1999-097
Regional TDM Set-Aside: TMA Partnerships
Amendment Reason: Add fiscal year 2028 funds, add 2026 and 2027 partnerships, and correct prior year funds. Total project cost increases.
Congestion Mitigation / Air Quality (Federal) Changed from $1,920,000 to $2,880,000
Congestion Mitigation / Air Quality (Local) Changed from $480,000 to $845,000
Surface Transportation Block Grant (Federal) Changed from $8,000 to $508,000
Congestion Mitigation / Air Quality (Local) Changed from $480,000 to $845,000
Surface Transportation Block Grant (Federal) Changed from $8,000 to $508,000
Pool Added - Commuting Solutions
Pool Added - Denver South
Pool Added - Downtown Denver Partnership
Pool Added - Northeast Transportation Connections
Pool Added - Smart Commute
Pool Added - Transportation Solutions
Pool Added - West Corridor Transportation Management Association
Pool Added - Boulder Chamber Transportation Connections
Pool Added - Unallocated 2026-2027 non-infrastructure
Pool Removed - Unallocated 2024/2025 non-infrastructure
Pool Added - Denver South
Pool Added - Downtown Denver Partnership
Pool Added - Northeast Transportation Connections
Pool Added - Smart Commute
Pool Added - Transportation Solutions
Pool Added - West Corridor Transportation Management Association
Pool Added - Boulder Chamber Transportation Connections
Pool Added - Unallocated 2026-2027 non-infrastructure
Pool Removed - Unallocated 2024/2025 non-infrastructure
Existing Project
| Funding Type | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 | Federal Fiscal Year 2028 | Federal Fiscal Year 2029 |
|---|---|---|---|---|
| Federal (Congestion Mitigation / Air Quality) | $960,000 | $960,000 | $0 | $0 |
| Federal (Surface Transportation Block Grant) | $0 | $8,000 | $0 | $0 |
| Local | $240,000 | $242,000 | $0 | $0 |
| Total | $1,200,000 | $1,210,000 | $0 | $0 |
| Project Phase to Initiate | TDM | TDM | None | None |
| Prior Funding | Four Year Period | Future Funding | Total Funding |
|---|---|---|---|
| $2,015,000 | $2,410,000 | $0 | $4,425,000 |
Pool Project Listing
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
| Agency/Project Name | Description | Notes | Cost |
|---|---|---|---|
| Unallocated 2024/2025 non-infrastructure | $95,000 | ||
| Commuting Solutions | Partnership (Fiscal Years 2024-2025) | $240,000 | |
| Boulder Transportation Connections | Partnership (Fiscal Years 2024-2025) | $240,000 | |
| Denver South | Partnership (Fiscal Years 2024-2025) | $240,000 | |
| Downtown Denver Partnership | Partnership (Fiscal Years 2024-2025) | $240,000 | |
| Northeast Transportation Connections | Partnership (Fiscal Years 2024-2025) | $240,000 | |
| Smart Commute | Partnership (Fiscal Years 2024-2025) | $240,000 | |
| Transportation Solutions | Partnership (Fiscal Years 2024-2025) | $240,000 | |
| West Corridor Transportation Management Association | Partnership (Fiscal Years 2024-2025) | $240,000 |
Revised Funding Table
| Funding Type | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 | Federal Fiscal Year 2028 | Federal Fiscal Year 2029 |
|---|---|---|---|---|
| Federal (Congestion Mitigation / Air Quality) | $960,000 | $960,000 | $960,000 | $0 |
| Federal (Surface Transportation Block Grant) | $0 | $8,000 | $500,000 | $0 |
| Local | $240,000 | $242,000 | $365,000 | $0 |
| Total | $1,200,000 | $1,210,000 | $1,825,000 | $0 |
| Project Phase to Initiate | TDM | TDM | TDM | None |
| Prior Funding | Four Year Period | Future Funding | Total Funding |
|---|---|---|---|
| $2,400,000 | $4,235,000 | $0 | $6,635,000 |
Revised Pool Project Listing
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
| Agency/Project Name | Description | Notes | Cost |
|---|---|---|---|
| Commuting Solutions | Partnership (Fiscal Years 2024-2025) | $240,000 | |
| Boulder Transportation Connections | Partnership (Fiscal Years 2024-2025) | $240,000 | |
| Denver South | Partnership (Fiscal Years 2024-2025) | $240,000 | |
| Downtown Denver Partnership | Partnership (Fiscal Years 2024-2025) | $240,000 | |
| Northeast Transportation Connections | Partnership (Fiscal Years 2024-2025) | $240,000 | |
| Smart Commute | Partnership (Fiscal Years 2024-2025) | $240,000 | |
| Transportation Solutions | Partnership (Fiscal Years 2024-2025) | $240,000 | |
| West Corridor Transportation Management Association | Partnership (Fiscal Years 2024-2025) | $240,000 | |
| Boulder Chamber Transportation Connections | Partnership (fiscal years 2026-2027) | $240,000 | |
| Commuting Solutions | Partnership (fiscal years 2026-2027) | $240,000 | |
| Denver South | Partnership (fiscal years 2026-2027) | $240,000 | |
| Downtown Denver Partnership | Partnership (fiscal years 2026-2027) | $240,000 | |
| Northeast Transportation Connections | Partnership (fiscal years 2026-2027) | $240,000 | |
| Smart Commute | Partnership (fiscal years 2026-2027) | $240,000 | |
| Transportation Solutions | Partnership (fiscal years 2026-2027) | $240,000 | |
| West Corridor Transportation Management Association | Partnership (fiscal years 2026-2027) | $240,000 | |
| Unallocated 2026-2027 non-infrastructure | $8,000 |
2012-064
Way to Go: Regional TDM Program
Amendment Reason: Add fiscal year 2028 funds. Total project cost increases.
Congestion Mitigation / Air Quality (Federal) Changed from $4,800,000 to $7,200,000
Congestion Mitigation / Air Quality (Local) Changed from $100,000 to $150,000
Congestion Mitigation / Air Quality (Local) Changed from $100,000 to $150,000
Existing Project
| Funding Type | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 | Federal Fiscal Year 2028 | Federal Fiscal Year 2029 |
|---|---|---|---|---|
| Federal (Congestion Mitigation / Air Quality) | $4,800,000 | $0 | $0 | $0 |
| Local | $100,000 | $0 | $0 | $0 |
| Total | $4,900,000 | $0 | $0 | $0 |
| Project Phase to Initiate | TDM | None | None | None |
| Prior Funding | Four Year Period | Future Funding | Total Funding |
|---|---|---|---|
| $5,224,000 | $4,900,000 | $0 | $10,124,000 |
Revised Funding Table
| Funding Type | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 | Federal Fiscal Year 2028 | Federal Fiscal Year 2029 |
|---|---|---|---|---|
| Federal (Congestion Mitigation / Air Quality) | $4,800,000 | $0 | $2,400,000 | $0 |
| Local | $100,000 | $0 | $50,000 | $0 |
| Total | $4,900,000 | $0 | $2,450,000 | $0 |
| Project Phase to Initiate | TDM | None | TDM | None |
| Prior Funding | Four Year Period | Future Funding | Total Funding |
|---|---|---|---|
| $5,224,000 | $7,350,000 | $0 | $12,574,000 |
2016-002
Air Quality Improvements Set-Aside
Amendment Reason: Add fiscal year 2028 funds. Total project cost increases.
Congestion Mitigation / Air Quality (Federal) Changed from $3,004,000 to $4,724,000
Congestion Mitigation / Air Quality (Local) Changed from $750,000 to $1,180,000
Congestion Mitigation / Air Quality (Local) Changed from $750,000 to $1,180,000
Existing Project
| Funding Type | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 | Federal Fiscal Year 2028 | Federal Fiscal Year 2029 |
|---|---|---|---|---|
| Federal (Congestion Mitigation / Air Quality) | $1,626,000 | $1,378,000 | $0 | $0 |
| Local | $406,000 | $344,000 | $0 | $0 |
| Total | $2,032,000 | $1,722,000 | $0 | $0 |
| Project Phase to Initiate | Other Phase | Other Phase | None | None |
| Prior Funding | Four Year Period | Future Funding | Total Funding |
|---|---|---|---|
| $7,745,000 | $3,754,000 | $0 | $11,499,000 |
Revised Funding Table
| Funding Type | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 | Federal Fiscal Year 2028 | Federal Fiscal Year 2029 |
|---|---|---|---|---|
| Federal (Congestion Mitigation / Air Quality) | $1,626,000 | $1,378,000 | $1,720,000 | $0 |
| Local | $406,000 | $344,000 | $430,000 | $0 |
| Total | $2,032,000 | $1,722,000 | $2,150,000 | $0 |
| Project Phase to Initiate | Other Phase | Other Phase | None | None |
| Prior Funding | Four Year Period | Future Funding | Total Funding |
|---|---|---|---|
| $7,745,000 | $5,904,000 | $0 | $13,649,000 |
2016-057
Region 1 RPP Pool
Amendment Reason: Transfer $1,400,000 of state Regional Priority Project funding to Project# 2026-021 and adjust one pool project. Total project cost decreases.
Regional Priority Projects (State) Changed from $71,864,000 to $70,464,000
Pool Added - I270 Corridor Improvements
Existing Project
| Funding Type | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 | Federal Fiscal Year 2028 | Federal Fiscal Year 2029 |
|---|---|---|---|---|
| State (Regional Priority Projects) | $17,966,000 | $17,966,000 | $17,966,000 | $17,966,000 |
| Local | $0 | $0 | $0 | $0 |
| Total | $17,966,000 | $17,966,000 | $17,966,000 | $17,966,000 |
| Prior Funding | Four Year Period | Future Funding | Total Funding |
|---|---|---|---|
| $0 | $71,864,000 | $0 | $71,864,000 |
Pool Project Listing
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
| Agency/Project Name | Description | Notes | Cost |
|---|---|---|---|
| Small projects/consultants/closeouts | $8,000,000 | ||
| local agency contributions | Included in various TIP pages | $5,000,000 | |
| Design | $2,000,000 | ||
| Steel Bridge Girders Cleanout | Regionwide | $1,000,000 | |
| Maintenance Paving Support IDIQ | Regionwide | $5,000,000 | |
| C470/I70 Emergency Bridge Repair | $1,780,000 | ||
| Expansion Device Replacement | I76 and I225 | $5,000,000 | |
| C470/Quincy Ramp Roundabouts | $1,363,000 | ||
| I76 and Dahlia Bridge Repair | $1,657,000 | ||
| I225 at 2nd and 6th | $4,000,000 | ||
| US40 and Tonn Valley Emergency Drainage | $220,000 | ||
| US6/Wadsworth Interchange Reconstruction | $14,700,000 in RPP in TIP# 2005-072 | $0 | |
| I70 and Kipling Bridge Deck Repairs | $2,500,000 in RPP in TIP# 2026-021 | $0 |
Revised Funding Table
| Funding Type | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 | Federal Fiscal Year 2028 | Federal Fiscal Year 2029 |
|---|---|---|---|---|
| State (Regional Priority Projects) | $16,566,000 | $17,966,000 | $17,966,000 | $17,966,000 |
| Local | $0 | $0 | $0 | $0 |
| Total | $16,566,000 | $17,966,000 | $17,966,000 | $17,966,000 |
| Prior Funding | Four Year Period | Future Funding | Total Funding |
|---|---|---|---|
| $0 | $70,464,000 | $0 | $70,464,000 |
Revised Pool Project Listing
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
| Agency/Project Name | Description | Notes | Cost |
|---|---|---|---|
| Small projects/consultants/closeouts | $6,600,000 | ||
| local agency contributions | Included in various TIP pages | $5,000,000 | |
| Design | $2,000,000 | ||
| Steel Bridge Girders Cleanout | Regionwide | $1,000,000 | |
| Maintenance Paving Support IDIQ | Regionwide | $5,000,000 | |
| C470/I70 Emergency Bridge Repair | $1,780,000 | ||
| Expansion Device Replacement | I76 and I225 | $5,000,000 | |
| C470/Quincy Ramp Roundabouts | $1,363,000 | ||
| I76 and Dahlia Bridge Repair | $1,657,000 | ||
| I225 at 2nd and 6th | $4,000,000 | ||
| US40 and Tonn Valley Emergency Drainage | $220,000 | ||
| US6/Wadsworth Interchange Reconstruction | $14,700,000 in RPP in TIP# 2005-072 | $0 | |
| I70 and Kipling Bridge Deck Repairs | $3,900,000 in RPP in TIP# 2026-021 | $0 | |
| I270 Corridor Improvements | $1,000,000 in RPP in TIP# 2020-068 | $0 |
2016-058
Ozone State Implementation Plan (SIP) Modeling
Amendment Reason: Add fiscal year 2028 funds. Total project cost increases.
Surface Transportation Block Grant (Federal) Changed from $180,000 to $440,000
Surface Transportation Block Grant (Local) Changed from $45,000 to $110,000
Surface Transportation Block Grant (Local) Changed from $45,000 to $110,000
Existing Project
| Funding Type | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 | Federal Fiscal Year 2028 | Federal Fiscal Year 2029 |
|---|---|---|---|---|
| Federal (Surface Transportation Block Grant) | $180,000 | $0 | $0 | $0 |
| Local | $45,000 | $0 | $0 | $0 |
| Total | $225,000 | $0 | $0 | $0 |
| Prior Funding | Four Year Period | Future Funding | Total Funding |
|---|---|---|---|
| $675,000 | $225,000 | $0 | $900,000 |
Revised Funding Table
| Funding Type | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 | Federal Fiscal Year 2028 | Federal Fiscal Year 2029 |
|---|---|---|---|---|
| Federal (Surface Transportation Block Grant) | $180,000 | $0 | $260,000 | $0 |
| Local | $45,000 | $0 | $65,000 | $0 |
| Total | $225,000 | $0 | $325,000 | $0 |
| Prior Funding | Four Year Period | Future Funding | Total Funding |
|---|---|---|---|
| $675,000 | $550,000 | $0 | $1,225,000 |
2020-079
Human Services Transportation Set-Aside
Amendment Reason: Correct prior year total, add 11 new pool projects, remove completed projects, and adjust local match. Total project cost increases.
Congestion Mitigation / Air Quality (Local) Changed from $2,000,000 to $2,044,000
Pool Added - DRCOG - Capital Trip Exchange Software (Fiscal year 2026) - $200,000
Pool Added - A Little Help - Capital Software (Fiscal year 2026) - $30,000
Pool Added - Via - Capital Replace 2 EVs (Fiscal year 2026) - $541,000
Pool Added - Evergreen PRD - Capital 1 Expansion Vehicle (Fiscal year 2026) - $100,000
Pool Added - Wheat Ridge - Capital Replace 1 Vehicle (Fiscal year 2026) - $128,000
Pool Added - AbleLight - Capital Replace 1 Vehicle (Fiscal year 2026) - $84,000
Pool Added - Evergreen PRD - Operating (Fiscal year 2026) - $30,000
Pool Added - Wellspring - Capital Replace 2 Vehicles (Fiscal year 2026) - $229,000
Pool Added - Laradon Hall - Capital Replace 4 EVs (Fiscal year 2026) - $562,000
Pool Added - Via - Capital Replace 2 Vehicles (Fiscal year 2026) - $269,000
Pool Removed - A Little Help - Capital - Software (FY24) - $25
Pool Removed - A Little Help - Mobility Management (FY24) - $40
Pool Removed - AbleLight - Capital 2 Vehicle Replacements (FY24) - $170
Pool Removed - Boulder County - Mobility Management (FY24) - $40
Pool Removed - Douglas County - Capital 1 Vehicle Expansion (FY24) - $124
Pool Removed - Douglas County - Capital EV Charging Station (FY24) - $44
Pool Removed - DRCOG - Mobility Management (FY24) - $55
Pool Removed - Jewish Family Service - Capital 1 Vehicle Expansion (FY24) - $54
Pool Removed - Lakewood - Capital 2 Vehicle Replacements (FY24) - $247
Pool Removed - Laradon Hall - Capital 2 Vehicle Replacements (FY24) - $153
Pool Removed - Erie - Operating (FY24) - $200
Pool Removed - DRCOG - Program Administration (FY24) - $254
Pool Removed - Douglas County - Mobility Management (Fiscal Year 2025) - $51,000
Pool Removed - Via - Operating (Fiscal Year 2025) - $38,000
Pool Removed - Program Administration
Pool Added - A Little Help - Capital Software (Fiscal year 2026) - $30,000
Pool Added - Via - Capital Replace 2 EVs (Fiscal year 2026) - $541,000
Pool Added - Evergreen PRD - Capital 1 Expansion Vehicle (Fiscal year 2026) - $100,000
Pool Added - Wheat Ridge - Capital Replace 1 Vehicle (Fiscal year 2026) - $128,000
Pool Added - AbleLight - Capital Replace 1 Vehicle (Fiscal year 2026) - $84,000
Pool Added - Evergreen PRD - Operating (Fiscal year 2026) - $30,000
Pool Added - Wellspring - Capital Replace 2 Vehicles (Fiscal year 2026) - $229,000
Pool Added - Laradon Hall - Capital Replace 4 EVs (Fiscal year 2026) - $562,000
Pool Added - Via - Capital Replace 2 Vehicles (Fiscal year 2026) - $269,000
Pool Removed - A Little Help - Capital - Software (FY24) - $25
Pool Removed - A Little Help - Mobility Management (FY24) - $40
Pool Removed - AbleLight - Capital 2 Vehicle Replacements (FY24) - $170
Pool Removed - Boulder County - Mobility Management (FY24) - $40
Pool Removed - Douglas County - Capital 1 Vehicle Expansion (FY24) - $124
Pool Removed - Douglas County - Capital EV Charging Station (FY24) - $44
Pool Removed - DRCOG - Mobility Management (FY24) - $55
Pool Removed - Jewish Family Service - Capital 1 Vehicle Expansion (FY24) - $54
Pool Removed - Lakewood - Capital 2 Vehicle Replacements (FY24) - $247
Pool Removed - Laradon Hall - Capital 2 Vehicle Replacements (FY24) - $153
Pool Removed - Erie - Operating (FY24) - $200
Pool Removed - DRCOG - Program Administration (FY24) - $254
Pool Removed - Douglas County - Mobility Management (Fiscal Year 2025) - $51,000
Pool Removed - Via - Operating (Fiscal Year 2025) - $38,000
Pool Removed - Program Administration
Existing Project
| Funding Type | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 | Federal Fiscal Year 2028 | Federal Fiscal Year 2029 |
|---|---|---|---|---|
| Federal (Congestion Mitigation / Air Quality) | $2,000,000 | $2,000,000 | $2,000,000 | $2,000,000 |
| State (FASTER Transit) | $0 | $0 | $0 | $0 |
| State (MMOF) | $0 | $0 | $0 | $0 |
| Local | $500,000 | $500,000 | $500,000 | $500,000 |
| Total | $2,500,000 | $2,500,000 | $2,500,000 | $2,500,000 |
| Prior Funding | Four Year Period | Future Funding | Total Funding |
|---|---|---|---|
| $2,910,000 | $10,000,000 | $0 | $12,910,000 |
Pool Project Listing
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
| Agency/Project Name | Description | Notes | Cost |
|---|---|---|---|
| A Little Help - Capital - Software (FY24) - $25 | Funded with CMAQ, FASTER | $0 | |
| A Little Help - Mobility Management (FY24) - $40 | Funded with MMOF, FASTER | $0 | |
| AbleLight - Capital 2 Vehicle Replacements (FY24) - $170 | Funded with CMAQ | $0 | |
| Boulder County - Mobility Management (FY24) - $40 | Funded with FASTER | $0 | |
| Douglas County - Capital 1 Vehicle Expansion (FY24) - $124 | Funded with CMAQ | $0 | |
| Douglas County - Capital EV Charging Station (FY24) - $44 | Funded with CMAQ | $0 | |
| DRCOG - Mobility Management (FY24) - $55 | Funded with MMOF | $0 | |
| Jewish Family Service - Capital 1 Vehicle Expansion (FY24) - $54 | Funded with CMAQ | $0 | |
| Lakewood - Capital 2 Vehicle Replacements (FY24) - $247 | Funded with CMAQ | $0 | |
| Laradon Hall - Capital 2 Vehicle Replacements (FY24) - $153 | Funded with CMAQ | $0 | |
| Erie - Operating (FY24) - $200 | Funded with CMAQ | $0 | |
| DRCOG - Program Administration (FY24) - $254 | |||
| Douglas County - Mobility Management (Fiscal Year 2025) - $51,000 | Funded with FASTER and also 5310 | $0 | |
| Via - Operating (Fiscal Year 2025) - $38,000 | Funded with FASTER and also with 5310 | $0 | |
| Capital Projects | $1,417,000 | ||
| Mobility Management Projects | $1,088,000 | ||
| Operating Projects | $1,046,000 | ||
| Program Administration | $254,000 | ||
| A Little Help - Capital 2 Software Projects (Fiscal year 2025) - $55,000 | Funded with CMAQ | $0 | |
| AbleLight - Capital Replace 2 Vehicles (Fiscal year 2025) - $128,000 | Funded with CMAQ and also 5310 | $0 | |
| DRCOG - Mobility Management (Fiscal year 2025) - $500,000 | Funded with MMOF and also 5310 | $0 | |
| DRMAC - Mobility Management (Fiscal year 2025) - $74,000 | Funded with MMOF and also 5310 | $0 | |
| Douglas County - Mobility Management (Fiscal year 2025) - $328,000 | Funded with MMOF and also 5310 | $0 | |
| Douglas County - Capital Replace 1 Vehicle (Fiscal year 2025) - $66,000 | Funded with CMAQ | ||
| Douglas County - Capital 1 Expansion Van (Fiscal year 2025) - $71,000 | Funded with CMAQ | ||
| Evergreen PRD - Operating (Fiscal year 2025) - $105,000 | Funded with CMAQ | ||
| Via - Operating (Fiscal year 2025) - $703,000 | Funded with MMOF and also 5310 | $0 | |
| Via - Capital EV Infrastructure (Fiscal year 2025) - $104,000 | Funded with CMAQ | ||
| Via - Capital 2 Servers, Rack, AI Software (Fiscal year 2025) - $175,000 | Funded with CMAQ | $0 |
Revised Funding Table
| Funding Type | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 | Federal Fiscal Year 2028 | Federal Fiscal Year 2029 |
|---|---|---|---|---|
| Federal (Congestion Mitigation / Air Quality) | $2,000,000 | $2,000,000 | $2,000,000 | $2,000,000 |
| State (MMOF) | $0 | $0 | $0 | $0 |
| Local | $544,000 | $500,000 | $500,000 | $500,000 |
| Total | $2,544,000 | $2,500,000 | $2,500,000 | $2,500,000 |
| Prior Funding | Four Year Period | Future Funding | Total Funding |
|---|---|---|---|
| $4,190,000 | $10,044,000 | $0 | $14,234,000 |
Revised Pool Project Listing
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
| Agency/Project Name | Description | Notes | Cost |
|---|---|---|---|
| Capital Projects | $2,742,000 | ||
| Mobility Management Projects | $902,000 | ||
| Operating Projects | $838,000 | ||
| A Little Help - Capital 2 Software Projects (Fiscal year 2025) - $55,000 | Funded with CMAQ | $0 | |
| AbleLight - Capital Replace 2 Vehicles (Fiscal year 2025) - $128,000 | Funded with CMAQ and also 5310 | $0 | |
| DRCOG - Mobility Management (Fiscal year 2025) - $500,000 | Funded with MMOF and also 5310 | $0 | |
| DRMAC - Mobility Management (Fiscal year 2025) - $74,000 | Funded with MMOF and also 5310 | $0 | |
| Douglas County - Mobility Management (Fiscal year 2025) - $328,000 | Funded with MMOF and also 5310 | $0 | |
| Douglas County - Capital Replace 1 Vehicle (Fiscal year 2025) - $66,000 | Funded with CMAQ | ||
| Douglas County - Capital 1 Expansion Van (Fiscal year 2025) - $71,000 | Funded with CMAQ | ||
| Evergreen PRD - Operating (Fiscal year 2025) - $105,000 | Funded with CMAQ | ||
| Via - Operating (Fiscal year 2025) - $703,000 | Funded with MMOF and also 5310 | $0 | |
| Via - Capital EV Infrastructure (Fiscal year 2025) - $104,000 | Funded with CMAQ | ||
| Via - Capital 2 Servers, Rack, AI Software (Fiscal year 2025) - $175,000 | Funded with CMAQ | $0 | |
| DRCOG - Capital Trip Exchange Software (Fiscal year 2026) - $200,000 | Funded with CMAQ | $0 | |
| A Little Help - Capital Software (Fiscal year 2026) - $30,000 | Funded with CMAQ | $0 | |
| Via - Capital Replace 2 EVs (Fiscal year 2026) - $541,000 | Funded with CMAQ | $0 | |
| Evergreen PRD - Capital 1 Expansion Vehicle (Fiscal year 2026) - $100,000 | Funded with CMAQ | $0 | |
| Wheat Ridge - Capital Replace 1 Vehicle (Fiscal year 2026) - $128,000 | Funded with CMAQ | $0 | |
| AbleLight - Capital Replace 1 Vehicle (Fiscal year 2026) - $84,000 | Funded with CMAQ | $0 | |
| Evergreen PRD - Operating (Fiscal year 2026) - $30,000 | Funded with CMAQ | $0 | |
| Wellspring - Capital Replace 2 Vehicles (Fiscal year 2026) - $229,000 | Funded with CMAQ | $0 | |
| Laradon Hall - Capital Replace 4 EVs (Fiscal year 2026) - $562,000 | Funded with CMAQ | $0 | |
| Via - Capital Replace 2 Vehicles (Fiscal year 2026) - $269,000 | Funded with CMAQ | $0 |
2022-025
Enhanced Mobility of Seniors and Individuals with Disabilities (FTA 5310 - DRCOG)
Amendment Reason: Add nine new pool projects and local match, remove completed projects, and correct prior funding. Total project cost decreases.
Section 5310 (Local) Changed from $1,800,000 to $2,988,000
Pool Added - Colorado Nonprofit Development Center
Pool Added - Laradon Hall
Pool Removed - Easter Seals
Pool Removed - Support Management
Pool Removed - Denver Regional Mobility and Access Council
Pool Removed - Douglas County
Pool Removed - Laradon Hall Society
Pool Removed - Laradon Hall Society
Pool Added - Laradon Hall
Pool Removed - Easter Seals
Pool Removed - Support Management
Pool Removed - Denver Regional Mobility and Access Council
Pool Removed - Douglas County
Pool Removed - Laradon Hall Society
Pool Removed - Laradon Hall Society
Existing Project
| Funding Type | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 | Federal Fiscal Year 2028 | Federal Fiscal Year 2029 |
|---|---|---|---|---|
| Federal (Section 5310) | $2,900,000 | $2,900,000 | $2,900,000 | $2,900,000 |
| Local | $450,000 | $450,000 | $450,000 | $450,000 |
| Total | $3,350,000 | $3,350,000 | $3,350,000 | $3,350,000 |
| Prior Funding | Four Year Period | Future Funding | Total Funding |
|---|---|---|---|
| $8,939,000 | $13,400,000 | $0 | $22,339,000 |
Pool Project Listing
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
| Agency/Project Name | Description | Notes | Cost |
|---|---|---|---|
| DRCOG | Program Administration (FY24) | $293,000 | |
| Douglas County | Mobility Management (FY24) | Funded also with HST | $301,000 |
| A Little Help | Mobility Management (Fiscal Year 2025) | $20,000 | |
| Denver Regional Mobility and Access Council | Mobility Management (Fiscal Year 2025) | $297,000 | |
| Douglas County | Mobility Management (Fiscal Year 2025) | Funded also with Human Services Transportation Set-Aside | $250,000 |
| DRCOG | Mobility Management (Fiscal Year 2025) | $516,000 | |
| Easter Seals | 1 Replacement Vehicle (Fiscal Year 2025) | $94,000 | |
| Lakewood | Operating (Fiscal Year 2025) | $70,000 | |
| Laradon Hall Society | Operating (Fiscal Year 2025) | $140,000 | |
| Laradon Hall Society | 1 Vehicle Replacement (Fiscal Year 2025) | $102,000 | |
| Support Management | 1 Vehicle Replacement (Fiscal Year 2025) | $144,000 | |
| Via | Operating (Fiscal Year 2025) | Funded also with Human Services Transportation Set-Aside | $945,000 |
| Via | Mobility Management (Fiscal Year 2025) | $479,000 | |
| A Little Help | Mobility Management (Fiscal year 2025) | $21,000 | |
| AbleLight | Capital Replace 2 Vehicles (Fiscal year 2025) | Funded also with Human Services Transportation Set-Aside | $64,000 |
| Lakewood | Operating (Fiscal year 2025) | $85,000 | |
| DRCOG | Mobility Management (Fiscal year 2025) | Funded also with Human Services Transportation Set-Aside | $500,000 |
| Denver Regional Mobility and Access Council | Mobility Management (Fiscal year 2025) | Funded also with Human Services Transportation Set-Aside | $297,000 |
| Douglas County | Mobility Management (Fiscal year 2025) | Funded also with Human Services Transportation Set-Aside | $271,000 |
| Laradon Hall Society | Operating (Fiscal year 2025) | $180,000 | |
| Laradon Hall Society | Capital 2 Replacement EVs (Fiscal year 2025) | $140,000 | |
| Via | Operating (Fiscal year 2025) | Funded also with Human Services Transportation Set-Aside | $822,000 |
| Via | Mobility Management (Fiscal year 2025) | $493,000 | |
| DRCOG | Program Administration (Fiscal year 2025) | $259,000 |
Revised Funding Table
| Funding Type | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 | Federal Fiscal Year 2028 | Federal Fiscal Year 2029 |
|---|---|---|---|---|
| Federal (Section 5310) | $2,900,000 | $2,900,000 | $2,900,000 | $2,900,000 |
| Local | $1,638,000 | $450,000 | $450,000 | $450,000 |
| Total | $4,538,000 | $3,350,000 | $3,350,000 | $3,350,000 |
| Prior Funding | Four Year Period | Future Funding | Total Funding |
|---|---|---|---|
| $4,715,000 | $14,588,000 | $0 | $19,303,000 |
Revised Pool Project Listing
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
| Agency/Project Name | Description | Notes | Cost |
|---|---|---|---|
| A Little Help | Mobility Management (Fiscal year 2025) | $21,000 | |
| AbleLight | Capital Replace 2 Vehicles (Fiscal year 2025) | Funded also with Human Services Transportation Set-Aside | $64,000 |
| Lakewood | Operating (Fiscal year 2025) | $85,000 | |
| DRCOG | Mobility Management (Fiscal year 2025) | Funded also with Human Services Transportation Set-Aside | $500,000 |
| Denver Regional Mobility and Access Council | Mobility Management (Fiscal year 2025) | Funded also with Human Services Transportation Set-Aside | $297,000 |
| Douglas County | Mobility Management (Fiscal year 2025) | Funded also with Human Services Transportation Set-Aside | $271,000 |
| Laradon Hall Society | Operating (Fiscal year 2025) | $180,000 | |
| Laradon Hall Society | Capital 2 Replacement EVs (Fiscal year 2025) | $140,000 | |
| Via | Operating (Fiscal year 2025) | Funded also with Human Services Transportation Set-Aside | $822,000 |
| Via | Mobility Management (Fiscal year 2025) | $493,000 | |
| DRCOG | Program Administration (Fiscal year 2025) | $259,000 | |
| DRCOG | Mobility Management (Fiscal year 2026) | $744,000 | |
| Via | Mobility Management (Fiscal year 2026) | $488,000 | |
| Via | Operating (Fiscal year 2026) | $916,000 | |
| A Little Help | Mobility Management (Fiscal year 2026) | $20,000 | |
| Lakewood | Operating (Fiscal year 2026) | $94,000 | |
| Colorado Nonprofit Development Center | Mobility Management (Fiscal year 2026) | $289,000 | |
| Douglas County | Mobility Management (Fiscal year 2026) | $250,000 | |
| Laradon Hall | Operating (Fiscal year 2026) | $180,000 | |
| DRCOG | Program Administration (Fiscal year 2026) | $250,000 |
2024-002
DRCOG Transportation Corridor Planning Set Aside
Amendment Reason: Add fiscal year 2028 funds. Total project cost increases.
Surface Transportation Block Grant (Federal) Changed from $250,000 to $1,000,000
Existing Project
| Funding Type | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 | Federal Fiscal Year 2028 | Federal Fiscal Year 2029 |
|---|---|---|---|---|
| Federal (Surface Transportation Block Grant) | $250,000 | $0 | $0 | $0 |
| Local | $0 | $0 | $0 | $0 |
| Total | $250,000 | $0 | $0 | $0 |
| Prior Funding | Four Year Period | Future Funding | Total Funding |
|---|---|---|---|
| $0 | $250,000 | $0 | $250,000 |
Revised Funding Table
| Funding Type | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 | Federal Fiscal Year 2028 | Federal Fiscal Year 2029 |
|---|---|---|---|---|
| Federal (Surface Transportation Block Grant) | $250,000 | $0 | $750,000 | $0 |
| Local | $0 | $0 | $0 | $0 |
| Total | $250,000 | $0 | $750,000 | $0 |
| Prior Funding | Four Year Period | Future Funding | Total Funding |
|---|---|---|---|
| $0 | $1,000,000 | $0 | $1,000,000 |
2024-003
DRCOG Community Mobility Planning Set-Aside - Community-Based Transportation Plans
Amendment Reason: Add fiscal year 2028 funds. Total project cost increases.
Surface Transportation Block Grant (Federal) Changed from $500,000 to $1,125,000
Existing Project
| Funding Type | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 | Federal Fiscal Year 2028 | Federal Fiscal Year 2029 |
|---|---|---|---|---|
| Federal (Surface Transportation Block Grant) | $500,000 | $0 | $0 | $0 |
| Local | $0 | $0 | $0 | $0 |
| Total | $500,000 | $0 | $0 | $0 |
| Project Phase to Initiate | Study | None | None | None |
| Prior Funding | Four Year Period | Future Funding | Total Funding |
|---|---|---|---|
| $0 | $500,000 | $0 | $500,000 |
Revised Funding Table
| Funding Type | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 | Federal Fiscal Year 2028 | Federal Fiscal Year 2029 |
|---|---|---|---|---|
| Federal (Surface Transportation Block Grant) | $500,000 | $0 | $625,000 | $0 |
| Local | $0 | $0 | $0 | $0 |
| Total | $500,000 | $0 | $625,000 | $0 |
| Project Phase to Initiate | Study | None | None | None |
| Prior Funding | Four Year Period | Future Funding | Total Funding |
|---|---|---|---|
| $0 | $1,125,000 | $0 | $1,125,000 |
2024-004
DRCOG Community Mobility Planning Set-Aside - Livable Centers Small-Area Planning
Amendment Reason: Remove $835,000 awarded to individual projects and add $625,000 in fiscal year 2028. Total project cost decreases.
Existing Project
| Funding Type | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 | Federal Fiscal Year 2028 | Federal Fiscal Year 2029 |
|---|---|---|---|---|
| Federal (Surface Transportation Block Grant) | $1,250,000 | $0 | $0 | $0 |
| Local | $0 | $0 | $0 | $0 |
| Total | $1,250,000 | $0 | $0 | $0 |
| Project Phase to Initiate | Study | None | None | None |
| Prior Funding | Four Year Period | Future Funding | Total Funding |
|---|---|---|---|
| $210,000 | $1,250,000 | $0 | $1,460,000 |
Revised Funding Table
| Funding Type | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 | Federal Fiscal Year 2028 | Federal Fiscal Year 2029 |
|---|---|---|---|---|
| Federal (Surface Transportation Block Grant) | $625,000 | $0 | $625,000 | $0 |
| Local | $0 | $0 | $0 | $0 |
| Total | $625,000 | $0 | $625,000 | $0 |
| Project Phase to Initiate | Study | None | None | None |
| Prior Funding | Four Year Period | Future Funding | Total Funding |
|---|---|---|---|
| $0 | $1,250,000 | $0 | $1,250,000 |
2024-005
DRCOG Innovative Mobility Set Aside
Amendment Reason: Add fiscal year 2028 funds. Total project cost increases.
Surface Transportation Block Grant (Federal) Changed from $1,500,000 to $2,500,000
Existing Project
| Funding Type | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 | Federal Fiscal Year 2028 | Federal Fiscal Year 2029 |
|---|---|---|---|---|
| Federal (Surface Transportation Block Grant) | $1,500,000 | $0 | $0 | $0 |
| Local | $0 | $0 | $0 | $0 |
| Total | $1,500,000 | $0 | $0 | $0 |
| Project Phase to Initiate | Other Phase | None | None | None |
| Prior Funding | Four Year Period | Future Funding | Total Funding |
|---|---|---|---|
| $0 | $1,500,000 | $0 | $1,500,000 |
Revised Funding Table
| Funding Type | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 | Federal Fiscal Year 2028 | Federal Fiscal Year 2029 |
|---|---|---|---|---|
| Federal (Surface Transportation Block Grant) | $1,500,000 | $0 | $1,000,000 | $0 |
| Local | $0 | $0 | $0 | $0 |
| Total | $1,500,000 | $0 | $1,000,000 | $0 |
| Project Phase to Initiate | Other Phase | None | None | None |
| Prior Funding | Four Year Period | Future Funding | Total Funding |
|---|---|---|---|
| $0 | $2,500,000 | $0 | $2,500,000 |
2026-021
I70 and Kipling Bridge Deck Repairs
Amendment Reason: Add $1,400,000 in state Regional Priority Project funding transferred from Project# 2016-057. Total project cost increases.
Regional Priority Projects (State) Changed from $2,500,000 to $3,900,000
Existing Project
| Funding Type | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 | Federal Fiscal Year 2028 | Federal Fiscal Year 2029 |
|---|---|---|---|---|
| Federal (Freight) | $1,000,000 | $0 | $0 | $0 |
| State (Regional Priority Projects) | $2,500,000 | $0 | $0 | $0 |
| Local | $0 | $0 | $0 | $0 |
| Total | $3,500,000 | $0 | $0 | $0 |
| Prior Funding | Four Year Period | Future Funding | Total Funding |
|---|---|---|---|
| $0 | $3,500,000 | $0 | $3,500,000 |
Revised Funding Table
| Funding Type | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 | Federal Fiscal Year 2028 | Federal Fiscal Year 2029 |
|---|---|---|---|---|
| Federal (Freight) | $1,000,000 | $0 | $0 | $0 |
| State (Regional Priority Projects) | $3,900,000 | $0 | $0 | $0 |
| Local | $0 | $0 | $0 | $0 |
| Total | $4,900,000 | $0 | $0 | $0 |
| Prior Funding | Four Year Period | Future Funding | Total Funding |
|---|---|---|---|
| $0 | $4,900,000 | $0 | $4,900,000 |
Request
N Line Station Areas Existing Plans Assessment
Amendment Reason: Add new Livable Centers Small-Area Set-Aside project.
New Project
| Funding Type | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 | Federal Fiscal Year 2028 | Federal Fiscal Year 2029 |
|---|---|---|---|---|
| Federal (Surface Transportation Block Grant) | $300,000 | $0 | $0 | $0 |
| Local | $0 | $0 | $0 | $0 |
| Total | $300,000 | $0 | $0 | $0 |
| Project Phase to Initiate | Study | None | None | None |
| Prior Funding | Four Year Period | Future Funding | Total Funding |
|---|---|---|---|
| $0 | $300,000 | $0 | $300,000 |
Request
Southwest Plaza Activity Center Small Area Plan
Amendment Reason: Add new Livable Centers Small-Area Set-Aside project.
New Project
| Funding Type | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 | Federal Fiscal Year 2028 | Federal Fiscal Year 2029 |
|---|---|---|---|---|
| Federal (Surface Transportation Block Grant) | $125,000 | $0 | $0 | $0 |
| Local | $0 | $0 | $0 | $0 |
| Total | $125,000 | $0 | $0 | $0 |
| Project Phase to Initiate | Study | None | None | None |
| Prior Funding | Four Year Period | Future Funding | Total Funding |
|---|---|---|---|
| $0 | $125,000 | $0 | $125,000 |
Request
CO119 Bus Rapid Transit and Multimodal Study: Downtown Longmont to I25 Mobility Hub
Amendment Reason: Add new Livable Centers Small-Area Set-Aside project.
New Project
| Funding Type | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 | Federal Fiscal Year 2028 | Federal Fiscal Year 2029 |
|---|---|---|---|---|
| Federal (Surface Transportation Block Grant) | $400,000 | $0 | $0 | $0 |
| Local | $0 | $0 | $0 | $0 |
| Total | $400,000 | $0 | $0 | $0 |
| Project Phase to Initiate | Study | None | None | None |
| Prior Funding | Four Year Period | Future Funding | Total Funding |
|---|---|---|---|
| $0 | $400,000 | $0 | $400,000 |