total project cost increases.
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name
Description
Notes
Cost
VIA
Vehicle Replacment (FY24)
$162,000
VIA
Charging Equipment (FY24)
$50,000
2026-2029 Transportation Improvement Program (Approved TIP)
CO119 Operational Improvements: Boulder to Longmont
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Critical Culvert)
$136,000
$0
$0
$0
Federal (MMOF - ARPA - DRCOG)
$0
$0
$0
$0
Federal (RAISE)
$0
$0
$0
$0
Federal (STBG-Pandemic)
$0
$0
$0
$0
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
Federal (Transportation Alternatives-CDOT)
$1,679,000
$0
$0
$0
State (10 Year Plan-Capital Funds)
$0
$0
$0
$0
State (House Bill 1466 - MMOF)
$0
$0
$0
$0
State (Intelligent Transportation System)
$0
$0
$0
$0
State (Legislative)
$0
$0
$0
$0
State (Planning and Research Initiatives)
$0
$0
$0
$0
State (Regional Priority Projects)
$0
$0
$0
$0
Local
$1,662,000
$1,000,000
$0
$0
Local (RTD Funds Only)
$0
$0
$0
$0
Total
$3,477,000
$1,000,000
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$158,721,000
$4,477,000
$0
$163,198,000
Amendment History
Date
Status
Description
05/22/2025
Amended
Add $136,000 in state Critical Culvert funding in 2026. Total project cost increases.
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
03/04/2025
Amended
Add $80,000 in state Intelligent Transportation System funds. Total project cost increases.
09/19/2024
Amended
Shift $29,811,000 from Multimodal Transportation and Mitigation Options Fund - American Rescue Plan Act and $502,000 in federal Surface Transportation Block Grant funds to House Bill 1466 General Funds, add $2,153,000 in Regional Transportation District funds and $38,000 in local funds. Total project cost increases.
08/27/2024
Amended
Swap $23,080,000 in state Legislative funding to state 10-Year Plan funding and shift funding to Fiscal Year 2025. Swap $5,000,000 in state Legislative-Transit funding to state Legislative funding. Decrease state Legislative funding by $99,000. Correct Regional Priority Project funding from local to state. Total project cost decreases.
Additional project amendment details can be found under this project in the TRIPS database.
2026-2029 Transportation Improvement Program (Approved TIP)
28th St Business Access Transit Lanes: Iris to Valmont
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
State (Surface Treatment)
$75,000
$0
$0
$0
Local
$0
$0
$0
$0
Total
$75,000
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$5,700,000
$75,000
$0
$5,775,000
Amendment History
Date
Status
Description
08/20/2025
Amended
Imported from 2026-2029. Add $75,000 in state Surface Treatment funding. Total project cost increases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
11/20/2019
Amended
New project created from the original SH-119 BRT project.
2026-2029 Transportation Improvement Program (Approved TIP)
Safer Main Streets Pool
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
State (Legislative)
$0
$0
$0
$0
State (Legislative-Transit)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$83,394,000
$0
$0
$83,394,000
Amendment History
Date
Status
Description
06/18/2025
Amended
Transfer $2,000,000 in state Legislative funds from prior funds (CDOT Region 1 Urban Arterials Safety Study pool project) to 2022-074. Total project cost decreases.
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
02/22/2024
Amended
Remove one pool project and move $2,300,000 in prior year state Legislative funding to TIP ID# 2022-008. Total project cost decreases.
01/30/2024
Amended
Remove one pool project and move $7,060,000 in prior year state Legislative-Transit funding and $2,940,000 in prior year state Legislative funding to TIP ID# 2024-048. Total project cost decreases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name
Description
Notes
Cost
Arapahoe County
Arapahoe Road at Olathe St Intersection Improvements
$450,000
Arapahoe County
S. Federal Blvd. Sidewalk Improvements
$464,000
Boulder
Safer Signals, Safer Streets
$435,000
Boulder
28th St. (US 36) and Colorado Ave. Protected Intersection
$2,104,000
Boulder
30th Street – Separated Bike Lanes (SH-7/Arapahoe Avenue – Colorado Avenue)
Funding on TIP ID# 2022-008
$0
Boulder County
US 36 Intersections Improvements Project (Lyons to Boulder)
$240,000
Broomfield
US 287/ 120th Avenue Sidepath Infill & Transit Access Improvements
$2,000,000
Broomfield
CO 128 / US 36 Bikeway Connection
$296,000
Broomfield
112th/Uptown Ave. Complete Streets and Railroad Safety Improvements
$3,542,000
Centennial
Arapahoe and Clarkson Traffic Signal and Bike Lane Continuation
$400,000
Centennial
S Holly St HAWK Signal and Pedestrian Improvements
$250,000
Commerce City
Colorado Boulevard Bicycle and Pedestrian Improvements
$2,720,000
Denver
Mississippi Avenue Vision Zero Safety Project
$2,132,000
Denver
SH-88/Federal Boulevard Median Gaps
$3,600,000
Denver
West Colfax Pedestrian and Transit Improvements + Partial E. Colfax
US Highway 85 Shoulder Widening (Castle Rock Parkway to Daniels Park Road)
$880,000
Englewood
West Dartmouth Ave Multimodal Safety
$1,260,000
Erie
County Line Road Telleen to Evans
$2,360,000
Littleton
Mineral Station East Mobility-shed Improvements
$1,600,000
Littleton
Prince Street Link Project
$615,000
Lone Tree
Rapid Rectangular Flashing Beacons (RRFBs)
$248,000
Lone Tree and Douglas County
C-470 Trail Connector to RTD/Park Meadows LRT
$1,600,000
Longmont
SH-119 & Sunset St Intersection Multimodal Safety Improvements (SDR5000)
$1,200,000
Morrison
Morrison Main Street Revitalization
$426,000
Nederland
Nederland Crosswalk Improvements
$280,000
Northglenn
Connect Northglenn Multimodal Improvements
$560,000
Superior
US 36 Bikeway Extension - Rock Creek Parkway Segment
$320,000
Denver
Evans Ave Vision Zero Safety Project
$744,000
Douglas County
C-470 Trail & University Blvd Ped Grade Separation
$5,120,000
Parker
Parker Rd (SH-83) Multi-Use Trail/Sidewalk
$3,200,000
RTD
Improving ADA Accessibility in Metro Denver
$905,000
CDOT R1
Urban Arterials Safety Study
$500,000
Lakewood
West Colfax Pedestrian Safety and Infrastructure Project
Funding on TIP ID# 2024-048
$0
2026-2029 Transportation Improvement Program (Approved TIP)
47th/BNSF Missing Sidewalks
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Transportation Alternatives-CDOT)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$499,000
$0
$0
$499,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
11/15/2023
Amended
Correct Denver Regional Council of Governments - Transportation Alternatives funding to Colorado Department of Transportation - Transportation Alternatives funding. Total project cost remains the same.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
04/16/2020
Amended
New project.
2026-2029 Transportation Improvement Program (Approved TIP)
I70/Picadilly New Interchange
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (BUILD)
$0
$0
$0
$0
Federal (Faster Safety)
$0
$0
$0
$0
State (Faster Safety)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$67,215,000
$0
$0
$67,215,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
07/21/2022
Amended
Add $8,500,000 in FASTER Safety funding. Total project cost increases.
04/22/2021
Amended
Proposed for adoption into 2022-2025
05/20/2020
Amended
New Project.
2026-2029 Transportation Improvement Program (Approved TIP)
State Vulnerable and Senior Transportation Funds
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Vulnerable )
$0
$0
$0
$0
State (Vulnerable )
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$375,000
$0
$0
$375,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
12/17/2020
Amended
Add pool projects. Total project cost remains the same.
10/22/2020
Amended
New Project.
2026-2029 Transportation Improvement Program (Approved TIP)
I25/Crystal Valley New Interchange
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (BUILD)
$0
$0
$0
$0
Federal (Surface Transportation Block Grant)
$2,431,000
$0
$0
$0
Local
$505,000
$0
$0
$0
Total
$2,936,000
$0
$0
$0
Project Phase to Initiate
Construction
None
None
None
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$95,064,000
$2,936,000
$0
$98,000,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
12/20/2024
Amended
Add $431,000 in federal Surface Transportation Block Grant funding made available by closeout of 2020-021. Total project cost remains the same.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
01/14/2021
Amended
New project.
2026-2029 Transportation Improvement Program (Approved TIP)
I70 Region 1 Noise Walls
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (STBG-Pandemic)
$0
$0
$0
$0
State (Legislative)
$0
$0
$0
$0
State (Regional Priority Projects)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$35,800,000
$0
$0
$35,800,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/27/2021
Amended
Add $20,000,000 in state Legislative funding for phases 3-6. Total project cost increases.
06/21/2021
Amended
Add funding for Phase 2. Total project cost increases.
04/22/2021
Amended
Proposed for adoption into 2022-2025
Additional project amendment details can be found under this project in the TRIPS database.
2026-2029 Transportation Improvement Program (Approved TIP)
I70 West Metro Bridges: I25 to C470
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
State (Legislative)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$30,854,000
$0
$0
$30,854,000
Amendment History
Date
Status
Description
06/18/2025
Amended
Remove $6,346,000 in prior year state Legislative funding. Funding to be transferred to the Floyd Hill project. Total project cost decreases.
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
08/19/2021
Amended
Add $2,000,000 in legislative funding. Total project cost increases
04/22/2021
Amended
Proposed for adoption into 2022-2025
Additional project amendment details can be found under this project in the TRIPS database.
2026-2029 Transportation Improvement Program (Approved TIP)
Region 1 Mobility Hub Pool
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
State (Legislative-Transit)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$17,070,000
$0
$0
$17,070,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
01/29/2025
Amended
Adjust one pool project, remove $2,100,000 in state Legislative-Transit funding transferred to Project 2022-032. Total project cost decreases.
07/22/2024
Amended
Remove one pool project and transfer $14,000,000 in prior year state Legislative-Transit funding to new I25/CO7 Interim Transit Improvement project. Total project cost decreases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
11/17/2022
Amended
Add $6,130,000 in state Legislative-Transit funding, remove one pool project, and adjust cost on two pool projects. Total project cost increases.
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name
Description
Notes
Cost
Bustang Maintenance Facility
$4,000,000
Castle Rock Mobility Hub
$11,070,000
Lone Tree Mobility Hub
$14,600 in Leg-T funding in TIP# 2022-032
$0
2026-2029 Transportation Improvement Program (Approved TIP)
E470 Widening: I70 to 104th
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$111,400,000
$0
$0
$111,400,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
2026-2029 Transportation Improvement Program (Approved TIP)
E470/I70 Interchange Improvements
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Local
$0
$1,000,000
$5,000,000
$15,000,000
Total
$0
$1,000,000
$5,000,000
$15,000,000
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$55,911,000
$21,000,000
$15,000,000
$91,911,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
2026-2029 Transportation Improvement Program (Approved TIP)
E470 Widening: 104th to US85
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Local
$25,000,000
$45,000,000
$45,000,000
$0
Total
$25,000,000
$45,000,000
$45,000,000
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$1,500,000
$115,000,000
$0
$116,500,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
2026-2029 Transportation Improvement Program (Approved TIP)
E470/88th New Interchange
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Local
$10,000,000
$5,000,000
$0
$0
Total
$10,000,000
$5,000,000
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$17,086,000
$15,000,000
$0
$32,086,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Proposed for adoption into 2022-2025
2026-2029 Transportation Improvement Program (Approved TIP)
County Line/WCR 1 Buffered Bike Lanes: 17th to CO66
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Transportation Alternatives-DRCOG)
$0
$0
$0
$0
State (MMOF)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$3,400,000
$0
$0
$3,400,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/22/2022
Amended
Add scope from 2022-2025 Subregional Share Call for Projects.
04/22/2021
Amended
Add new waitlist project
2026-2029 Transportation Improvement Program (Approved TIP)
5th St Operational Improvements: Woodlands to Ridge
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$11,100,000
$0
$0
$11,100,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP. Increase prior year by $4,100,000 to reflect additional local funding.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Add new waitlist project
2026-2029 Transportation Improvement Program (Approved TIP)
South Platte River Trail Improvements: West Virginia to W Bayaud
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
Federal (Transportation Alternatives-CDOT)
$0
$0
$0
$0
Federal (Transportation Alternatives-DRCOG)
$0
$0
$0
$0
State (MMOF)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$10,467,000
$0
$0
$10,467,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
09/19/2024
Amended
Swap $2,500,000 in prior year local match for federal Transportation Alternatives-CDOT funding and add $467,000 in prior year local match. Total project cost increases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
05/19/2021
Amended
Revise limits. Total project cost remains the same.
04/22/2021
Amended
Add new waitlist project
2026-2029 Transportation Improvement Program (Approved TIP)
St Vrain Trail Extension: CO66 from McConnell to US36
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Congressional Allocation)
$0
$0
$0
$0
Federal (STBG-Pandemic DRCOG Region)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$966,000
$0
$0
$966,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
06/26/2024
Amended
Add $800,000 in federal Congressional Allocation funding. Total project cost increases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/22/2021
Amended
Add new waitlist project
2026-2029 Transportation Improvement Program (Approved TIP)
Wadsworth Operational Improvements: Vassar to Woodard
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality)
$0
$0
$0
$0
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
Federal (Transportation Alternatives-DRCOG)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$8,644,000
$0
$0
$8,644,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
05/16/2023
Amended
Swap $1,920,000 in federal CRP for $1,920,000 in federal CMAQ funding. No change to total project cost.
03/16/2023
Amended
Add $2,004,000 in federal TAP funding and $501,000 in local match transferred from Region 1 TAP Pool, and adjust scope. Total project cost increases.
09/22/2022
Amended
Add new scope from 2022-2025 Subregional Share Call for Projects.
Additional project amendment details can be found under this project in the TRIPS database.
2026-2029 Transportation Improvement Program (Approved TIP)
Region 1 Revitalizing Main Streets Pool
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
State (Legislative)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$5,101,000
$0
$0
$5,101,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
10/17/2024
Amended
Add $250,000 in state Legislative funding and add one pool project. Total project cost increases.
05/16/2024
Amended
Add one pool project and $250,000 of state Legislative funding. Total project cost increases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
03/16/2023
Amended
Remove one pool project and $1,360,000 in state Legislative funding. Project is transferred to 2016-020. Total project cost decreases.
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
2026-2029 Transportation Improvement Program (Approved TIP)
CO7/95th Intersection Improvements
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Faster Safety)
$0
$0
$0
$0
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
State (Faster Safety)
$0
$0
$0
$0
State (House Bill 1466 - MMOF)
$0
$0
$0
$0
State (Legislative-Transit)
$0
$0
$0
$0
State (MMOF)
$0
$0
$0
$0
Local
$450,000
$95,000
$0
$0
Total
$450,000
$95,000
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$26,586,000
$545,000
$0
$27,131,000
Amendment History
Date
Status
Description
07/16/2025
Amended
Swap $500,000 in state MMOF funds for $500,000 in House Bill 1466 - MMOF funds, in prior years. Total project cost remains the same.
05/22/2025
Amended
Add $355,000 in state FASTER Safety funding in 2026. Total project cost increases.
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
12/20/2024
Amended
Add $200,000 in state FASTER-Safety funding. Total project cost increases.
10/17/2024
Amended
Remove $300,000 in state Legislative-Transit funding transferred to Project 2022-061. Total project cost decreases.
Additional project amendment details can be found under this project in the TRIPS database.
2026-2029 Transportation Improvement Program (Approved TIP)
I70 Floyd Hill Improvements: JC65 to Genesee Park
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
State (Legislative)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$17,300,000
$0
$0
$17,300,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
07/21/2022
Amended
Add parking at El Rancho to project scope. Increase Legislative funding by $6,300,000. Total project cost increases.
02/17/2022
Amended
Add new project.
2026-2029 Transportation Improvement Program (Approved TIP)
I25/Happy Canyon Interchange - Precon
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$762,000
$0
$0
$0
Local
$191,000
$0
$0
$0
Total
$953,000
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$4,609,000
$953,000
$0
$5,562,000
Amendment History
Date
Status
Description
07/16/2025
Amended
Add $762,000 federal Surface Transportation Block Grant funding from the Douglas Subregional Wait List and moving a portion of local match from 2025 to 2026. Total project cost increases.
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
09/21/2023
Amended
Correct funding amounts to include previously awarded FY24 funds (additional $200,000 in federal Surface Transportation Block Grant and $200,000 in local match). Total project cost increases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
03/17/2022
Amended
Add new project as part of Spring 2022 Wait List Process.
2026-2029 Transportation Improvement Program (Approved TIP)
Enhanced Mobility of Seniors and Individuals with Disabilities (FTA 5310 - DRCOG)
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Section 5310)
$2,900,000
$2,900,000
$2,900,000
$2,900,000
Local
$450,000
$450,000
$450,000
$450,000
Total
$3,350,000
$3,350,000
$3,350,000
$3,350,000
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$8,939,000
$13,400,000
$0
$22,339,000
Amendment History
Date
Status
Description
05/22/2025
Amended
Remove seven completed projects, add nine new awarded projects, and correct prior funding and match. Total project cost increases.
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
05/16/2024
Amended
Remove completed prior awards, add 11 newly awarded projects and required local match, and update annual allotment based on new projections. Total project cost decreases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/24/2023
Amended
Add 14 new pool projects from recent FY 24 Call for Projects and correct prior funding amounts. Total project cost increases.
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name
Description
Notes
Cost
DRCOG
Program Administration (FY24)
$293,000
Douglas County
Mobility Management (FY24)
Funded also with HST
$301,000
A Little Help
Mobility Management (Fiscal Year 2025)
$20,000
Denver Regional Mobility and Access Council
Mobility Management (Fiscal Year 2025)
$297,000
Douglas County
Mobility Management (Fiscal Year 2025)
Funded also with Human Services Transportation Set-Aside
$250,000
DRCOG
Mobility Management (Fiscal Year 2025)
$516,000
Easter Seals
1 Replacement Vehicle (Fiscal Year 2025)
$94,000
Lakewood
Operating (Fiscal Year 2025)
$70,000
Laradon Hall Society
Operating (Fiscal Year 2025)
$140,000
Laradon Hall Society
1 Vehicle Replacement (Fiscal Year 2025)
$102,000
Support Management
1 Vehicle Replacement (Fiscal Year 2025)
$144,000
Via
Operating (Fiscal Year 2025)
Funded also with Human Services Transportation Set-Aside
$945,000
Via
Mobility Management (Fiscal Year 2025)
$479,000
A Little Help
Mobility Management (Fiscal year 2025)
$21,000
AbleLight
Capital Replace 2 Vehicles (Fiscal year 2025)
Funded also with Human Services Transportation Set-Aside
$64,000
Lakewood
Operating (Fiscal year 2025)
$85,000
DRCOG
Mobility Management (Fiscal year 2025)
Funded also with Human Services Transportation Set-Aside
$500,000
Denver Regional Mobility and Access Council
Mobility Management (Fiscal year 2025)
Funded also with Human Services Transportation Set-Aside
$297,000
Douglas County
Mobility Management (Fiscal year 2025)
Funded also with Human Services Transportation Set-Aside
$271,000
Laradon Hall Society
Operating (Fiscal year 2025)
$180,000
Laradon Hall Society
Capital 2 Replacement EVs (Fiscal year 2025)
$140,000
Via
Operating (Fiscal year 2025)
Funded also with Human Services Transportation Set-Aside
$822,000
Via
Mobility Management (Fiscal year 2025)
$493,000
DRCOG
Program Administration (Fiscal year 2025)
$259,000
2026-2029 Transportation Improvement Program (Approved TIP)
Washington St Improvements: 47th to 52nd
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (RAISE)
$7,631,000
$0
$0
$0
Local
$15,344,000
$0
$0
$0
Total
$22,975,000
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$13,820,000
$22,975,000
$0
$36,795,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
07/21/2022
Amended
Create new project for RAISE Grant award.
2026-2029 Transportation Improvement Program (Approved TIP)
Region 1 Congressionally Directed Funding Pool
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Congressional Allocation)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$8,136,000
$0
$0
$8,136,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
07/22/2024
Amended
Add three pool projects and $5,362,000 in federal Congressional Allocation funds. Total project cost increases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
05/16/2023
Amended
Add two pool projects and $3,400,000 in federal Congressional funding. Total project cost increases.
09/08/2022
Amended
Create new pool for congressionally directed funding in CDOT Region 1.
Project Pools
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name
Description
Notes
Cost
Golden
SH-93 Design
$2,320,000
Commerce City
Chambers Avenue Widening
$4,116,000
Golden
Compactor/Roller Purchase
$850,000
Thornton
Quebec Street Widening
$850,000
2026-2029 Transportation Improvement Program (Approved TIP)
I25 Chain Down Station: Larkspur
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Freight)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$5,000,000
$0
$0
$5,000,000
Amendment History
Date
Status
Description
05/27/2025
Amended
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
11/17/2022
Amended
Add $2,000,000 in federal Freight funding. Total project cost increases.
09/08/2022
Amended
Create new project for chain station on I-25.
2026-2029 Transportation Improvement Program (Approved TIP)
East Colfax Bus Rapid Transit: Civic Center Station to Yosemite
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Capital Investment Grant)
$0
$0
$0
$0
Federal (Carbon Reduction Program)
$0
$0
$0
$0
Federal (Congestion Mitigation / Air Quality)
$0
$0
$0
$0
Federal (Surface Transportation Block Grant)
$2,685,000
$0
$0
$0
Local
$2,305,000
$0
$0
$0
Total
$4,990,000
$0
$0
$0
Project Phase to Initiate
CM/GC Construction
None
None
None
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$275,489,000
$4,990,000
$0
$280,479,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
09/19/2024
Amended
Add $23,111,000 in federal Capital Investment Grant funds. Total project cost increases.
05/16/2024
Amended
Add $126,889,000 in federal Capital Investment Grant funds and local match. Total project cost increases.
12/19/2023
Amended
Swap $13,249,000 in federal Multimodal Transportation and Mitigation Options Fund - American Rescue Plan Act funds for $10,988,000 in federal Congestion Mitigation/Air Quality funds and $2,261,000 in federal Surface Transportation Block Grant funds. Total project cost remains the same.
08/17/2023
Amended
Proposed for adoption into 2024-2027, add funds from 2024-2027 Subregional Share Call for Projects.
Additional project amendment details can be found under this project in the TRIPS database.
2026-2029 Transportation Improvement Program (Approved TIP)
Lone Tree Mobility Hub at Sky Ridge Station
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality)
$0
$0
$0
$0
State (House Bill 1466 - MMOF)
$0
$0
$0
$0
State (Legislative-Transit)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$26,600,000
$0
$0
$26,600,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
01/29/2025
Amended
Add $2,100,000 in state Legislative-Transit funding transferred from Project 2020-100. Total project cost increases.
09/19/2024
Amended
Shift $3,339,000 from Multimodal Transportation and Mitigation Options Fund - American Rescue Plan Act funds to House Bill 1466 General Funds. Add $4,500,000 in state Legislative funding. Total project cost increases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
11/17/2022
Amended
Increase state Legislative-Transit funding by $10,000,000 to capture funds previously included in Region 1 Mobility Hub pool (TIP ID# 2020-100). Total project cost increases.
Additional project amendment details can be found under this project in the TRIPS database.
2026-2029 Transportation Improvement Program (Approved TIP)
Mineral Station Area Multimodal Improvements
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Carbon Reduction Program)
$0
$0
$0
$0
State (MMOF)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$2,395,000
$0
$0
$2,395,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/22/2022
Amended
Add new project from 2022-2025 Regional Share Call for Projects.
2026-2029 Transportation Improvement Program (Approved TIP)
Buchtel Complete Street/Evans Intersection Improvements: University to Colorado
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality)
$0
$0
$0
$0
State (MMOF)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$24,240,000
$0
$0
$24,240,000
Amendment History
Date
Status
Description
07/22/2025
Proposed
Swap $4,825,000 in MMOF funding for the same amount of House Bill 1466 funding in 2024. Shift $1,888,000 CMAQ from 2024 to 2025 to maintain funding levels in each year. Total project cost remains the same.
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2026-2029 Transportation Improvement Program (Approved TIP)
Bike/Ped Bridge over Santa Fe: Jewell to Evans Station
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality)
$0
$0
$0
$0
State (MMOF)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$15,002,000
$0
$0
$15,002,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2026-2029 Transportation Improvement Program (Approved TIP)
South Platte River Trail Improvements: Mississippi to Dartmouth - Precon
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality)
$0
$0
$0
$0
State (MMOF)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$5,000,000
$0
$0
$5,000,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2026-2029 Transportation Improvement Program (Approved TIP)
Airport Creek Trail Underpass at BNSF
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality)
$0
$0
$0
$0
State (MMOF)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$5,063,000
$0
$0
$5,063,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2026-2029 Transportation Improvement Program (Approved TIP)
Jefferson County Bicycle Plan Implementation
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Carbon Reduction Program)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$627,000
$0
$0
$627,000
Amendment History
Date
Status
Description
07/16/2025
Amended
Remove $624,000 of state Multimodal Transportation and Mitigation Options Funds at the request of the sponsor. Remaining funds include $501,000 in federal Carbon Reduction Program funds and $126,000 local match. Total project cost decreases.
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2026-2029 Transportation Improvement Program (Approved TIP)
Wadsworth Shared-Use Path: 32nd to 35th
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality)
$0
$0
$0
$0
State (MMOF)
$0
$0
$0
$0
State (Regional Priority Projects)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$7,500,000
$0
$0
$7,500,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/24/2023
Amended
Replace $700,000 in Safety funding with $700,000 in RPP funding. Total project cost remains the same.
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2026-2029 Transportation Improvement Program (Approved TIP)
Ward Station Multimodal Access Improvements
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality)
$0
$0
$0
$0
State (House Bill 1466 - MMOF)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$9,650,000
$0
$0
$9,650,000
Amendment History
Date
Status
Description
07/22/2025
Proposed
Swap MMOF for CMAQ. Shift funding to 2026. Add additional local match. Total project cost increases.
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
09/19/2024
Amended
Shift $4,825,000 from Multimodal Transportation and Mitigation Options Fund - American Rescue Plan Act funds to House Bill 1466 General Funds. Total project cost remains the same.
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2026-2029 Transportation Improvement Program (Approved TIP)
Smith Rd Multimodal Improvements: Peoria to Powhaton - Precon
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Carbon Reduction Program)
$0
$0
$0
$0
State (House Bill 1466 - MMOF)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$5,000,000
$0
$0
$5,000,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
09/19/2024
Amended
Shift $1,250,000 in Fiscal Year 2024 and $1,250,000 in prior years funding from Multimodal Transportation and Mitigation Options Fund - American Rescue Plan Act funds to House Bill 1466 General Funds. Total project cost remains the same.
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2026-2029 Transportation Improvement Program (Approved TIP)
Aurora Multimodal Access Improvements
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Carbon Reduction Program)
$0
$0
$0
$0
State (MMOF)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$6,640,000
$0
$0
$6,640,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2026-2029 Transportation Improvement Program (Approved TIP)
Bennett Kiowa Creek Trail
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality)
$0
$0
$0
$0
Federal (Transportation Alternatives-DRCOG)
$0
$0
$0
$0
State (MMOF)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$5,871,000
$0
$0
$5,871,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2026-2029 Transportation Improvement Program (Approved TIP)
64th Corridor Study: CO2 to Quebec
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Carbon Reduction Program)
$0
$0
$0
$0
State (House Bill 1466 - MMOF)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$250,000
$0
$0
$250,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
09/19/2024
Amended
Shift $62,000 in Fiscal Year 2024 and $62,000 in prior years funding from Multimodal Transportation and Mitigation Options Fund - American Rescue Plan Act funds to House Bill 1466 General Funds. Total project cost remains the same.
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2026-2029 Transportation Improvement Program (Approved TIP)
88th Ave Multimodal Improvements: I76 to CO2
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Transportation Alternatives-DRCOG)
$0
$0
$0
$0
State (MMOF)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$0
$0
$0
$0
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
05/16/2024
Amended
Zero out funding to combine with Project# 2020-032. Total project cost decreases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2026-2029 Transportation Improvement Program (Approved TIP)
Thornton Multimodal Trail Study and Precon
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality)
$0
$0
$0
$0
Federal (STBG-Pandemic DRCOG Region)
$0
$0
$0
$0
State (House Bill 1466 - MMOF)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$1,710,000
$0
$0
$1,710,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
09/19/2024
Amended
Shift $655,000 in Fiscal Year 2024 and $200,000 in prior years funding from Multimodal Transportation and Mitigation Options Fund - American Rescue Plan Act funds to House Bill 1466 General Funds. Total project cost remains the same.
08/17/2023
Amended
Proposed for adoption into 2024-2027
12/21/2022
Amended
Swap $385,000 in CMAQ for $385,000 in STBG-PDR. Total project cost remains the same.
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2026-2029 Transportation Improvement Program (Approved TIP)
100th Ave Multi-Use Path: Riverdale to Forest Circle
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Transportation Alternatives-DRCOG)
$0
$0
$0
$0
State (MMOF)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$946,000
$0
$0
$946,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2026-2029 Transportation Improvement Program (Approved TIP)
Thornton Protected Bike Facility Study
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Carbon Reduction Program)
$0
$0
$0
$0
Federal (MMOF - ARPA - DRCOG)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$510,000
$0
$0
$510,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2026-2029 Transportation Improvement Program (Approved TIP)
High Line Canal Trail Underpass at Broadway - Precon
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$1,342,000
$1,341,000
$0
$0
Federal (Transportation Alternatives-DRCOG)
$0
$0
$0
$0
State (MMOF)
$0
$0
$0
$0
Local
$336,000
$335,000
$0
$0
Total
$1,678,000
$1,676,000
$0
$0
Project Phase to Initiate
Design
ROW
None
None
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$1,800,000
$3,354,000
$0
$5,154,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2026-2029 Transportation Improvement Program (Approved TIP)
Arapahoe County Transit and Micromobility Study
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
State (MMOF)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$537,000
$0
$0
$537,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
12/19/2023
Amended
Swap federal Carbon Reduction Program funds for federal Surface Transportation Block Grant funds. Total project cost remains the same.
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2026-2029 Transportation Improvement Program (Approved TIP)
Aurora Multimodal Transportation Master Plan
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
State (MMOF)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$3,225,000
$0
$0
$3,225,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
12/19/2023
Amended
Swap federal Carbon Reduction Program funds for federal Surface Transportation Block Grant funds. Total project cost remains the same.
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2026-2029 Transportation Improvement Program (Approved TIP)
Lone Tree Creek Trail Underpass of Arapahoe
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality)
$0
$0
$0
$0
State (House Bill 1466 - MMOF)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$4,312,000
$0
$0
$4,312,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
09/19/2024
Amended
Shift $2,156,000 from Multimodal Transportation and Mitigation Options Fund - American Rescue Plan Act funds to House Bill 1466 General Funds. Total project cost remains the same.
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2026-2029 Transportation Improvement Program (Approved TIP)
Arapahoe Sidepath Improvements: I25 to Parker Rd
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality)
$0
$0
$0
$0
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
State (MMOF)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$6,818,000
$0
$0
$6,818,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
11/21/2024
Amended
Add $2,000,000 in federal Surface Transportation Block Grant funds returned from Project 2020-059 and reallocated by the Arapahoe County Subregional Forum. Total project cost increases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2026-2029 Transportation Improvement Program (Approved TIP)
Hampden Complete Streets: Broadway to Lafayette
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Transportation Alternatives-DRCOG)
$0
$0
$0
$0
State (House Bill 1466 - MMOF)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$9,125,000
$0
$0
$9,125,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
09/19/2024
Amended
Shift $3,285,000 in Fiscal Year 2024 and $1,140,000 in prior years funding from Multimodal Transportation and Mitigation Options Fund - American Rescue Plan Act funds to House Bill 1466 General Funds. Total project cost remains the same.
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2026-2029 Transportation Improvement Program (Approved TIP)
Broadway Complete Streets Improvements: Hampden to Belleview
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (MMOF - ARPA - DRCOG)
$0
$0
$0
$0
Federal (Transportation Alternatives-DRCOG)
$0
$0
$0
$0
State (House Bill 1466 - MMOF)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$7,540,000
$0
$0
$7,540,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
09/19/2024
Amended
Shift $2,450,000 in Fiscal Year 2024 and $1,050,000 in prior years funding from Multimodal Transportation and Mitigation Options Fund - American Rescue Plan Act funds to House Bill 1466 General Funds. Total project cost remains the same.
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2026-2029 Transportation Improvement Program (Approved TIP)
30th Street Complete Streets: CO119 to CO7
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (MMOF - ARPA - DRCOG)
$0
$0
$0
$0
Federal (Transportation Alternatives-DRCOG)
$0
$0
$0
$0
State (10 Year Plan-Mobility Funds)
$300,000
$0
$0
$0
State (House Bill 1466 - MMOF)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$300,000
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$1,000,000
$300,000
$0
$1,300,000
Amendment History
Date
Status
Description
08/20/2025
Amended
Adopted into the 2026-2029 TIP. Swap $300,000 of state Legislative funds in prior years for $300,000 in state 10 Year Plan-Mobility Funds in 2026. Total project cost remains the same.
10/17/2024
Amended
Add $300,000 in state Legislative funding transferred from Project 2022-018. Total project cost increases.
09/19/2024
Amended
Shift $200,000 from Multimodal Transportation and Mitigation Options Fund - American Rescue Plan Act funds to House Bill 1466 General Funds. Total project cost remains the same.
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2026-2029 Transportation Improvement Program (Approved TIP)
Baseline Multimodal Improvements: 30th to Foothills
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Carbon Reduction Program)
$0
$0
$0
$0
State (MMOF)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$3,066,000
$0
$0
$3,066,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2026-2029 Transportation Improvement Program (Approved TIP)
CO93/Table Mesa and Regent Intersection Improvements
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality)
$0
$0
$0
$0
State (Legislative)
$0
$0
$0
$0
State (MMOF)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$4,600,000
$0
$0
$4,600,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
02/16/2023
Amended
Replace $1,500,000 in RPP funding with $1,500,000 in Legislative funding per CDOT R4.
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2026-2029 Transportation Improvement Program (Approved TIP)
Longmont Main/21st Bike/Ped Improvements - Precon
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality)
$0
$0
$0
$0
State (MMOF)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$805,000
$0
$0
$805,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2026-2029 Transportation Improvement Program (Approved TIP)
I25/Castle Pines Pkwy Bike/Ped Overpass
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality)
$74,000
$0
$0
$0
Federal (MMOF - ARPA - DRCOG)
$250,000
$0
$0
$0
Local
$176,000
$0
$0
$0
Total
$500,000
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$0
$500,000
$0
$500,000
Amendment History
Date
Status
Description
07/16/2025
Amended
Remove $500,000 in House Bill 1466 MMOF and $276,000 Congestion Mitigation/Air Quality funds at request of the sponsor. Total project cost decreases.
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
11/21/2024
Amended
Adjust scope per Douglas County Subregional Forum action. No change to overall project cost.
09/19/2024
Amended
Shift $500,000 from Multimodal Transportation and Mitigation Options Fund - American Rescue Plan Act funds to House Bill 1466 General Funds. Total project cost remains the same.
08/17/2023
Amended
Proposed for adoption into 2024-2027
Additional project amendment details can be found under this project in the TRIPS database.
2026-2029 Transportation Improvement Program (Approved TIP)
Castle Rock Industrial Tributary Trail: Plum Creek to Plum Creek Trail
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality)
$0
$0
$0
$0
State (MMOF)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$9,165,000
$0
$0
$9,165,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2026-2029 Transportation Improvement Program (Approved TIP)
Douglas County Transit & Multimodal Feasibility Study
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Carbon Reduction Program)
$0
$0
$0
$0
Federal (MMOF - ARPA - DRCOG)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$600,000
$0
$0
$600,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2026-2029 Transportation Improvement Program (Approved TIP)
County Line Shared Use Path: Broadway to High Line Canal Trail
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Transportation Alternatives-DRCOG)
$0
$0
$0
$0
State (MMOF)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$3,330,000
$0
$0
$3,330,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2026-2029 Transportation Improvement Program (Approved TIP)
S Havana Bikeway: RidgeGate Station to Lone Tree City Limits
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality)
$0
$0
$0
$0
State (MMOF)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$1,600,000
$0
$0
$1,600,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
05/16/2023
Amended
Swap $300,000 in federal CRP funding for $300,000 in federal CMAQ funding. No change in total project cost.
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2026-2029 Transportation Improvement Program (Approved TIP)
Parker Rd Multi-Use Path East Side Gaps: Pine to Stroh
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Carbon Reduction Program)
$0
$0
$0
$0
State (MMOF)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$5,000,000
$0
$0
$5,000,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2026-2029 Transportation Improvement Program (Approved TIP)
32nd/I-70 Bike Lanes: Wright to Zinnia
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality)
$0
$0
$0
$0
State (House Bill 1466 - MMOF)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$1,000,000
$0
$0
$1,000,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
09/19/2024
Amended
Shift $500,000 from Multimodal Transportation and Mitigation Options Fund - American Rescue Plan Act funds to House Bill 1466 General Funds. Total project cost remains the same.
08/17/2023
Amended
Proposed for adoption into 2024-2027
09/22/2022
Amended
Add new project from 2022-2025 Subregional Share Call for Projects.
2026-2029 Transportation Improvement Program (Approved TIP)
Colorado Boulevard Bus Rapid Transit - Precon
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
State (Legislative)
$7,000,000
$5,000,000
$0
$0
State (Legislative-Transit)
$5,000,000
$5,000,000
$0
$0
Local
$0
$0
$0
$0
Total
$12,000,000
$10,000,000
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$31,651,000
$22,000,000
$0
$53,651,000
Amendment History
Date
Status
Description
06/18/2025
Amended
Add $2,000,000 in state Legislative funding transferred from 2020-087. Total project cost increases.
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
10/18/2023
Amended
Add one pool project, transfer $13,349,000 in state Legislative funding and $10,000,000 in state Legislative-Transit funding to TIP ID# 2024-008. Total project cost decreases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
11/17/2022
Amended
Create new pool for design and preconstruction activities for arterial BRT in CDOT R1.
2026-2029 Transportation Improvement Program (Approved TIP)
I25/Speer and 23rd Interchange Reconstructions
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
State (FASTER Bridge and Tunnel Enterprise)
$0
$8,000,000
$30,000,000
$22,000,000
State (Legislative)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$8,000,000
$30,000,000
$22,000,000
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$5,000,000
$60,000,000
$0
$65,000,000
Amendment History
Date
Status
Description
06/18/2025
Amended
Remove $10,000,000 in state Legislative funding from prior years. This funding to be reallocated to Floyd Hill. Move $22,000,000 in future state Bridge and Tunnel Enterprise funding into 2029. Total project cost decreases.
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
11/17/2022
Amended
Add new project for I-25 and Speer/23rd interchange reconstruction.
2026-2029 Transportation Improvement Program (Approved TIP)
I25 Improvements: US36 to 104th - Precon
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
State (Legislative)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$20,000,000
$0
$0
$20,000,000
Amendment History
Date
Status
Description
05/22/2025
Amended
Update project name and scope to reflect revised limits. Total project cost remains the same.
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
11/17/2022
Amended
Add new project for operational and safety improvements to I-25 between 84th Ave. and 104th Ave.
2026-2029 Transportation Improvement Program (Approved TIP)
Region 4 Revitalizing Main Streets Pool
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
State (Legislative)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$278,000
$0
$0
$278,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
02/22/2024
Amended
Add one pool project, $250,000 in state Legislative funding, and $28,000 in local match. Total project cost increases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
11/17/2022
Amended
Add new pool for Revitalizing Main Streets projects in CDOT R4.
Project Pools
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name
Description
Notes
Cost
Mead
Town of Mead Regional Trail Extension
Prior funding in TIP ID# 2007-144
$250,000
2026-2029 Transportation Improvement Program (Approved TIP)
Central Corridor Rail Replacement: I25/Broadway Station to 30th/Downing Station
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Congressional Allocation-Transit)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$5,063,000
$0
$0
$5,063,000
Amendment History
Date
Status
Description
05/22/2025
Amended
Imported from 2026-2029
06/26/2024
Amended
Add $850,000 in federal Congressional Allocation funding. Total project cost increases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
02/16/2023
Amended
Add new project with $4,000,000 of (unmatched) FY 2023 Appropriations Act for Community Projects funding.
2026-2029 Transportation Improvement Program (Approved TIP)
Add three new pool projects and correct FY2025 funding amount to $7,000,000. Overall project cost decreases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
02/16/2023
Amended
Create new pool for improvements related to Vision Zero in CDOT R1.
Project Pools
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name
Description
Notes
Cost
Sheridan Blvd Multimodal Improvements
17th to 26th
$6,000,000
S Federal Median/Signal Project
Belleview to Hampden
$6,000,000
Bike/Ped Safety Project
5 Locations in Aurora and Bennett
$3,000,000
2026-2029 Transportation Improvement Program (Approved TIP)
I25 Segment 5: CO66 to WCR38
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Congressional Allocation)
$0
$0
$0
$0
Federal (Faster Safety)
$0
$0
$0
$0
Federal (TIFIA)
$0
$0
$0
$0
State (Faster Safety)
$1,605,000
$0
$0
$0
State (Legislative)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$1,605,000
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$210,740,000
$1,605,000
$0
$212,345,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
01/29/2025
Amended
Add $50,000 local match funding. Total project cost increases.
11/21/2024
Amended
Add scope and funding for High Plains Boulevard from 2024-090. Total project cost increases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
05/16/2023
Amended
Add $11,000,000 in state Legislative funding and $185,282,000 in federal TIFIA loans. Total project cost increases.
Additional project amendment details can be found under this project in the TRIPS database.
2026-2029 Transportation Improvement Program (Approved TIP)
U85/168th Intersection Improvements
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
State (10 Year Plan-Capital Funds)
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$300,000
$0
$0
$300,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
04/18/2024
Amended
Add $300,000 in state 10-Year Capital Plan funds. Total project cost increases.
08/17/2023
Amended
Proposed for adoption into 2024-2027
03/16/2023
Amended
Add new project with 10C funding.
2026-2029 Transportation Improvement Program (Approved TIP)
Arapahoe Ave Multimodal Improvements: 28th to Foothills - Precon
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality)
$0
$0
$0
$0
State (10 Year Plan-Mobility Funds)
$0
$0
$0
$0
State (Legislative)
$0
$0
$0
$0
State (MMOF)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$2,967,000
$0
$0
$2,967,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
12/20/2024
Amended
Switch $281,000 from state Legislative funding to state 10 Year Plan - Mobility funds. Total project cost remains the same.
08/17/2023
Amended
Proposed for adoption into 2024-2027
04/24/2023
Amended
Create new project split from TIP# 2020-007 for improvements within City of Boulder.
2026-2029 Transportation Improvement Program (Approved TIP)
Mineral Multimodal Improvements: Santa Fe to Jackass Hill/Long Ave
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$2,611,000
$0
$0
$2,611,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Proposed for adoption into 2024-2027
05/16/2023
Amended
Transfer $2,089,000 in Surface Transportation Block Grant funding from TIP ID# 2012-010 for their Second Commitment in Principal amount to be applied toward multimodal access improvements to Mineral Station.
2026-2029 Transportation Improvement Program (Approved TIP)
Peoria St Bridge Replacement: Over Sand Creek - Precon
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$3,000,000
$0
$0
$3,000,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Add new project from 2024-2027 Regional Share Call for Projects.
2026-2029 Transportation Improvement Program (Approved TIP)
DRCOG Transportation Corridor Planning Set Aside
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$1,500,000
$0
$0
$0
Local
$0
$0
$0
$0
Total
$1,500,000
$0
$0
$0
Project Phase to Initiate
Study
None
None
None
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$250,000
$1,500,000
$0
$1,750,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
05/16/2024
Amended
Transfer all funding into 2024 and 2026. Total project cost remains the same.
10/18/2023
Amended
Remove $1,250,000 to program to individual corridor planning projects. Total project cost decreases.
08/17/2023
Amended
Adopt into the 24-27 TIP.
2026-2029 Transportation Improvement Program (Approved TIP)
DRCOG Community Mobility Planning Set-Aside - Community-Based Transportation Plans
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$1,250,000
$0
$0
$0
Local
$0
$0
$0
$0
Total
$1,250,000
$0
$0
$0
Project Phase to Initiate
Study
None
None
None
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$50,000
$1,250,000
$0
$1,300,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
05/16/2024
Amended
Transfer all funding into 2024 and 2026. Total project cost remains the same.
04/18/2024
Amended
Remove $1,200,000 to program to individual community-based transportation planning projects. Total project cost decreases.
08/17/2023
Amended
Amended into the 24-27 TIP
2026-2029 Transportation Improvement Program (Approved TIP)
DRCOG Community Mobility Planning Set-Aside - Livable Centers Small-Area Planning
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$1,250,000
$0
$0
$0
Local
$0
$0
$0
$0
Total
$1,250,000
$0
$0
$0
Project Phase to Initiate
Study
None
None
None
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$110,000
$1,250,000
$0
$1,360,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
12/20/2024
Amended
Remove $1,140,000 awarded to individual projects. Total project cost decreases.
05/16/2024
Amended
Shift all funding into 2024 and 2026. Total project cost remains the same.
08/17/2023
Amended
Amend into the 24-27 TIP.
2026-2029 Transportation Improvement Program (Approved TIP)
DRCOG Innovative Mobility Set Aside
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$2,000,000
$0
$0
$0
Local
$0
$0
$0
$0
Total
$2,000,000
$0
$0
$0
Project Phase to Initiate
Other Phase
None
None
None
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$550,000
$2,000,000
$0
$2,550,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
12/20/2024
Amended
Reduce funding by $1,450,000, distributed to newly awarded set-aside projects. Total project cost decreases.
05/16/2024
Amended
Shift all funding into 2024 and 2026. Total project cost remains the same.
08/17/2023
Amended
Adopted into the 24-27 TIP.
2026-2029 Transportation Improvement Program (Approved TIP)
CO7 Transit Service: Boulder to Brighton
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality)
$2,561,000
$4,303,000
$0
$0
Federal (Congestion Mitigation/Air Quality - CDOT)
$375,000
$375,000
$0
$0
Local
$586,000
$1,014,000
$0
$0
Local (RTD Funds Only)
$50,000
$0
$0
$0
Total
$3,572,000
$5,692,000
$0
$0
Project Phase to Initiate
Bus Service
Bus Service
None
None
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$0
$9,264,000
$0
$9,264,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
12/19/2024
Amended
Switch state Legislative-Transit and Regional Priority Project funding for state-allocated federal Congestion Mitigation/Air Quality funds. Total project cost remains the same.
08/17/2023
Amended
Add new project from 2024-2027 Regional and Subregional Shares Calls for Projects.
2026-2029 Transportation Improvement Program (Approved TIP)
Federal Blvd Bus Rapid Transit: Englewood Station to Wagon Road Park-n-Ride - Precon
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Carbon Reduction Program)
$0
$0
$0
$0
Federal (Surface Transportation Block Grant)
$10,476,000
$4,017,000
$0
$0
State (House Bill 1466 - MMOF)
$0
$0
$0
$0
State (Legislative)
$2,000,000
$2,000,000
$0
$0
State (Legislative-Transit)
$5,453,000
$8,133,000
$0
$0
Local
$2,240,000
$0
$0
$0
Local (RTD Funds Only)
$0
$0
$0
$0
Total
$20,169,000
$14,150,000
$0
$0
Project Phase to Initiate
Design
ROW
None
None
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$32,753,000
$34,319,000
$0
$67,072,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
09/19/2024
Amended
Shift $439,000 from Multimodal Transportation and Mitigation Options Fund - American Rescue Plan Act funds to House Bill 1466 General Funds. Total project cost remains the same.
02/22/2024
Amended
Add $340,000 in federal Carbon Reduction Program funds and $439,000 in federal Multimodal Transportation and Mitigation Options Fund - American Rescue Plan Act fund transferred from TIP ID# 2022-053. Total project cost increases.
10/18/2023
Amended
Add $13,349,000 in state Legislative funding and $10,000,000 in state Legislative-Transit funding transferred from TIP ID# 2022-074. Total project cost increases.
08/17/2023
Amended
Add new project from 2024-2027 Regional and Subregional Shares Calls for Projects.
2026-2029 Transportation Improvement Program (Approved TIP)
South Platte River Trail Improvements: Bayaud to Phil Milstein Park
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Carbon Reduction Program)
$4,250,000
$4,250,000
$0
$0
State (Regional Priority Projects)
$500,000
$500,000
$0
$0
Local
$1,050,000
$1,050,000
$0
$0
Total
$5,800,000
$5,800,000
$0
$0
Project Phase to Initiate
Construction
Construction
None
None
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$0
$11,600,000
$0
$11,600,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Add new project from 2024-2027 Regional Share Call for Projects.
2026-2029 Transportation Improvement Program (Approved TIP)
SW Weld County Transit First and Last Mile Study
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
State (MMOF)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$167,000
$0
$0
$167,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
12/19/2023
Amended
Swap federal Carbon Reduction Program funds for federal Surface Transportation Block Grant funds. Total project cost remains the same.
08/17/2023
Amended
Add new project from 2024-2027 Regional Share Call for Projects.
2026-2029 Transportation Improvement Program (Approved TIP)
Adams County Comprehensive Safety Action Plan
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$400,000
$0
$0
$0
Local
$100,000
$0
$0
$0
Total
$500,000
$0
$0
$0
Project Phase to Initiate
Study
None
None
None
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$1,500,000
$500,000
$0
$2,000,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Add new project from 2024-2027 Subregional Share Call for Projects.
2026-2029 Transportation Improvement Program (Approved TIP)
High Line Canal Trail Underpass at Colfax
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality)
$2,600,000
$4,800,000
$0
$0
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
Federal (Transportation Alternatives-DRCOG)
$200,000
$0
$0
$0
Local
$700,000
$1,200,000
$0
$0
Total
$3,500,000
$6,000,000
$0
$0
Project Phase to Initiate
ROW
Construction
None
None
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$2,500,000
$9,500,000
$0
$12,000,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Add new project from 2024-2027 Subregional Share Call for Projects.
2026-2029 Transportation Improvement Program (Approved TIP)
McKay Operational Improvements: 104th to 96th - Precon
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$200,000
$0
$0
$0
Local
$200,000
$0
$0
$0
Total
$400,000
$0
$0
$0
Project Phase to Initiate
Environmental
None
None
None
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$1,600,000
$400,000
$0
$2,000,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Add new project from 2024-2027 Subregional Share Call for Projects.
2026-2029 Transportation Improvement Program (Approved TIP)
124th Multimodal Improvements: Claude to Colorado
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality)
$44,000
$1,844,000
$0
$0
State (MMOF)
$54,000
$2,304,000
$0
$0
Local
$11,000
$461,000
$0
$0
Total
$109,000
$4,609,000
$0
$0
Project Phase to Initiate
ROW
Construction
None
None
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$1,609,000
$4,718,000
$0
$6,327,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Add new project from 2024-2027 Subregional Share Call for Projects.
2026-2029 Transportation Improvement Program (Approved TIP)
Big Dry Creek Trail: 136th to 144th
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Carbon Reduction Program)
$1,125,000
$1,125,000
$0
$0
State (MMOF)
$1,375,000
$1,375,000
$0
$0
Local
$250,000
$250,000
$0
$0
Total
$2,750,000
$2,750,000
$0
$0
Project Phase to Initiate
Construction
Construction
None
None
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$500,000
$5,500,000
$0
$6,000,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Add new project from 2024-2027 Subregional Share Call for Projects.
2026-2029 Transportation Improvement Program (Approved TIP)
Colorado Blvd Separated Bike Facility: 88th to E470 - Precon
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Transportation Alternatives-DRCOG)
$0
$821,000
$0
$0
State (MMOF)
$0
$1,026,000
$0
$0
Local
$0
$206,000
$0
$0
Total
$0
$2,053,000
$0
$0
Project Phase to Initiate
None
Design
None
None
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$0
$2,053,000
$0
$2,053,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Add new project from 2024-2027 Subregional Share Call for Projects.
2026-2029 Transportation Improvement Program (Approved TIP)
Thornton Pkwy Multiuse Path: I25 to Grant
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality)
$160,000
$636,000
$0
$0
State (MMOF)
$200,000
$796,000
$0
$0
Local
$40,000
$160,000
$0
$0
Total
$400,000
$1,592,000
$0
$0
Project Phase to Initiate
Design
Construction
None
None
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$0
$1,992,000
$0
$1,992,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Add new project from 2024-2027 Subregional Share Call for Projects.
2026-2029 Transportation Improvement Program (Approved TIP)
Easter Trail Study: Cherry Creek Trail to Parker Rd
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality)
$160,000
$0
$0
$0
Local
$40,000
$0
$0
$0
Total
$200,000
$0
$0
$0
Project Phase to Initiate
Study
None
None
None
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$0
$200,000
$0
$200,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Add new project from 2024-2027 Subregional Share Call for Projects.
2026-2029 Transportation Improvement Program (Approved TIP)
13th Ave Multimodal Improvements: Yosemite to High Line Canal Trail - Precon
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality)
$270,000
$0
$0
$0
Local
$180,000
$0
$0
$0
Total
$450,000
$0
$0
$0
Project Phase to Initiate
Design
None
None
None
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$1,050,000
$450,000
$0
$1,500,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Add new project from 2024-2027 Subregional Share Call for Projects.
2026-2029 Transportation Improvement Program (Approved TIP)
Gun Club Multimodal Capacity Improvements: Quincy to Aurora Pkwy - Precon
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$600,000
$300,000
$0
$0
Local
$400,000
$200,000
$0
$0
Total
$1,000,000
$500,000
$0
$0
Project Phase to Initiate
Design
Design
None
None
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$1,000,000
$1,500,000
$0
$2,500,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Add new project from 2024-2027 Subregional Share Call for Projects.
2026-2029 Transportation Improvement Program (Approved TIP)
I225 & Alameda Bridge Replacement - Precon
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
State (Regional Priority Projects)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$3,000,000
$0
$0
$3,000,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Add new project from 2024-2027 Subregional Share Call for Projects.
2026-2029 Transportation Improvement Program (Approved TIP)
Colorado Blvd Multimodal Improvements: Arapahoe to Dry Creek
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Transportation Alternatives-DRCOG)
$1,866,000
$1,865,000
$0
$0
State (MMOF)
$2,340,000
$2,340,000
$0
$0
Local
$475,000
$475,000
$0
$0
Total
$4,681,000
$4,680,000
$0
$0
Project Phase to Initiate
Construction
Construction
None
None
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$0
$9,361,000
$0
$9,361,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Add new project from 2024-2027 Subregional Share Call for Projects.
2026-2029 Transportation Improvement Program (Approved TIP)
Add new project from 2024-2027 Subregional Share Call for Projects.
2026-2029 Transportation Improvement Program (Approved TIP)
Bowles Corridor Study: Sheridan to Santa Fe
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$300,000
$299,000
$0
$0
Local
$76,000
$75,000
$0
$0
Total
$376,000
$374,000
$0
$0
Project Phase to Initiate
Study
Study
None
None
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$0
$750,000
$0
$750,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Add new project from 2024-2027 Subregional Share Call for Projects.
2026-2029 Transportation Improvement Program (Approved TIP)
30th St Multimodal Improvements: Colorado to Baseline
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality)
$1,460,000
$1,540,000
$0
$0
Local
$365,000
$385,000
$0
$0
Total
$1,825,000
$1,925,000
$0
$0
Project Phase to Initiate
Design
Construction
None
None
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$0
$3,750,000
$0
$3,750,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Add new project from 2024-2027 Subregional Share Call for Projects.
2026-2029 Transportation Improvement Program (Approved TIP)
Folsom Multimodal Study: Pine to Colorado
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality)
$1,000,000
$0
$0
$0
Local
$450,000
$0
$0
$0
Total
$1,450,000
$0
$0
$0
Project Phase to Initiate
Study
None
None
None
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$0
$1,450,000
$0
$1,450,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Add new project from 2024-2027 Subregional Share Call for Projects.
2026-2029 Transportation Improvement Program (Approved TIP)
Boulder County Vision Zero SRTS Action Plan
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$120,000
$0
$0
$0
Local
$34,000
$0
$0
$0
Total
$154,000
$0
$0
$0
Project Phase to Initiate
Study
None
None
None
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$296,000
$154,000
$0
$450,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Add new project from 2024-2027 Subregional Share Call for Projects.
2026-2029 Transportation Improvement Program (Approved TIP)
Boulder Countywide Strategic Transit Plan
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$1,500,000
$0
$0
$1,500,000
Amendment History
Date
Status
Description
06/18/2025
Amended
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Add new project from 2024-2027 Subregional Share Call for Projects.
2026-2029 Transportation Improvement Program (Approved TIP)
WCR26 Multi-Use Trail: Union Reservoir to St Vrain State Park
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Transportation Alternatives-DRCOG)
$873,000
$0
$0
$0
State (MMOF)
$1,091,000
$0
$0
$0
Local
$219,000
$0
$0
$0
Total
$2,183,000
$0
$0
$0
Project Phase to Initiate
Construction
None
None
None
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$0
$2,183,000
$0
$2,183,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Adopt into the 24-27 TIP.
2026-2029 Transportation Improvement Program (Approved TIP)
Lafayette to Boulder Protected Bikeway Feasibility Study
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Transportation Alternatives-DRCOG)
$170,000
$0
$0
$0
State (MMOF)
$212,000
$0
$0
$0
Local
$43,000
$0
$0
$0
Total
$425,000
$0
$0
$0
Project Phase to Initiate
Study
None
None
None
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$0
$425,000
$0
$425,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Add new project from 2024-2027 Subregional Share Call for Projects.
2026-2029 Transportation Improvement Program (Approved TIP)
WCR13/WCR20 Intersection Operational Improvements
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$1,768,000
$0
$0
$0
Local
$444,000
$0
$0
$0
Total
$2,212,000
$0
$0
$0
Project Phase to Initiate
Construction
None
None
None
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$364,000
$2,212,000
$0
$2,576,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Adopted into the 24-27 TIP.
2026-2029 Transportation Improvement Program (Approved TIP)
S Boulder Rd BRT Study: Broadway/Table Mesa to CO7/119th
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$500,000
$0
$0
$500,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
12/19/2023
Amended
Swap federal Carbon Reduction Program funds with federal Surface Transportation Block Grant funds. Total project cost remains the same.
08/17/2023
Amended
Add new project from 2024-2027 Subregional Share Call for Projects.
2026-2029 Transportation Improvement Program (Approved TIP)
I25 Interchange Study: CO52 to Erie Pkwy
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$500,000
$0
$0
$500,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Adopted into the 24-27 TIP.
2026-2029 Transportation Improvement Program (Approved TIP)
SE Boulder County SuperFlex
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality)
$1,176,000
$0
$0
$0
State (MMOF)
$1,455,000
$0
$0
$0
Local
$279,000
$0
$0
$0
Total
$2,910,000
$0
$0
$0
Project Phase to Initiate
Bus Service
None
None
None
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$801,000
$2,910,000
$0
$3,711,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Add new project from 2024-2027 Subregional Share Call for Projects.
2026-2029 Transportation Improvement Program (Approved TIP)
Erie FlexRide
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality)
$240,000
$0
$0
$0
State (MMOF)
$300,000
$0
$0
$0
Local
$60,000
$0
$0
$0
Total
$600,000
$0
$0
$0
Project Phase to Initiate
Bus Service
None
None
None
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$600,000
$600,000
$0
$1,200,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Add new project from 2024-2027 Subregional Share Call for Projects.
2026-2029 Transportation Improvement Program (Approved TIP)
CO66 Multi-Use Trail: Hover to Main
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality)
$0
$2,240,000
$0
$0
Local
$0
$560,000
$0
$0
Total
$0
$2,800,000
$0
$0
Project Phase to Initiate
None
Construction
None
None
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$0
$2,800,000
$0
$2,800,000
Amendment History
Date
Status
Description
06/18/2025
Amended
Shift funding from 2026 to 2027 at the request of Longmont. Total project cost remains the same.
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
09/21/2023
Amended
Correct local match amount from $260,000 to $560,000. Total project cost increases.
08/17/2023
Amended
Add new project from 2024-2027 Subregional Share Call for Projects.
2026-2029 Transportation Improvement Program (Approved TIP)
CO52 Intersection Safety Improvements: WCR5 to WCR7 - Precon
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$72,000
$74,000
$0
$0
Local
$19,000
$19,000
$0
$0
Total
$91,000
$93,000
$0
$0
Project Phase to Initiate
Design
ROW
None
None
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$167,000
$184,000
$0
$351,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
12/20/2024
Amended
Modify scope to address change in intersections and addition of multi-use path right-of-way. Total project cost remains the same.
08/17/2023
Amended
Adopted into the 24-27 TIP.
2026-2029 Transportation Improvement Program (Approved TIP)
Tabor St Multimodal Improvements: Clear Creek Trail to I70 Frontage Rd N - Precon
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Transportation Alternatives-DRCOG)
$1,596,000
$0
$0
$0
State (MMOF)
$2,000,000
$0
$0
$0
Local
$404,000
$0
$0
$0
Total
$4,000,000
$0
$0
$0
Project Phase to Initiate
Design
None
None
None
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$0
$4,000,000
$0
$4,000,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Adopt into the 24-27 TIP.
2026-2029 Transportation Improvement Program (Approved TIP)
CO42 Bike/Ped Underpass at South St
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$3,000,000
$0
$0
$0
State (Legislative)
$1,900,000
$0
$0
$0
Local
$750,000
$0
$0
$0
Total
$5,650,000
$0
$0
$0
Project Phase to Initiate
Construction
None
None
None
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$0
$5,650,000
$0
$5,650,000
Amendment History
Date
Status
Description
06/18/2025
Amended
Add $1,900,000 in state Legislative funding. Total project cost increases.
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Add new project from 2024-2027 Subregional Share Call for Projects.
2026-2029 Transportation Improvement Program (Approved TIP)
35th Ave Multimodal Improvements: Sheridan to Wadsworth - Precon
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Transportation Alternatives-DRCOG)
$399,000
$1,576,000
$0
$0
State (MMOF)
$500,000
$1,975,000
$0
$0
Local
$101,000
$399,000
$0
$0
Total
$1,000,000
$3,950,000
$0
$0
Project Phase to Initiate
Environmental
ROW
None
None
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$0
$4,950,000
$0
$4,950,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Adopted into the 24-27 TIP.
2026-2029 Transportation Improvement Program (Approved TIP)
McCaslin Boulevard Multiuse Path Crossing at Rock Creek Parkway
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Carbon Reduction Program)
$500,000
$0
$0
$0
Local
$125,000
$0
$0
$0
Total
$625,000
$0
$0
$0
Project Phase to Initiate
Construction
None
None
None
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$0
$625,000
$0
$625,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
01/15/2025
Amended
Revise scope from design of underpass to construction of at-grade hybrid beacon crossing. Total project cost remains the same.
08/17/2023
Amended
Add new project from 2024-2027 Subregional Share Call for Projects.
2026-2029 Transportation Improvement Program (Approved TIP)
Midway Blvd Multimodal Improvements: Lake Link Trail to Zuni - Precon
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality)
$1,200,000
$2,400,000
$0
$0
Local
$300,000
$600,000
$0
$0
Total
$1,500,000
$3,000,000
$0
$0
Project Phase to Initiate
Design
ROW
None
None
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$0
$4,500,000
$0
$4,500,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Add new project from 2024-2027 Subregional Share Call for Projects.
2026-2029 Transportation Improvement Program (Approved TIP)
Alameda Underpass Improvements: Kalamath to Cherokee - Precon
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$1,950,000
$5,850,000
$0
$0
Local
$488,000
$1,462,000
$0
$0
Total
$2,438,000
$7,312,000
$0
$0
Project Phase to Initiate
Environmental
Design
None
None
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$0
$9,750,000
$0
$9,750,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Add new project from 2024-2027 Subregional Share Call for Projects.
2026-2029 Transportation Improvement Program (Approved TIP)
High Line Canal Trail Underpass at Yale
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality)
$2,000,000
$9,000,000
$0
$0
Local
$2,500,000
$2,200,000
$0
$0
Total
$4,500,000
$11,200,000
$0
$0
Project Phase to Initiate
ROW
Construction
None
None
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$0
$15,700,000
$0
$15,700,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Add new project from 2024-2027 Subregional Share Call for Projects.
2026-2029 Transportation Improvement Program (Approved TIP)
Wadsworth Path Improvements: Mansfield to Bear Creek
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality)
$2,168,000
$0
$0
$0
Local
$542,000
$0
$0
$0
Total
$2,710,000
$0
$0
$0
Project Phase to Initiate
Construction
None
None
None
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$0
$2,710,000
$0
$2,710,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Adopted into the 24-27 TIP.
2026-2029 Transportation Improvement Program (Approved TIP)
W Colfax Safety Improvements: Teller to Sheridan
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$3,139,000
$1,046,000
$0
$0
State (Legislative)
$0
$0
$0
$0
State (Legislative-Transit)
$0
$0
$0
$0
Local
$1,101,000
$367,000
$0
$0
Total
$4,240,000
$1,413,000
$0
$0
Project Phase to Initiate
Construction
Construction
None
None
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$10,000,000
$5,653,000
$0
$15,653,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
01/30/2024
Amended
Add $7,060,000 in prior year state Legislative-Transit funding and $2,940,000 in prior year state Legislative funding transferred from TIP ID# 2020-087. Total project cost increases.
08/17/2023
Amended
Adopt into the 24-27 TIP.
2026-2029 Transportation Improvement Program (Approved TIP)
Sheridan Blvd Multimodal Path: Jewell to Iowa
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality)
$1,936,000
$0
$0
$0
Local
$484,000
$0
$0
$0
Total
$2,420,000
$0
$0
$0
Project Phase to Initiate
Construction
None
None
None
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$0
$2,420,000
$0
$2,420,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Adopted into the 24-27 TIP.
2026-2029 Transportation Improvement Program (Approved TIP)
Golden Free Transit Program
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality)
$666,000
$0
$0
$0
Local
$200,000
$0
$0
$0
Total
$866,000
$0
$0
$0
Project Phase to Initiate
Bus Service
None
None
None
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$434,000
$866,000
$0
$1,300,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Adopted into the 24-27 TIP.
2026-2029 Transportation Improvement Program (Approved TIP)
64th Multimodal Improvements: CO93 to Virgil Way
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$135,000
$865,000
$0
$0
Local
$105,000
$675,000
$0
$0
Total
$240,000
$1,540,000
$0
$0
Project Phase to Initiate
Design
Construction
None
None
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$0
$1,780,000
$0
$1,780,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Adopted into the 24-27 TIP.
2026-2029 Transportation Improvement Program (Approved TIP)
2026-2029 Transportation Improvement Program (Approved TIP)
I25/Lincoln Multimodal Connections
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality)
$0
$5,907,000
$0
$0
Local
$0
$4,093,000
$0
$0
Total
$0
$10,000,000
$0
$0
Project Phase to Initiate
None
Construction
None
None
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$0
$10,000,000
$0
$10,000,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Adopted into the 24-27 TIP.
2026-2029 Transportation Improvement Program (Approved TIP)
Douglas County Transit Pilot Projects
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Carbon Reduction Program)
$500,000
$500,000
$0
$0
State (MMOF)
$625,000
$625,000
$0
$0
Local
$125,000
$125,000
$0
$0
Total
$1,250,000
$1,250,000
$0
$0
Project Phase to Initiate
Bus Service
Bus Service
None
None
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$0
$2,500,000
$0
$2,500,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Adopted into the 24-27 TIP.
2026-2029 Transportation Improvement Program (Approved TIP)
Colorado Blvd Bike/Ped Bridge over C470 - Precon
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Transportation Alternatives-DRCOG)
$275,000
$0
$0
$0
Local
$75,000
$0
$0
$0
Total
$350,000
$0
$0
$0
Project Phase to Initiate
Design
None
None
None
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$350,000
$350,000
$0
$700,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
01/17/2024
Amended
Split funding equally between Fiscal Years 2025 and 2026. Total project cost remains the same.
08/17/2023
Amended
Adopted into the 24-27 TIP.
2026-2029 Transportation Improvement Program (Approved TIP)
North Central Denver Community Multimodal Improvements
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality)
$4,537,000
$0
$0
$0
Local
$1,134,000
$0
$0
$0
Total
$5,671,000
$0
$0
$0
Project Phase to Initiate
Construction
None
None
None
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$0
$5,671,000
$0
$5,671,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Add new project from 2024-2027 Subregional Share Call for Projects.
2026-2029 Transportation Improvement Program (Approved TIP)
Peña Capacity Improvements: I70 to E470 - Precon
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$1,500,000
$1,500,000
$0
$0
Local
$4,000,000
$4,000,000
$0
$0
Total
$5,500,000
$5,500,000
$0
$0
Project Phase to Initiate
Design
Design
None
None
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$7,500,000
$11,000,000
$0
$18,500,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Add new project from 2024-2027 Subregional Share Call for Projects.
2026-2029 Transportation Improvement Program (Approved TIP)
South Platte River Trail Improvements: Mississippi to Florida
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Congestion Mitigation / Air Quality)
$2,400,000
$2,400,000
$0
$0
Local
$600,000
$600,000
$0
$0
Total
$3,000,000
$3,000,000
$0
$0
Project Phase to Initiate
Construction
Construction
None
None
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$0
$6,000,000
$0
$6,000,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Add new project from 2024-2027 Subregional Share Call for Projects.
2026-2029 Transportation Improvement Program (Approved TIP)
Federal Pkwy Multimodal Improvements: 120th to 122nd
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Congressional Allocation)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$3,750,000
$0
$0
$3,750,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Adopted into the 24-27 TIP.
2026-2029 Transportation Improvement Program (Approved TIP)
Peaks to Plains Trail - Downtown Golden
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Congressional Allocation)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$500,000
$0
$0
$500,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
08/17/2023
Amended
Adopted into the 24-27 TIP.
2026-2029 Transportation Improvement Program (Approved TIP)
28th St Multi-use Path: Fourmile Canyon Creek to Jay
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Transportation Alternatives-CDOT)
$736,000
$0
$0
$0
Local
$184,000
$0
$0
$0
Total
$920,000
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$250,000
$920,000
$0
$1,170,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
09/21/2023
Amended
Add new project from CDOT Transportation Alternatives awards.
2026-2029 Transportation Improvement Program (Approved TIP)
R1 Safe Wildlife Crossings Pool
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
State (Legislative)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$500,000
$0
$0
$500,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
07/22/2024
Amended
Transfer one pool project and $500,000 in state Legislative funding to new I25 Greenland Wildlife Crossing project.
09/21/2023
Amended
Add new pool for wildlife crossings in CDOT Region 1.
Project Pools
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name
Description
Notes
Cost
US285 and I70 Wildlife Fencing
$500,000
2026-2029 Transportation Improvement Program (Approved TIP)
E Colfax Mobility Benefits District
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$199,000
$0
$0
$199,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
09/21/2023
Amended
Create new project from FY2024-2025 TDM Set-Aside awards.
2026-2029 Transportation Improvement Program (Approved TIP)
Welcome Kits for Sun Valley Residents
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$170,000
$0
$0
$170,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
09/21/2023
Amended
Create new project from FY2024-2025 TDM Set-Aside awards.
2026-2029 Transportation Improvement Program (Approved TIP)
Using Data to Optimize FlexRide Services
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$252,000
$0
$0
$252,000
Amendment History
Date
Status
Description
05/22/2025
Amended
Imported from 2026-2029
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
09/21/2023
Amended
Create new project from FY2024-2025 TDM Set-Aside awards.
2026-2029 Transportation Improvement Program (Approved TIP)
Gunbarrel On-Demand Microtransit Shuttle Service Marketing Campaign
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$150,000
$0
$0
$150,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
09/21/2023
Amended
Create new project from FY2024-2025 TDM Set-Aside awards.
2026-2029 Transportation Improvement Program (Approved TIP)
Creating the Commerce City Connector
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$152,000
$0
$0
$152,000
Amendment History
Date
Status
Description
05/22/2025
Amended
Imported from 2026-2029
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
09/21/2023
Amended
Create new project from FY2024-2025 TDM Set-Aside awards.
2026-2029 Transportation Improvement Program (Approved TIP)
Sheridan Corridor Plan: 52nd to Hampden
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$250,000
$0
$0
$250,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
05/16/2024
Amended
Transfer all funding into 2024. Total project cost remains the same.
10/18/2023
Amended
Add new project from the DRCOG Transportation Corridor Planning - CCLIP Set Aside. Toll credits to be used to remove match requirements.
2026-2029 Transportation Improvement Program (Approved TIP)
E Colfax BRT Extension Corridor Plan: I225 to E470
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$1,000,000
$0
$0
$1,000,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
05/16/2024
Amended
Transfer all funding into 2024. Total project cost remains the same.
10/18/2023
Amended
Add new project from the DRCOG Transportation Corridor Planning - CCLIP Set Aside. Toll credits to be used to remove match requirements.
2026-2029 Transportation Improvement Program (Approved TIP)
Aurora Traffic Management Center
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$1,101,000
$0
$0
$0
Local
$495,000
$0
$0
$0
Total
$1,596,000
$0
$0
$0
Project Phase to Initiate
Construction
None
None
None
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$0
$1,596,000
$0
$1,596,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
10/18/2023
Amended
Add new project from the Regional Transportation Operations and Technology Set-Aside.
2026-2029 Transportation Improvement Program (Approved TIP)
Louisville Signal Technology Upgrade
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$745,000
$0
$0
$745,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
10/18/2023
Amended
Add new project from the Regional Transportation Operations and Technology Set-Aside.
2026-2029 Transportation Improvement Program (Approved TIP)
Longmont Smart Signals to Schools
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$1,128,000
$0
$0
$1,128,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
10/18/2023
Amended
Add new project from the Regional Transportation Operations and Technology Set-Aside.
2026-2029 Transportation Improvement Program (Approved TIP)
Jefferson County Traffic Camera System
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$300,000
$0
$0
$300,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
10/18/2023
Amended
Add new project from the Regional Transportation Operations and Technology Set-Aside.
2026-2029 Transportation Improvement Program (Approved TIP)
US287 and CO7 Advance Detection Expansion
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$378,000
$0
$0
$378,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
10/18/2023
Amended
Add new project from the Regional Transportation Operations and Technology Set-Aside.
2026-2029 Transportation Improvement Program (Approved TIP)
Denver V2X Communications Devices
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$0
$0
$0
$0
Amendment History
Date
Status
Description
07/16/2025
Amended
Sponsor has requested to cancel project. All project funding returned to Regional Transportation Operations and Technology Set-Aside.
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
10/18/2023
Amended
Add new project from the Regional Transportation Operations and Technology Set-Aside.
2026-2029 Transportation Improvement Program (Approved TIP)
Boulder Communications Network and Signal System Performance Enhancement
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$1,505,000
$0
$0
$1,505,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
10/18/2023
Amended
Add new project from the Regional Transportation Operations and Technology Set-Aside.
2026-2029 Transportation Improvement Program (Approved TIP)
Aurora Communications Infrastructure Improvements
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$736,000
$0
$0
$0
Local
$197,000
$0
$0
$0
Total
$933,000
$0
$0
$0
Project Phase to Initiate
Construction
None
None
None
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$0
$933,000
$0
$933,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
10/18/2023
Amended
Add new project from the Regional Transportation Operations and Technology Set-Aside.
2026-2029 Transportation Improvement Program (Approved TIP)
Broadway Signal Interconnect (Phase 2)
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$2,635,000
$0
$0
$0
Local
$575,000
$0
$0
$0
Total
$3,210,000
$0
$0
$0
Project Phase to Initiate
Construction
None
None
None
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$400,000
$3,210,000
$0
$3,610,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
10/18/2023
Amended
Add new project from the Regional Transportation Operations and Technology Set-Aside.
2026-2029 Transportation Improvement Program (Approved TIP)
Thornton Travel Time Monitoring Expansion
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$126,000
$0
$0
$126,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
10/18/2023
Amended
Add new project from the Regional Transportation Operations and Technology Set-Aside.
2026-2029 Transportation Improvement Program (Approved TIP)
Superior Traffic Safety and Climate Resilience
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$120,000
$0
$0
$120,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
10/18/2023
Amended
Add new project from the Regional Transportation Operations and Technology Set-Aside.
2026-2029 Transportation Improvement Program (Approved TIP)
Aurora Traffic Signal Equipment Upgrade
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$1,021,000
$0
$0
$1,021,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
10/18/2023
Amended
Add new project from the Regional Transportation Operations and Technology Set-Aside.
2026-2029 Transportation Improvement Program (Approved TIP)
I70 Resurfacing: Chief Hosa to W Colfax
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Faster Safety)
$0
$0
$0
$0
Federal (Strategic Safety Funds)
$0
$0
$0
$0
State (Faster Safety)
$0
$0
$0
$0
State (Regional Priority Projects)
$0
$0
$0
$0
State (Surface Treatment)
$0
$0
$0
$0
State (TC Contingency)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$44,792,000
$0
$0
$44,792,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
07/22/2024
Amended
Add $6,392,000 of state Transportation Commission Contingency funds. Total project cost increases.
02/22/2024
Amended
Add $4,100,000 in state Surface Treatment funds transferred from TIP ID# 2007-096. Total project cost increases.
01/17/2024
Amended
Add $3,000,000 in federal Strategic Safety Funds. Total project cost increases.
12/19/2023
Amended
Adjust scope and add $12,800,000 in state FASTER-Safety funding transferred from 2008-076. Total project cost increases.
Additional project amendment details can be found under this project in the TRIPS database.
2026-2029 Transportation Improvement Program (Approved TIP)
Clean Transit Enterprise Pool
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
State (Clean Transit Enterprise)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$2,692,000
$0
$0
$2,692,000
Amendment History
Date
Status
Description
06/18/2025
Amended
Add one pool project, $40,000 in state Clean Transit Enterprise funding and $10,000 local match in prior years. Total project cost increases.
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
12/19/2024
Amended
Add four new pool projects and $2,485,000 in state Clean Transportation Enterprise funds. Total project cost increases.
12/19/2023
Amended
Add new pool for Colorado Department of Transportation Clean Transit Enterprise projects.
Project Pools
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name
Description
Notes
Cost
Laradon Hall
Planning (Fiscal Year 2024)
$90,000
Via Mobility
Planning (FIscal Year 2024)
$68,000
Via Mobility
Facility (Fiscal Year 2025)
$1,500,000
Laradon Hall
Vehicles (Fiscal Year 2025)
$238,000
Developmental Disabilities Resource Center
Vehicles (Fiscal Year 2025)
$150,000
Boulder
Vehicles (Fiscal Year 2025)
$596,000
Denver
Planning (Fiscal Year 2025)
$40,000
2026-2029 Transportation Improvement Program (Approved TIP)
303 Artway and Montbello Loop Implementation Plan
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$250,000
$0
$0
$250,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
05/16/2024
Amended
Transfer all funding to 2024. Total project cost remains the same.
04/18/2024
Amended
Add new project from the DRCOG Community Mobility Planning Set-Aside - Community-Based Transportation Plans. Toll credits to be used to remove match requirements.
2026-2029 Transportation Improvement Program (Approved TIP)
Brighton Core City Circulation Plan
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$300,000
$0
$0
$300,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
05/16/2024
Amended
Transfer all funding to 2024. Total project cost remains the same.
04/18/2024
Amended
Add new project from the DRCOG Community Mobility Planning Set-Aside - Community-Based Transportation Plans. Toll credits to be used to remove match requirements.
2026-2029 Transportation Improvement Program (Approved TIP)
92nd Avenue Corridor Study
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$200,000
$0
$0
$200,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
05/16/2024
Amended
Transfer all funding to 2024. Total project cost remains the same.
04/18/2024
Amended
Add new project from the DRCOG Community Mobility Planning Set-Aside - Community-Based Transportation Plans. Toll credits to be used to remove match requirements.
2026-2029 Transportation Improvement Program (Approved TIP)
Pecos Street Corridor Study
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Surface Transportation Block Grant)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$450,000
$0
$0
$450,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
05/16/2024
Amended
Transfer all funding to 2024. Total project cost remains the same.
04/18/2024
Amended
Add new project from the DRCOG Community Mobility Planning Set-Aside - Community-Based Transportation Plans. Toll credits to be used to remove match requirements.
2026-2029 Transportation Improvement Program (Approved TIP)
Region 4 Congressionally Directed Funding Pool
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Congressional Allocation)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$2,235,000
$0
$0
$2,235,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
11/21/2024
Amended
Transfer scope and funding for High Plains Boulevard into 2022-080. Total project cost decreases.
06/26/2024
Amended
Create new pool for congressionally directed funding in CDOT Region 4.
Project Pools
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name
Description
Notes
Cost
Dacono
CO52 - WCR7 to WCR15
$850,000
Lyons
Saint Vrain Multimodal Trail
Funds in Project 2022-013
$0
Weld County
High Plains Boulevard - CO66 to WCR34 parallel to I25
Funds in Project 2022-080
$1,000,000
2026-2029 Transportation Improvement Program (Approved TIP)
Longmont Microtransit Vehicles
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Congressional Allocation-Transit)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$1,209,000
$0
$0
$1,209,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
06/26/2024
Amended
Add new project funded with Congressionally Allocated funding.
2026-2029 Transportation Improvement Program (Approved TIP)
CO7 Corridor Multimodal Improvements
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Congressional Allocation-Transit)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$604,000
$0
$0
$604,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
06/26/2024
Amended
Add new project funded with Congressionally Allocated funding.
2026-2029 Transportation Improvement Program (Approved TIP)
Denver Area Hydrogen Fueling Stations: FHWA CFI Grant
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Charging and Fueling Infrastructure)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$4,445,000
$0
$0
$4,445,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
06/26/2024
Amended
Add new project funded with discretionary funds.
2026-2029 Transportation Improvement Program (Approved TIP)
I25 Greenland Wildlife Overpass
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Faster Safety)
$0
$0
$0
$0
Federal (Wildlife Crossings Pilot Program)
$0
$0
$0
$0
State (Faster Safety)
$4,000,000
$0
$0
$0
State (Legislative)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$4,000,000
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$26,750,000
$4,000,000
$0
$30,750,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
07/22/2024
Amended
Add new project with new Wildlife Crossing Pilot Program funding.
2026-2029 Transportation Improvement Program (Approved TIP)
I25/CO7 Interim Transit Improvements
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Faster Safety)
$0
$0
$0
$0
State (Faster Safety)
$0
$0
$0
$0
State (Legislative-Transit)
$0
$3,500,000
$0
$0
State (Permanent Water Quality)
$0
$4,800,000
$0
$0
Local
$0
$0
$0
$0
Total
$0
$8,300,000
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$17,249,000
$8,300,000
$0
$25,549,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
07/22/2024
Amended
Create new project. Transfer $14,000,000 in prior year state Legislative-Transit funds from project 2020-100, $1,249,000 in state Permanent Water Quality funds from project 2018-011, and $2,000,000 in state FASTER-Safety funds from project 2008-076. Add $3,500,000 in state Legislative-Transit funds and $4,800,000 in state Permanent Water Quality funds.
2026-2029 Transportation Improvement Program (Approved TIP)
Boulder County Electric Vehicle Charging Infrastructure
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Charging and Fueling Infrastructure)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$7,000,000
$0
$0
$7,000,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
07/22/2024
Amended
Add new project with $4,900,000 in federal Charging and Fueling Infrastructure discretionary funds.
2026-2029 Transportation Improvement Program (Approved TIP)
I25 Resurfacing: Mile Post 208 to 214
Four Year Funding by Funding Types
Funding Type
Federal Fiscal Year 2026
Federal Fiscal Year 2027
Federal Fiscal Year 2028
Federal Fiscal Year 2029
Federal (Bridge On-System)
$0
$0
$0
$0
Federal (Strategic Safety Funds)
$0
$0
$0
$0
State (Bridge On-System)
$0
$0
$0
$0
State (Surface Treatment)
$0
$0
$0
$0
Local
$0
$0
$0
$0
Total
$0
$0
$0
$0
Overall Funding
Prior Funding
Four Year Period
Future Funding
Total Funding
$26,382,000
$0
$0
$26,382,000
Amendment History
Date
Status
Description
04/17/2025
Approved
Adopted into the 2026-2029 TIP.
09/19/2024
Amended
Add new project with funding from the Region 1 Surface Treatment Pool and Region 1 Bridge On-System Pool.
2026-2029 Transportation Improvement Program (Approved TIP)