Table of Contents
Projects in order by TIP Year
RTD Preventive Maintenance: Transit Vehicle Overhaul and MaintenanceState of Good Repair
Regional TDM Set-Aside: TMA Partnerships
US85 Widening: Cook Ranch to Meadows
US6/Wadsworth Interchange Reconstruction
FasTracks Northwest Rail Corridor: Downtown Longmont Station
Region 1 Hazard Elimination Pool
Region 1 Hot Spot Pool
Region 1 Traffic Signal Pool
Region 1 Bridge On-System Pool
Region 1 Bridge Off-System Pool
Region 4 Traffic Signal Pool
Region 4 Hot Spot Pool
Region 4 Hazard Elimination Pool
Region 4 Surface Treatment Pool
Region 1 Surface Treatment Pool
Region 4 Bridge On-System Pool
Safe Routes to School Pool
Region 1 Design Pool
Region 4 Bridge Off-System Pool
Region 1 FASTER Pool
Region 4 FASTER Pool
Region 1 FASTER Bridge and Tunnel Enterprise Pool
CDOT FASTER Transit Pool
DRCOG Second Commitment to FasTracks
Way to Go: Regional TDM Program
Enhanced Mobility of Seniors and Individuals with Disabilities (FTA 5310 - CDOT)
RTD Capital Improvements: Bus and Facilities Funding
Region 1 Rockfall/Geohazard Pool
Region 4 2013 Flood-Related Projects Pool
Region 4 Non-Regionally Significant RPP Pool
Air Quality Improvements Set-Aside
Regional Transportation Operations and Technology Set-Aside
FLEX Route Extension: Boulder to Longmont
Wadsworth Operations and Widening: 35th to I70
I25/Broadway Station Interchange Improvements
16th St. Mall Rehabilitation: Market to Civic Center Station
East Lafayette Multimodal Path Connection: Commerce to Lafayette Park-n-Ride
I25 Managed Lanes: 120th to E470
Region 1 ITS Pool
Region 1 RPP Pool
Ozone State Implementation Plan (SIP) Modeling
C470 Toll Express Lanes: I25 to Wadsworth
RTD Bus Purchases
Transit Operating and Capital (FTA 5311)
US85 Operational Improvements: I76 to 124th
88th NEPA Study: I76 to CO2
19th St Multimodal Improvements: Norwood to Sumac
Region 1 ADA Projects
Region 1 Transportation Alternatives (TA) Pool
Region 4 ADA Projects
Transit Capital Program (FTA 5339)
Vasquez Operational Improvements: 52nd to 64th
Region 1 Permanent Water Quality Pool
Westminster Quiet Zones: BNSF Railway and Lowell, W 72nd, and Bradburn
I25 Capacity Improvements: Castle Rock to El Paso County Line
I25/CO119 Transit Facility Improvements
Transit Capital Program (State SB 228)
CO119 BRT Enhancements in Boulder and Longmont
Peaks to Plains Trail: CO6 from Tunnel 1 to Big Easy Trailhead
CO7 Corridor Multimodal Improvements: Foothills Pkwy to Brighton - Precon
Aurora Missing Sidewalk Program
Nine Mile Station Bicycle and Pedestrian Bridge over Parker Rd.
Inverness Dr West Bicycle and Pedestrian Facilities: Fulton to Inverness Dr East
Oxford Station Pedestrian Bridge: Over Oxford Ave
CO119 Bikeway: Boulder to Longmont - Precon
Rock Creek/Coal Creek Trail Connection: 104th from Coal Creek Trail to Rock Creek Trail
Downtown ADA Sidewalk Connections: Jackson, 1st, Jefferson
US36 Bikeway Extension: Superior to Broomfield
US36/Broomfield and US36/Flatiron Bike-N-Ride Shelters, Amenities, Operations, and Marketing
Industrial Ln. Bikeway Phase 2: Bike/Ped Bridge over BNSF to US36/Flatiron Station
C470 Grade-Separated Trail over Acres Green Drive
Evergreen Lake Trail Improvements: Evergreen Dam to Upper Bear Creek Rd
Colfax Complete Streets: Violet to I70
St Vrain Greenway, Phase 13: CO119 to St Vrain State Park
Greenway Trail: CR37 to Stagecoach
CO66/WCR7 Pedestrian Underpass
120th/US85 Interchange Improvements - Precon
88th Widening: I76 to CO2
104th Widening: Colorado to US85 - Precon
County Line Capacity Improvements: Broadway to University
US6/Heritage Interchange - Precon
CO66 Improvements: Hover to Main - Precon
Sheridan/US36 Multimodal Improvements
CO42 Multimodal Improvements: Empire/Lock to CO7 - Precon
CO7 Multimodal Improvements: 38th/Marine to Cherryvale
CO7/119th Intersection Improvements
South Boulder Rd At-Grade Crossing Improvements: Via Capri to Courtesy
Micro Transit Service & Mobility Options: North I-25 Area
Downtown Boulder Station Improvements
HOP Electric Bus Purchases
Federal Blvd Transit Improvements: Floyd to 54th
Industrial and Nickel/Commerce Intersection Operational Improvements
CO86/5th and Founders/Ridge Intersection Operational Improvements
I70/CO79 Eastbound Ramp Improvements
Parker/Quincy/Smoky Hill Intersection Operational Improvements
Dry Creek Operational Improvements: I25 to Inverness Dr East
US285/Broadway Operational Improvements
Mineral/Santa Fe Operational Improvements
I25/Alameda Operational Improvements: Valley Highway Phase 2.0
I25/Lincoln Traffic and Mobility Improvements
Parker Rd Operational Improvements: Lincoln to Pine
CO83 Safety Improvements: Bayou Gulch to El Paso County
JC73: CO74 to Buffalo Park Operational Improvements
I270 Corridor Improvements: I70 to I25
13th Ave Multimodal Mobility Study: Yosemite to High Line Canal Trail/Chambers
Parker Rd Multimodal Transportation and Safety Study: Mississippi to Hampden
US287/120th Multimodal and Safety Study: Alter to Lowell
Broomfield Transit Needs Assessment & Pilot Project
Front Range Trail Study: CO93 from North Table Mountain Park to Boulder County
Broomfield FlexRide
Community Mobility Planning and Implementation Set-Aside
US285 Congestion Management Study: Lowell/Knox to I25
Human Services Transportation/FASTER Set-Aside
CDOT Trust Settlement Pool
CO119 Operational Improvements: Boulder to Longmont
Coffman Busway: 1st to 9th
CO119/CO52 Transit Bypass Lanes
28th St Business Access Transit Lanes: Iris to Valmont
I25 Valley Highway Phases 3 and 4: Santa Fe to 20th
Safer Main Streets Pool
I25/CO119 Interchange Improvements
47th/BNSF Missing Sidewalks
I70/Picadilly New Interchange
I70/Harlan Bridge Reconstruction
State Vulnerable and Senior Transportation Funds
I25/Crystal Valley New Interchange
I70 Region 1 Noise Walls
I70 West Metro Bridges: I25 to C470
Region 1 Mobility Hub Pool
E470/38th New Interchange
E470 Widening: I70 to 104th
E470/I70 Interchange Improvements
E470 Widening: 104th to I76
E470/88th New Interchange
Broadway Corridor Study: Belleview to C470
US287 BRT Feasibility & Safety Study: Longmont to Broomfield
30th St Corridor Improvements: Boulder Creek to Arapahoe
County Line/WCR 1 Buffered Bike Lanes: 17th to CO66
5th St Operational Improvements: Woodlands to Ridge
100th Ave Multimodal Improvements: Alkire to Simms
South Platte River Trail Improvements: West Virginia to W Bayaud
St Vrain Trail Extension: CO66 from McConnell to US36
US36 Multimodal Improvements: 3rd to McConnell
Wadsworth Operational Improvements: Vassar to Woodard
Region 1 Revitalizing Main Streets Pool
CO7/95th Intersection Improvements
I70 Escape Ramp Between Floyd Hill and Denver West
I70 Floyd Hill Improvements: JC65 to Genesee Park
3rd/Welker Intersection Improvements
CO119/63rd Transit Bypass Lanes
I25/Happy Canyon Interchange - Precon
88th Corridor Study: Pecos to Dahlia
Enhanced Mobility of Seniors and Individuals with Disabilities (FTA 5310 - DRCOG)
Washington St Improvements: 47th to 52nd
I25/WCR34 Emergency Bridge Replacement
Region 1 Congressionally Directed Funding Pool
I25 Chain Down Station: Larkspur
East Colfax BRT: Civic Center Station to Yosemite
Lone Tree Mobility Hub at Sky Ridge Station
Mineral Station Area Multimodal Improvements
Southwest Weld County Trail Alignment Study
Buchtel Complete Street/Evans Intersection Improvements: University to Colorado
Bike/Ped Bridge over Santa Fe: Jewell to Evans Station
South Platte River Trail Improvements: Mississippi to Dartmouth - Precon
Airport Creek Trail Underpass at BNSF
Downtown Golden Traffic Signal Upgrade
Jefferson County Bicycle Plan Implementation
Wadsworth Shared-Use Path: 32nd to 35th
Ward Station Multimodal Access Improvements
120th Safety and Multimodal Corridor Study: US85 to Tower
Smith Rd Multimodal Improvements: Peoria to Powhaton - Precon
Aurora Multimodal Access Improvements
Bennett Kiowa Creek Trail
64th Corridor Study: CO2 to Quebec
88th Ave Multimodal Improvements: I76 to CO2
Thornton Multimodal Trail Study and Precon
100th Ave Multi-Use Path: Riverdale to Forest Circle
Thornton Protected Bike Facility Study
Federal Blvd Bus Stop Improvements: 70th to 92nd
High Line Canal Trail Underpass at Broadway - Precon
Arapahoe County Transit and Micromobility Study
Aurora Multimodal Transportation Master Plan
Lone Tree Creek Trail Underpass of Arapahoe
Arapahoe Sidepath Improvements: I25 to Parker Rd
Hampden Complete Streets: Broadway to Lafayette
Broadway Complete Streets Improvements: Hampden to Belleview
30th St Complete Streets: CO119 to CO7 - Precon
Baseline Multimodal Improvements: 30th to Foothills
CO93/Table Mesa and Regent Intersection Improvements
CO119 Branding and Wayfinding Study: Boulder to Longmont
Longmont Main/21st Bike/Ped Improvements - Precon
Nederland Multimodal Transportation Plan
I25/Castle Pines Pkwy Bike/Ped Overpass - Precon
Castle Rock Industrial Tributary Trail: Plum Creek to Plum Creek Trail
Douglas County Transit & Multimodal Feasibility Study
County Line Shared Use Path: Broadway to High Line Canal Trail
S Havana Bikeway: RidgeGate Station to Lone Tree City Limits
Parker Rd Multi-Use Path East Side Gaps: Pine to Stroh
32nd/I-70 Bike Lanes: Wright to Zinnia
Region 1 Arterial BRT and Transit Improvements Pool
I25/Speer and 23rd Interchange Reconstructions - Precon
I25 Improvements: 84th to 104th - Precon
Region 4 Revitalizing Main Streets Pool
Central Corridor Rail Replacement: I25/Broadway Station to 30th/Downing Station
Region 1 Vision Zero Pool
I25 Segment 5: CO66 to WCR38
U85/168th Intersection Improvements
Arapahoe Ave Multimodal Improvements: 28th to Foothills - Precon
I70/Harvest Interchange TDM Plan
Mineral Multimodal Improvements: Santa Fe to Jackass Hill/Long Ave
I70/Harvest Interchange
Peoria St Bridge Replacement: Over Sand Creek - Precon
DRCOG Transportation Corridor Planning Set Aside
DRCOG Community Mobility Planning Set-Aside - Community-Based Transportation Plans
DRCOG Community Mobility Planning Set-Aside - Livable Centers Small-Area Planning
DRCOG Innovative Mobility Set Aside
CO7 Transit Service: Boulder to Brighton
Federal Blvd BRT: Englewood Station to Wagon Road Park-n-Ride - Precon
South Platte River Trail Improvements: Bayaud to Phil Milstein Park
SW Weld County Transit First and Last Mile Study
Light Rail Level Boarding Feasibility Study
Adams County Comprehensive Safety Action Plan
High Line Canal Trail Underpass at Colfax
McKay Operational Improvements: 104th to 96th - Precon
124th Multimodal Improvements: Claude to Colorado
Big Dry Creek Trail: 136th to 144th
Colorado Blvd Separated Bike Facility: 88th to E470 - Precon
Thornton Pkwy Multiuse Path: I25 to Grant
Easter Trail Study: Cherry Creek Trail to Parker Rd
13th Ave Multimodal Improvements: Yosemite to High Line Canal Trail - Precon
Gun Club Multimodal Capacity Improvements: Quincy to Aurora Pkwy - Precon
I225 & Alameda Bridge Replacement - Precon
Colorado Blvd Multimodal Improvements: Arapahoe to Dry Creek
Havana/Easter Intersection Operational Improvements
Bowles Corridor Study: Sheridan to Santa Fe
30th St Multimodal Improvements: Colorado to Baseline
Folsom Multimodal Study: Pine to Colorado
Boulder County Vision Zero SRTS Action Plan
Boulder Countywide Strategic Transit Plan
Mead Trails & Open Space Master Plan Update
WCR26 Multi-Use Trail: Union Reservoir to St Vrain State Park
Lafayette to Boulder Protected Bikeway Feasibility Study
WCR13/WCR20 Intersection Operational Improvements
S Boulder Rd BRT Study: Broadway/Table Mesa to CO7/119th
I25 Interchange Study: CO52 to Erie Pkwy
SE Boulder County SuperFlex
Erie FlexRide
CO66 Multi-Use Path: Hover to Main
CO52 Intersection Safety Improvements: WCR3 to I25 - Precon
Tabor St Multimodal Improvements: Clear Creek Trail to I70 Frontage Rd N - Precon
CO42 Bike/Ped Underpass at South St
35th Ave Multimodal Improvements: Sheridan to Wadsworth - Precon
McCaslin Blvd Multiuse Underpass at Rock Creek Pkwy - Precon
Midway Blvd Multimodal Improvements: Lake Link Trail to Zuni - Precon
Alameda Underpass Improvements: Kalamath to Cherokee - Precon
High Line Canal Trail Underpass at Yale
Wadsworth Path Improvements: Mansfield to Bear Creek
W Colfax Safety Improvements: Teller to Sheridan
Sheridan Blvd Multimodal Path: Jewell to Iowa
Golden Free Transit Program
64th Multimodal Improvements: CO93 to Virgil Way
Parker Rd/Mainstreet Operational Improvements - Precon
I25/Lincoln Multimodal Connections
Douglas County Transit Pilot Projects
Colorado Blvd Bike/Ped Bridge over C470 - Precon
North Central Denver Community Multimodal Improvements
Peña Capacity Improvements: I70 to E470 - Precon
South Platte River Trail Improvements: Mississippi to Florida
Federal Pkwy Multimodal Improvements: 120th to 122nd
Peaks to Plains Trail - Downtown Golden
28th St Multi-use Path: Fourmile Canyon Creek to Jay
Coffman St Bikeway Extension: Boston to 1st
R1 Safe Wildlife Crossings Pool
E Colfax Mobility Benefits District
Downtown Denver ¡Viva! Streets Year 2 Expansion
Welcome Kits for Sun Valley Residents
Using Data to Optimize FlexRide Services
Gunbarrel On-Demand Microtransit Shuttle Service
Creating the Commerce City Connector
Sheridan Corridor Plan: 52nd to Hampden
E Colfax BRT Extension Corridor Plan: I225 to E470
Aurora Traffic Management Center
Louisville Signal Technology Upgrade
Longmont Smart Signals to Schools
Jefferson County Traffic Camera System
US287 and CO7 Advance Detection Expansion
Denver V2X Communications Devices
Boulder Communications Network and Signal System Performance Enhancement
Aurora Communications Infrastructure Improvements
Broadway Signal Interconnect (Phase 2)
Thornton Travel Time Monitoring Expansion
Superior Traffic Safety and Climate Resilience
Aurora Traffic Signal Equipment Upgrade
I70 Resurfacing: Chief Hosa to W Colfax
Clean Transit Enterprise Pool
303 Artway and Montbello Loop Implementation Plan
Brighton Core City Circulation Plan
92nd Avenue Corridor Study
Pecos Street Corridor Study
Region 4 Congressionally Directed Funding Pool
Longmont Microtransit Vehicles
CO7 Corridor Multimodal Improvements
Denver Area Hydrogen Fueling Stations: FHWA CFI Grant
I25 Greenland Wildlife Overpass
I25/CO7 Interim Transit Improvements
Boulder County Electric Vehicle Charging Infrastructure
- Project Listings -
2024-2027 Transportation Improvement Program (Approved TIP)
RTD Preventive Maintenance: Transit Vehicle Overhaul and Maintenance
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Section 5307) | $83,200,000 | $84,900,000 | $87,400,000 | $90,000,000 |
State (Section 5307) | $0 | $0 | $0 | $0 |
Local | $27,700,000 | $28,300,000 | $29,100,000 | $30,000,000 |
Total | $110,900,000 | $113,200,000 | $116,500,000 | $120,000,000 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $460,600,000 | $0 | $460,600,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
02/16/2023 | Amended | Add $43,800,000 in federal Section 5307 funding. Total project cost increases. |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
08/22/2019 | Amended | Proposed for adoption into 2020-2023 |
07/19/2018 | Amended | Increase funding in FY2019, FY2020, and FY2021. Total project funding increases. |
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
State of Good Repair
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Section 5337 State of Good Repair) | $27,500,000 | $28,050,000 | $28,900,000 | $29,800,000 |
State (Section 5337 State of Good Repair) | $0 | $0 | $0 | $0 |
Local | $6,880,000 | $7,000,000 | $7,200,000 | $7,440,000 |
Total | $34,380,000 | $35,050,000 | $36,100,000 | $37,240,000 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $142,770,000 | $0 | $142,770,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
02/16/2023 | Amended | Add $32,010,000 in federal Section 5337 funds. Total project cost increases. |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
08/22/2019 | Amended | Proposed for adoption into 2020-2023 |
07/19/2018 | Amended | Increase funding in FY2019, FY2020, and FY2021. Total project cost increase. |
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
Regional TDM Set-Aside: TMA Partnerships
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congestion Mitigation / Air Quality) | $960,000 | $960,000 | $960,000 | $960,000 |
Federal (Surface Transportation Block Grant) | $0 | $5,000 | $500,000 | $500,000 |
Local | $240,000 | $241,000 | $365,000 | $365,000 |
Total | $1,200,000 | $1,206,000 | $1,825,000 | $1,825,000 |
Project Phase to Initiate | TDM | TDM | TDM | TDM |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$2,777,000 | $6,056,000 | $0 | $8,833,000 |
Date | Status | Description |
---|---|---|
05/16/2024 | Amended | Add Fiscal Year 2024 and 2024 Transportation Management Association partnerships. Total project cost remains the same. |
09/21/2023 | Amended | Remove FY 2024 and FY 2025 Surface Transportation Block Grant funding programmed to individual projects in FY 2024/2025 Call for Projects. |
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
11/17/2022 | Amended | Add $100,000 in unused rollover CMAQ in FY23. Total project cost increases. |
02/17/2022 | Amended | Add eight pool projects selected by the DRCOG Board for FY 2022 and 2023. Total cost remains the same. |
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name | Description | Notes | Cost |
---|---|---|---|
Bicycle Colorado | Digital Bicycle-Friendly Driving Course (20/21) | $202,000 | |
Transportation Solutions | Pandemic Recovery and TDM Marketing Campaign (22/23) | $174,000 | |
Community Cycles | Ride by Ebike (22/23) | $83,000 | |
West Corridor TMA | Culturally Sensitive Encouragement and Marketing Campaigns (22/23) | $83,000 | |
West Corridor TMA | Colfax Safety Project Outreach (22/23) | $29,000 | |
Downtown Denver Partnership | Denver Open Streets (22/23) | $255,000 | |
City of Aurora/Northeast Transportation Connections | Aurora Aerotropolis/I-70 TDM Prgm Development & Implementation (22/23) | $108,000 | |
Commuting Solutions | Expansion of B-Cycle Bikeshare System - Feasibility Study (22/23) | $66,000 | |
DRMAC | Getting There Travel Training (22/23) | $177,000 | |
Commuting Solutions | TDM Partnership (22/23) | $200,000 | |
Boulder Transportation Connections | TDM Partnership (22/23) | $200,000 | |
Denver South TMA | TDM Partnership (22/23) | $200,000 | |
Downtown Denver Partnership | TDM Partnership (22/23) | $200,000 | |
Northeast Transportation Connections | TDM Partnership (22/23) | $200,000 | |
Smart Commute Metro North | TDM Partnership (22/23) | $200,000 | |
Transportation Solutions | TDM Partnership (22/23) | $200,000 | |
West Corridor TMA | TDM Partnership (22/23) | $200,000 | |
Unallocated FY 2024/2025 Non-Infrastructure | $5,000 | ||
Commuting Solutions | Partnership (Fiscal Years 2024-2025) | $240,000 | |
Boulder Transportation Connections | Partnership (Fiscal Years 2024-2025) | $240,000 | |
Denver South | Partnership (Fiscal Years 2024-2025) | $240,000 | |
Downtown Denver Partnership | Partnership (Fiscal Years 2024-2025) | $240,000 | |
Northeast Transportation Connections | Partnership (Fiscal Years 2024-2025) | $240,000 | |
Smart Commute | Partnership (Fiscal Years 2024-2025) | $240,000 | |
Transportation Solutions | Partnership (Fiscal Years 2024-2025) | $240,000 | |
West Corridor Transportation Management Association | Partnership (Fiscal Years 2024-2025) | $240,000 |
2024-2027 Transportation Improvement Program (Approved TIP)
US85 Widening: Cook Ranch to Meadows
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Faster Safety) | $0 | $0 | $0 | $0 |
Federal (Freight) | $0 | $0 | $0 | $0 |
Federal (Surface Transportation Block Grant) | $0 | $0 | $0 | $0 |
State (Faster Safety) | $0 | $0 | $0 | $0 |
State (Regional Priority Projects) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$94,702,000 | $0 | $37,300,000 | $132,002,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
08/22/2019 | Amended | Proposed for adoption into 2020-2023 |
10/18/2018 | Amended | Add $850,000 in state RPP in FY 2019. Total project cost increases. |
04/19/2018 | Amended | Add $1,500,000 in state FASTER safety funds in FY 2018 for two traffic signal replacements and one new signal. Total project cost increases. |
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
US6/Wadsworth Interchange Reconstruction
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
State (FASTER Br. Enterprise) | $0 | $0 | $8,000,000 | $12,000,000 |
State (Legislative) | $10,000,000 | $0 | $0 | $0 |
State (Regional Priority Projects) | $2,209,000 | $0 | $0 | $0 |
State (TC Contingency) | $2,898,000 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $15,107,000 | $0 | $8,000,000 | $12,000,000 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$92,000,000 | $35,107,000 | $0 | $127,107,000 |
Date | Status | Description |
---|---|---|
04/18/2024 | Amended | Add $2,209,000 in state Regional Priority Project funds. Total project cost increases. |
11/15/2023 | Amended | Add $2,898,000 in state Transportation Commission Contingency funds. Total project cost increases. |
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
11/17/2022 | Amended | Add $5,000,000 in state FASTER-Safety funding and $60,000,000 in state Legislative funding. Total project cost increases. |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
FasTracks Northwest Rail Corridor: Downtown Longmont Station
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Local (RTD Funds Only) | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$17,945,000 | $0 | $0 | $17,945,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
08/22/2019 | Amended | Proposed for adoption into 2020-2023 |
04/20/2017 | Amended | Proposed for adoption into 2018-2021 |
04/16/2015 | Approved | Proposed for adoption into 2016-2021 |
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
Region 1 Hazard Elimination Pool
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Strategic Safety Funds) | $371,000 | $3,650,000 | $0 | $0 |
State (Safety) | $17,000,000 | $17,000,000 | $17,000,000 | $17,000,000 |
Local | $0 | $0 | $0 | $0 |
Total | $17,371,000 | $20,650,000 | $17,000,000 | $17,000,000 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $72,021,000 | $0 | $72,021,000 |
Date | Status | Description |
---|---|---|
06/26/2024 | Amended | Add $3,650,000 in federal Strategic Safety Funds. Total project cost increases. |
10/18/2023 | Amended | Add $371,000 in federal SAE funds. Total project cost increases. |
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
11/17/2022 | Amended | Remove $8,500,000 in state Safety funding that will be programmed to a separate project. Total project cost decreases. |
09/22/2022 | Amended | Add $8,500,000 in state Safety funding due to one-time increase in HSIP funding. |
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
Region 1 Hot Spot Pool
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
State (Safety) | $433,000 | $433,000 | $433,000 | $433,000 |
Local | $0 | $0 | $0 | $0 |
Total | $433,000 | $433,000 | $433,000 | $433,000 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $1,732,000 | $0 | $1,732,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
08/22/2019 | Amended | Proposed for adoption into 2020-2023 |
04/20/2017 | Amended | Proposed for adoption into 2018-2021 |
04/16/2015 | Approved | Proposed for adoption into 2016-2021 |
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
Region 1 Traffic Signal Pool
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
State (Safety) | $3,491,000 | $3,168,000 | $3,162,000 | $3,162,000 |
Local | $0 | $0 | $0 | $0 |
Total | $3,491,000 | $3,168,000 | $3,162,000 | $3,162,000 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $12,983,000 | $0 | $12,983,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
08/22/2019 | Amended | Proposed for adoption into 2020-2023 |
10/18/2018 | Amended | Remove $1,100,000 of funding in FY 2019 and transfer to 2016-020 in order to move funding into one location. |
04/20/2017 | Amended | Proposed for adoption into 2018-2021 |
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
Region 1 Bridge On-System Pool
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Bridge On-System) | $17,400,000 | $9,620,000 | $9,950,000 | $9,900,000 |
State (Bridge On-System) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $17,400,000 | $9,620,000 | $9,950,000 | $9,900,000 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $46,870,000 | $0 | $46,870,000 |
Date | Status | Description |
---|---|---|
05/16/2024 | Amended | Add $8,000,000 in federal Bridge On-System funds and adjust one pool project. Total project cost increases. |
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
06/17/2020 | Amended | Add $1,000,000 to FY 2020 for additional design shelf project(s). Total project cost increases. |
08/22/2019 | Amended | Proposed for adoption into 2020-2023 |
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name | Description | Notes | Cost |
---|---|---|---|
Essential Culvert Repairs | $13,220,000 | ||
Essential Wall Repairs | $5,300,000 | ||
Preventative Bridge Maintenance | Proactive work, including scour work, fiber wrap | $8,500,000 | |
Joint Treatments | $6,800,000 | ||
Deck Treatments | Resurfacing/overlays | $7,000,000 | |
Bridge Essential Repairs | Generally reactive; girder cleanouts | $6,040,000 |
2024-2027 Transportation Improvement Program (Approved TIP)
Region 1 Bridge Off-System Pool
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Bridge Off-System) | $2,131,000 | $0 | $0 | $0 |
State (Bridge Off-System) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $2,131,000 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$8,252,000 | $2,131,000 | $0 | $10,383,000 |
Date | Status | Description |
---|---|---|
04/18/2024 | Amended | Add two pool projects and $2,131,000 in federal Bridge Off-System funds. Total project cost increases. |
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
07/11/2023 | Amended | Add $1,779,000 in federal Bridge Off-System funds, local match, and one new pool project. Total project cost increases. |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
01/16/2020 | Amended | Add new pool project. Total project cost increases. |
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name | Description | Notes | Cost |
---|---|---|---|
Dartmouth Ave | @ S Platte River | $1,392,000 | |
Rio Grande St | @ Slaughterhouse Gulch | $406,000 | |
112th Ave | @ Fulton Ditch | $500,000 | |
Potomac St | @ O'Brien Canal (partial replacement) | $760,000 | |
Chambers | @ Sand Creek Bridge (Aurora) | $214,000 | |
Windermere St | @ Highline Canal Bridge | $1,241,000 | |
Community Center Dr. | Northglenn | $524,000 | |
West Dartmouth Ave. | Englewood | $229,000 | |
Laredo St Bridge Rehab | Aurora | $1,779,000 | |
Tower Road | At 3rd Creek | $720,000 | |
88th | At Wolf Creek | $1,410,000 |
2024-2027 Transportation Improvement Program (Approved TIP)
Region 4 Traffic Signal Pool
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
State (Planning and Research Initiatives) | $0 | $0 | $0 | $0 |
State (Safety) | $250,000 | $250,000 | $250,000 | $250,000 |
Local | $0 | $0 | $0 | $0 |
Total | $250,000 | $250,000 | $250,000 | $250,000 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$660,000 | $1,000,000 | $0 | $1,660,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
03/18/2021 | Amended | Remove PRI funding. Total project cost decreases. |
06/17/2020 | Amended | Add funding to FY 2021, 2022, and 2023. Total project cost increases. |
05/20/2020 | Amended | Add funding. Overall project funding increases. |
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
Region 4 Hot Spot Pool
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
State (Safety) | $100,000 | $100,000 | $100,000 | $100,000 |
Local | $0 | $0 | $0 | $0 |
Total | $100,000 | $100,000 | $100,000 | $100,000 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$400,000 | $400,000 | $0 | $800,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
08/22/2019 | Amended | Proposed for adoption into 2020-2023 |
04/20/2017 | Amended | Proposed for adoption into 2018-2021 |
04/16/2015 | Approved | Proposed for adoption into 2016-2021 |
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
Region 4 Hazard Elimination Pool
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Strategic Safety Funds) | $0 | $1,000,000 | $0 | $0 |
State (Safety) | $1,000,000 | $1,000,000 | $1,000,000 | $1,000,000 |
Local | $1,000,000 | $1,000,000 | $1,000,000 | $1,000,000 |
Total | $2,000,000 | $3,000,000 | $2,000,000 | $2,000,000 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$11,000,000 | $9,000,000 | $0 | $20,000,000 |
Date | Status | Description |
---|---|---|
06/26/2024 | Amended | Add $1,000,000 in federal Strategic Safety Funds. Total project cost increases. |
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
08/19/2021 | Amended | Remove individually listed pool projects. Total project cost remains the same. |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
08/22/2019 | Amended | Proposed for adoption into 2020-2023 |
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
Region 4 Surface Treatment Pool
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
State (Surface Treatment) | $9,500,000 | $6,500,000 | $2,000,000 | $2,000,000 |
Local | $0 | $0 | $0 | $0 |
Total | $9,500,000 | $6,500,000 | $2,000,000 | $2,000,000 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$15,400,000 | $20,000,000 | $0 | $35,400,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
05/19/2021 | Amended | Add FASTER funding to existing pool project. Total project cost increases. |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
01/11/2021 | Amended | Combine two pool projects. Total project funding remains unchanged. |
10/22/2020 | Amended | Add new federal funding. Overall project cost increases. |
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name | Description | Notes | Cost |
---|---|---|---|
36B | Lyons South | Project also has $490 in FASTER funds in TIP# 2008-077 | $2,225,000 |
SH-119 | Nederland West to Roundabout | $6,025,000 |
2024-2027 Transportation Improvement Program (Approved TIP)
Region 1 Surface Treatment Pool
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
State (Surface Treatment) | $36,057,000 | $33,364,000 | $42,187,000 | $42,684,000 |
Local | $0 | $0 | $0 | $0 |
Total | $36,057,000 | $33,364,000 | $42,187,000 | $42,684,000 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$16,782,000 | $154,292,000 | $0 | $171,074,000 |
Date | Status | Description |
---|---|---|
02/22/2024 | Amended | Transfer $4,100,000 in state Surface Treatment funds to TIP ID# 2024-084. Total project cost decreases. |
11/15/2023 | Amended | Remove five completed pool projects, modify descriptions and costs for thirteen pool projects, and add one new pool project. Total project cost decreases. |
10/18/2023 | Amended | Remove one completed pool project, remove one pool project split into own TIP project, add four new pool projects, and transfer $9,500,000 in state Surface Treatment funds to new I70: Chief Hosa to W Colfax project. Total project cost decreases. |
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
07/11/2023 | Amended | Add $783,000 in state Surface funds and one new pool project. Total project cost increases. |
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name | Description | Notes | Cost |
---|---|---|---|
CO88 (Federal Blvd) | Alameda Ave to Louisiana Ave | $8,500,000 | |
US-85 | H. Ranch Pkwy to C-470 | $3,000,000 | |
CO86 | Woodlands Blvd to IREA Access | $2,500,000 | |
CO7 | I25 to US85 | $13,200,000 | |
I76 | York St to Dahlia St | $19,800,000 | |
US85 | I76 to 124th Ave | $8,100,000 | |
SH-224 | I-25 to US-6 | $5,000,000 | |
US40 | MP 252 to I70 | $12,000,000 | |
SH-391 | Hampden Ave to Jewell Ave | $4,000,000 | |
US287 | I70 to 92nd Ave | $10,100,000 | |
SH-265 | I-70 to US-6 | $4,600,000 | |
CO8 | Soda Lakes Rd to McIntyre St | $1,000,000 | |
Design | Various Locations | $2,000,000 | |
I76 | Emergency Repair | $782,000 | |
I70 | MP 215.7 to MP 231 | $9,800,000 | |
US85 | Florida to I25 | $3,000,000 | |
CO74 | Evergreen DT to Cold Springs Gulch | $7,200,000 | |
US285 | Federal to Dahlia | $10,800,000 | |
CO83 | MP 70.9 to Mississippi | $6,300,000 | |
US6 | 19th to Colfax | $6,500,000 | |
I25 | MP 208 to 44th | $12,300,000 | |
Alameda | Bryant to S Lipan St | $3,500,000 | |
CO88 | W Asbury to W Belleview | $9,000,000 | |
CO72 | I70 to W 52nd | $5,000,000 | |
CO121 | 4th to 37th | $5,100,000 | |
Maintenance | Various Locations | $2,000,000 |
2024-2027 Transportation Improvement Program (Approved TIP)
Region 4 Bridge On-System Pool
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Bridge On-System) | $2,484,000 | $2,484,000 | $0 | $0 |
State (Bridge On-System) | $516,000 | $516,000 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $3,000,000 | $3,000,000 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$8,350,000 | $6,000,000 | $0 | $14,350,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
05/16/2023 | Amended | Add one new pool project and $350,000 of federal Bridge On-System funds. Total project cost increases. |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
01/11/2021 | Amended | Reduce FY 21 funds. Add pool project. Total project funding decreases. |
06/17/2020 | Amended | Adjust funding of one pool project. Total overall cost remains unchanged. |
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name | Description | Notes | Cost |
---|---|---|---|
I-25 Preventative Maintenance (FY20) | $200,000 | ||
Boulder Polyester Overlay | $2,705,000 | ||
Critical Culvert Construction (FY 22) | Pkg D - SH-170 | $222,000 | |
CO7 and Boulder Creek | $350,000 |
2024-2027 Transportation Improvement Program (Approved TIP)
Safe Routes to School Pool
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Safe Routes to School) | $1,171,000 | $0 | $0 | $0 |
State (Safe Routes to School) | $0 | $0 | $0 | $0 |
Local | $294,000 | $0 | $0 | $0 |
Total | $1,465,000 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$8,034,000 | $1,465,000 | $0 | $9,499,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
05/16/2023 | Amended | Add three new pool projects and $1,171,000 in federal Safe Routes to School funding. Total project cost increases. |
07/22/2021 | Amended | Edit funding source to reflect federal Safe Routes to School funding is used. Total project cost remains the same. |
05/19/2021 | Amended | Add four pool projects. Total project cost increases. |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name | Description | Notes | Cost |
---|---|---|---|
Denver | DPS-Cole Arts & Science Academy Multimodal Improvements | $350,000 | |
Jefferson County | Fairmount ES & Cornerstone Montessori School Ped/Bike Safety Improvements | $265,000 | |
Frederick | Thunder Valley K-8 Multipurpose Trail Project | $300,000 | |
Boulder County | South Heatherwood Intersection and Sidewalk Improvements | $350,000 | |
Edgewater | Edgewater School Crossing and Traffic Calming Project | $134,000 | |
Thornton | Westgage Community School Sidewalks | $314,000 | |
Denver | McAuliffe International School Pedestrian Improvements (FY20) | $500,000 | |
Lyons | 4th Ave Pedestrian Bridge and Connection (FY20) | $500,000 | |
Lakewood | 1st Ave Sidewalks (FY20) | $435,000 | |
Boulder | Mesa Elementary Safety Improvements (FY20) | $193,000 | |
Denver | Smith Elementary Intersection Improvements (FY22) | $402,000 | |
Arvada | Secrest Elementary Sidewalk (FY22) | $508,000 | |
Mead | Town of Mead Regional Trail (FY22) | $425,000 | |
Denver | Advancing a Culture of Active Transportation in Schools (FY22) | $67,000 | |
Adams County | Lowell Blvd & 54th Ave Crossing Improvements (FY24) | $121,000 | |
Columbine Valley | Wilder Walk and Bike Way (FY24) | $342,000 | |
Boulder | Safe Routes for Manhattan Middle School (FY24) | $708,000 |
2024-2027 Transportation Improvement Program (Approved TIP)
Region 1 Design Pool
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Freight) | $0 | $0 | $0 | $0 |
State (Legislative) | $0 | $0 | $0 | $0 |
State (Regional Priority Projects) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$10,250,000 | $0 | $0 | $10,250,000 |
Date | Status | Description |
---|---|---|
07/22/2024 | Amended | Remove one pool project and transfer $750,000 of prior year state Legislative funding to I25 Greenland Wildlife Overpass project. Total project cost decreases. |
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
02/17/2022 | Amended | Add one new pool project and add $2,000,000 in federal FR8 funding. Total project cost increases. |
12/16/2021 | Amended | Remove one pool project and reduce state legislative funding by $1,500,000. |
09/27/2021 | Amended | Proposed for adoption into 2022-2025 |
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name | Description | Notes | Cost |
---|---|---|---|
Kings Valley Interchange | $1,000,000 | ||
Regionwide Bottleneck Reductions | $2,500,000 | ||
US-85 | Daniels to Meadows | $500,000 | |
Bicycle/Pedestrian Grade Separations | $4,250,000 | ||
SH-79 Bridge over I-70 | $2,000,000 |
2024-2027 Transportation Improvement Program (Approved TIP)
Region 4 Bridge Off-System Pool
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Bridge Off-System) | $4,408,000 | $0 | $0 | $0 |
State (Bridge Off-System) | $0 | $0 | $0 | $0 |
Local | $2,133,000 | $0 | $0 | $0 |
Total | $6,541,000 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$3,049,000 | $6,541,000 | $0 | $9,590,000 |
Date | Status | Description |
---|---|---|
03/21/2024 | Amended | Add one new pool project and $308,000 in federal Bridge Off-System funding. Total project cost increases. |
01/17/2024 | Amended | Add two pool projects and adjust one existing pool project. Add $4,100,000 in federal Bridge Off-System funds. Total project cost increases. |
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
05/16/2023 | Amended | Add two new pool projects and $1,766,000 in federal Bridge Off-System funding. Total project cost increases. |
01/19/2023 | Amended | Add $513,000 of federal Bridge Off-System funds and $128,000 in local match in FY2023 and add one new pool project. Total project cost increases. |
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name | Description | Notes | Cost |
---|---|---|---|
WCR34 - Mead (Fiscal Year 2022/2024) | $1,746,000 | ||
120th St over Coal Creek (FY23) | $513,000 | ||
WCR20 (FY23) | $730,000 | ||
WCR3 north of WCR12 (FY23) | $1,036,000 | ||
Rock Creek Pkwy Rehab (Fiscal Year 2024) | $1,077,000 | ||
WCR26 - Firestone (Fiscal Year 2024) | $1,438,000 | ||
WCR4 - Lochbuie (Fiscal Year 2024) | $308,000 |
2024-2027 Transportation Improvement Program (Approved TIP)
Region 1 FASTER Pool
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Faster Safety) | $10,200,000 | $0 | $0 | $0 |
State (Faster Safety) | $23,218,000 | $22,300,000 | $21,550,000 | $25,550,000 |
Local | $0 | $0 | $0 | $0 |
Total | $33,418,000 | $22,300,000 | $21,550,000 | $25,550,000 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$23,181,000 | $102,818,000 | $0 | $125,999,000 |
Date | Status | Description |
---|---|---|
07/22/2024 | Amended | Transfer $2,000,000 in state FASTER-Safety funding to new I25/CO7 Interim Transit Improvements project, and $7,500,000 to new I25 Greenland Wildlife Overpass project. Total project cost decreases. |
12/19/2023 | Amended | Remove $12,800,000 in prior funding transferred to 2024-084. Total project cost decreases. |
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
12/21/2022 | Amended | Add one new pool project. Total project cost remains the same. |
11/17/2022 | Amended | Remove $5,000,000 in state FASTER-Safety funding that will go to 2005-072. Total project cost decreases. |
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
Region 4 FASTER Pool
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Faster Safety) | $0 | $0 | $0 | $0 |
State (Faster Safety) | $5,000,000 | $5,000,000 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $5,000,000 | $5,000,000 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$12,500,000 | $10,000,000 | $0 | $22,500,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
03/16/2023 | Amended | Add one new pool project for bike/ped safety improvements along US-287 at four intersections in Longmont (9th Ave., Mountain View Ave., 17th Ave., & 23rd Ave.). Total project cost remains the same. |
05/19/2021 | Amended | Add new pool project. Total project cost remains the same. |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
09/17/2020 | Amended | Add one new pool project. Total funding remains the same. |
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name | Description | Notes | Cost |
---|---|---|---|
SH-66 and WCR 13 | Radii Widening | $36,000 | |
SH-119 | Nederland West to Roundabout | $2,500,000 | |
US-287 Bike/Ped Safety Improvements | Four Intersections in Longmont | $1,521,000 |
2024-2027 Transportation Improvement Program (Approved TIP)
Region 1 FASTER Bridge and Tunnel Enterprise Pool
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
State (FASTER Br. Enterprise) | $7,700,000 | $2,000,000 | $15,000,000 | $24,750,000 |
State (Legislative) | $0 | $0 | $0 | $16,250,000 |
Local | $0 | $0 | $0 | $0 |
Total | $7,700,000 | $2,000,000 | $15,000,000 | $41,000,000 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$29,844,000 | $65,700,000 | $0 | $95,544,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
06/17/2020 | Amended | Add funding and 3 new pool projects. Total funding amount increases. |
09/18/2019 | Amended | Add one new pool project. Total funding remains the same. |
08/22/2019 | Amended | Proposed for adoption into 2020-2023 |
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name | Description | Notes | Cost |
---|---|---|---|
I-70 WB Over US 6 | Clear Creek (Floyd Hill) | $5,700,000 | |
Speer and 23rd | Bridge Replacements | $60,000,000 | |
I-76 over York St. | E-17-GW and E-14-GV | $12,535,000 | |
I-70 over W. 32nd Ave. | Replace 2 Bridges | $13,773,000 |
2024-2027 Transportation Improvement Program (Approved TIP)
CDOT FASTER Transit Pool
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
State (Faster Transit) | $7,483,000 | $3,216,000 | $3,000,000 | $3,000,000 |
Local | $1,042,000 | $804,000 | $750,000 | $750,000 |
Total | $8,525,000 | $4,020,000 | $3,750,000 | $3,750,000 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$6,924,000 | $20,045,000 | $0 | $26,969,000 |
Date | Status | Description |
---|---|---|
11/15/2023 | Amended | Transfer one pool project to 2018-004 and update one pool project funding. Total project cost decreases. |
09/21/2023 | Amended | Add three new pool projects, and add $374,000 in state FASTER-Transit funds and $94,000 in local match. Total project cost increases. |
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/24/2023 | Amended | Add two new pool projects. Total project cost increases. |
09/08/2022 | Amended | Adjust scope of one pool project and reduce cost by $38,000. Total project cost decreases. |
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name | Description | Notes | Cost |
---|---|---|---|
RTD | East Colfax/15L Transit Enhancements Project | $770,000 | |
RTD | Mineral PnR Bridge Rehab (FY17) | $57,000 | |
RTD | Thornton PnR Passenger Amenities (FY17) | $308,000 | |
RTD | US-36 and Sheridan PnR (FY18) | $1,500,000 | |
RTD | Bus Replacements (FY20) | $2,000,000 | |
Boulder | Vehicle Replacement (FY21) | $323,000 | |
VIA | Bus Cameras (FY21) | $151,000 | |
DRCOG | HST/FASTER Set-Aside (See TIP-ID 2020-079) | $0 | |
VIA | Facility Security Improvements (FY23) | $120,000 | |
RTD | East Metro Roof Replacement (FY23) | $3,171,000 | |
RTD | District Shops Hoist Replacement (FY23) | $2,929,000 | |
VIA | 2 Replacement Vans (FY23) | $166,000 | |
Boulder | 3 Replacement Buses (FY23) | $938,000 | |
VIA | Equipment (FY23) | $278,000 | |
VIA | Construction (FY23) | $96,000 | |
VIA | Maintenance Equipment (FY24) | $71,000 | |
VIA | Facility Design (FY24) | $96,000 |
2024-2027 Transportation Improvement Program (Approved TIP)
DRCOG Second Commitment to FasTracks
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $771,000 | $0 | $0 | $0 |
Local | $193,000 | $0 | $0 | $0 |
Total | $964,000 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$59,036,000 | $964,000 | $0 | $60,000,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
05/16/2023 | Amended | Transfer $2,089,000 in federal Surface Transportation Block Grant funding to TIP ID# 2022-033 for their Second Commitment in Principal amount to be applied toward multimodal access improvements to Mineral Station. Pool total decreases. |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
08/22/2019 | Amended | Proposed for adoption into 2020-2023 |
10/19/2017 | Amended | Transfer $1,746,000 in federal STP-Metro funding to 2 new projects for the remaining Northwest Corridor allocation. Update scope. Pool total decreases. |
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
Way to Go: Regional TDM Program
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congestion Mitigation / Air Quality) | $5,124,000 | $0 | $4,800,000 | $0 |
Local | $100,000 | $0 | $100,000 | $0 |
Total | $5,224,000 | $0 | $4,900,000 | $0 |
Project Phase to Initiate | Other Phase | None | Other Phase | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $10,124,000 | $0 | $10,124,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
06/16/2022 | Amended | Add $417,000 in CMAQ funds to FY2022. Total project cost increases. |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
08/22/2019 | Amended | Proposed for adoption into 2020-2023 |
04/19/2018 | Amended | Add $244,270 in federal CMAQ funding in FY 2018 using previous contract savings. Adjust local match to reflect match on the matched portion of the grant only. Total project costs increase. |
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
Enhanced Mobility of Seniors and Individuals with Disabilities (FTA 5310 - CDOT)
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Section 5310) | $4,128,000 | $0 | $0 | $0 |
Local | $1,381,000 | $0 | $0 | $0 |
Total | $5,509,000 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$34,561,000 | $5,509,000 | $0 | $40,070,000 |
Date | Status | Description |
---|---|---|
06/26/2024 | Amended | Increase cost of one pool project and add $17,000 in federal Section 5310 funds. Total project cost increases. |
12/19/2023 | Amended | Add two new pool projects and $1,110,000 in federal Section 5310 funding. Total project cost increases. |
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/24/2023 | Amended | Remove two pool projects and add one new FY 2023 Small Urban pool projects. Total project cost decreases. |
03/16/2023 | Amended | Add four new FY 23 Small Urban pool projects. Total project cost increases. |
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name | Description | Notes | Cost |
---|---|---|---|
Via Mobility Services | Bus replacement (FY19 Small Urban) | $105,000 | |
Easter Seals | Minivan replacement (FY19 Large Urban) | $38,000 | |
Seniors Resource Center | Bus Replacement (FY19 Large Urban) | $408,000 | |
Via | Mobility Management (FY19 Large Urban) | $227,000 | |
Seniors Resource Center | Mobility Management (FY19 Large urban) | $248,000 | |
Seniors Resource Center | Operating (FY19 Large Urban) | $273,000 | |
DRMAC | Mobility Management (FY19 Large Urban) | $250,000 | |
Douglas County | Mobility Management (FY19 Large Urban) | $375,000 | |
Continuum of Colorado | Operating (FY19 Large Urban) | $90,000 | |
Continuum of Colorado | Vehicle Replacement (FY19 Large Urban) | $68,000 | |
Easter Seals Colorado | Vehicle Replacement (FY19 Large Urban) | $55,000 | |
SRC | Vehicle Replacement (FY19 Large Urban | $42,000 | |
SRC | Bus Replacement (FY19 Large Urban) | $72,000 | |
SRC | Bus Replacement (FY19 Large Urban) | $124,000 | |
Adams County | Mobility Management (FY20) | $108,000 | |
Broomfield | 1 Vehicle Expansion (FY20) | Funded also with HST | $54,000 |
Broomfield | Equipment (FY20) | Funded also with HST | $25,000 |
DRMAC | Mobility Management (FY20) | Funded also with HST | $288,000 |
SRC | Mobility Management (FY20) | Funded also with HST | $439,000 |
SRC | Operating (FY20) | Funded also with HST | $385,000 |
SRC | Van Expansion (FY20) | Funded also with HST | $83,000 |
SRC | BOC Expansion (FY20) | Funded also with HST | $73,000 |
VIA | Mobility Management (FY20) | $192,000 | |
Douglas County | 1 Van Expansion (FY20) | $48,000 | |
Douglas County | Mobility Management (FY20) | $395,000 | |
Easter Seals | 1 BOC Expansion (FY20) | $52,000 | |
Laradon Hall Society | Van Replacement (FY20) | $103,000 | |
Goodwill - Denver | Replacement Vehicle (FY20) | $55,000 | |
Continuum of Colorado | Operating (FY21) | $135,000 | |
VIA | 2 Replacement Vehicles (FY21 Small Urban) | $180,000 | |
VIA | Mobility Management (FY22 Small Urban) | $573,000 | |
VIA | One BOC Replacement (FY22 Small Urban) | $144,000 | |
Laradon Hall Society | 3 Replacement Vehicles (FY22 Small Urban) | $176,000 | |
Via | 4 Replacement Vans (Fiscal Year 2022 Small Urban) | $333,000 | |
VIA | Mobility Management (FY23 Small Urban) | $585,000 | |
VIA | Operating (FY23 Small Urban) | $491,000 | |
Laradon Hall Society | 5 Vehicle Replacements (FY23 Small Urban) | $392,000 | |
Via | Operating (Fiscal Year 2024 Small Urban) | $510,000 | |
Via | Mobility Management (Fiscal Year 2024 Small Urban) | $600,000 |
2024-2027 Transportation Improvement Program (Approved TIP)
RTD Capital Improvements: Bus and Facilities Funding
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Section 5339) | $6,730,000 | $6,940,000 | $7,140,000 | $7,360,000 |
Local | $1,690,000 | $1,740,000 | $1,790,000 | $1,840,000 |
Total | $8,420,000 | $8,680,000 | $8,930,000 | $9,200,000 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$18,244,000 | $35,230,000 | $0 | $53,474,000 |
Date | Status | Description |
---|---|---|
05/16/2024 | Amended | Add $18,244,000 in prior year funding incorrectly not carried forward to new TIP. Total project cost increases. |
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
08/22/2019 | Amended | Proposed for adoption into 2020-2023 |
07/19/2018 | Amended | Increase FY2019, FY2020, and FY2021 funding. Total project cost increases. |
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
Region 1 Rockfall/Geohazard Pool
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
State (Rockfall Mitigation) | $500,000 | $500,000 | $500,000 | $500,000 |
Local | $0 | $0 | $0 | $0 |
Total | $500,000 | $500,000 | $500,000 | $500,000 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $2,000,000 | $0 | $2,000,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
05/20/2020 | Amended | Add funding. Overall project funding increases. |
08/22/2019 | Amended | Proposed for adoption into 2020-2023 |
11/29/2018 | Amended | Restore from the 2016-2021 TIP. Add state rockfall funding; increase total project funding. |
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
Region 4 2013 Flood-Related Projects Pool
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Federal Emergency ) | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$278,335,000 | $0 | $0 | $278,335,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
10/21/2021 | Amended | Add $6,000,000 in FY 22 for SH-7 repairs. Total project cost increases. |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
01/11/2021 | Amended | Shift funds from FY 20 to FY 21. Total project funding increases. |
08/22/2019 | Amended | Proposed for adoption into 2020-2023 |
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name | Description | Notes | Cost |
---|---|---|---|
PR SH7 Flood Repair | MP 19-33 |
2024-2027 Transportation Improvement Program (Approved TIP)
Region 4 Non-Regionally Significant RPP Pool
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
State (Regional Priority Projects) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$6,392,000 | $0 | $0 | $6,392,000 |
Date | Status | Description |
---|---|---|
10/18/2023 | Amended | Move $7,300,000 in RPP funds to TIP ID# 2020-081. Total project cost decreases. |
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
02/16/2023 | Amended | Remove eight pool projects incorrectly programmed with RPP funds. |
11/17/2022 | Amended | Add six new pool projects. Total project cost remains the same. |
07/21/2022 | Amended | Add one new pool project and $2,692,000 in prior year funding. Total project cost increases. |
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name | Description | Notes | Cost |
---|---|---|---|
SH-66: WCR 7 Intersection Imp | $1,000,000 | ||
SH-119/SH-52 Transit Bypass Lanes | $470 in RPP in TIP# 2020-081 | $0 | |
Coffman St. Busway | $1,230 in RPP in TIP# 2020-083 | $0 | |
SH-119/Hover Intersection | $7,300 in RPP in TIP# 2020-081 | $0 |
2024-2027 Transportation Improvement Program (Approved TIP)
Air Quality Improvements Set-Aside
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congestion Mitigation / Air Quality) | $2,420,000 | $1,776,000 | $1,626,000 | $1,378,000 |
Local | $605,000 | $444,000 | $406,000 | $344,000 |
Total | $3,025,000 | $2,220,000 | $2,032,000 | $1,722,000 |
Project Phase to Initiate | Other Phase | Other Phase | Other Phase | Other Phase |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $8,999,000 | $0 | $8,999,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
08/22/2019 | Amended | Proposed for adoption into 2020-2023 |
04/18/2019 | Amended | Remove $120,000 in local project returns and shift to 2016-058, SIP Modeling Study. |
11/29/2018 | Amended | Remove $90,000 of federal CMAQ funding in FY 2019 and replace with RTD local funding. Total project cost remains the same. |
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
Regional Transportation Operations and Technology Set-Aside
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $2,357,000 | $1,268,000 | $528,000 | $5,000,000 |
Local | $589,000 | $317,000 | $132,000 | $1,250,000 |
Total | $2,946,000 | $1,585,000 | $660,000 | $6,250,000 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$10,379,000 | $11,441,000 | $0 | $21,820,000 |
Date | Status | Description |
---|---|---|
10/18/2023 | Amended | Remove $10,847,000 to program to individual set-aside projects. Total project cost decreases. |
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
09/17/2020 | Amended | Add pool projects from recent call and adjust funding. Total project cost increases. |
08/22/2019 | Amended | Proposed for adoption into 2020-2023 |
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name | Description | Notes | Cost |
---|---|---|---|
Aurora | Signal System Upgrade (FY22) | Funded at 100% | $460,000 |
Aurora | Signal Controller Upgrades (FY23) | Funded at 100% | $796,000 |
Boulder | ATSPM & System Communication (FY22-23) | $1,349,000 | |
CDOT R1 | Advance Detection (FY21,23) | Funded at 100% | $892,000 |
CDOT R1 | Traffic Camera Expansion (FY21-23) | $161,000 | |
Centennial | S2S Communication (FY21-23) | $800,000 | |
Commerce City | ATSPM System (FY21-22) | $190,000 | |
Denver | Bluetooth Expansion (FY23) | $977,000 | |
Denver | Adaptive Signal Control & ATSPM System (FY22) | Funded at 100% | $891,000 |
Denver | Pedestrian Detection (FY21) | $927,000 | |
Douglas County | ATSPM System (FY22) | $292,000 | |
Jefferson County | System Communication (FY21) | Funded at 100% | $434,000 |
Littleton | System Communication (FY21-22) | $590,000 | |
Lone Tree | Adaptive Signal Control (FY22) | Funded at 100% | $200,000 |
Parker | Traffic Responsive Signal Control (FY21) | $400,000 | |
RTD | TSP Data Management (FY21-22) | Funded at 100% | $530,000 |
RTD | TSP Conditionality (FY21-22) | Funded at 100% | $450,000 |
2024-2027 Transportation Improvement Program (Approved TIP)
FLEX Route Extension: Boulder to Longmont
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congestion Mitigation / Air Quality) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$2,778,000 | $0 | $0 | $2,778,000 |
Date | Status | Description |
---|---|---|
07/22/2024 | Amended | Change the scope for $250,000 in Fiscal Year 2023 federal Congestion Mitigation/Air Quality funds to new Transfort electric vehicle chargers. Total project cost remains the same. |
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Per FY20 project delays report, shift FY20-23 funding to FY21-24. Proposed for adoption into 2022-2025. |
10/22/2020 | Amended | Increase local match. Total project cost increases. |
08/22/2019 | Amended | Proposed for adoption into 2020-2023 |
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
Wadsworth Operations and Widening: 35th to I70
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congestion Mitigation / Air Quality) | $0 | $0 | $0 | $0 |
Federal (Congressional Allocation) | $4,000,000 | $0 | $0 | $0 |
Federal (STBG-Pandemic DRCOG Region) | $0 | $0 | $0 | $0 |
Federal (Surface Transportation Block Grant) | $0 | $0 | $0 | $0 |
State (Legislative) | $0 | $0 | $0 | $0 |
State (Safety) | $0 | $0 | $0 | $0 |
State (Surface Treatment) | $0 | $0 | $0 | $0 |
Local | $832,000 | $0 | $0 | $0 |
Total | $4,832,000 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$60,369,000 | $4,832,000 | $0 | $65,201,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
05/16/2023 | Amended | Add $4,000,000 in federal Congressional funding. Total project cost increases. |
03/16/2023 | Amended | Add $1,360,000 in state Legislative funding from the Region 1 Revitalizing Main Streets Pool. Total project cost increases. |
12/21/2022 | Amended | Add $1,100,000 in state Safety funds. Total project cost increases. |
07/22/2021 | Amended | Add $4,909,000 in funding, including $1,600,000 in STBG funds transferred from 2020-065, and $3,309,000 in local funds. Transfer approved by Jefferson forum. Total project cost increases. |
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
I25/Broadway Station Interchange Improvements
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (STBG-Pandemic DRCOG Region) | $0 | $0 | $0 | $0 |
Federal (Surface Transportation Block Grant) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$89,922,000 | $0 | $0 | $89,922,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
08/22/2019 | Amended | Proposed for adoption into 2020-2023 |
11/16/2017 | Amended | Add $1,221,000 of state Permanent Water Quality funding in FY 2018. Total project cost increases. |
04/20/2017 | Amended | Proposed for adoption into 2018-2021 |
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
16th St. Mall Rehabilitation: Market to Civic Center Station
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
State (MMOF) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$113,000,000 | $0 | $0 | $113,000,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
02/19/2020 | Amended | Change FY 2022 STP-Metro funding to MMOF. Overall project funding remains the same. |
08/22/2019 | Amended | Proposed for adoption into 2020-2023 |
08/17/2017 | Amended | Roll Forward project and funding from 2016-2021 TIP and place $4,799,000 in federal STP-Metro funding and $1,200,000 of local funding into FY 2018 in order to obligate. Total project funding remains unchanged. |
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
East Lafayette Multimodal Path Connection: Commerce to Lafayette Park-n-Ride
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $0 | $0 | $0 | $0 |
Federal (Transportation Alternatives-DRCOG) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$10,359,000 | $0 | $0 | $10,359,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
08/11/2020 | Amended | Add $2,600,000 in additional local overmatch for the increase of one underpass to two after project award. Total project cost increases. |
06/17/2020 | Amended | Import into the 20-23 TIP and add local overmatch to account for the increase of one underpass to two after project award. Total project cost increases. |
08/17/2017 | Amended | Correct FY 2018 CDOT TAP funding to agree with award and add FY 2019 CDOT TAP funding. Total project funding increases. |
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
I25 Managed Lanes: 120th to E470
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (TIFIA) | $0 | $0 | $0 | $0 |
Federal (Tolling) | $0 | $0 | $0 | $0 |
State (Regional Priority Projects) | $0 | $0 | $0 | $0 |
State (Tolling) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$121,477,000 | $0 | $0 | $121,477,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
07/11/2023 | Amended | Remove $4,800,000 in federal TIFIA loans and add $4,800,000 in state toll funding. Total project cost remains the same. |
07/21/2022 | Amended | Refinanced TIFIA loan. $23,630,000 of prior loan funding moves into FY23 and increases by $4,800,000. Total project cost increases. |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
08/22/2019 | Amended | Proposed for adoption into 2020-2023 |
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
Region 1 ITS Pool
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
State (Intelligent Transportation System) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$8,000,000 | $0 | $0 | $8,000,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
08/22/2019 | Amended | Proposed for adoption into 2020-2023 |
04/20/2017 | Amended | Proposed for adoption into 2018-2021 |
04/16/2015 | Approved | Adopted into the 2016-2021 TIP |
2024-2027 Transportation Improvement Program (Approved TIP)
Region 1 RPP Pool
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
State (Regional Priority Projects) | $17,750,000 | $8,085,000 | $15,050,000 | $18,170,000 |
State (TC Contingency) | $4,800,000 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $22,550,000 | $8,085,000 | $15,050,000 | $18,170,000 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $63,855,000 | $0 | $63,855,000 |
Date | Status | Description |
---|---|---|
06/26/2024 | Amended | Add $1,657,000 of Transportation Commission Contingency funds and one pool project. Total project cost increases. |
03/21/2024 | Amended | Add two new pool projects and $1,363,000 in state Transportation Commission Contingency funds. Total project cost increases. |
02/22/2024 | Amended | Add one pool project, adjust one pool project funding using existing unallocated funding, and add $1,780,000 in state Transportation Commission Contingency funds. Total project cost increases. |
10/18/2023 | Amended | Transfer $9,000,000 in state Regional Priority Project funds to new I70: Chief Hosa to W Colfax project. Total project cost decreases. |
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name | Description | Notes | Cost |
---|---|---|---|
Small projects/consultants/closeouts | $8,000,000 | ||
local agency contributions | Included in various TIP pages | $5,000,000 | |
Design | $2,000,000 | ||
Steel Bridge Girders Cleanout | Regionwide | $1,000,000 | |
Maintenance Paving Support IDIQ | Regionwide | $5,000,000 | |
C470/I70 Emergency Bridge Repair | $1,780,000 | ||
Expansion Device Replacement | I76 and I225 | $5,000,000 | |
C470/Quincy Ramp Roundabouts | $1,363,000 | ||
I76 and Dahlia Bridge Repair | $1,657,000 |
2024-2027 Transportation Improvement Program (Approved TIP)
Ozone State Implementation Plan (SIP) Modeling
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $360,000 | $180,000 | $180,000 | $0 |
Local | $90,000 | $45,000 | $45,000 | $0 |
Total | $450,000 | $225,000 | $225,000 | $0 |
Project Phase to Initiate | Other Phase | None | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $900,000 | $0 | $900,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
08/22/2019 | Amended | Proposed for adoption into 2020-2023 |
04/18/2019 | Amended | Add $120,000 transferred from 2016-002. Total project cost increases. |
12/20/2018 | Amended | Add $125,000 of STP-Metro funding in FY 2019. This allocation advances a portion of the FY 2020 allocation. Total project cost increases. |
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
C470 Toll Express Lanes: I25 to Wadsworth
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Bond/Loans) | $0 | $0 | $0 | $0 |
Federal (TIFIA) | $0 | $0 | $0 | $0 |
State (Bond/Loans) | $0 | $0 | $0 | $0 |
State (Operations) | $0 | $0 | $0 | $0 |
State (Permanent Water Quality) | $0 | $0 | $0 | $0 |
State (RAMP) | $0 | $0 | $0 | $0 |
State (TC Contingency) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$344,061,000 | $0 | $0 | $344,061,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
08/22/2019 | Amended | Proposed for adoption into 2020-2023 |
01/17/2019 | Amended | Add $11,000,000 of state TC Contingency and $14,000,000 of state RAMP funding in FY 2018. Total project cost increases. |
08/17/2017 | Amended | Adjust funding amounts and years to reflect current funding scenario post-TIFIA loan closing. |
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
RTD Bus Purchases
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congestion Mitigation / Air Quality) | $0 | $0 | $0 | $0 |
Federal (Section 5339) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$5,000,000 | $0 | $0 | $5,000,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
08/22/2019 | Amended | Proposed for adoption into 2020-2023 |
07/10/2019 | Amended | Add $7,500,000 of FTA Section 5339 funding and $7,500,000 of RTD match in FY 2019 for bus purchases. Total project increases. |
11/29/2018 | Amended | Add $90,000 of CMAQ funding in FY 2019 transferred from TIPID 2016-002. Total project cost increases. |
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
Transit Operating and Capital (FTA 5311)
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Section 5311) | $800,000 | $800,000 | $830,000 | $850,000 |
State (Section 5311) | $0 | $0 | $0 | $0 |
Local | $600,000 | $600,000 | $620,000 | $650,000 |
Total | $1,400,000 | $1,400,000 | $1,450,000 | $1,500,000 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$2,099,000 | $5,750,000 | $0 | $7,849,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
06/17/2020 | Amended | Adjust funding for one pool project. Total funding amount decreases. |
04/16/2020 | Amended | Add one project from recent call for projects. Total project cost increases. |
11/20/2019 | Amended | Add one pool project and funding. Total project cost increases. |
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name | Description | Notes | Cost |
---|---|---|---|
SRC (Jefferson Co) | Cutaway Replacement (FY17) | $66,000 | |
VIA | 1 Bus Replacement (FY20 Rural) | $91,000 |
2024-2027 Transportation Improvement Program (Approved TIP)
US85 Operational Improvements: I76 to 124th
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
State (Regional Priority Projects) | $0 | $0 | $0 | $0 |
State (TC Contingency) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$17,437,000 | $0 | $0 | $17,437,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
08/22/2019 | Amended | Proposed for adoption into 2020-2023 |
10/18/2018 | Amended | Add $338,000 of state RPP in FY 2019. Total project cost increases. |
04/19/2018 | Amended | Add $900,000 in state Transportation Commission Contingency (TCC) funds and $1,199,000 in Regional Project Priority funds in FY 2018 for ROW acquisition. Total project funding increases. |
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
88th NEPA Study: I76 to CO2
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$250,000 | $0 | $0 | $250,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
08/22/2019 | Amended | Proposed for adoption into 2020-2023 |
09/22/2016 | Amended | Adopted into the 2016-2021 TIP from the waitlist. |
2024-2027 Transportation Improvement Program (Approved TIP)
19th St Multimodal Improvements: Norwood to Sumac
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Transportation Alternatives-DRCOG) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$890,000 | $0 | $0 | $890,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
08/22/2019 | Amended | Proposed for adoption into 2020-2023 |
04/20/2017 | Amended | Proposed for adoption into 2018-2021 |
01/19/2017 | Amended | Reduce FY 2018 and FY 2019 local match to $41,000 in each year. Overall funding decreases. |
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
Region 1 ADA Projects
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
State (ADA) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$44,972,000 | $0 | $0 | $44,972,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
10/17/2019 | Amended | Add funding to FY 2020 and 2021. Total project cost increases. |
08/22/2019 | Amended | Proposed for adoption into 2020-2023 |
07/20/2017 | Amended | Adjust funding between TIP years and add future funding. Increase total project costs. |
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
Region 1 Transportation Alternatives (TA) Pool
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Transportation Alternatives-CDOT) | $3,205,000 | $3,274,000 | $3,345,000 | $0 |
Local | $667,000 | $681,000 | $696,000 | $0 |
Total | $3,872,000 | $3,955,000 | $4,041,000 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$14,231,000 | $11,868,000 | $0 | $26,099,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
03/16/2023 | Amended | Remove one pool project and $2,505,000 in prior year funding. Total project cost decreases. |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
05/20/2020 | Amended | Add 4 projects from recent call for projects. Total project cost increases. |
08/22/2019 | Amended | Proposed for adoption into 2020-2023 |
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name | Description | Notes | Cost |
---|---|---|---|
Jefferson County | Peaks and Plains: Mouth of Clear Creek Canyon Segment | $852,000 | |
Evergreen | North Lake Trail | $200,000 | |
Denver | 47th and York Safe Crossing Project | $2,500,000 | |
Golden | US-6 Wildlife Crossing and Multi-use Trail Improvements | $400,000 | |
Golden | West Colfax Ave Sidewalk/Connectivity Project | $530,000 | |
Jefferson County | Peaks to Plains - Huntsman Gulch to Rigor Mortis Rapids | $1,653,000 | |
Westminster | Citywide Multimodal Transportation Safety, Access, and Connections Improvem | $199,000 | |
Arvada | Alkire St Sidepath | $1,200,000 | |
Denver | NE Trails to Transit Connectivity Project | $1,150,000 | |
Denver | Sanderson Gulch Trail | $2,500,000 | |
Broomfield | 120th Ave Complete Streets | $2,335,000 | |
Golden | Ford St | $1,200,000 | |
Wheat Ridge | Peaks to Plains Trail | $952,000 | |
Jefferson County Open Space | I70 Trail Geological Point of Interest | $1,804,000 | |
Sheridan | Mary Carter Greenway - US285 Underpass | $752,000 |
2024-2027 Transportation Improvement Program (Approved TIP)
Region 4 ADA Projects
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
State (ADA) | $250,000 | $250,000 | $250,000 | $250,000 |
Local | $0 | $0 | $0 | $0 |
Total | $250,000 | $250,000 | $250,000 | $250,000 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$2,000,000 | $1,000,000 | $0 | $3,000,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
06/17/2020 | Amended | Reduce funding to align with actual revenues. Total project cost decreases. |
08/22/2019 | Amended | Proposed for adoption into 2020-2023 |
05/18/2017 | Amended | Add $100,000 in prior funding. Increases total project overall. |
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
Transit Capital Program (FTA 5339)
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Section 5339) | $1,238,000 | $0 | $0 | $0 |
Local | $310,000 | $0 | $0 | $0 |
Total | $1,548,000 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$2,773,000 | $1,548,000 | $0 | $4,321,000 |
Date | Status | Description |
---|---|---|
11/15/2023 | Amended | Add one new pool project. Total project cost increases. |
09/21/2023 | Amended | Add three new pool projects, and add $1,031,000 in federal Section 5339 funds and $258,000 in local match. Total project cost increases. |
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/24/2023 | Amended | Add two new pool projects. Total project cost increases. |
05/19/2021 | Amended | Add new pool project. Total project cost increases. |
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name | Description | Notes | Cost |
---|---|---|---|
VIA | 2 Vehicle Replacements (FY21 Small Urban) | $180,000 | |
VIA | 9 Vehicle Replacements (FY23) | $728,000 | |
VIA | 2 Vehicle Expansion (FY23) | $303,000 | |
VIA | 9 Van Replacements (FY24) | $610,000 | |
VIA | Diesel Bus Replacement (FY24) | $118,000 | |
VIA | 2 Bus Expansion (FY24) | $303,000 | |
VIA | Software Improvements (FY24) | $207,000 |
2024-2027 Transportation Improvement Program (Approved TIP)
Vasquez Operational Improvements: 52nd to 64th
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congestion Mitigation / Air Quality) | $0 | $0 | $0 | $0 |
Federal (Congressional Allocation) | $4,000,000 | $0 | $0 | $0 |
Federal (Freight) | $0 | $0 | $0 | $0 |
State (Legislative) | $0 | $1,442,000 | $0 | $0 |
State (Regional Priority Projects) | $0 | $0 | $0 | $0 |
State (Safety) | $4,279,000 | $4,279,000 | $0 | $0 |
Local | $832,000 | $0 | $0 | $0 |
Total | $9,111,000 | $5,721,000 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$12,000,000 | $14,832,000 | $0 | $26,832,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
05/16/2023 | Amended | Add $4,000,000 in federal Congressional funding. Total project cost increases. |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
08/22/2019 | Amended | Proposed for adoption into 2020-2023 |
04/19/2018 | Amended | Move and change FY 2018 state RDP funding of $1,750,000 to FY 2019 state RPP funding. Total project cost remains the same. |
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
Region 1 Permanent Water Quality Pool
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
State (Permanent Water Quality) | $40,000 | $764,000 | $0 | $2,199,000 |
Local | $0 | $0 | $0 | $0 |
Total | $40,000 | $764,000 | $0 | $2,199,000 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$8,397,000 | $3,003,000 | $0 | $11,400,000 |
Date | Status | Description |
---|---|---|
07/22/2024 | Amended | Remove one pool project, transfer $1,249,000 in state Permanent Water Quality funds to new I25/CO7 Interim Transit Improvement project, adjust funding of two pool projects, and add $2,239,000 in state Permanent Water Quality funds. Total project cost increases. |
03/21/2024 | Amended | Adjust one pool project and add $110,000 in state Permanent Water Quality funds. Total project cost increases. |
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/24/2023 | Amended | Add two new pool projects and $654,000 of Permanent Water Quality funds. Total project cost increases. |
01/19/2023 | Amended | Add $1,249,000 in state Water Quality funds in FY2024 and add one new pool project. |
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name | Description | Notes | Cost |
---|---|---|---|
Federal Blvd | Green infrastructure/Water Quality Facilities | $1,995,000 | |
I-76 Water Quality Facilities | York St. to Dahlia St. | $1,640,000 | |
12th and Wadsworth Boulevard Water Quality Pond | $1,800,000 | ||
CO7 Bike Path Widening | $1,203,000 |
2024-2027 Transportation Improvement Program (Approved TIP)
Westminster Quiet Zones: BNSF Railway and Lowell, W 72nd, and Bradburn
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$1,455,000 | $0 | $0 | $1,455,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/24/2023 | Amended | Proposed for adoption into 2022-2025 |
10/19/2017 | Amended | Add new project with funding from the Northwest Corridor SCIP funding. |
2024-2027 Transportation Improvement Program (Approved TIP)
I25 Capacity Improvements: Castle Rock to El Paso County Line
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Faster Safety) | $0 | $0 | $0 | $0 |
Federal (Freight) | $0 | $0 | $0 | $0 |
Federal (INFRA) | $0 | $0 | $0 | $0 |
State (FASTER Br. Enterprise) | $0 | $0 | $0 | $0 |
State (Faster Safety) | $0 | $0 | $0 | $0 |
State (Legislative) | $0 | $0 | $0 | $0 |
State (Surface Treatment) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$356,200,000 | $0 | $0 | $356,200,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
01/16/2020 | Amended | Add $650,000 in federal Freight funding for improvements to the SB rest area to turn it into a chain-up station. Total project costs increase. |
12/18/2019 | Amended | Add $26 million in new SB 267 funding in FY 2020. Total project cost increases. |
10/17/2019 | Amended | Add $8,000,000 in federal Freight funding for a southbound truck climbing lane and $50,000 in local funding and wildlife elements. Total project cost increases. |
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
I25/CO119 Transit Facility Improvements
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (MMOF - ARPA - CDOT) | $500,000 | $0 | $0 | $0 |
State (Legislative) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $500,000 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$8,351,000 | $500,000 | $0 | $8,851,000 |
Date | Status | Description |
---|---|---|
04/18/2024 | Amended | Add $1,000 in previous state Legislative funding and $500,000 in federal Multimodal Transportation and Mitigation Options Fund - American Rescue Plan Act - CDOT funds. Total project cost increases. |
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
05/23/2022 | Amended | Reduce state Legislative funding by $373,000. Total project cost decreases. |
09/16/2021 | Amended | Advance funding from FY 2023 to FY 2022. Total project cost remains the same. |
07/22/2021 | Amended | Add $2,000,000 of state Legislative funding in FY 23. Total project funding increases. |
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
Transit Capital Program (State SB 228)
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
State (Legislative-Transit) | $392,000 | $0 | $0 | $0 |
Local | $98,000 | $0 | $0 | $0 |
Total | $490,000 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$458,000 | $490,000 | $0 | $948,000 |
Date | Status | Description |
---|---|---|
09/21/2023 | Amended | Add one new pool project, and add $392,000 in state Legislative-Transit funding and $98,000 in local match. Total project cost increases. |
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
06/17/2020 | Amended | Adjust one pool project funding and description. Total project cost decreases. |
04/16/2020 | Amended | Add 2 new projects to FY 2021. Total project cost increases. |
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name | Description | Notes | Cost |
---|---|---|---|
Laradon Hall | 1 Vehicle Purchase (FY24) | $392,000 |
2024-2027 Transportation Improvement Program (Approved TIP)
CO119 BRT Enhancements in Boulder and Longmont
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Local (RTD Funds Only) | $8,000,000 | $8,000,000 | $0 | $0 |
Total | $8,000,000 | $8,000,000 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $16,000,000 | $0 | $16,000,000 |
Date | Status | Description |
---|---|---|
10/18/2023 | Amended | Remove funding and scope from 2022-2025 Regional and Subregional Share Calls for Projects. Funding and scope moved to TIP ID# 2020-081. Project funding decreases. |
08/17/2023 | Amended | Proposed for adoption into 2024-2027, add new funding from 2024-2027 Regional and Subregional Shares Calls for Projects. |
02/16/2023 | Amended | Replace $350,000 in RPP funding with $350,000 in Legislative funding per CDOT R4. |
09/22/2022 | Amended | Add new scope from 2022-2025 Regional and Subregional Shares Calls for Projects. |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
Peaks to Plains Trail: CO6 from Tunnel 1 to Big Easy Trailhead
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $1,900,000 | $329,000 | $2,777,000 | $13,994,000 |
State (MMOF) | $0 | $0 | $0 | $0 |
Local | $700,000 | $1,000,000 | $9,200,000 | $43,100,000 |
Total | $2,600,000 | $1,329,000 | $11,977,000 | $57,094,000 |
Project Phase to Initiate | Environmental | Design | Construction | Construction |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$30,000,000 | $73,000,000 | $0 | $103,000,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 and add new funding and scope from 2024-2027 Regional and Subregional Shares Calls for Projects. |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
08/22/2019 | Amended | Proposed for adoption into the 20-23 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
CO7 Corridor Multimodal Improvements: Foothills Pkwy to Brighton - Precon
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congestion Mitigation / Air Quality) | $436,000 | $1,424,000 | $0 | $0 |
Federal (Surface Transportation Block Grant) | $210,000 | $210,000 | $0 | $0 |
State (Legislative) | $0 | $230,000 | $0 | $0 |
State (MMOF) | $583,000 | $2,820,000 | $0 | $0 |
State (Regional Priority Projects) | $208,000 | $712,000 | $0 | $0 |
Local | $30,000 | $545,000 | $0 | $0 |
Total | $1,467,000 | $5,941,000 | $0 | $0 |
Project Phase to Initiate | Design | Design | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$10,000,000 | $7,408,000 | $0 | $17,408,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/24/2023 | Amended | Reduce project by $1,153,000 in federal CMAQ funds, $340,000 in state Legislative funds, and $1,304,000 in state MMOF funds. City of Boulder elements broken into separate project. |
02/16/2023 | Amended | Replace $570,000 in RPP funding with $570,000 in Legislative funding per CDOT R4 and add $328,000 in local match. |
09/22/2022 | Amended | Add new scope from 2022-2025 Regional and Subregional Shares Calls for Projects. |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
Aurora Missing Sidewalk Program
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Transportation Alternatives-DRCOG) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$2,885,000 | $0 | $0 | $2,885,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
08/22/2019 | Amended | Adopted in the 2020-2023 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
Nine Mile Station Bicycle and Pedestrian Bridge over Parker Rd.
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congressional Allocation) | $0 | $850,000 | $0 | $0 |
Federal (STBG-Pandemic DRCOG Region) | $0 | $0 | $0 | $0 |
Federal (Surface Transportation Block Grant) | $0 | $0 | $0 | $0 |
Local | $0 | $213,000 | $0 | $0 |
Total | $0 | $1,063,000 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$7,400,000 | $1,063,000 | $0 | $8,463,000 |
Date | Status | Description |
---|---|---|
06/26/2024 | Amended | Add $850,000 in federal Congressional Allocation funding. Total project cost increases. |
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
08/22/2019 | Amended | Adopted in the 2020-2023 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
Inverness Dr West Bicycle and Pedestrian Facilities: Fulton to Inverness Dr East
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congestion Mitigation / Air Quality) | $0 | $0 | $0 | $0 |
Federal (STBG-Pandemic DRCOG Region) | $0 | $0 | $0 | $0 |
State (MMOF) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$5,922,000 | $0 | $0 | $5,922,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
12/17/2020 | Amended | Shift FY 2020 to FY 2022, as project sponsor is not federalizing the design process. Total project cost remains the same. |
08/22/2019 | Amended | Adopted in the 2020-2023 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
Oxford Station Pedestrian Bridge: Over Oxford Ave
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $0 | $0 | $0 | $0 |
Federal (Transportation Alternatives-DRCOG) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$2,000,000 | $0 | $0 | $2,000,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
08/22/2019 | Amended | Adopted in the 2020-2023 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
CO119 Bikeway: Boulder to Longmont - Precon
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$1,383,000 | $0 | $0 | $1,383,000 |
Date | Status | Description |
---|---|---|
10/18/2023 | Amended | Remove construction funding and scope from 2022-2025 Regional and Subregional Share Calls for Projects. Funding and scope moved to TIP ID# 2020-081. Project funding decreases. |
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
02/16/2023 | Amended | Replace $575,000 in RPP funding with $575,000 in Legislative funding per CDOT R4. |
09/22/2022 | Amended | Add new scope from 2022-2025 Regional and Subregional Shares Calls for Projects. |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
Rock Creek/Coal Creek Trail Connection: 104th from Coal Creek Trail to Rock Creek Trail
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
State (MMOF) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$950,000 | $0 | $0 | $950,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
08/22/2019 | Amended | Adopted in the 2020-2023 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
Downtown ADA Sidewalk Connections: Jackson, 1st, Jefferson
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $0 | $0 | $0 | $0 |
State (MMOF) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$1,550,000 | $0 | $0 | $1,550,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
08/22/2019 | Amended | Adopted in the 2020-2023 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
US36 Bikeway Extension: Superior to Broomfield
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Transportation Alternatives-DRCOG) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$1,312,000 | $0 | $0 | $1,312,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
08/22/2019 | Amended | Adopted in the 2020-2023 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
US36/Broomfield and US36/Flatiron Bike-N-Ride Shelters, Amenities, Operations, and Marketing
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$650,000 | $0 | $0 | $650,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
08/22/2019 | Amended | Adopted in the 2020-2023 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
Industrial Ln. Bikeway Phase 2: Bike/Ped Bridge over BNSF to US36/Flatiron Station
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Carbon Reduction Program) | $0 | $0 | $0 | $0 |
Federal (Surface Transportation Block Grant) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$3,501,000 | $0 | $0 | $3,501,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
03/17/2022 | Amended | Add $2,186,000 in CRP funding in FY23 and add $547,000 in local match as part of Spring 2022 Wait List Process. Total project cost increases. |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
02/19/2020 | Amended | Move funding from FY 2020 to FY 2021 and switch funding type from TA to STP-Metro. Total project costs remain the same. |
08/22/2019 | Amended | Adopted in the 2020-2023 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
C470 Grade-Separated Trail over Acres Green Drive
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
State (MMOF) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$4,000,000 | $0 | $0 | $4,000,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
08/22/2019 | Amended | Adopted in the 2020-2023 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
Evergreen Lake Trail Improvements: Evergreen Dam to Upper Bear Creek Rd
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $0 | $0 | $0 | $0 |
State (Regional Priority Projects) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$4,664,000 | $0 | $0 | $4,664,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
03/17/2022 | Amended | Add $400,000 in STBG funds as part of Spring 2022 Wait List Process. Total project cost increases. |
09/16/2021 | Amended | Add Phase 2 funding from FY22 CMPI project selection. |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
08/22/2019 | Amended | Adopted in the 2020-2023 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
Colfax Complete Streets: Violet to I70
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congestion Mitigation / Air Quality) | $0 | $3,950,000 | $0 | $0 |
Federal (Surface Transportation Block Grant) | $0 | $0 | $0 | $0 |
State (MMOF) | $0 | $4,950,000 | $0 | $0 |
Local | $0 | $1,000,000 | $0 | $0 |
Total | $0 | $9,900,000 | $0 | $0 |
Project Phase to Initiate | None | Construction | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$8,700,000 | $9,900,000 | $0 | $18,600,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
09/22/2022 | Amended | Add new scope from 2022-2025 Subregional Share Call for Projects. |
03/17/2022 | Amended | Add $1,360,000 in STBG funds and $340,000 in local match as part of Spring 2022 Wait List process. Total project cost increases. |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
08/22/2019 | Amended | Adopted in the 2020-2023 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
St Vrain Greenway, Phase 13: CO119 to St Vrain State Park
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
State (MMOF) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$3,000,000 | $0 | $0 | $3,000,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
08/22/2019 | Amended | Adopted in the 2020-2023 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
Greenway Trail: CR37 to Stagecoach
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
State (MMOF) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$1,125,000 | $0 | $0 | $1,125,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
08/22/2019 | Amended | Adopted in the 2020-2023 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
CO66/WCR7 Pedestrian Underpass
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Transportation Alternatives-DRCOG) | $825,000 | $0 | $0 | $0 |
Local | $206,000 | $0 | $0 | $0 |
Total | $1,031,000 | $0 | $0 | $0 |
Project Phase to Initiate | Construction | None | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$1,969,000 | $1,031,000 | $0 | $3,000,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
08/22/2019 | Amended | Adopted in the 2020-2023 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
120th/US85 Interchange Improvements - Precon
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $0 | $0 | $0 | $0 |
State (Regional Priority Projects) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$12,600,000 | $0 | $0 | $12,600,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
08/22/2019 | Amended | Adopted in the 2020-2023 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
88th Widening: I76 to CO2
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $3,000,000 | $3,000,000 | $0 | $0 |
Federal (Transportation Alternatives-DRCOG) | $0 | $720,000 | $0 | $0 |
State (MMOF) | $0 | $1,200,000 | $0 | $0 |
Local | $9,825,000 | $10,305,000 | $0 | $0 |
Total | $12,825,000 | $15,225,000 | $0 | $0 |
Project Phase to Initiate | Construction | Construction | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$6,400,000 | $28,050,000 | $0 | $34,450,000 |
Date | Status | Description |
---|---|---|
05/16/2024 | Amended | Add active transportation scope and funding from Project# 2022-049. Total project cost increases. |
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
08/22/2019 | Amended | Adopted in the 2020-2023 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
104th Widening: Colorado to US85 - Precon
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $1,890,000 | $735,000 | $0 | $0 |
State (Regional Priority Projects) | $375,000 | $0 | $0 | $0 |
Local | $435,000 | $315,000 | $0 | $0 |
Total | $2,700,000 | $1,050,000 | $0 | $0 |
Project Phase to Initiate | Design | ROW | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$2,000,000 | $3,750,000 | $0 | $5,750,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
08/22/2019 | Amended | Adopted in the 2020-2023 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
County Line Capacity Improvements: Broadway to University
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$20,000,000 | $0 | $0 | $20,000,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
02/16/2023 | Amended | Change sponsor from Centennial to Douglas County. No change to total project cost. |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
08/22/2019 | Amended | Adopted in the 2020-2023 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
US6/Heritage Interchange - Precon
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $480,000 | $1,960,000 | $1,960,000 | $0 |
State (Legislative) | $0 | $0 | $0 | $0 |
Local | $120,000 | $490,000 | $490,000 | $0 |
Total | $600,000 | $2,450,000 | $2,450,000 | $0 |
Project Phase to Initiate | Design | ROW | Other Phase | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$4,000,000 | $5,500,000 | $0 | $9,500,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
07/22/2021 | Amended | Add $1,000,000 in state Legislative funding in FY 23. Total project cost increases. |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
08/22/2019 | Amended | Adopted in the 2020-2023 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
CO66 Improvements: Hover to Main - Precon
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $0 | $0 | $0 | $0 |
State (Regional Priority Projects) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$650,000 | $0 | $0 | $650,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
08/22/2019 | Amended | Adopted in the 2020-2023 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
Sheridan/US36 Multimodal Improvements
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congestion Mitigation / Air Quality) | $0 | $0 | $0 | $0 |
State (Regional Priority Projects) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$8,500,000 | $0 | $0 | $8,500,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
08/22/2019 | Amended | Adopted in the 2020-2023 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
CO42 Multimodal Improvements: Empire/Lock to CO7 - Precon
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (MMOF - ARPA - DRCOG) | $800,000 | $0 | $0 | $0 |
Federal (Surface Transportation Block Grant) | $0 | $0 | $0 | $0 |
State (10 Year Plan Funds) | $0 | $0 | $0 | $0 |
State (Legislative) | $0 | $0 | $0 | $0 |
Local | $800,000 | $0 | $0 | $0 |
Total | $1,600,000 | $0 | $0 | $0 |
Project Phase to Initiate | ROW | None | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$6,900,000 | $1,600,000 | $0 | $8,500,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
02/16/2023 | Amended | Replace $4,000,000 in RPP funding with $3,000,000 in Legislative and $1,000,000 in 10C funding per CDOT R4. |
09/22/2022 | Amended | Add new scope from 2022-2025 Subregional Share Call for Projects. |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
08/22/2019 | Amended | Adopted in the 2020-2023 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
CO7 Multimodal Improvements: 38th/Marine to Cherryvale
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$1,900,000 | $0 | $0 | $1,900,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
08/22/2019 | Amended | Adopted in the 2020-2023 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
CO7/119th Intersection Improvements
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congestion Mitigation / Air Quality) | $0 | $0 | $0 | $0 |
Federal (STBG-Pandemic) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$12,053,000 | $0 | $0 | $12,053,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
08/22/2019 | Amended | Adopted in the 2020-2023 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
South Boulder Rd At-Grade Crossing Improvements: Via Capri to Courtesy
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$1,433,000 | $0 | $0 | $1,433,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
08/22/2019 | Amended | Adopted in the 2020-2023 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
Micro Transit Service & Mobility Options: North I-25 Area
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congestion Mitigation / Air Quality) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Local (RTD Funds Only) | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$2,000,000 | $0 | $0 | $2,000,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
09/18/2019 | Amended | Adjust years of funding. Total project cost remains the same. |
08/22/2019 | Amended | Adopted in the 2020-2023 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
Downtown Boulder Station Improvements
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Local (RTD Funds Only) | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$982,000 | $0 | $0 | $982,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
08/22/2019 | Amended | Adopted in the 2020-2023 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
HOP Electric Bus Purchases
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
State (Faster Transit) | $0 | $0 | $0 | $0 |
State (MMOF) | $0 | $0 | $0 | $0 |
State (Settlement Fund) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$5,343,000 | $0 | $0 | $5,343,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
12/16/2021 | Amended | Revise project scope from transit service expansion to bus purchases. Total project cost decreases. |
04/22/2021 | Amended | Per FY20 project delays report, shift FY20-22 funding to FY21-23. Proposed for adoption into 2022-2025. |
08/22/2019 | Amended | Adopted in the 2020-2023 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
Federal Blvd Transit Improvements: Floyd to 54th
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Local (RTD Funds Only) | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$4,000,000 | $0 | $0 | $4,000,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
08/22/2019 | Amended | Adopted in the 2020-2023 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
Industrial and Nickel/Commerce Intersection Operational Improvements
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$1,619,000 | $0 | $0 | $1,619,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
08/22/2019 | Amended | Adopted in the 2020-2023 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
CO86/5th and Founders/Ridge Intersection Operational Improvements
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congestion Mitigation / Air Quality) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$6,500,000 | $0 | $0 | $6,500,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
08/22/2019 | Amended | Adopted in the 2020-2023 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
I70/CO79 Eastbound Ramp Improvements
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congestion Mitigation / Air Quality) | $0 | $0 | $0 | $0 |
Federal (STBG-Pandemic DRCOG Region) | $0 | $0 | $0 | $0 |
State (Regional Priority Projects) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$2,200,000 | $0 | $0 | $2,200,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
08/22/2019 | Amended | Adopted in the 2020-2023 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
Parker/Quincy/Smoky Hill Intersection Operational Improvements
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congestion Mitigation / Air Quality) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$9,171,000 | $0 | $0 | $9,171,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
08/22/2019 | Amended | Adopted in the 2020-2023 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
Dry Creek Operational Improvements: I25 to Inverness Dr East
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congestion Mitigation / Air Quality) | $0 | $496,000 | $0 | $0 |
Local | $0 | $124,000 | $0 | $0 |
Total | $0 | $620,000 | $0 | $0 |
Project Phase to Initiate | Construction | None | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$4,520,000 | $620,000 | $0 | $5,140,000 |
Date | Status | Description |
---|---|---|
06/26/2024 | Amended | Add funding from the closeout of project 2020-058. The Arapahoe Forum has approved. Total funding has increased. |
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
05/23/2022 | Amended | Adjust project scope. Project cost remains the same. |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
08/22/2019 | Amended | Adopted in the 2020-2023 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
US285/Broadway Operational Improvements
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $0 | $0 | $0 | $0 |
State (Regional Priority Projects) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$14,900,000 | $0 | $0 | $14,900,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
05/23/2022 | Amended | Add $500,000 in state RPP funds. Total project cost increases. |
04/24/2022 | Amended | Add $1,800,000 in RPP funds and $3,100,000 in local funds. Total project cost increases. |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
08/22/2019 | Amended | Adopted in the 2020-2023 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
Mineral/Santa Fe Operational Improvements
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congestion Mitigation / Air Quality) | $0 | $0 | $0 | $0 |
Federal (Surface Transportation Block Grant) | $1,167,000 | $2,333,000 | $0 | $0 |
Local | $3,033,000 | $6,067,000 | $0 | $0 |
Total | $4,200,000 | $8,400,000 | $0 | $0 |
Project Phase to Initiate | Construction | Construction | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$11,441,000 | $12,600,000 | $0 | $24,041,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
08/22/2019 | Amended | Adopted in the 2020-2023 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
I25/Alameda Operational Improvements: Valley Highway Phase 2.0
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $0 | $0 | $0 | $0 |
State (Regional Priority Projects) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$33,200,000 | $0 | $0 | $33,200,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
08/22/2019 | Amended | Adopted in the 2020-2023 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
I25/Lincoln Traffic and Mobility Improvements
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $0 | $0 | $0 | $0 |
Local | $1,750,000 | $0 | $0 | $0 |
Total | $1,750,000 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$6,750,000 | $1,750,000 | $0 | $8,500,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
03/17/2022 | Amended | Add $2,000,000 in STBG funds in FY23 and add $2,750,000 in local match as part of the Spring 2022 Wait List Process. Overall funding increases. |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
05/20/2020 | Amended | Adjust funding per Step 1 funding advancements of the Spring 2020 Waiting List Protocol. Overall funding remains the same. |
08/22/2019 | Amended | Adopted in the 2020-2023 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
Parker Rd Operational Improvements: Lincoln to Pine
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congestion Mitigation / Air Quality) | $0 | $0 | $0 | $0 |
Federal (Faster Safety) | $0 | $0 | $0 | $0 |
State (Faster Safety) | $0 | $0 | $0 | $0 |
State (MMOF) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$4,000,000 | $0 | $0 | $4,000,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
08/22/2019 | Amended | Adopted in the 2020-2023 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
CO83 Safety Improvements: Bayou Gulch to El Paso County
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congestion Mitigation / Air Quality) | $0 | $0 | $0 | $0 |
Federal (Faster Safety) | $0 | $0 | $0 | $0 |
Federal (Surface Transportation Block Grant) | $0 | $0 | $0 | $0 |
State (Faster Safety) | $2,615,000 | $7,123,000 | $3,980,000 | $0 |
State (Regional Priority Projects) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $2,615,000 | $7,123,000 | $3,980,000 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$12,127,000 | $13,718,000 | $0 | $25,845,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
02/16/2023 | Amended | Remove $1,567,000 in state FASTER-Safety funding and add $1,567,000 in federal Hazard Elimination funding. No change to total project cost |
11/17/2022 | Amended | Add $13,845,000 in state FASTER-Safety funding. Total project cost increases. |
04/24/2022 | Amended | Add $400,000 in STBG transferred from 2020-022. Reduce local match by $400,000. Total project cost remains the same. |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
JC73: CO74 to Buffalo Park Operational Improvements
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$12,500,000 | $0 | $0 | $12,500,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
08/22/2019 | Amended | Adopted in the 2020-2023 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
I270 Corridor Improvements: I70 to I25
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $0 | $0 | $0 | $0 |
State (FASTER Br. Enterprise) | $6,250,000 | $400,000 | $0 | $0 |
State (Legislative) | $74,500,000 | $10,000,000 | $70,000,000 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $80,750,000 | $10,400,000 | $70,000,000 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$28,750,000 | $161,150,000 | $0 | $189,900,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
02/16/2023 | Amended | Add $10,100,000 in state FASTER-Bridge Enterprise funding. Total project cost increases. |
02/17/2022 | Amended | Add $30,000,000 in state Legislative funding. Add preconstruction and early action projects to project scope. Total project cost increases. |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
08/22/2019 | Amended | Adopted in the 2020-2023 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
13th Ave Multimodal Mobility Study: Yosemite to High Line Canal Trail/Chambers
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$500,000 | $0 | $0 | $500,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
08/22/2019 | Amended | Adopted in the 2020-2023 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
Parker Rd Multimodal Transportation and Safety Study: Mississippi to Hampden
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $0 | $0 | $0 | $0 |
State (Regional Priority Projects) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$1,735,000 | $0 | $0 | $1,735,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/24/2022 | Amended | Adjust scope and title. Decrease STBG funds by $155,000. Decrease match by $110,000. Total project cost decreases. |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
08/22/2019 | Amended | Adopted in the 2020-2023 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
US287/120th Multimodal and Safety Study: Alter to Lowell
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $0 | $0 | $0 | $0 |
State (Regional Priority Projects) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$600,000 | $0 | $0 | $600,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
08/22/2019 | Amended | Adopted in the 2020-2023 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
Broomfield Transit Needs Assessment & Pilot Project
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $280,000 | $0 | $0 | $0 |
Local | $70,000 | $0 | $0 | $0 |
Total | $350,000 | $0 | $0 | $0 |
Project Phase to Initiate | Bus Service - Year 1 | None | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$450,000 | $350,000 | $0 | $800,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
05/19/2021 | Amended | Adjust funding per year per FTA guidance. Total project cost stays the same. |
04/22/2021 | Amended | Per FY20 Project Delays report, shift FY20-23 funding to FY21-24. Proposed for adoption into 2022-2025. |
08/22/2019 | Amended | Adopted in the 2020-2023 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
Front Range Trail Study: CO93 from North Table Mountain Park to Boulder County
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
State (MMOF) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$250,000 | $0 | $0 | $250,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
08/22/2019 | Amended | Adopted in the 2020-2023 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
Broomfield FlexRide
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congestion Mitigation / Air Quality) | $360,000 | $0 | $0 | $0 |
Local | $90,000 | $0 | $0 | $0 |
Total | $450,000 | $0 | $0 | $0 |
Project Phase to Initiate | Bus Service - Year 3 | None | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$1,350,000 | $450,000 | $0 | $1,800,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
08/22/2019 | Amended | Proposed for adoption in 2020-2023 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
Community Mobility Planning and Implementation Set-Aside
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$7,310,000 | $0 | $0 | $7,310,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
03/16/2023 | Amended | Remove one pool project. Total project cost remains the same. |
09/16/2021 | Amended | Add FY 2022 pool projects and increase local match. Total project cost increases. |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
04/16/2020 | Amended | Using project savings from the previous Centennial project, fully fund the Thornton Trail Wayfinding project and partially fund the Denver Mobility Choice Network project based on March 2020 DRCOG Board action. Reduce Unprogrammed. Reallocate funding by year and adjust pool project year names. Total project coat remains the same. |
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name | Description | Notes | Cost |
---|---|---|---|
Castle Rock | Downtown Alley Master Plan (FY20) | $180,000 | |
West Colfax BID | Colfax Viaduct Planning Study (FY20/21) | $200,000 | |
Edgewater | Sheridan Corridor Master Plan: Sloan's Lake (FY20) | $140,000 | |
Thornton | Eastlake Streetscape Conceptual Plan (FY21) | $145,000 | |
Adams County | SW County Sidewalk Community Prioritization Planning (FY20) | $35,000 | |
Boulder | Curbside Management Policy and Program (FY21) | $248,000 | |
Lakewood | Alameda Corridor Shared-Use Path (FY20/21) | $336,000 | |
Denver | Passenger Amenity Program (FY20) | $200,000 | |
Westminster | US-36/Church Ranch Station Multimodal Access Improvements (FY20) | $83,000 | |
Sheridan | Safe Stops Through Sheridan (FY20) | $158,000 | |
Littleton | Downtown Raised Pedestrian Crossings (FY20/21) | $214,000 | |
Boulder | Enhanced Pedestrian/Bicyclist Crossings (FY21) | $230,000 | |
Aurora | 25th Ave. Pedestrian Improvements (FY20) | $391,000 | |
Thornton | Trail Wayfinding Signage ( FY20) | $250,000 | |
Denver | Mobility Choice Network (FY21) | $247,000 | |
Boulder County | North Foothills Bikeway Feasibility Study (FY22) | $331,000 | |
Denver | Permanent Outdoor Expansion (FY22) | $207,000 | |
Arvada | Little Dry Creek Trail Grade Separation (FY23) | $83,000 | |
Boulder | Speed Limit Setting and Signing Framework (FY23) | $103,000 | |
Lakewood | 40 West ArtLine Framework Plan (FY22/23) | $112,000 | |
Sheridan | S. Federal Blvd. Plan - Safe Streets through Sheridan (FY23) | $76,000 | |
Westminster | 72nd Avenue Corridor Study and Plan (FY22) | $190,000 | |
Superior | McCaslin Underpass Feasibility Study (FY22) | $83,000 | |
Denver | Westwood-Athmar Park Transportation Management Program (FY23) | $300,000 | |
Evergreen Parks & Rec District | Phase 2 Enhancements scope and funding included in TIP# 2020-025 | $0 | |
RTD | University of Denver Station Bike Shelter (FY22/23) | $124,000 | |
Castle Rock | Castle Rock Downtown Pedestrian Lighting Improvements (FY22/23) | $480,000 | |
Superior | Superior Wayfinding (FY22) | $100,000 | |
Thornton | Thornton Transit Study (FY22/23) | $137,000 | |
Unprogrammed | $187,000 |
2024-2027 Transportation Improvement Program (Approved TIP)
US285 Congestion Management Study: Lowell/Knox to I25
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $0 | $0 | $0 | $0 |
State (Regional Priority Projects) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$1,600,000 | $0 | $0 | $1,600,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
08/22/2019 | Amended | Adopted into the 2020-2023 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
Human Services Transportation/FASTER Set-Aside
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congestion Mitigation / Air Quality) | $1,318,000 | $2,000,000 | $2,000,000 | $2,000,000 |
State (Faster Transit) | $210,000 | $0 | $0 | $0 |
State (MMOF) | $682,000 | $0 | $0 | $0 |
Local | $1,300,000 | $500,000 | $500,000 | $500,000 |
Total | $3,510,000 | $2,500,000 | $2,500,000 | $2,500,000 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$5,813,000 | $11,010,000 | $0 | $16,823,000 |
Date | Status | Description |
---|---|---|
05/16/2024 | Amended | Add two new pool projects and local match funds from recent Section 5310 solicitation. Total project cost increases. |
12/19/2023 | Amended | Shift $210,000 in unallocated state FASTER funding from prior years to Fiscal Year 2024. Total project cost remains the same. |
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/24/2023 | Amended | Add nine new pool projects from recent FY 23/24 Call for Projects. Total project cost increases. |
09/08/2022 | Amended | Increase funding for Denver Inner City Parish pool project by reallocating unspent funding from VIA"s pool project and add $60,000 unallocated funding to program administration. Total project cost remains the same. |
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name | Description | Notes | Cost |
---|---|---|---|
Boulder County - Operating (FY20) - $177 | Funded with FASTER | $0 | |
City of Boulder - Operating (FY20) - $17 | Funded with FASTER | $0 | |
VIA - Operating (FY20) - $43 | Funded with FASTER | $0 | |
VIA - Capital Replacement-BOC (FY20) - $87 | Funded with FASTER | $0 | |
VIA - Capital Replacement-Van (FY20) - $56 | Funded with FASTER | $0 | |
Broomfield - Capital 1 Vehicle Expansion (FY20) - $11 | Funded with FASTER and also with 5310 | $0 | |
Broomfield - Capital Equipment (FY20) - $5 | Funded with FASTER and also with 5310 | $0 | |
DRMAC - Mobility Management (FY20) - $60 | Funded with FASTER and also with 5310 | $0 | |
Douglas County - Operating (FY20) - $138 | Funded with FASTER | $0 | |
DRCOG - Program Administration (FY20) - $97 | Funded with FASTER | $0 | |
VIA - SRC Fleet Acquisition (FY20) - $250 | Funded with FASTER | $0 | |
VIA - Capital 4 Vehicle Expansion - $58 | Funded with FASTER and also with 5310 | $0 | |
Boulder County - Operating (FY21-22) - $150 | Funded with FASTER | $0 | |
VIA - Operating (FY21-22) - $500 | Funded with FASTER and also with 5310 | $0 | |
A Little Help - Mobility Management (FY21-22) - $45 | Funded with FASTER | $0 | |
Douglas County - Mobility Management (FY21-22) - $287 | Funded with FASTER and also with 5310 | $0 | |
DRMAC - Mobility Management (FY21-22) - $74 | Funded with FASTER and also with 5310 | $0 | |
VIA - Mobility Management (FY21-22) - $100 | Funded with FASTER and also with 5310 | $0 | |
A Little Help - Capital Facilities (FY21-22) - $25 | Funded with FASTER | $0 | |
VIA - Capital Software (FY21-22) - $42 | Funded with FASTER and also with 5310 | $0 | |
VIA - Capital Security Cameras (FY21-22) - $242 | Funded with FASTER | $0 | |
A Little Help - Mobility Management (FY23) - $34 | Funded with FASTER | $0 | |
Boulder County - Operating (FY23) - $200 | Funded with FASTER | $0 | |
Denver Inner City Parish - Capital 1 Vehicle Expansion (FY23) - $73 | Funded with FASTER | $0 | |
Douglas County - Capital 2 Vehicle Replacements (FY23) - $120 | Funded with FASTER | $0 | |
Douglas County - Mobility Management (FY23) - $248 | Funded with FASTER and also with 5310 | $0 | |
DRMAC - Mobility Management (FY23) - $63 | Funded with FASTER and also with 5310 | $0 | |
Firestone - Operating (FY23) - $32 | Funded with FASTER | $0 | |
VIA - Capital Facilities (FY23) - $600 | Funded with FASTER | $0 | |
VIA - Mobility Management (FY23) - $145 | Funded with FASTER and also with 5310 | $0 | |
VIA - Operating (FY23) - $116 | Funded with FASTER and also with 5310 | $0 | |
A Little Help - Capital - Software (FY24) - $25 | Funded with CMAQ, FASTER | $0 | |
A Little Help - Mobility Management (FY24) - $40 | Funded with MMOF, FASTER | $0 | |
AbleLight - Capital 2 Vehicle Replacements (FY24) - $170 | Funded with CMAQ | $0 | |
Boulder County - Mobility Management (FY24) - $40 | Funded with FASTER | $0 | |
Douglas County - Capital 1 Vehicle Expansion (FY24) - $124 | Funded with CMAQ | $0 | |
Douglas County - Capital EV Charging Station (FY24) - $44 | Funded with CMAQ | $0 | |
Douglas County - Mobility Management (FY24) - $162 | Funded with FASTER and also 5310 | $0 | |
DRCOG - Mobility Management (FY24) - $55 | Funded with MMOF | $0 | |
DRMAC - Mobility Management (FY24) - $74 | Funded with FASTER and also 5310 | $0 | |
Jewish Family Service - Capital 1 Vehicle Expansion (FY24) - $54 | Funded with CMAQ | $0 | |
Lakewood - Capital 2 Vehicle Replacements (FY24) - $247 | Funded with CMAQ | $0 | |
Laradon Hall - Capital 2 Vehicle Replacements (FY24) - $153 | Funded with CMAQ | $0 | |
Erie - Operating (FY24) - $200 | Funded with CMAQ | $0 | |
VIA - Operating (FY24) - $515 | Funded with MMOF, FASTER, and also 5310 | $0 | |
DRCOG - Program Administration (FY24) - $254 | |||
Douglas County - Mobility Management (Fiscal Year 2025) - $51,000 | Funded with FASTER and also 5310 | $0 | |
Via - Operating (Fiscal Year 2025) - $38,000 | Funded with FASTER and also with 5310 | $0 | |
Capital Projects | $2,386,000 | ||
Mobility Management Projects | $1,478,000 | ||
Operating Projects | $2,126,000 | ||
Program Administration | $297,000 |
2024-2027 Transportation Improvement Program (Approved TIP)
CDOT Trust Settlement Pool
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
State (Settlement Fund) | $957,000 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $957,000 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$2,947,000 | $957,000 | $0 | $3,904,000 |
Date | Status | Description |
---|---|---|
09/21/2023 | Amended | Add two new pool projects and $212,000 in state Settlement funds. Total project cost increases. |
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
07/11/2023 | Amended | Add $745,000 in state Settlement funds. Total project cost increases. |
04/24/2023 | Amended | Add one new pool project. Total project cost increases. |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name | Description | Notes | Cost |
---|---|---|---|
RTD | Purchase 15 Battery Electric Bus Replacements (FY20) | See new RTD Electric Bus Purchases project | $0 |
RTD | 12 Battery Electric Chargers w/ Infrastructure (FY20) | See new RTD Electric Bus Purchases project | $0 |
Boulder | 4 Electric Bus Replacements (FY21) | $2,490,000 | |
Boulder | 4 Electric Bus Chargers (FY21) | $340,000 | |
VIA | Electric Bus Replacement (FY21) | $167,000 | |
VIA | Vehicles (FY23) | $212,000 | |
VIA | Vehicle Replacment (FY24) | $162,000 | |
VIA | Charging Equipment (FY24) | $50,000 |
2024-2027 Transportation Improvement Program (Approved TIP)
CO119 Operational Improvements: Boulder to Longmont
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (MMOF - ARPA - DRCOG) | $33,430,000 | $0 | $0 | $0 |
Federal (RAISE) | $0 | $25,000,000 | $0 | $0 |
Federal (STBG-Pandemic) | $0 | $0 | $0 | $0 |
Federal (Surface Transportation Block Grant) | $0 | $4,503,000 | $0 | $0 |
Federal (Transportation Alternatives-CDOT) | $0 | $0 | $1,679,000 | $0 |
State (Legislative) | $33,742,000 | $22,155,000 | $0 | $0 |
State (Legislative-Transit) | $5,000,000 | $0 | $0 | $0 |
State (Planning and Research Initiatives) | $0 | $0 | $0 | $0 |
State (Regional Priority Projects) | $0 | $0 | $0 | $0 |
Local | $8,360,000 | $300,000 | $1,662,000 | $1,000,000 |
Local (RTD Funds Only) | $15,500,000 | $1,500,000 | $0 | $0 |
Total | $96,032,000 | $53,458,000 | $3,341,000 | $1,000,000 |
Project Phase to Initiate | Construction | Construction | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$7,059,000 | $153,831,000 | $0 | $160,890,000 |
Date | Status | Description |
---|---|---|
04/18/2024 | Amended | Reduce state Legislative funding by $99,000. Total project cost decreases. |
02/22/2024 | Amended | Replace $2,272,000 in federal Surface Transportation Block Grant funding with $2,272,000 in federal Multimodal Transportation and Mitigation Options Funds-American Rescue Plan Act funds. Total project cost remains the same. |
12/19/2023 | Amended | Swap $10,988,000 in federal Congestion Mitigation/Air Quality funds and $2,261,000 in federal Surface Transportation Block Grant funds for $13,249,000 in federal Multimodal Transportation and Mitigation Options Fund - American Rescue Plan Act funds. All Fiscal Year 2023 funding rolls to 2024. Total project cost remains the same. |
10/18/2023 | Amended | Add funding from TIP IDs: 2012-121 (CDOT Region 4), 2022-022 (CDOT Region 4), 2020-084 (Boulder County), 2020-001 (RTD), and 2020-013 (Boulder County) to consolidate all trunkline construction elements in CDOT project. Add RAISE and CDOT Transportation Alternatives awards and additional CDOT funding. Total project cost increases. |
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
Coffman Busway: 1st to 9th
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congestion Mitigation / Air Quality) | $0 | $0 | $0 | $0 |
Federal (Surface Transportation Block Grant) | $0 | $0 | $0 | $0 |
Federal (Transportation Alternatives-CDOT) | $572,000 | $428,000 | $0 | $0 |
State (Regional Priority Projects) | $0 | $0 | $0 | $0 |
Local | $143,000 | $107,000 | $0 | $0 |
Total | $715,000 | $535,000 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$6,900,000 | $1,250,000 | $0 | $8,150,000 |
Date | Status | Description |
---|---|---|
04/18/2024 | Amended | Add $1,000,000 in federal Colorado Department of Transportation - Transportation Alternatives funds and local match transferred from Project # 2024-062. Total project cost increases. |
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
06/17/2020 | Amended | Adjust FY 2023 local match amounts and types. Overall project cost remains unchanged. |
10/24/2019 | Amended | New project created from the original SH-119 BRT project. |
2024-2027 Transportation Improvement Program (Approved TIP)
CO119/CO52 Transit Bypass Lanes
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congestion Mitigation / Air Quality) | $0 | $0 | $0 | $0 |
State (Regional Priority Projects) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Local (RTD Funds Only) | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $0 | $0 | $0 |
Date | Status | Description |
---|---|---|
10/18/2023 | Amended | Remove funding at the request of project sponsor. Funding and scope moved to TIP ID# 2020-081. Project funding decreases. |
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
06/17/2020 | Amended | Adjust FY 2023 local match amounts and types. Overall project cost remains unchanged. |
11/20/2019 | Amended | New project created from the original SH-119 BRT project. |
2024-2027 Transportation Improvement Program (Approved TIP)
28th St Business Access Transit Lanes: Iris to Valmont
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$5,700,000 | $0 | $0 | $5,700,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
11/20/2019 | Amended | New project created from the original SH-119 BRT project. |
2024-2027 Transportation Improvement Program (Approved TIP)
I25 Valley Highway Phases 3 and 4: Santa Fe to 20th
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Bond/Loans) | $0 | $0 | $0 | $0 |
State (Bond/Loans) | $0 | $0 | $0 | $0 |
State (Legislative) | $0 | $0 | $0 | $0 |
State (Regional Priority Projects) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$63,205,000 | $0 | $0 | $63,205,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
08/19/2021 | Amended | Increase legislative funding by $2,130,000 in FY22. Total project cost increases. |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
01/14/2021 | Amended | Swap SB-1 funding for RPP funding in FY 2020. Add HPTE loan funding and SB-267 funding in FY 2021. Total project cost increases. |
09/17/2020 | Amended | Decreasing legislative (SB-1) funding from $60,000,000 to $575,000 after notification that previously awarded legislative funding is being taken away from this project due to COVID-19 impacts to state revenues. Total project cost decreases. |
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
Safer Main Streets Pool
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $0 | $0 | $0 | $0 |
State (Legislative) | $0 | $0 | $0 | $0 |
State (Legislative-Transit) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$85,394,000 | $0 | $0 | $85,394,000 |
Date | Status | Description |
---|---|---|
02/22/2024 | Amended | Remove one pool project and move $2,300,000 in prior year state Legislative funding to TIP ID# 2022-008. Total project cost decreases. |
01/30/2024 | Amended | Remove one pool project and move $7,060,000 in prior year state Legislative-Transit funding and $2,940,000 in prior year state Legislative funding to TIP ID# 2024-048. Total project cost decreases. |
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
08/19/2021 | Amended | Add one new pool project. Add $2,500,000 in state legislative funding. Total project cost increases. |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name | Description | Notes | Cost |
---|---|---|---|
Arapahoe County | Arapahoe Road at Olathe St Intersection Improvements | $450,000 | |
Arapahoe County | S. Federal Blvd. Sidewalk Improvements | $464,000 | |
Boulder | Safer Signals, Safer Streets | $435,000 | |
Boulder | 28th St. (US 36) and Colorado Ave. Protected Intersection | $2,104,000 | |
Boulder | 30th Street – Separated Bike Lanes (SH-7/Arapahoe Avenue – Colorado Avenue) | Funding on TIP ID# 2022-008 | $0 |
Boulder County | US 36 Intersections Improvements Project (Lyons to Boulder) | $240,000 | |
Broomfield | US 287/ 120th Avenue Sidepath Infill & Transit Access Improvements | $2,000,000 | |
Broomfield | CO 128 / US 36 Bikeway Connection | $296,000 | |
Broomfield | 112th/Uptown Ave. Complete Streets and Railroad Safety Improvements | $3,542,000 | |
Centennial | Arapahoe and Clarkson Traffic Signal and Bike Lane Continuation | $400,000 | |
Centennial | S Holly St HAWK Signal and Pedestrian Improvements | $250,000 | |
Commerce City | Colorado Boulevard Bicycle and Pedestrian Improvements | $2,720,000 | |
Denver | Mississippi Avenue Vision Zero Safety Project | $2,132,000 | |
Denver | SH-88/Federal Boulevard Median Gaps | $3,600,000 | |
Denver | West Colfax Pedestrian and Transit Improvements + Partial E. Colfax | $10,000,000 | |
Denver | Broadway Corridor Multi-Modal Improvements (Elevate Project) | $9,600,000 | |
Denver | Federal Blvd Pedestrian Improvement Project | $3,812,000 | |
Douglas County | US Highway 85 Shoulder Widening (Castle Rock Parkway to Daniels Park Road) | $880,000 | |
Englewood | West Dartmouth Ave Multimodal Safety | $1,260,000 | |
Erie | County Line Road Telleen to Evans | $2,360,000 | |
Littleton | Mineral Station East Mobility-shed Improvements | $1,600,000 | |
Littleton | Prince Street Link Project | $615,000 | |
Lone Tree | Rapid Rectangular Flashing Beacons (RRFBs) | $248,000 | |
Lone Tree and Douglas County | C-470 Trail Connector to RTD/Park Meadows LRT | $1,600,000 | |
Longmont | SH-119 & Sunset St Intersection Multimodal Safety Improvements (SDR5000) | $1,200,000 | |
Morrison | Morrison Main Street Revitalization | $426,000 | |
Nederland | Nederland Crosswalk Improvements | $280,000 | |
Northglenn | Connect Northglenn Multimodal Improvements | $560,000 | |
Superior | US 36 Bikeway Extension - Rock Creek Parkway Segment | $320,000 | |
Denver | Evans Ave Vision Zero Safety Project | $744,000 | |
Douglas County | C-470 Trail & University Blvd Ped Grade Separation | $5,120,000 | |
Parker | Parker Rd (SH-83) Multi-Use Trail/Sidewalk | $3,200,000 | |
RTD | Improving ADA Accessibility in Metro Denver | $905,000 | |
CDOT R1 | Urban Arterials Safety Study | $2,500,000 | |
Lakewood | West Colfax Pedestrian Safety and Infrastructure Project | Funding on TIP ID# 2024-048 | $0 |
2024-2027 Transportation Improvement Program (Approved TIP)
I25/CO119 Interchange Improvements
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
State (Legislative) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$3,871,000 | $0 | $0 | $3,871,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
05/23/2022 | Amended | Add $371,000 in state Legislative funding. Total project cost increases. |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
01/16/2020 | Amended | New project. |
2024-2027 Transportation Improvement Program (Approved TIP)
47th/BNSF Missing Sidewalks
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Transportation Alternatives-CDOT) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$636,000 | $0 | $0 | $636,000 |
Date | Status | Description |
---|---|---|
11/15/2023 | Amended | Correct Denver Regional Council of Governments - Transportation Alternatives funding to Colorado Department of Transportation - Transportation Alternatives funding. Total project cost remains the same. |
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
04/16/2020 | Amended | New project. |
2024-2027 Transportation Improvement Program (Approved TIP)
I70/Picadilly New Interchange
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (BUILD) | $5,000,000 | $5,000,000 | $0 | $0 |
Federal (Faster Safety) | $0 | $0 | $0 | $0 |
State (Faster Safety) | $0 | $0 | $0 | $0 |
Local | $3,840,000 | $3,840,000 | $0 | $0 |
Total | $8,840,000 | $8,840,000 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$49,535,000 | $17,680,000 | $0 | $67,215,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
07/21/2022 | Amended | Add $8,500,000 in FASTER Safety funding. Total project cost increases. |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
05/20/2020 | Amended | New Project. |
2024-2027 Transportation Improvement Program (Approved TIP)
I70/Harlan Bridge Reconstruction
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
State (Legislative) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$21,500,000 | $0 | $0 | $21,500,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
09/17/2020 | Amended | Add new project. |
2024-2027 Transportation Improvement Program (Approved TIP)
State Vulnerable and Senior Transportation Funds
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Vulnerable ) | $0 | $0 | $0 | $0 |
State (Vulnerable ) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$375,000 | $0 | $0 | $375,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
12/17/2020 | Amended | Add pool projects. Total project cost remains the same. |
10/22/2020 | Amended | New Project. |
Project Pools
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name | Description | Notes | Cost |
---|---|---|---|
Douglas County | Operating Assistance | $48,000 | |
Douglas County | Purchase of Prius | $27,000 | |
Goodwill Denver | Match on 5310 Vehicle | $14,000 | |
Via | Match on Mobility Management and Operating | $75,000 | |
Laradon | Match on 5310 Vehicles | $26,000 | |
DRMAC | Updating Software Platform | $23,000 | |
Lakewood | Operating Match | $20,000 | |
Easter Seals | Operating Expenses | $60,000 | |
Broomfield | Match on 5310 Vehicle and COVID-19 Expenses | $5,000 | |
A Little Help | Match on Operating Grants and COVID-19 Expenses | $18,000 | |
Continuum | Operating Expenses | $60,000 |
2024-2027 Transportation Improvement Program (Approved TIP)
I25/Crystal Valley New Interchange
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (BUILD) | $0 | $0 | $0 | $0 |
Federal (Surface Transportation Block Grant) | $4,000,000 | $2,500,000 | $2,000,000 | $0 |
Local | $38,500,000 | $38,584,000 | $416,000 | $0 |
Total | $42,500,000 | $41,084,000 | $2,416,000 | $0 |
Project Phase to Initiate | Construction | Construction | Construction | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$12,000,000 | $86,000,000 | $0 | $98,000,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
01/14/2021 | Amended | New project. |
2024-2027 Transportation Improvement Program (Approved TIP)
I70 Region 1 Noise Walls
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (STBG-Pandemic) | $0 | $0 | $0 | $0 |
State (Legislative) | $0 | $0 | $0 | $0 |
State (Regional Priority Projects) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$35,800,000 | $0 | $0 | $35,800,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
09/27/2021 | Amended | Add $20,000,000 in state Legislative funding for phases 3-6. Total project cost increases. |
06/21/2021 | Amended | Add funding for Phase 2. Total project cost increases. |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
01/15/2021 | Amended | New project |
2024-2027 Transportation Improvement Program (Approved TIP)
I70 West Metro Bridges: I25 to C470
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
State (Legislative) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$37,200,000 | $0 | $0 | $37,200,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
08/19/2021 | Amended | Add $2,000,000 in legislative funding. Total project cost increases |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
01/25/2021 | Amended | New project. |
2024-2027 Transportation Improvement Program (Approved TIP)
Region 1 Mobility Hub Pool
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
State (Legislative-Transit) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$19,170,000 | $0 | $0 | $19,170,000 |
Date | Status | Description |
---|---|---|
07/22/2024 | Amended | Remove one pool project and transfer $14,000,000 in prior year state Legislative-Transit funding to new I25/CO7 Interim Transit Improvement project. Total project cost decreases. |
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
11/17/2022 | Amended | Add $6,130,000 in state Legislative-Transit funding, remove one pool project, and adjust cost on two pool projects. Total project cost increases. |
02/17/2022 | Amended | Increase cost on one pool project by $4,000,000 in state Legislative-Transit funds. Total project cost increases. |
11/18/2021 | Amended | Add one pool project. Total project cost increases. |
Additional project amendment details can be found under this project in the TRIPS database.
Project Pools
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name | Description | Notes | Cost |
---|---|---|---|
Bustang Maintenance Facility | $4,000,000 | ||
Castle Rock Mobility Hub | $13,170,000 | ||
Lone Tree Mobility Hub | $20,000 in Leg-T funding in TIP# 2022-032 | $0 |
2024-2027 Transportation Improvement Program (Approved TIP)
E470/38th New Interchange
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$31,183,000 | $0 | $0 | $31,183,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
2024-2027 Transportation Improvement Program (Approved TIP)
E470 Widening: I70 to 104th
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Local | $36,568,000 | $0 | $0 | $0 |
Total | $36,568,000 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$74,836,000 | $36,568,000 | $0 | $111,404,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
2024-2027 Transportation Improvement Program (Approved TIP)
E470/I70 Interchange Improvements
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Local | $28,761,000 | $0 | $0 | $0 |
Total | $28,761,000 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$27,150,000 | $28,761,000 | $62,744,000 | $118,655,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended |
2024-2027 Transportation Improvement Program (Approved TIP)
E470 Widening: 104th to I76
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Local | $0 | $1,500,000 | $0 | $0 |
Total | $0 | $1,500,000 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $1,500,000 | $108,359,000 | $109,859,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended |
2024-2027 Transportation Improvement Program (Approved TIP)
E470/88th New Interchange
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Local | $17,086,000 | $0 | $0 | $0 |
Total | $17,086,000 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $17,086,000 | $0 | $17,086,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Proposed for adoption into 2022-2025 |
2024-2027 Transportation Improvement Program (Approved TIP)
Broadway Corridor Study: Belleview to C470
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$1,000,000 | $0 | $0 | $1,000,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Add new project from waiting list. |
2024-2027 Transportation Improvement Program (Approved TIP)
US287 BRT Feasibility & Safety Study: Longmont to Broomfield
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Faster Safety) | $0 | $0 | $0 | $0 |
Federal (Surface Transportation Block Grant) | $0 | $0 | $0 | $0 |
State (Faster Safety) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$536,000 | $0 | $0 | $536,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
11/17/2022 | Amended | Add $185,000 in state FASTER-Safety funding. Total project cost increases. |
04/22/2021 | Amended | Add new wait list project |
2024-2027 Transportation Improvement Program (Approved TIP)
30th St Corridor Improvements: Boulder Creek to Arapahoe
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $0 | $0 | $0 | $0 |
State (Legislative) | $2,300,000 | $0 | $0 | $0 |
State (MMOF) | $0 | $0 | $0 | $0 |
Local | $575,000 | $0 | $0 | $0 |
Total | $2,875,000 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$4,300,000 | $2,875,000 | $0 | $7,175,000 |
Date | Status | Description |
---|---|---|
02/22/2024 | Amended | Add $2,300,000 in state Legislative funding and $575,000 local match from TIP ID# 2020-087. Total project cost increases. |
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Add new waitlist project |
2024-2027 Transportation Improvement Program (Approved TIP)
County Line/WCR 1 Buffered Bike Lanes: 17th to CO66
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Transportation Alternatives-DRCOG) | $0 | $1,356,000 | $0 | $0 |
State (MMOF) | $0 | $1,700,000 | $0 | $0 |
Local | $0 | $344,000 | $0 | $0 |
Total | $0 | $3,400,000 | $0 | $0 |
Project Phase to Initiate | None | Construction | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$450,000 | $3,400,000 | $0 | $3,850,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
09/22/2022 | Amended | Add scope from 2022-2025 Subregional Share Call for Projects. |
04/22/2021 | Amended | Add new waitlist project |
2024-2027 Transportation Improvement Program (Approved TIP)
5th St Operational Improvements: Woodlands to Ridge
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$7,000,000 | $0 | $0 | $7,000,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Add new waitlist project |
2024-2027 Transportation Improvement Program (Approved TIP)
100th Ave Multimodal Improvements: Alkire to Simms
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (STBG-Pandemic DRCOG Region) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$1,400,000 | $0 | $0 | $1,400,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Add new waitlist project |
2024-2027 Transportation Improvement Program (Approved TIP)
South Platte River Trail Improvements: West Virginia to W Bayaud
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $0 | $0 | $0 | $0 |
Federal (Transportation Alternatives-DRCOG) | $0 | $0 | $0 | $0 |
State (MMOF) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$10,000,000 | $0 | $0 | $10,000,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
05/19/2021 | Amended | Revise limits. Total project cost remains the same. |
04/22/2021 | Amended | Add new waitlist project |
2024-2027 Transportation Improvement Program (Approved TIP)
St Vrain Trail Extension: CO66 from McConnell to US36
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congressional Allocation) | $0 | $800,000 | $0 | $0 |
Federal (STBG-Pandemic DRCOG Region) | $0 | $0 | $0 | $0 |
Local | $0 | $166,000 | $0 | $0 |
Total | $0 | $966,000 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$1,200,000 | $966,000 | $0 | $2,166,000 |
Date | Status | Description |
---|---|---|
06/26/2024 | Amended | Add $800,000 in federal Congressional Allocation funding. Total project cost increases. |
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/22/2021 | Amended | Add new waitlist project |
2024-2027 Transportation Improvement Program (Approved TIP)
US36 Multimodal Improvements: 3rd to McConnell
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (STBG-Pandemic DRCOG Region) | $0 | $0 | $0 | $0 |
State (Legislative) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$2,701,000 | $0 | $0 | $2,701,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
10/21/2021 | Amended | Add $243,000 in state Legislative funding from recent Revitalizing Main Streets award |
04/22/2021 | Amended | Add new waitlist project |
2024-2027 Transportation Improvement Program (Approved TIP)
Wadsworth Operational Improvements: Vassar to Woodard
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congestion Mitigation / Air Quality) | $0 | $0 | $0 | $0 |
Federal (Surface Transportation Block Grant) | $0 | $0 | $0 | $0 |
Federal (Transportation Alternatives-DRCOG) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$8,644,000 | $0 | $0 | $8,644,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
05/16/2023 | Amended | Swap $1,920,000 in federal CRP for $1,920,000 in federal CMAQ funding. No change to total project cost. |
03/16/2023 | Amended | Add $2,004,000 in federal TAP funding and $501,000 in local match transferred from Region 1 TAP Pool, and adjust scope. Total project cost increases. |
09/22/2022 | Amended | Add new scope from 2022-2025 Subregional Share Call for Projects. |
04/22/2021 | Amended | Add new project |
2024-2027 Transportation Improvement Program (Approved TIP)
Region 1 Revitalizing Main Streets Pool
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
State (Legislative) | $250,000 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $250,000 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$4,601,000 | $250,000 | $0 | $4,851,000 |
Date | Status | Description |
---|---|---|
05/16/2024 | Amended | Add one pool project and $250,000 of state Legislative funding. Total project cost increases. |
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
03/16/2023 | Amended | Remove one pool project and $1,360,000 in state Legislative funding. Project is transferred to 2016-020. Total project cost decreases. |
09/08/2022 | Amended | Add three new pool projects and increase state Legislative funding by $2,160,000. Total project cost increases. |
09/16/2021 | Amended | New project. |
Project Pools
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name | Description | Notes | Cost |
---|---|---|---|
Aurora | Northwest Aurora Intersection Pedestrian Safety Enhancement | $1,600,000 | |
Edgewater | 25th Avenue Streetscape Project | $841,000 | |
Commerce City | 68th Ave. Multimodal Safety Improvements | $1,420,000 | |
Englewood | South Broadway HAWK Signal | $316,000 | |
Lakewood | 40 West ArtLine Bike Path Lighting and Safety | $424,000 | |
Wheat Ridge | Main Street Plaza, Event, and Park Space | $250,000 |
2024-2027 Transportation Improvement Program (Approved TIP)
CO7/95th Intersection Improvements
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (MMOF - ARPA - DRCOG) | $0 | $0 | $0 | $0 |
Federal (Surface Transportation Block Grant) | $0 | $2,272,000 | $0 | $0 |
State (Legislative-Transit) | $11,940,000 | $568,000 | $0 | $0 |
State (MMOF) | $2,800,000 | $0 | $0 | $0 |
Local | $4,436,000 | $0 | $0 | $0 |
Total | $19,176,000 | $2,840,000 | $0 | $0 |
Project Phase to Initiate | None | Construction | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$4,860,000 | $22,016,000 | $0 | $26,876,000 |
Date | Status | Description |
---|---|---|
02/22/2024 | Amended | Replace $2,272,000 in federal Multimodal Transportation and Mitigation Options Fund-American Rescue Plan Act funds with $2,272,000 in federal Surface Transportation Block Grant funds. Total project cost remains the same. |
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
02/16/2023 | Amended | Replace $6,719,000 in RPP funding with $6,719,000 in Legislative-Transit funding per CDOT R4. |
09/22/2022 | Amended | Switch FY23 funding from state MMOF to federal MMOF-ARPA. Total project cost remains the same. |
03/17/2022 | Amended | Add $5,200,000 in MMOF funding in FY23 & 24 and add $8,238,000 in local match as part of Spring 2022 Wait List Process. Total project cost increases. |
Additional project amendment details can be found under this project in the TRIPS database.
2024-2027 Transportation Improvement Program (Approved TIP)
I70 Escape Ramp Between Floyd Hill and Denver West
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Freight) | $0 | $0 | $0 | $0 |
State (Legislative) | $0 | $0 | $0 | $0 |
State (Safety) | $2,502,000 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $2,502,000 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$19,100,000 | $2,502,000 | $0 | $21,602,000 |
Date | Status | Description |
---|---|---|
10/18/2023 | Amended | Add $2,502,000 in state Safety funds. Total project cost increases. |
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
11/17/2022 | Amended | Add $4,100,000 in federal Freight funds and $13,000,000 in state Legislative funding recently awarded, and $8,500,000 in state Safety funds from Region 1 Hazard Elimination Pool (TIP ID# 2007-073). |
12/16/2021 | Amended | New project split from 2007-164. |
2024-2027 Transportation Improvement Program (Approved TIP)
I70 Floyd Hill Improvements: JC65 to Genesee Park
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
State (Legislative) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$17,300,000 | $0 | $0 | $17,300,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
07/21/2022 | Amended | Add parking at El Rancho to project scope. Increase Legislative funding by $6,300,000. Total project cost increases. |
02/17/2022 | Amended | Add new project. |
2024-2027 Transportation Improvement Program (Approved TIP)
3rd/Welker Intersection Improvements
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Carbon Reduction Program) | $0 | $0 | $0 | $0 |
Federal (Congressional Allocation) | $0 | $1,000,000 | $0 | $0 |
Local | $1,815,000 | $208,000 | $0 | $0 |
Total | $1,815,000 | $1,208,000 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$3,600,000 | $3,023,000 | $0 | $6,623,000 |
Date | Status | Description |
---|---|---|
06/26/2024 | Amended | Add $1,000,000 in federal Congressional Allocation funding. Total project cost increases. |
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
03/17/2022 | Amended | Add new project as part of Spring 2022 Wait List process. |
2024-2027 Transportation Improvement Program (Approved TIP)
CO119/63rd Transit Bypass Lanes
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (MMOF - ARPA - DRCOG) | $0 | $0 | $0 | $0 |
State (Legislative-Transit) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $0 | $0 | $0 |
Date | Status | Description |
---|---|---|
10/18/2023 | Amended | Remove funding at the request of project sponsor. Funding and scope moved to TIP ID# 2020-081. Project funding decreases. |
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
09/22/2022 | Amended | Replace state MMOF funding with federal MMOF-ARPA funding. Total project cost remains the same. |
03/17/2022 | Amended | Add new project as part of Spring 2022 Wait List Process. |
2024-2027 Transportation Improvement Program (Approved TIP)
I25/Happy Canyon Interchange - Precon
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $1,319,000 | $1,119,000 | $0 | $0 |
Local | $1,081,000 | $881,000 | $0 | $0 |
Total | $2,400,000 | $2,000,000 | $0 | $0 |
Project Phase to Initiate | Design | Environmental | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$400,000 | $4,400,000 | $0 | $4,800,000 |
Date | Status | Description |
---|---|---|
09/21/2023 | Amended | Correct funding amounts to include previously awarded FY24 funds (additional $200,000 in federal Surface Transportation Block Grant and $200,000 in local match). Total project cost increases. |
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
03/17/2022 | Amended | Add new project as part of Spring 2022 Wait List Process. |
2024-2027 Transportation Improvement Program (Approved TIP)
88th Corridor Study: Pecos to Dahlia
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $200,000 | $0 | $0 | $0 |
Local | $50,000 | $0 | $0 | $0 |
Total | $250,000 | $0 | $0 | $0 |
Project Phase to Initiate | Study | None | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $250,000 | $0 | $250,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
03/17/2022 | Amended | Add new project as part of Spring 2022 Wait List Process. |
2024-2027 Transportation Improvement Program (Approved TIP)
Enhanced Mobility of Seniors and Individuals with Disabilities (FTA 5310 - DRCOG)
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Section 5310) | $2,900,000 | $2,900,000 | $2,900,000 | $2,900,000 |
Local | $1,511,000 | $450,000 | $450,000 | $450,000 |
Total | $4,411,000 | $3,350,000 | $3,350,000 | $3,350,000 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$5,023,000 | $14,461,000 | $0 | $19,484,000 |
Date | Status | Description |
---|---|---|
05/16/2024 | Amended | Remove completed prior awards, add 11 newly awarded projects and required local match, and update annual allotment based on new projections. Total project cost decreases. |
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/24/2023 | Amended | Add 14 new pool projects from recent FY 24 Call for Projects and correct prior funding amounts. Total project cost increases. |
05/23/2022 | Amended | Create new project for DRCOG sponsored FTA 5310 projects. |
Project Pools
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name | Description | Notes | Cost |
---|---|---|---|
DRCOG | Program Administration (FY24) | $293,000 | |
VIA | Mobility Management (FY24) | $472,000 | |
VIA | Operating (FY24) | Funded also with HST | $969,000 |
Laradon Hall | Operating (FY24) | $139,000 | |
DRCOG | Mobility Management (FY24) | Funded also with HST | $845,000 |
Douglas County | Mobility Management (FY24) | Funded also with HST | $301,000 |
DRMAC | Mobility Management (FY24) | Funded also with HST | $297,000 |
Lakewood | Operating (FY24) | $60,000 | |
A Little Help | Mobility Management (Fiscal Year 2025) | $20,000 | |
Denver Regional Mobility and Access Council | Mobility Management (Fiscal Year 2025) | $297,000 | |
Douglas County | Mobility Management (Fiscal Year 2025) | Funded also with Human Services Transportation Set-Aside | $250,000 |
DRCOG | Mobility Management (Fiscal Year 2025) | $516,000 | |
Easter Seals | 1 Replacement Vehicle (Fiscal Year 2025) | $94,000 | |
Lakewood | Operating (Fiscal Year 2025) | $70,000 | |
Laradon Hall Society | Operating (Fiscal Year 2025) | $140,000 | |
Laradon Hall Society | 1 Vehicle Replacement (Fiscal Year 2025) | $102,000 | |
Support Management | 1 Vehicle Replacement (Fiscal Year 2025) | $144,000 | |
Via | Operating (Fiscal Year 2025) | Funded also with Human Services Transportation Set-Aside | $945,000 |
Via | Mobility Management (Fiscal Year 2025) | $479,000 |
2024-2027 Transportation Improvement Program (Approved TIP)
Washington St Improvements: 47th to 52nd
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (RAISE) | $6,362,000 | $0 | $7,631,000 | $0 |
Local | $2,690,000 | $0 | $15,344,000 | $0 |
Total | $9,052,000 | $0 | $22,975,000 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$4,768,000 | $32,027,000 | $0 | $36,795,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
07/21/2022 | Amended | Create new project for RAISE Grant award. |
2024-2027 Transportation Improvement Program (Approved TIP)
I25/WCR34 Emergency Bridge Replacement
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
State (TC Contingency) | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$2,000,000 | $0 | $0 | $2,000,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
09/22/2022 | Amended | Add $1 million in state TC Contingency funds. Total project cost increases. |
09/08/2022 | Amended | Add new project. |
2024-2027 Transportation Improvement Program (Approved TIP)
Region 1 Congressionally Directed Funding Pool
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congressional Allocation) | $5,362,000 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $5,362,000 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$3,545,000 | $5,362,000 | $0 | $8,907,000 |
Date | Status | Description |
---|---|---|
07/22/2024 | Amended | Add three pool projects and $5,362,000 in federal Congressional Allocation funds. Total project cost increases. |
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
05/16/2023 | Amended | Add two pool projects and $3,400,000 in federal Congressional funding. Total project cost increases. |
09/08/2022 | Amended | Create new pool for congressionally directed funding in CDOT Region 1. |
Project Pools
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name | Description | Notes | Cost |
---|---|---|---|
Golden | SH-93 Design | $2,320,000 | |
Commerce City | Quiet Zones | $615,000 | |
Commerce City | Chambers Avenue Widening | $4,116,000 | |
Golden | Compactor/Roller Purchase | $850,000 | |
Thornton | Quebec Street Widening | $850,000 |
2024-2027 Transportation Improvement Program (Approved TIP)
I25 Chain Down Station: Larkspur
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Freight) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$5,000,000 | $0 | $0 | $5,000,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
11/17/2022 | Amended | Add $2,000,000 in federal Freight funding. Total project cost increases. |
09/08/2022 | Amended | Create new project for chain station on I-25. |
2024-2027 Transportation Improvement Program (Approved TIP)
East Colfax BRT: Civic Center Station to Yosemite
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Capital Investment Grant) | $126,889,000 | $0 | $0 | $0 |
Federal (Carbon Reduction Program) | $2,845,000 | $0 | $0 | $0 |
Federal (Congestion Mitigation / Air Quality) | $5,686,000 | $0 | $0 | $0 |
Federal (Surface Transportation Block Grant) | $8,513,000 | $0 | $2,685,000 | $0 |
Local | $91,107,000 | $0 | $2,305,000 | $0 |
Total | $235,040,000 | $0 | $4,990,000 | $0 |
Project Phase to Initiate | CM/GC Construction | None | CM/GC Construction | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$15,126,000 | $240,030,000 | $0 | $255,156,000 |
Date | Status | Description |
---|---|---|
05/16/2024 | Amended | Add $126,889,000 in federal Capital Investment Grant funds and local match. Total project cost increases. |
12/19/2023 | Amended | Swap $13,249,000 in federal Multimodal Transportation and Mitigation Options Fund - American Rescue Plan Act funds for $10,988,000 in federal Congestion Mitigation/Air Quality funds and $2,261,000 in federal Surface Transportation Block Grant funds. Total project cost remains the same. |
08/17/2023 | Amended | Proposed for adoption into 2024-2027, add funds from 2024-2027 Subregional Share Call for Projects. |
09/22/2022 | Amended | Add new project from 2022-2025 Regional and Subregional Shares Calls for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
Lone Tree Mobility Hub at Sky Ridge Station
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congestion Mitigation / Air Quality) | $0 | $4,661,000 | $0 | $0 |
Federal (MMOF - ARPA - DRCOG) | $3,339,000 | $0 | $0 | $0 |
State (Legislative-Transit) | $2,000,000 | $6,000,000 | $0 | $0 |
Local | $2,000,000 | $0 | $0 | $0 |
Total | $7,339,000 | $10,661,000 | $0 | $0 |
Project Phase to Initiate | Design | Construction | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$2,000,000 | $18,000,000 | $0 | $20,000,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
11/17/2022 | Amended | Increase state Legislative-Transit funding by $10,000,000 to capture funds previously included in Region 1 Mobility Hub pool (TIP ID# 2020-100). Total project cost increases. |
09/22/2022 | Amended | Add new project from 2022-2025 Regional and Subregional Shares Calls for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
Mineral Station Area Multimodal Improvements
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Carbon Reduction Program) | $0 | $733,000 | $0 | $0 |
State (MMOF) | $0 | $919,000 | $0 | $0 |
Local | $0 | $186,000 | $0 | $0 |
Total | $0 | $1,838,000 | $0 | $0 |
Project Phase to Initiate | None | Construction | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$557,000 | $1,838,000 | $0 | $2,395,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
09/22/2022 | Amended | Add new project from 2022-2025 Regional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
Southwest Weld County Trail Alignment Study
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Carbon Reduction Program) | $320,000 | $0 | $0 | $0 |
Federal (MMOF - ARPA - DRCOG) | $400,000 | $0 | $0 | $0 |
Local | $80,000 | $0 | $0 | $0 |
Total | $800,000 | $0 | $0 | $0 |
Project Phase to Initiate | Design | None | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$200,000 | $800,000 | $0 | $1,000,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
09/22/2022 | Amended | Add new project from 2022-2025 Subregional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
Buchtel Complete Street/Evans Intersection Improvements: University to Colorado
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congestion Mitigation / Air Quality) | $2,395,000 | $7,285,000 | $0 | $0 |
State (MMOF) | $2,927,000 | $9,193,000 | $0 | $0 |
Local | $532,000 | $1,908,000 | $0 | $0 |
Total | $5,854,000 | $18,386,000 | $0 | $0 |
Project Phase to Initiate | Construction | Construction | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $24,240,000 | $0 | $24,240,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
09/22/2022 | Amended | Add new project from 2022-2025 Subregional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
Bike/Ped Bridge over Santa Fe: Jewell to Evans Station
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congestion Mitigation / Air Quality) | $1,198,000 | $3,302,000 | $0 | $0 |
State (MMOF) | $1,996,000 | $5,504,000 | $0 | $0 |
Local | $799,000 | $2,203,000 | $0 | $0 |
Total | $3,993,000 | $11,009,000 | $0 | $0 |
Project Phase to Initiate | Construction | Construction | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $15,002,000 | $0 | $15,002,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
09/22/2022 | Amended | Add new project from 2022-2025 Subregional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
South Platte River Trail Improvements: Mississippi to Dartmouth - Precon
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congestion Mitigation / Air Quality) | $750,000 | $750,000 | $0 | $0 |
State (MMOF) | $1,250,000 | $1,250,000 | $0 | $0 |
Local | $500,000 | $500,000 | $0 | $0 |
Total | $2,500,000 | $2,500,000 | $0 | $0 |
Project Phase to Initiate | Design | Environmental | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $5,000,000 | $0 | $5,000,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
09/22/2022 | Amended | Add new project from 2022-2025 Subregional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
Airport Creek Trail Underpass at BNSF
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congestion Mitigation / Air Quality) | $263,000 | $1,243,000 | $0 | $0 |
State (MMOF) | $437,000 | $2,071,000 | $0 | $0 |
Local | $175,000 | $828,000 | $0 | $0 |
Total | $875,000 | $4,142,000 | $0 | $0 |
Project Phase to Initiate | Design | Construction | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$46,000 | $5,017,000 | $0 | $5,063,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
09/22/2022 | Amended | Add new project from 2022-2025 Subregional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
Downtown Golden Traffic Signal Upgrade
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Carbon Reduction Program) | $0 | $0 | $0 | $0 |
Federal (MMOF - ARPA - DRCOG) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$1,004,000 | $0 | $0 | $1,004,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
09/22/2022 | Amended | Add new project from 2022-2025 Subregional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
Jefferson County Bicycle Plan Implementation
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Carbon Reduction Program) | $168,000 | $168,000 | $0 | $0 |
State (MMOF) | $207,000 | $207,000 | $0 | $0 |
Local | $40,000 | $40,000 | $0 | $0 |
Total | $415,000 | $415,000 | $0 | $0 |
Project Phase to Initiate | Construction | Construction | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$420,000 | $830,000 | $0 | $1,250,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
09/22/2022 | Amended | Add new project from 2022-2025 Subregional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
Wadsworth Shared-Use Path: 32nd to 35th
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congestion Mitigation / Air Quality) | $750,000 | $2,000,000 | $0 | $0 |
State (MMOF) | $1,250,000 | $2,500,000 | $0 | $0 |
State (Regional Priority Projects) | $200,000 | $500,000 | $0 | $0 |
Local | $300,000 | $0 | $0 | $0 |
Total | $2,500,000 | $5,000,000 | $0 | $0 |
Project Phase to Initiate | Environmental | Construction | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $7,500,000 | $0 | $7,500,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/24/2023 | Amended | Replace $700,000 in Safety funding with $700,000 in RPP funding. Total project cost remains the same. |
09/22/2022 | Amended | Add new project from 2022-2025 Subregional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
Ward Station Multimodal Access Improvements
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congestion Mitigation / Air Quality) | $3,475,000 | $0 | $0 | $0 |
Federal (MMOF - ARPA - DRCOG) | $4,825,000 | $0 | $0 | $0 |
Local | $1,350,000 | $0 | $0 | $0 |
Total | $9,650,000 | $0 | $0 | $0 |
Project Phase to Initiate | Construction | None | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $9,650,000 | $0 | $9,650,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
09/22/2022 | Amended | Add new project from 2022-2025 Subregional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
120th Safety and Multimodal Corridor Study: US85 to Tower
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Carbon Reduction Program) | $80,000 | $0 | $0 | $0 |
Federal (MMOF - ARPA - DRCOG) | $100,000 | $0 | $0 | $0 |
Local | $20,000 | $0 | $0 | $0 |
Total | $200,000 | $0 | $0 | $0 |
Project Phase to Initiate | Study | None | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$600,000 | $200,000 | $0 | $800,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
09/22/2022 | Amended | Add new project from 2022-2025 Subregional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
Smith Rd Multimodal Improvements: Peoria to Powhaton - Precon
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Carbon Reduction Program) | $1,000,000 | $0 | $0 | $0 |
Federal (MMOF - ARPA - DRCOG) | $1,250,000 | $0 | $0 | $0 |
Local | $250,000 | $0 | $0 | $0 |
Total | $2,500,000 | $0 | $0 | $0 |
Project Phase to Initiate | Design | None | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$2,500,000 | $2,500,000 | $0 | $5,000,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
09/22/2022 | Amended | Add new project from 2022-2025 Subregional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
Aurora Multimodal Access Improvements
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Carbon Reduction Program) | $65,000 | $1,791,000 | $0 | $0 |
State (MMOF) | $107,000 | $2,369,000 | $0 | $0 |
Local | $43,000 | $1,040,000 | $0 | $0 |
Total | $215,000 | $5,200,000 | $0 | $0 |
Project Phase to Initiate | ROW | Construction | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$1,225,000 | $5,415,000 | $0 | $6,640,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
09/22/2022 | Amended | Add new project from 2022-2025 Subregional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
Bennett Kiowa Creek Trail
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congestion Mitigation / Air Quality) | $1,420,000 | $0 | $0 | $0 |
Federal (Transportation Alternatives-DRCOG) | $0 | $577,000 | $0 | $0 |
State (MMOF) | $1,775,000 | $721,000 | $0 | $0 |
Local | $355,000 | $145,000 | $0 | $0 |
Total | $3,550,000 | $1,443,000 | $0 | $0 |
Project Phase to Initiate | Construction | Construction | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$878,000 | $4,993,000 | $0 | $5,871,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
09/22/2022 | Amended | Add new project from 2022-2025 Subregional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
64th Corridor Study: CO2 to Quebec
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Carbon Reduction Program) | $38,000 | $0 | $0 | $0 |
Federal (MMOF - ARPA - DRCOG) | $62,000 | $0 | $0 | $0 |
Local | $25,000 | $0 | $0 | $0 |
Total | $125,000 | $0 | $0 | $0 |
Project Phase to Initiate | Study | None | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$125,000 | $125,000 | $0 | $250,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
09/22/2022 | Amended | Add new project from 2022-2025 Subregional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
88th Ave Multimodal Improvements: I76 to CO2
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Transportation Alternatives-DRCOG) | $0 | $0 | $0 | $0 |
State (MMOF) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $0 | $0 | $0 |
Date | Status | Description |
---|---|---|
05/16/2024 | Amended | Zero out funding to combine with Project# 2020-032. Total project cost decreases. |
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
09/22/2022 | Amended | Add new project from 2022-2025 Subregional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
Thornton Multimodal Trail Study and Precon
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congestion Mitigation / Air Quality) | $298,000 | $0 | $0 | $0 |
Federal (MMOF - ARPA - DRCOG) | $655,000 | $0 | $0 | $0 |
Federal (STBG-Pandemic DRCOG Region) | $235,000 | $0 | $0 | $0 |
Local | $122,000 | $0 | $0 | $0 |
Total | $1,310,000 | $0 | $0 | $0 |
Project Phase to Initiate | Design | None | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$400,000 | $1,310,000 | $0 | $1,710,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
12/21/2022 | Amended | Swap $385,000 in CMAQ for $385,000 in STBG-PDR. Total project cost remains the same. |
09/22/2022 | Amended | Add new project from 2022-2025 Subregional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
100th Ave Multi-Use Path: Riverdale to Forest Circle
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Transportation Alternatives-DRCOG) | $36,000 | $191,000 | $0 | $0 |
State (MMOF) | $58,000 | $318,000 | $0 | $0 |
Local | $23,000 | $128,000 | $0 | $0 |
Total | $117,000 | $637,000 | $0 | $0 |
Project Phase to Initiate | ROW | Construction | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$192,000 | $754,000 | $0 | $946,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
09/22/2022 | Amended | Add new project from 2022-2025 Subregional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
Thornton Protected Bike Facility Study
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Carbon Reduction Program) | $0 | $0 | $0 | $0 |
Federal (MMOF - ARPA - DRCOG) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$510,000 | $0 | $0 | $510,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
09/22/2022 | Amended | Add new project from 2022-2025 Subregional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
Federal Blvd Bus Stop Improvements: 70th to 92nd
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Carbon Reduction Program) | $0 | $0 | $0 | $0 |
Federal (MMOF - ARPA - DRCOG) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $0 | $0 | $0 |
Date | Status | Description |
---|---|---|
02/22/2024 | Amended | Zero out project at sponsor"s request. Funds are transferring to the Federal Blvd BRT project - TIP ID# 2024-008 |
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
09/22/2022 | Amended | Add new project from 2022-2025 Subregional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
High Line Canal Trail Underpass at Broadway - Precon
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $0 | $0 | $1,342,000 | $1,341,000 |
Federal (Transportation Alternatives-DRCOG) | $0 | $537,000 | $0 | $0 |
State (MMOF) | $0 | $900,000 | $0 | $0 |
Local | $0 | $363,000 | $336,000 | $335,000 |
Total | $0 | $1,800,000 | $1,678,000 | $1,676,000 |
Project Phase to Initiate | None | Environmental | Design | ROW |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $5,154,000 | $0 | $5,154,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
09/22/2022 | Amended | Add new project from 2022-2025 Subregional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
Arapahoe County Transit and Micromobility Study
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (MMOF - ARPA - DRCOG) | $332,000 | $0 | $0 | $0 |
Federal (Surface Transportation Block Grant) | $263,000 | $0 | $0 | $0 |
Local | $70,000 | $0 | $0 | $0 |
Total | $665,000 | $0 | $0 | $0 |
Project Phase to Initiate | Study | None | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$790,000 | $665,000 | $0 | $1,455,000 |
Date | Status | Description |
---|---|---|
12/19/2023 | Amended | Swap federal Carbon Reduction Program funds for federal Surface Transportation Block Grant funds. Total project cost remains the same. |
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
09/22/2022 | Amended | Add new project from 2022-2025 Subregional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
Aurora Multimodal Transportation Master Plan
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $356,000 | $424,000 | $0 | $0 |
State (MMOF) | $593,000 | $707,000 | $0 | $0 |
Local | $237,000 | $283,000 | $0 | $0 |
Total | $1,186,000 | $1,414,000 | $0 | $0 |
Project Phase to Initiate | Study | Study | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$625,000 | $2,600,000 | $0 | $3,225,000 |
Date | Status | Description |
---|---|---|
12/19/2023 | Amended | Swap federal Carbon Reduction Program funds for federal Surface Transportation Block Grant funds. Total project cost remains the same. |
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
09/22/2022 | Amended | Add new project from 2022-2025 Subregional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
Lone Tree Creek Trail Underpass of Arapahoe
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congestion Mitigation / Air Quality) | $1,725,000 | $0 | $0 | $0 |
Federal (MMOF - ARPA - DRCOG) | $2,156,000 | $0 | $0 | $0 |
Local | $431,000 | $0 | $0 | $0 |
Total | $4,312,000 | $0 | $0 | $0 |
Project Phase to Initiate | Construction | None | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $4,312,000 | $0 | $4,312,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
09/22/2022 | Amended | Add new project from 2022-2025 Subregional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
Arapahoe Sidepath Improvements: I25 to Parker Rd
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congestion Mitigation / Air Quality) | $0 | $1,790,000 | $0 | $0 |
State (MMOF) | $0 | $2,240,000 | $0 | $0 |
Local | $0 | $450,000 | $0 | $0 |
Total | $0 | $4,480,000 | $0 | $0 |
Project Phase to Initiate | None | Construction | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $4,480,000 | $0 | $4,480,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
09/22/2022 | Amended | Add new project from 2022-2025 Subregional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
Hampden Complete Streets: Broadway to Lafayette
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (MMOF - ARPA - DRCOG) | $3,285,000 | $0 | $0 | $0 |
Federal (Transportation Alternatives-DRCOG) | $2,190,000 | $0 | $0 | $0 |
Local | $1,369,000 | $0 | $0 | $0 |
Total | $6,844,000 | $0 | $0 | $0 |
Project Phase to Initiate | Construction | None | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$2,281,000 | $6,844,000 | $0 | $9,125,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
09/22/2022 | Amended | Add new project from 2022-2025 Subregional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
Broadway Complete Streets Improvements: Hampden to Belleview
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (MMOF - ARPA - DRCOG) | $2,450,000 | $0 | $0 | $0 |
Federal (Transportation Alternatives-DRCOG) | $1,863,000 | $0 | $0 | $0 |
Local | $588,000 | $0 | $0 | $0 |
Total | $4,901,000 | $0 | $0 | $0 |
Project Phase to Initiate | Construction | None | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$2,639,000 | $4,901,000 | $0 | $7,540,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
09/22/2022 | Amended | Add new project from 2022-2025 Subregional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
30th St Complete Streets: CO119 to CO7 - Precon
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (MMOF - ARPA - DRCOG) | $380,000 | $0 | $0 | $0 |
Federal (Transportation Alternatives-DRCOG) | $220,000 | $0 | $0 | $0 |
Local | $160,000 | $0 | $0 | $0 |
Total | $760,000 | $0 | $0 | $0 |
Project Phase to Initiate | Design | None | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$240,000 | $760,000 | $0 | $1,000,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
09/22/2022 | Amended | Add new project from 2022-2025 Subregional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
Baseline Multimodal Improvements: 30th to Foothills
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Carbon Reduction Program) | $0 | $878,000 | $0 | $0 |
State (MMOF) | $0 | $1,463,000 | $0 | $0 |
Local | $0 | $585,000 | $0 | $0 |
Total | $0 | $2,926,000 | $0 | $0 |
Project Phase to Initiate | None | Construction | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$976,000 | $2,926,000 | $0 | $3,902,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
09/22/2022 | Amended | Add new project from 2022-2025 Subregional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
CO93/Table Mesa and Regent Intersection Improvements
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congestion Mitigation / Air Quality) | $0 | $930,000 | $0 | $0 |
State (Legislative) | $0 | $0 | $0 | $0 |
State (MMOF) | $0 | $1,550,000 | $0 | $0 |
Local | $0 | $620,000 | $0 | $0 |
Total | $0 | $3,100,000 | $0 | $0 |
Project Phase to Initiate | None | Construction | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$1,500,000 | $3,100,000 | $0 | $4,600,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
02/16/2023 | Amended | Replace $1,500,000 in RPP funding with $1,500,000 in Legislative funding per CDOT R4. |
09/22/2022 | Amended | Add new project from 2022-2025 Subregional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
CO119 Branding and Wayfinding Study: Boulder to Longmont
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (MMOF - ARPA - DRCOG) | $0 | $0 | $0 | $0 |
Federal (Surface Transportation Block Grant) | $0 | $0 | $0 | $0 |
State (10 Year Plan Funds) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$350,000 | $0 | $0 | $350,000 |
Date | Status | Description |
---|---|---|
12/19/2023 | Amended | Swap federal Carbon Reduction Program funds for federal Surface Transportation Block Grant funds. Total project cost remains the same. |
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
02/16/2023 | Amended | Replace $25,000 in RPP funds with $25,000 in 10C plans per CDOT DPD request. |
09/22/2022 | Amended | Add new project from 2022-2025 Subregional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
Longmont Main/21st Bike/Ped Improvements - Precon
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congestion Mitigation / Air Quality) | $79,000 | $320,000 | $0 | $0 |
State (MMOF) | $100,000 | $400,000 | $0 | $0 |
Local | $21,000 | $80,000 | $0 | $0 |
Total | $200,000 | $800,000 | $0 | $0 |
Project Phase to Initiate | Study | Design | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $1,000,000 | $0 | $1,000,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
09/22/2022 | Amended | Add new project from 2022-2025 Subregional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
Nederland Multimodal Transportation Plan
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (MMOF - ARPA - DRCOG) | $74,000 | $0 | $0 | $0 |
Federal (Surface Transportation Block Grant) | $57,000 | $0 | $0 | $0 |
Local | $18,000 | $0 | $0 | $0 |
Total | $149,000 | $0 | $0 | $0 |
Project Phase to Initiate | Study | None | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$51,000 | $149,000 | $0 | $200,000 |
Date | Status | Description |
---|---|---|
12/19/2023 | Amended | Swap federal Carbon Reduction Program funds for federal Surface Transportation Block Grant funds. Total project cost remains the same. |
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
09/22/2022 | Amended | Add new project from 2022-2025 Subregional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
I25/Castle Pines Pkwy Bike/Ped Overpass - Precon
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congestion Mitigation / Air Quality) | $350,000 | $0 | $0 | $0 |
Federal (MMOF - ARPA - DRCOG) | $750,000 | $0 | $0 | $0 |
Local | $400,000 | $0 | $0 | $0 |
Total | $1,500,000 | $0 | $0 | $0 |
Project Phase to Initiate | Design | None | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $1,500,000 | $0 | $1,500,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
09/22/2022 | Amended | Add new project from 2022-2025 Subregional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
Castle Rock Industrial Tributary Trail: Plum Creek to Plum Creek Trail
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congestion Mitigation / Air Quality) | $85,000 | $253,000 | $0 | $0 |
State (MMOF) | $500,000 | $4,082,000 | $0 | $0 |
Local | $415,000 | $3,830,000 | $0 | $0 |
Total | $1,000,000 | $8,165,000 | $0 | $0 |
Project Phase to Initiate | Design | Construction | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $9,165,000 | $0 | $9,165,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
09/22/2022 | Amended | Add new project from 2022-2025 Subregional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
Douglas County Transit & Multimodal Feasibility Study
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Carbon Reduction Program) | $133,000 | $0 | $0 | $0 |
Federal (MMOF - ARPA - DRCOG) | $200,000 | $0 | $0 | $0 |
Local | $67,000 | $0 | $0 | $0 |
Total | $400,000 | $0 | $0 | $0 |
Project Phase to Initiate | Study | None | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$200,000 | $400,000 | $0 | $600,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
09/22/2022 | Amended | Add new project from 2022-2025 Subregional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
County Line Shared Use Path: Broadway to High Line Canal Trail
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Transportation Alternatives-DRCOG) | $45,000 | $819,000 | $0 | $0 |
State (MMOF) | $75,000 | $1,310,000 | $0 | $0 |
Local | $30,000 | $491,000 | $0 | $0 |
Total | $150,000 | $2,620,000 | $0 | $0 |
Project Phase to Initiate | ROW | Construction | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$560,000 | $2,770,000 | $0 | $3,330,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
09/22/2022 | Amended | Add new project from 2022-2025 Subregional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
S Havana Bikeway: RidgeGate Station to Lone Tree City Limits
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congestion Mitigation / Air Quality) | $0 | $300,000 | $0 | $0 |
State (MMOF) | $0 | $800,000 | $0 | $0 |
Local | $0 | $500,000 | $0 | $0 |
Total | $0 | $1,600,000 | $0 | $0 |
Project Phase to Initiate | None | Construction | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $1,600,000 | $0 | $1,600,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
05/16/2023 | Amended | Swap $300,000 in federal CRP funding for $300,000 in federal CMAQ funding. No change in total project cost. |
09/22/2022 | Amended | Add new project from 2022-2025 Subregional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
Parker Rd Multi-Use Path East Side Gaps: Pine to Stroh
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Carbon Reduction Program) | $0 | $1,096,000 | $0 | $0 |
State (MMOF) | $0 | $2,500,000 | $0 | $0 |
Local | $0 | $1,404,000 | $0 | $0 |
Total | $0 | $5,000,000 | $0 | $0 |
Project Phase to Initiate | None | Construction | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $5,000,000 | $0 | $5,000,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
09/22/2022 | Amended | Add new project from 2022-2025 Subregional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
32nd/I-70 Bike Lanes: Wright to Zinnia
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congestion Mitigation / Air Quality) | $390,000 | $0 | $0 | $0 |
Federal (MMOF - ARPA - DRCOG) | $500,000 | $0 | $0 | $0 |
Local | $110,000 | $0 | $0 | $0 |
Total | $1,000,000 | $0 | $0 | $0 |
Project Phase to Initiate | Construction | None | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $1,000,000 | $0 | $1,000,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
09/22/2022 | Amended | Add new project from 2022-2025 Subregional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
Region 1 Arterial BRT and Transit Improvements Pool
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
State (Legislative) | $1,664,000 | $2,987,000 | $5,000,000 | $5,000,000 |
State (Legislative-Transit) | $4,000,000 | $6,000,000 | $5,000,000 | $5,000,000 |
Local | $0 | $0 | $0 | $0 |
Total | $5,664,000 | $8,987,000 | $10,000,000 | $10,000,000 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$17,000,000 | $34,651,000 | $0 | $51,651,000 |
Date | Status | Description |
---|---|---|
10/18/2023 | Amended | Add one pool project, transfer $13,349,000 in state Legislative funding and $10,000,000 in state Legislative-Transit funding to TIP ID# 2024-008. Total project cost decreases. |
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
11/17/2022 | Amended | Create new pool for design and preconstruction activities for arterial BRT in CDOT R1. |
Project Pools
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name | Description | Notes | Cost |
---|---|---|---|
Colorado Blvd | Early Action, NEPA, & 30% Design | $6,000,000 |
2024-2027 Transportation Improvement Program (Approved TIP)
I25/Speer and 23rd Interchange Reconstructions - Precon
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
State (Legislative) | $11,500,000 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $11,500,000 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$3,500,000 | $11,500,000 | $0 | $15,000,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
11/17/2022 | Amended | Add new project for I-25 and Speer/23rd interchange reconstruction. |
2024-2027 Transportation Improvement Program (Approved TIP)
I25 Improvements: 84th to 104th - Precon
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
State (Legislative) | $16,000,000 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $16,000,000 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$4,000,000 | $16,000,000 | $0 | $20,000,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
11/17/2022 | Amended | Add new project for operational and safety improvements to I-25 between 84th Ave. and 104th Ave. |
2024-2027 Transportation Improvement Program (Approved TIP)
Region 4 Revitalizing Main Streets Pool
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
State (Legislative) | $250,000 | $0 | $0 | $0 |
Local | $28,000 | $0 | $0 | $0 |
Total | $278,000 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$2,400,000 | $278,000 | $0 | $2,678,000 |
Date | Status | Description |
---|---|---|
02/22/2024 | Amended | Add one pool project, $250,000 in state Legislative funding, and $28,000 in local match. Total project cost increases. |
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
11/17/2022 | Amended | Add new pool for Revitalizing Main Streets projects in CDOT R4. |
Project Pools
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name | Description | Notes | Cost |
---|---|---|---|
Boulder | Colorado Ave. Multimodal Enhancements | $1,120,000 | |
Dacono | Forest Ave. Street Improvements | $800,000 | |
Mead | Town of Mead Regional Trail Extension | Prior funding in TIP ID# 2007-144 | $250,000 |
2024-2027 Transportation Improvement Program (Approved TIP)
Central Corridor Rail Replacement: I25/Broadway Station to 30th/Downing Station
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congressional Allocation-Transit) | $850,000 | $0 | $0 | $0 |
Local | $213,000 | $0 | $0 | $0 |
Total | $1,063,000 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$4,000,000 | $1,063,000 | $0 | $5,063,000 |
Date | Status | Description |
---|---|---|
06/26/2024 | Amended | Add $850,000 in federal Congressional Allocation funding. Total project cost increases. |
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
02/16/2023 | Amended | Add new project with $4,000,000 of (unmatched) FY 2023 Appropriations Act for Community Projects funding. |
2024-2027 Transportation Improvement Program (Approved TIP)
Region 1 Vision Zero Pool
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
State (Legislative) | $0 | $5,000,000 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $5,000,000 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$10,000,000 | $5,000,000 | $0 | $15,000,000 |
Date | Status | Description |
---|---|---|
10/18/2023 | Amended | Correct FY 2025 funding amount to $5,000,000. Overall project cost decreases. |
09/21/2023 | Amended | Add three new pool projects and correct FY2025 funding amount to $7,000,000. Overall project cost decreases. |
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
02/16/2023 | Amended | Create new pool for improvements related to Vision Zero in CDOT R1. |
Project Pools
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name | Description | Notes | Cost |
---|---|---|---|
Sheridan Blvd Multimodal Improvements | 17th to 26th | $6,000,000 | |
S Federal Median/Signal Project | Belleview to Hampden | $6,000,000 | |
Bike/Ped Safety Project | 5 Locations in Aurora and Bennett | $3,000,000 |
2024-2027 Transportation Improvement Program (Approved TIP)
I25 Segment 5: CO66 to WCR38
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (TIFIA) | $185,282,000 | $0 | $0 | $0 |
State (Legislative) | $19,200,000 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $204,482,000 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$4,000,000 | $204,482,000 | $0 | $208,482,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
05/16/2023 | Amended | Add $11,000,000 in state Legislative funding and $185,282,000 in federal TIFIA loans. Total project cost increases. |
02/16/2023 | Amended | Add new project (splitting out from RPP pool) per CDOT R4. |
2024-2027 Transportation Improvement Program (Approved TIP)
U85/168th Intersection Improvements
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
State (10 Year Plan Funds) | $300,000 | $0 | $0 | $0 |
Total | $300,000 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$610,000 | $300,000 | $0 | $910,000 |
Date | Status | Description |
---|---|---|
04/18/2024 | Amended | Add $300,000 in state 10-Year Capital Plan funds. Total project cost increases. |
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
03/16/2023 | Amended | Add new project with 10C funding. |
2024-2027 Transportation Improvement Program (Approved TIP)
Arapahoe Ave Multimodal Improvements: 28th to Foothills - Precon
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congestion Mitigation / Air Quality) | $206,000 | $947,000 | $0 | $0 |
State (Legislative) | $0 | $340,000 | $0 | $0 |
State (MMOF) | $270,000 | $1,034,000 | $0 | $0 |
Local | $69,000 | $101,000 | $0 | $0 |
Total | $545,000 | $2,422,000 | $0 | $0 |
Project Phase to Initiate | Design | Design | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $2,967,000 | $0 | $2,967,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
04/24/2023 | Amended | Create new project split from TIP# 2020-007 for improvements within City of Boulder. |
2024-2027 Transportation Improvement Program (Approved TIP)
I70/Harvest Interchange TDM Plan
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
State (Office of Innovative Mobility) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$2,000,000 | $0 | $0 | $2,000,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Add new project. |
05/16/2023 | Amended | Add new project. |
2024-2027 Transportation Improvement Program (Approved TIP)
Mineral Multimodal Improvements: Santa Fe to Jackass Hill/Long Ave
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $2,089,000 | $0 | $0 | $0 |
Local | $522,000 | $0 | $0 | $0 |
Total | $2,611,000 | $0 | $0 | $0 |
Project Phase to Initiate | Construction | None | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $2,611,000 | $0 | $2,611,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
05/16/2023 | Amended | Transfer $2,089,000 in Surface Transportation Block Grant funding from TIP ID# 2012-010 for their Second Commitment in Principal amount to be applied toward multimodal access improvements to Mineral Station. |
2024-2027 Transportation Improvement Program (Approved TIP)
I70/Harvest Interchange
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Local | $26,000,000 | $0 | $0 | $0 |
Total | $26,000,000 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$4,000,000 | $26,000,000 | $0 | $30,000,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Proposed for adoption into 2024-2027 |
06/05/2023 | Amended | Add new locally funded project. |
2024-2027 Transportation Improvement Program (Approved TIP)
Peoria St Bridge Replacement: Over Sand Creek - Precon
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $1,080,000 | $720,000 | $0 | $0 |
Local | $720,000 | $480,000 | $0 | $0 |
Total | $1,800,000 | $1,200,000 | $0 | $0 |
Project Phase to Initiate | Design | Design | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $3,000,000 | $0 | $3,000,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Add new project from 2024-2027 Regional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
DRCOG Transportation Corridor Planning Set Aside
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $250,000 | $0 | $1,500,000 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $250,000 | $0 | $1,500,000 | $0 |
Project Phase to Initiate | Study | None | Study | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $1,750,000 | $0 | $1,750,000 |
Date | Status | Description |
---|---|---|
05/16/2024 | Amended | Transfer all funding into 2024 and 2026. Total project cost remains the same. |
10/18/2023 | Amended | Remove $1,250,000 to program to individual corridor planning projects. Total project cost decreases. |
08/17/2023 | Amended | Adopt into the 24-27 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
DRCOG Community Mobility Planning Set-Aside - Community-Based Transportation Plans
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $50,000 | $0 | $1,250,000 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $50,000 | $0 | $1,250,000 | $0 |
Project Phase to Initiate | Study | None | Study | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $1,300,000 | $0 | $1,300,000 |
Date | Status | Description |
---|---|---|
05/16/2024 | Amended | Transfer all funding into 2024 and 2026. Total project cost remains the same. |
04/18/2024 | Amended | Remove $1,200,000 to program to individual community-based transportation planning projects. Total project cost decreases. |
08/17/2023 | Amended | Amended into the 24-27 TIP |
2024-2027 Transportation Improvement Program (Approved TIP)
DRCOG Community Mobility Planning Set-Aside - Livable Centers Small-Area Planning
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $1,250,000 | $0 | $1,250,000 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $1,250,000 | $0 | $1,250,000 | $0 |
Project Phase to Initiate | Study | None | Study | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $2,500,000 | $0 | $2,500,000 |
Date | Status | Description |
---|---|---|
05/16/2024 | Amended | Shift all funding into 2024 and 2026. Total project cost remains the same. |
08/17/2023 | Amended | Amend into the 24-27 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
DRCOG Innovative Mobility Set Aside
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $2,000,000 | $0 | $2,000,000 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $2,000,000 | $0 | $2,000,000 | $0 |
Project Phase to Initiate | Other Phase | None | Other Phase | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $4,000,000 | $0 | $4,000,000 |
Date | Status | Description |
---|---|---|
05/16/2024 | Amended | Shift all funding into 2024 and 2026. Total project cost remains the same. |
08/17/2023 | Amended | Adopted into the 24-27 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
CO7 Transit Service: Boulder to Brighton
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congestion Mitigation / Air Quality) | $0 | $0 | $2,561,000 | $4,303,000 |
State (Legislative-Transit) | $0 | $0 | $375,000 | $0 |
State (Regional Priority Projects) | $0 | $0 | $0 | $375,000 |
Local | $0 | $0 | $808,000 | $792,000 |
Local (RTD Funds Only) | $0 | $0 | $50,000 | $0 |
Total | $0 | $0 | $3,794,000 | $5,470,000 |
Project Phase to Initiate | None | None | Bus Service - Year 1 | Bus Service - Year 2 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $9,264,000 | $0 | $9,264,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Add new project from 2024-2027 Regional and Subregional Shares Calls for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
Federal Blvd BRT: Englewood Station to Wagon Road Park-n-Ride - Precon
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Carbon Reduction Program) | $0 | $340,000 | $0 | $0 |
Federal (MMOF - ARPA - DRCOG) | $0 | $439,000 | $0 | $0 |
Federal (Surface Transportation Block Grant) | $0 | $4,512,000 | $8,122,000 | $4,017,000 |
State (Legislative) | $5,336,000 | $4,013,000 | $2,000,000 | $2,000,000 |
State (Legislative-Transit) | $6,000,000 | $8,063,000 | $5,453,000 | $8,133,000 |
Local | $0 | $3,050,000 | $1,750,000 | $0 |
Local (RTD Funds Only) | $0 | $1,000,000 | $0 | $0 |
Total | $11,336,000 | $21,417,000 | $17,325,000 | $14,150,000 |
Project Phase to Initiate | None | Design | Design | ROW |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $64,228,000 | $0 | $64,228,000 |
Date | Status | Description |
---|---|---|
02/22/2024 | Amended | Add $340,000 in federal Carbon Reduction Program funds and $439,000 in federal Multimodal Transportation and Mitigation Options Fund - American Rescue Plan Act fund transferred from TIP ID# 2022-053. Total project cost increases. |
10/18/2023 | Amended | Add $13,349,000 in state Legislative funding and $10,000,000 in state Legislative-Transit funding transferred from TIP ID# 2022-074. Total project cost increases. |
08/17/2023 | Amended | Add new project from 2024-2027 Regional and Subregional Shares Calls for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
South Platte River Trail Improvements: Bayaud to Phil Milstein Park
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Carbon Reduction Program) | $0 | $0 | $4,250,000 | $4,250,000 |
State (Regional Priority Projects) | $0 | $0 | $500,000 | $500,000 |
Local | $0 | $0 | $1,050,000 | $1,050,000 |
Total | $0 | $0 | $5,800,000 | $5,800,000 |
Project Phase to Initiate | None | None | Construction | Construction |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $11,600,000 | $0 | $11,600,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Add new project from 2024-2027 Regional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
SW Weld County Transit First and Last Mile Study
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $0 | $67,000 | $0 | $0 |
State (MMOF) | $0 | $83,000 | $0 | $0 |
Local | $0 | $17,000 | $0 | $0 |
Total | $0 | $167,000 | $0 | $0 |
Project Phase to Initiate | None | Study | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $167,000 | $0 | $167,000 |
Date | Status | Description |
---|---|---|
12/19/2023 | Amended | Swap federal Carbon Reduction Program funds for federal Surface Transportation Block Grant funds. Total project cost remains the same. |
08/17/2023 | Amended | Add new project from 2024-2027 Regional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
Light Rail Level Boarding Feasibility Study
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $1,200,000 | $0 | $0 | $0 |
Local | $300,000 | $0 | $0 | $0 |
Total | $1,500,000 | $0 | $0 | $0 |
Project Phase to Initiate | Study | None | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $1,500,000 | $0 | $1,500,000 |
Date | Status | Description |
---|---|---|
11/15/2023 | Amended | Shift all funding to Fiscal Year 2024. Total project cost remains the same. |
08/17/2023 | Amended | Add new project from 2024-2027 Regional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
Adams County Comprehensive Safety Action Plan
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $400,000 | $800,000 | $400,000 | $0 |
Local | $100,000 | $200,000 | $100,000 | $0 |
Total | $500,000 | $1,000,000 | $500,000 | $0 |
Project Phase to Initiate | Study | Study | Study | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $2,000,000 | $0 | $2,000,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Add new project from 2024-2027 Subregional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
High Line Canal Trail Underpass at Colfax
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congestion Mitigation / Air Quality) | $0 | $1,400,000 | $2,600,000 | $4,800,000 |
Federal (Surface Transportation Block Grant) | $0 | $600,000 | $0 | $0 |
Federal (Transportation Alternatives-DRCOG) | $0 | $0 | $200,000 | $0 |
Local | $0 | $500,000 | $700,000 | $1,200,000 |
Total | $0 | $2,500,000 | $3,500,000 | $6,000,000 |
Project Phase to Initiate | None | Design | ROW | Construction |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $12,000,000 | $0 | $12,000,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Add new project from 2024-2027 Subregional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
McKay Operational Improvements: 104th to 96th - Precon
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $100,000 | $700,000 | $200,000 | $0 |
Local | $100,000 | $700,000 | $200,000 | $0 |
Total | $200,000 | $1,400,000 | $400,000 | $0 |
Project Phase to Initiate | Design | Design | Environmental | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $2,000,000 | $0 | $2,000,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Add new project from 2024-2027 Subregional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
124th Multimodal Improvements: Claude to Colorado
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congestion Mitigation / Air Quality) | $0 | $644,000 | $44,000 | $1,844,000 |
State (MMOF) | $0 | $804,000 | $54,000 | $2,304,000 |
Local | $0 | $161,000 | $11,000 | $461,000 |
Total | $0 | $1,609,000 | $109,000 | $4,609,000 |
Project Phase to Initiate | None | Design | ROW | Construction |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $6,327,000 | $0 | $6,327,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Add new project from 2024-2027 Subregional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
Big Dry Creek Trail: 136th to 144th
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Carbon Reduction Program) | $0 | $150,000 | $1,125,000 | $1,125,000 |
State (MMOF) | $0 | $250,000 | $1,375,000 | $1,375,000 |
Local | $0 | $100,000 | $250,000 | $250,000 |
Total | $0 | $500,000 | $2,750,000 | $2,750,000 |
Project Phase to Initiate | None | Design | Construction | Construction |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $6,000,000 | $0 | $6,000,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Add new project from 2024-2027 Subregional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
Colorado Blvd Separated Bike Facility: 88th to E470 - Precon
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Transportation Alternatives-DRCOG) | $0 | $0 | $0 | $821,000 |
State (MMOF) | $0 | $0 | $0 | $1,026,000 |
Local | $0 | $0 | $0 | $206,000 |
Total | $0 | $0 | $0 | $2,053,000 |
Project Phase to Initiate | None | None | None | Design |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $2,053,000 | $0 | $2,053,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Add new project from 2024-2027 Subregional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
Thornton Pkwy Multiuse Path: I25 to Grant
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congestion Mitigation / Air Quality) | $0 | $0 | $160,000 | $636,000 |
State (MMOF) | $0 | $0 | $200,000 | $796,000 |
Local | $0 | $0 | $40,000 | $160,000 |
Total | $0 | $0 | $400,000 | $1,592,000 |
Project Phase to Initiate | None | None | Design | Construction |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $1,992,000 | $0 | $1,992,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Add new project from 2024-2027 Subregional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
Easter Trail Study: Cherry Creek Trail to Parker Rd
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congestion Mitigation / Air Quality) | $0 | $0 | $160,000 | $0 |
Local | $0 | $0 | $40,000 | $0 |
Total | $0 | $0 | $200,000 | $0 |
Project Phase to Initiate | None | None | Study | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $200,000 | $0 | $200,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Add new project from 2024-2027 Subregional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
13th Ave Multimodal Improvements: Yosemite to High Line Canal Trail - Precon
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congestion Mitigation / Air Quality) | $0 | $630,000 | $270,000 | $0 |
Local | $0 | $420,000 | $180,000 | $0 |
Total | $0 | $1,050,000 | $450,000 | $0 |
Project Phase to Initiate | None | Design | Design | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $1,500,000 | $0 | $1,500,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Add new project from 2024-2027 Subregional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
Gun Club Multimodal Capacity Improvements: Quincy to Aurora Pkwy - Precon
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $0 | $600,000 | $600,000 | $300,000 |
Local | $0 | $400,000 | $400,000 | $200,000 |
Total | $0 | $1,000,000 | $1,000,000 | $500,000 |
Project Phase to Initiate | None | Environmental | Design | Design |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $2,500,000 | $0 | $2,500,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Add new project from 2024-2027 Subregional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
I225 & Alameda Bridge Replacement - Precon
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $900,000 | $900,000 | $0 | $0 |
State (Regional Priority Projects) | $300,000 | $300,000 | $0 | $0 |
Local | $300,000 | $300,000 | $0 | $0 |
Total | $1,500,000 | $1,500,000 | $0 | $0 |
Project Phase to Initiate | Environmental | Design | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $3,000,000 | $0 | $3,000,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Add new project from 2024-2027 Subregional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
Colorado Blvd Multimodal Improvements: Arapahoe to Dry Creek
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Transportation Alternatives-DRCOG) | $0 | $0 | $1,866,000 | $1,865,000 |
State (MMOF) | $0 | $0 | $2,340,000 | $2,340,000 |
Local | $0 | $0 | $475,000 | $475,000 |
Total | $0 | $0 | $4,681,000 | $4,680,000 |
Project Phase to Initiate | None | None | Construction | Construction |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $9,361,000 | $0 | $9,361,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Add new project from 2024-2027 Subregional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
Havana/Easter Intersection Operational Improvements
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $0 | $0 | $5,720,000 | $5,720,000 |
Local | $0 | $0 | $2,452,000 | $2,452,000 |
Total | $0 | $0 | $8,172,000 | $8,172,000 |
Project Phase to Initiate | None | None | Construction | Construction |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $16,344,000 | $0 | $16,344,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Add new project from 2024-2027 Subregional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
Bowles Corridor Study: Sheridan to Santa Fe
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $0 | $0 | $300,000 | $299,000 |
Local | $0 | $0 | $76,000 | $75,000 |
Total | $0 | $0 | $376,000 | $374,000 |
Project Phase to Initiate | None | None | Study | Study |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $750,000 | $0 | $750,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Add new project from 2024-2027 Subregional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
30th St Multimodal Improvements: Colorado to Baseline
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congestion Mitigation / Air Quality) | $0 | $0 | $1,460,000 | $1,540,000 |
Local | $0 | $0 | $365,000 | $385,000 |
Total | $0 | $0 | $1,825,000 | $1,925,000 |
Project Phase to Initiate | None | None | Design | Construction |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $3,750,000 | $0 | $3,750,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Add new project from 2024-2027 Subregional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
Folsom Multimodal Study: Pine to Colorado
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congestion Mitigation / Air Quality) | $0 | $0 | $1,000,000 | $0 |
Local | $0 | $0 | $450,000 | $0 |
Total | $0 | $0 | $1,450,000 | $0 |
Project Phase to Initiate | None | None | Study | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $1,450,000 | $0 | $1,450,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Add new project from 2024-2027 Subregional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
Boulder County Vision Zero SRTS Action Plan
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $90,000 | $149,000 | $120,000 | $0 |
Local | $20,000 | $37,000 | $34,000 | $0 |
Total | $110,000 | $186,000 | $154,000 | $0 |
Project Phase to Initiate | Study | Study | Study | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $450,000 | $0 | $450,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Add new project from 2024-2027 Subregional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
Boulder Countywide Strategic Transit Plan
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $1,198,000 | $0 | $0 | $0 |
Local | $302,000 | $0 | $0 | $0 |
Total | $1,500,000 | $0 | $0 | $0 |
Project Phase to Initiate | Study | None | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $1,500,000 | $0 | $1,500,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Add new project from 2024-2027 Subregional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
Mead Trails & Open Space Master Plan Update
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congestion Mitigation / Air Quality) | $0 | $225,000 | $0 | $0 |
Local | $0 | $100,000 | $0 | $0 |
Total | $0 | $325,000 | $0 | $0 |
Project Phase to Initiate | None | Study | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $325,000 | $0 | $325,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Adopted into the 24-27 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
WCR26 Multi-Use Trail: Union Reservoir to St Vrain State Park
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Transportation Alternatives-DRCOG) | $0 | $0 | $873,000 | $0 |
State (MMOF) | $0 | $0 | $1,091,000 | $0 |
Local | $0 | $0 | $219,000 | $0 |
Total | $0 | $0 | $2,183,000 | $0 |
Project Phase to Initiate | None | None | Construction | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $2,183,000 | $0 | $2,183,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Adopt into the 24-27 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
Lafayette to Boulder Protected Bikeway Feasibility Study
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Transportation Alternatives-DRCOG) | $0 | $0 | $170,000 | $0 |
State (MMOF) | $0 | $0 | $212,000 | $0 |
Local | $0 | $0 | $43,000 | $0 |
Total | $0 | $0 | $425,000 | $0 |
Project Phase to Initiate | None | None | Study | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $425,000 | $0 | $425,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Add new project from 2024-2027 Subregional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
WCR13/WCR20 Intersection Operational Improvements
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $187,000 | $104,000 | $1,768,000 | $0 |
Local | $47,000 | $26,000 | $444,000 | $0 |
Total | $234,000 | $130,000 | $2,212,000 | $0 |
Project Phase to Initiate | Design | ROW | Construction | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $2,576,000 | $0 | $2,576,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Adopted into the 24-27 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
S Boulder Rd BRT Study: Broadway/Table Mesa to CO7/119th
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $0 | $399,000 | $0 | $0 |
Local | $0 | $101,000 | $0 | $0 |
Total | $0 | $500,000 | $0 | $0 |
Project Phase to Initiate | None | Study | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $500,000 | $0 | $500,000 |
Date | Status | Description |
---|---|---|
12/19/2023 | Amended | Swap federal Carbon Reduction Program funds with federal Surface Transportation Block Grant funds. Total project cost remains the same. |
08/17/2023 | Amended | Add new project from 2024-2027 Subregional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
I25 Interchange Study: CO52 to Erie Pkwy
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $0 | $370,000 | $0 | $0 |
Local | $0 | $130,000 | $0 | $0 |
Total | $0 | $500,000 | $0 | $0 |
Project Phase to Initiate | None | Study | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $500,000 | $0 | $500,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Adopted into the 24-27 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
SE Boulder County SuperFlex
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congestion Mitigation / Air Quality) | $0 | $294,000 | $1,176,000 | $0 |
State (MMOF) | $0 | $400,000 | $1,455,000 | $0 |
Local | $0 | $107,000 | $279,000 | $0 |
Total | $0 | $801,000 | $2,910,000 | $0 |
Project Phase to Initiate | None | Bus Service - Year 1 | Bus Service - Year 2 | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $3,711,000 | $0 | $3,711,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Add new project from 2024-2027 Subregional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
Erie FlexRide
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congestion Mitigation / Air Quality) | $0 | $240,000 | $240,000 | $0 |
State (MMOF) | $0 | $300,000 | $300,000 | $0 |
Local | $0 | $60,000 | $60,000 | $0 |
Total | $0 | $600,000 | $600,000 | $0 |
Project Phase to Initiate | None | Bus Service - Year 1 | Bus Service - Year 2 | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $1,200,000 | $0 | $1,200,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Add new project from 2024-2027 Subregional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
CO66 Multi-Use Path: Hover to Main
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congestion Mitigation / Air Quality) | $0 | $0 | $2,240,000 | $0 |
Local | $0 | $0 | $560,000 | $0 |
Total | $0 | $0 | $2,800,000 | $0 |
Project Phase to Initiate | None | None | Construction | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $2,800,000 | $0 | $2,800,000 |
Date | Status | Description |
---|---|---|
09/21/2023 | Amended | Correct local match amount from $260,000 to $560,000. Total project cost increases. |
08/17/2023 | Amended | Add new project from 2024-2027 Subregional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
CO52 Intersection Safety Improvements: WCR3 to I25 - Precon
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $0 | $134,000 | $72,000 | $74,000 |
Local | $0 | $33,000 | $19,000 | $19,000 |
Total | $0 | $167,000 | $91,000 | $93,000 |
Project Phase to Initiate | None | Design | Design | ROW |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $351,000 | $0 | $351,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Adopted into the 24-27 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
Tabor St Multimodal Improvements: Clear Creek Trail to I70 Frontage Rd N - Precon
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Transportation Alternatives-DRCOG) | $0 | $0 | $1,596,000 | $0 |
State (MMOF) | $0 | $0 | $2,000,000 | $0 |
Local | $0 | $0 | $404,000 | $0 |
Total | $0 | $0 | $4,000,000 | $0 |
Project Phase to Initiate | None | None | Design | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $4,000,000 | $0 | $4,000,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Adopt into the 24-27 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
CO42 Bike/Ped Underpass at South St
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $0 | $334,000 | $2,666,000 | $0 |
Local | $0 | $83,000 | $667,000 | $0 |
Total | $0 | $417,000 | $3,333,000 | $0 |
Project Phase to Initiate | None | Design | Construction | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $3,750,000 | $0 | $3,750,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Add new project from 2024-2027 Subregional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
35th Ave Multimodal Improvements: Sheridan to Wadsworth - Precon
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Transportation Alternatives-DRCOG) | $0 | $0 | $399,000 | $1,576,000 |
State (MMOF) | $0 | $0 | $500,000 | $1,975,000 |
Local | $0 | $0 | $101,000 | $399,000 |
Total | $0 | $0 | $1,000,000 | $3,950,000 |
Project Phase to Initiate | None | None | Environmental | ROW |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $4,950,000 | $0 | $4,950,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Adopted into the 24-27 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
McCaslin Blvd Multiuse Underpass at Rock Creek Pkwy - Precon
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Carbon Reduction Program) | $0 | $0 | $500,000 | $0 |
Local | $0 | $0 | $125,000 | $0 |
Total | $0 | $0 | $625,000 | $0 |
Project Phase to Initiate | None | None | Design | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $625,000 | $0 | $625,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Add new project from 2024-2027 Subregional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
Midway Blvd Multimodal Improvements: Lake Link Trail to Zuni - Precon
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congestion Mitigation / Air Quality) | $0 | $0 | $1,200,000 | $2,400,000 |
Local | $0 | $0 | $300,000 | $600,000 |
Total | $0 | $0 | $1,500,000 | $3,000,000 |
Project Phase to Initiate | None | None | Design | ROW |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $4,500,000 | $0 | $4,500,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Add new project from 2024-2027 Subregional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
Alameda Underpass Improvements: Kalamath to Cherokee - Precon
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $0 | $0 | $1,950,000 | $5,850,000 |
Local | $0 | $0 | $488,000 | $1,462,000 |
Total | $0 | $0 | $2,438,000 | $7,312,000 |
Project Phase to Initiate | None | None | Environmental | Design |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $9,750,000 | $0 | $9,750,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Add new project from 2024-2027 Subregional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
High Line Canal Trail Underpass at Yale
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congestion Mitigation / Air Quality) | $0 | $0 | $2,000,000 | $9,000,000 |
Local | $0 | $0 | $2,500,000 | $2,200,000 |
Total | $0 | $0 | $4,500,000 | $11,200,000 |
Project Phase to Initiate | None | None | ROW | Construction |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $15,700,000 | $0 | $15,700,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Add new project from 2024-2027 Subregional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
Wadsworth Path Improvements: Mansfield to Bear Creek
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congestion Mitigation / Air Quality) | $0 | $0 | $2,168,000 | $0 |
Local | $0 | $0 | $542,000 | $0 |
Total | $0 | $0 | $2,710,000 | $0 |
Project Phase to Initiate | None | None | Construction | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $2,710,000 | $0 | $2,710,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Adopted into the 24-27 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
W Colfax Safety Improvements: Teller to Sheridan
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $0 | $0 | $3,139,000 | $1,046,000 |
State (Legislative) | $0 | $0 | $0 | $0 |
State (Legislative-Transit) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $1,101,000 | $367,000 |
Total | $0 | $0 | $4,240,000 | $1,413,000 |
Project Phase to Initiate | None | None | Construction | Construction |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$10,000,000 | $5,653,000 | $0 | $15,653,000 |
Date | Status | Description |
---|---|---|
01/30/2024 | Amended | Add $7,060,000 in prior year state Legislative-Transit funding and $2,940,000 in prior year state Legislative funding transferred from TIP ID# 2020-087. Total project cost increases. |
08/17/2023 | Amended | Adopt into the 24-27 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
Sheridan Blvd Multimodal Path: Jewell to Iowa
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congestion Mitigation / Air Quality) | $0 | $0 | $1,936,000 | $0 |
Local | $0 | $0 | $484,000 | $0 |
Total | $0 | $0 | $2,420,000 | $0 |
Project Phase to Initiate | None | None | Construction | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $2,420,000 | $0 | $2,420,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Adopted into the 24-27 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
Golden Free Transit Program
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congestion Mitigation / Air Quality) | $0 | $334,000 | $666,000 | $0 |
Local | $0 | $100,000 | $200,000 | $0 |
Total | $0 | $434,000 | $866,000 | $0 |
Project Phase to Initiate | None | Bus Service - Year 1 | Bus Service - Year 2 | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $1,300,000 | $0 | $1,300,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Adopted into the 24-27 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
64th Multimodal Improvements: CO93 to Virgil Way
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $0 | $0 | $135,000 | $865,000 |
Local | $0 | $0 | $105,000 | $675,000 |
Total | $0 | $0 | $240,000 | $1,540,000 |
Project Phase to Initiate | None | None | Design | Construction |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $1,780,000 | $0 | $1,780,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Adopted into the 24-27 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
Parker Rd/Mainstreet Operational Improvements - Precon
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $0 | $500,000 | $0 | $0 |
Local | $0 | $250,000 | $0 | $0 |
Total | $0 | $750,000 | $0 | $0 |
Project Phase to Initiate | None | Design | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $750,000 | $0 | $750,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Adopted into the 24-27 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
I25/Lincoln Multimodal Connections
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congestion Mitigation / Air Quality) | $0 | $0 | $0 | $5,907,000 |
Local | $0 | $0 | $0 | $4,093,000 |
Total | $0 | $0 | $0 | $10,000,000 |
Project Phase to Initiate | None | None | None | Construction |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $10,000,000 | $0 | $10,000,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Adopted into the 24-27 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
Douglas County Transit Pilot Projects
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Carbon Reduction Program) | $0 | $0 | $500,000 | $500,000 |
State (MMOF) | $0 | $0 | $625,000 | $625,000 |
Local | $0 | $0 | $125,000 | $125,000 |
Total | $0 | $0 | $1,250,000 | $1,250,000 |
Project Phase to Initiate | None | None | Bus Service - Year 1 | Bus Service - Year 2 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $2,500,000 | $0 | $2,500,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Adopted into the 24-27 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
Colorado Blvd Bike/Ped Bridge over C470 - Precon
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Transportation Alternatives-DRCOG) | $0 | $275,000 | $275,000 | $0 |
Local | $0 | $75,000 | $75,000 | $0 |
Total | $0 | $350,000 | $350,000 | $0 |
Project Phase to Initiate | None | Design | Design | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $700,000 | $0 | $700,000 |
Date | Status | Description |
---|---|---|
01/17/2024 | Amended | Split funding equally between Fiscal Years 2025 and 2026. Total project cost remains the same. |
08/17/2023 | Amended | Adopted into the 24-27 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
North Central Denver Community Multimodal Improvements
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congestion Mitigation / Air Quality) | $0 | $0 | $4,537,000 | $0 |
Local | $0 | $0 | $1,134,000 | $0 |
Total | $0 | $0 | $5,671,000 | $0 |
Project Phase to Initiate | None | None | Construction | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $5,671,000 | $0 | $5,671,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Add new project from 2024-2027 Subregional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
Peña Capacity Improvements: I70 to E470 - Precon
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $500,000 | $1,500,000 | $1,500,000 | $1,500,000 |
Local | $1,500,000 | $4,000,000 | $4,000,000 | $4,000,000 |
Total | $2,000,000 | $5,500,000 | $5,500,000 | $5,500,000 |
Project Phase to Initiate | Environmental | Environmental | Design | Design |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $18,500,000 | $0 | $18,500,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Add new project from 2024-2027 Subregional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
South Platte River Trail Improvements: Mississippi to Florida
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congestion Mitigation / Air Quality) | $0 | $0 | $2,400,000 | $2,400,000 |
Local | $0 | $0 | $600,000 | $600,000 |
Total | $0 | $0 | $3,000,000 | $3,000,000 |
Project Phase to Initiate | None | None | Construction | Construction |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $6,000,000 | $0 | $6,000,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Add new project from 2024-2027 Subregional Share Call for Projects. |
2024-2027 Transportation Improvement Program (Approved TIP)
Federal Pkwy Multimodal Improvements: 120th to 122nd
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congressional Allocation) | $3,000,000 | $0 | $0 | $0 |
Local | $750,000 | $0 | $0 | $0 |
Total | $3,750,000 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $3,750,000 | $0 | $3,750,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Adopted into the 24-27 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
Peaks to Plains Trail - Downtown Golden
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congressional Allocation) | $400,000 | $0 | $0 | $0 |
Local | $100,000 | $0 | $0 | $0 |
Total | $500,000 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $500,000 | $0 | $500,000 |
Date | Status | Description |
---|---|---|
08/17/2023 | Amended | Adopted into the 24-27 TIP. |
2024-2027 Transportation Improvement Program (Approved TIP)
28th St Multi-use Path: Fourmile Canyon Creek to Jay
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Transportation Alternatives-CDOT) | $0 | $200,000 | $736,000 | $0 |
Local | $0 | $50,000 | $184,000 | $0 |
Total | $0 | $250,000 | $920,000 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $1,170,000 | $0 | $1,170,000 |
Date | Status | Description |
---|---|---|
09/21/2023 | Amended | Add new project from CDOT Transportation Alternatives awards. |
2024-2027 Transportation Improvement Program (Approved TIP)
Coffman St Bikeway Extension: Boston to 1st
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Transportation Alternatives-CDOT) | $0 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $0 | $0 | $0 |
Date | Status | Description |
---|---|---|
04/18/2024 | Amended | Transfer all funding to Project #2020-083. Total project cost decreases. |
09/21/2023 | Amended | Add new project from CDOT Transportation Alternatives awards. |
2024-2027 Transportation Improvement Program (Approved TIP)
R1 Safe Wildlife Crossings Pool
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
State (Legislative) | $500,000 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $500,000 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $500,000 | $0 | $500,000 |
Date | Status | Description |
---|---|---|
07/22/2024 | Amended | Transfer one pool project and $500,000 in state Legislative funding to new I25 Greenland Wildlife Crossing project. |
09/21/2023 | Amended | Add new pool for wildlife crossings in CDOT Region 1. |
Project Pools
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name | Description | Notes | Cost |
---|---|---|---|
US285 and I70 Wildlife Fencing | $500,000 |
2024-2027 Transportation Improvement Program (Approved TIP)
E Colfax Mobility Benefits District
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $110,000 | $55,000 | $0 | $0 |
Local | $23,000 | $11,000 | $0 | $0 |
Total | $133,000 | $66,000 | $0 | $0 |
Project Phase to Initiate | TDM | TDM | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $199,000 | $0 | $199,000 |
Date | Status | Description |
---|---|---|
09/21/2023 | Amended | Create new project from FY2024-2025 TDM Set-Aside awards. |
2024-2027 Transportation Improvement Program (Approved TIP)
Downtown Denver ¡Viva! Streets Year 2 Expansion
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $231,000 | $0 | $0 | $0 |
Local | $500,000 | $0 | $0 | $0 |
Total | $731,000 | $0 | $0 | $0 |
Project Phase to Initiate | TDM | None | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $731,000 | $0 | $731,000 |
Date | Status | Description |
---|---|---|
09/21/2023 | Amended | Create new project from FY2024-2025 TDM Set-Aside awards. |
2024-2027 Transportation Improvement Program (Approved TIP)
Welcome Kits for Sun Valley Residents
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $70,000 | $70,000 | $0 | $0 |
Local | $15,000 | $15,000 | $0 | $0 |
Total | $85,000 | $85,000 | $0 | $0 |
Project Phase to Initiate | TDM | TDM | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $170,000 | $0 | $170,000 |
Date | Status | Description |
---|---|---|
09/21/2023 | Amended | Create new project from FY2024-2025 TDM Set-Aside awards. |
2024-2027 Transportation Improvement Program (Approved TIP)
Using Data to Optimize FlexRide Services
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $104,000 | $104,000 | $0 | $0 |
Local | $22,000 | $22,000 | $0 | $0 |
Total | $126,000 | $126,000 | $0 | $0 |
Project Phase to Initiate | TDM | TDM | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $252,000 | $0 | $252,000 |
Date | Status | Description |
---|---|---|
09/21/2023 | Amended | Create new project from FY2024-2025 TDM Set-Aside awards. |
2024-2027 Transportation Improvement Program (Approved TIP)
Gunbarrel On-Demand Microtransit Shuttle Service
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $99,000 | $25,000 | $0 | $0 |
Local | $21,000 | $5,000 | $0 | $0 |
Total | $120,000 | $30,000 | $0 | $0 |
Project Phase to Initiate | TDM | TDM | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $150,000 | $0 | $150,000 |
Date | Status | Description |
---|---|---|
09/21/2023 | Amended | Create new project from FY2024-2025 TDM Set-Aside awards. |
2024-2027 Transportation Improvement Program (Approved TIP)
Creating the Commerce City Connector
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $63,000 | $63,000 | $0 | $0 |
Local | $13,000 | $13,000 | $0 | $0 |
Total | $76,000 | $76,000 | $0 | $0 |
Project Phase to Initiate | TDM | TDM | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $152,000 | $0 | $152,000 |
Date | Status | Description |
---|---|---|
09/21/2023 | Amended | Create new project from FY2024-2025 TDM Set-Aside awards. |
2024-2027 Transportation Improvement Program (Approved TIP)
Sheridan Corridor Plan: 52nd to Hampden
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $250,000 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $250,000 | $0 | $0 | $0 |
Project Phase to Initiate | Study | None | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $250,000 | $0 | $250,000 |
Date | Status | Description |
---|---|---|
05/16/2024 | Amended | Transfer all funding into 2024. Total project cost remains the same. |
10/18/2023 | Amended | Add new project from the DRCOG Transportation Corridor Planning - CCLIP Set Aside. Toll credits to be used to remove match requirements. |
2024-2027 Transportation Improvement Program (Approved TIP)
E Colfax BRT Extension Corridor Plan: I225 to E470
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $1,000,000 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $1,000,000 | $0 | $0 | $0 |
Project Phase to Initiate | Study | None | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $1,000,000 | $0 | $1,000,000 |
Date | Status | Description |
---|---|---|
05/16/2024 | Amended | Transfer all funding into 2024. Total project cost remains the same. |
10/18/2023 | Amended | Add new project from the DRCOG Transportation Corridor Planning - CCLIP Set Aside. Toll credits to be used to remove match requirements. |
2024-2027 Transportation Improvement Program (Approved TIP)
Aurora Traffic Management Center
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $0 | $0 | $1,101,000 | $0 |
Local | $0 | $0 | $495,000 | $0 |
Total | $0 | $0 | $1,596,000 | $0 |
Project Phase to Initiate | None | None | Construction | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $1,596,000 | $0 | $1,596,000 |
Date | Status | Description |
---|---|---|
10/18/2023 | Amended | Add new project from the Regional Transportation Operations and Technology Set-Aside. |
2024-2027 Transportation Improvement Program (Approved TIP)
Louisville Signal Technology Upgrade
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $545,000 | $0 | $0 | $0 |
Local | $200,000 | $0 | $0 | $0 |
Total | $745,000 | $0 | $0 | $0 |
Project Phase to Initiate | Procurement | None | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $745,000 | $0 | $745,000 |
Date | Status | Description |
---|---|---|
10/18/2023 | Amended | Add new project from the Regional Transportation Operations and Technology Set-Aside. |
2024-2027 Transportation Improvement Program (Approved TIP)
Longmont Smart Signals to Schools
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $446,000 | $445,000 | $0 | $0 |
Local | $119,000 | $118,000 | $0 | $0 |
Total | $565,000 | $563,000 | $0 | $0 |
Project Phase to Initiate | Procurement | Procurement | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $1,128,000 | $0 | $1,128,000 |
Date | Status | Description |
---|---|---|
10/18/2023 | Amended | Add new project from the Regional Transportation Operations and Technology Set-Aside. |
2024-2027 Transportation Improvement Program (Approved TIP)
Jefferson County Traffic Camera System
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $0 | $248,000 | $0 | $0 |
Local | $0 | $52,000 | $0 | $0 |
Total | $0 | $300,000 | $0 | $0 |
Project Phase to Initiate | None | Procurement | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $300,000 | $0 | $300,000 |
Date | Status | Description |
---|---|---|
10/18/2023 | Amended | Add new project from the Regional Transportation Operations and Technology Set-Aside. |
2024-2027 Transportation Improvement Program (Approved TIP)
US287 and CO7 Advance Detection Expansion
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $0 | $238,000 | $0 | $0 |
Local | $0 | $140,000 | $0 | $0 |
Total | $0 | $378,000 | $0 | $0 |
Project Phase to Initiate | None | Procurement | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $378,000 | $0 | $378,000 |
Date | Status | Description |
---|---|---|
10/18/2023 | Amended | Add new project from the Regional Transportation Operations and Technology Set-Aside. |
2024-2027 Transportation Improvement Program (Approved TIP)
Denver V2X Communications Devices
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $850,000 | $850,000 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $850,000 | $850,000 | $0 | $0 |
Project Phase to Initiate | Design | Construction | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $1,700,000 | $0 | $1,700,000 |
Date | Status | Description |
---|---|---|
10/18/2023 | Amended | Add new project from the Regional Transportation Operations and Technology Set-Aside. |
2024-2027 Transportation Improvement Program (Approved TIP)
Boulder Communications Network and Signal System Performance Enhancement
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $602,000 | $602,000 | $0 | $0 |
Local | $151,000 | $150,000 | $0 | $0 |
Total | $753,000 | $752,000 | $0 | $0 |
Project Phase to Initiate | Procurement | Procurement | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $1,505,000 | $0 | $1,505,000 |
Date | Status | Description |
---|---|---|
10/18/2023 | Amended | Add new project from the Regional Transportation Operations and Technology Set-Aside. |
2024-2027 Transportation Improvement Program (Approved TIP)
Aurora Communications Infrastructure Improvements
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $0 | $0 | $736,000 | $0 |
Local | $0 | $0 | $197,000 | $0 |
Total | $0 | $0 | $933,000 | $0 |
Project Phase to Initiate | None | None | Construction | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $933,000 | $0 | $933,000 |
Date | Status | Description |
---|---|---|
10/18/2023 | Amended | Add new project from the Regional Transportation Operations and Technology Set-Aside. |
2024-2027 Transportation Improvement Program (Approved TIP)
Broadway Signal Interconnect (Phase 2)
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $0 | $328,000 | $2,635,000 | $0 |
Local | $0 | $72,000 | $575,000 | $0 |
Total | $0 | $400,000 | $3,210,000 | $0 |
Project Phase to Initiate | None | Design | Construction | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $3,610,000 | $0 | $3,610,000 |
Date | Status | Description |
---|---|---|
10/18/2023 | Amended | Add new project from the Regional Transportation Operations and Technology Set-Aside. |
2024-2027 Transportation Improvement Program (Approved TIP)
Thornton Travel Time Monitoring Expansion
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $101,000 | $0 | $0 | $0 |
Local | $25,000 | $0 | $0 | $0 |
Total | $126,000 | $0 | $0 | $0 |
Project Phase to Initiate | Procurement | None | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $126,000 | $0 | $126,000 |
Date | Status | Description |
---|---|---|
10/18/2023 | Amended | Add new project from the Regional Transportation Operations and Technology Set-Aside. |
2024-2027 Transportation Improvement Program (Approved TIP)
Superior Traffic Safety and Climate Resilience
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $99,000 | $0 | $0 | $0 |
Local | $21,000 | $0 | $0 | $0 |
Total | $120,000 | $0 | $0 | $0 |
Project Phase to Initiate | Procurement | None | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $120,000 | $0 | $120,000 |
Date | Status | Description |
---|---|---|
10/18/2023 | Amended | Add new project from the Regional Transportation Operations and Technology Set-Aside. |
2024-2027 Transportation Improvement Program (Approved TIP)
Aurora Traffic Signal Equipment Upgrade
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $0 | $1,021,000 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $0 | $1,021,000 | $0 | $0 |
Project Phase to Initiate | None | Procurement | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $1,021,000 | $0 | $1,021,000 |
Date | Status | Description |
---|---|---|
10/18/2023 | Amended | Add new project from the Regional Transportation Operations and Technology Set-Aside. |
2024-2027 Transportation Improvement Program (Approved TIP)
I70 Resurfacing: Chief Hosa to W Colfax
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Faster Safety) | $0 | $0 | $0 | $0 |
Federal (Strategic Safety Funds) | $0 | $3,000,000 | $0 | $0 |
State (Faster Safety) | $0 | $12,800,000 | $0 | $0 |
State (Regional Priority Projects) | $0 | $9,000,000 | $0 | $0 |
State (Surface Treatment) | $4,100,000 | $9,500,000 | $0 | $0 |
State (TC Contingency) | $0 | $6,392,000 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $4,100,000 | $40,692,000 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $44,792,000 | $0 | $44,792,000 |
Date | Status | Description |
---|---|---|
07/22/2024 | Amended | Add $6,392,000 of state Transportation Commission Contingency funds. Total project cost increases. |
02/22/2024 | Amended | Add $4,100,000 in state Surface Treatment funds transferred from TIP ID# 2007-096. Total project cost increases. |
01/17/2024 | Amended | Add $3,000,000 in federal Strategic Safety Funds. Total project cost increases. |
12/19/2023 | Amended | Adjust scope and add $12,800,000 in state FASTER-Safety funding transferred from 2008-076. Total project cost increases. |
10/18/2023 | Amended | Create new project with funding from TIP ID# 2007-096 and 2016-057. |
2024-2027 Transportation Improvement Program (Approved TIP)
Clean Transit Enterprise Pool
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
State (Clean Transit Enterprise) | $158,000 | $0 | $0 | $0 |
Local | $18,000 | $0 | $0 | $0 |
Total | $176,000 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $176,000 | $0 | $176,000 |
Date | Status | Description |
---|---|---|
12/19/2023 | Amended | Add new pool for Colorado Department of Transportation Clean Transit Enterprise projects. |
Project Pools
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name | Description | Notes | Cost |
---|---|---|---|
Laradon Hall | Planning (Fiscal Year 2024) | $90,000 | |
Via Mobility | Planning (FIscal Year 2024) | $68,000 |
2024-2027 Transportation Improvement Program (Approved TIP)
303 Artway and Montbello Loop Implementation Plan
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $250,000 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $250,000 | $0 | $0 | $0 |
Project Phase to Initiate | Study | None | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $250,000 | $0 | $250,000 |
Date | Status | Description |
---|---|---|
05/16/2024 | Amended | Transfer all funding to 2024. Total project cost remains the same. |
04/18/2024 | Amended | Add new project from the DRCOG Community Mobility Planning Set-Aside - Community-Based Transportation Plans. Toll credits to be used to remove match requirements. |
2024-2027 Transportation Improvement Program (Approved TIP)
Brighton Core City Circulation Plan
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $250,000 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $250,000 | $0 | $0 | $0 |
Project Phase to Initiate | Study | None | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $250,000 | $0 | $250,000 |
Date | Status | Description |
---|---|---|
05/16/2024 | Amended | Transfer all funding to 2024. Total project cost remains the same. |
04/18/2024 | Amended | Add new project from the DRCOG Community Mobility Planning Set-Aside - Community-Based Transportation Plans. Toll credits to be used to remove match requirements. |
2024-2027 Transportation Improvement Program (Approved TIP)
92nd Avenue Corridor Study
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $250,000 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $250,000 | $0 | $0 | $0 |
Project Phase to Initiate | Study | None | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $250,000 | $0 | $250,000 |
Date | Status | Description |
---|---|---|
05/16/2024 | Amended | Transfer all funding to 2024. Total project cost remains the same. |
04/18/2024 | Amended | Add new project from the DRCOG Community Mobility Planning Set-Aside - Community-Based Transportation Plans. Toll credits to be used to remove match requirements. |
2024-2027 Transportation Improvement Program (Approved TIP)
Pecos Street Corridor Study
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Surface Transportation Block Grant) | $450,000 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $450,000 | $0 | $0 | $0 |
Project Phase to Initiate | Study | None | None | None |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $450,000 | $0 | $450,000 |
Date | Status | Description |
---|---|---|
05/16/2024 | Amended | Transfer all funding to 2024. Total project cost remains the same. |
04/18/2024 | Amended | Add new project from the DRCOG Community Mobility Planning Set-Aside - Community-Based Transportation Plans. Toll credits to be used to remove match requirements. |
2024-2027 Transportation Improvement Program (Approved TIP)
Region 4 Congressionally Directed Funding Pool
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congressional Allocation) | $0 | $1,850,000 | $0 | $0 |
Local | $0 | $385,000 | $0 | $0 |
Total | $0 | $2,235,000 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $2,235,000 | $0 | $2,235,000 |
Date | Status | Description |
---|---|---|
06/26/2024 | Amended | Create new pool for congressionally directed funding in CDOT Region 4. |
Project Pools
This pool includes the following current projects. All pool project funding depicts federal and/or state funding only.
Agency/Project Name | Description | Notes | Cost |
---|---|---|---|
Mead | 3rd and Welker | Funds in Project 2022-021 | $0 |
Dacono | CO52 - WCR7 to WCR15 | $850,000 | |
Lyons | Saint Vrain Multimodal Trail | Funds in Project 2022-013 | $0 |
Weld County | High Plains Boulevard - CO66 to WCR34 parallel to I25 | $1,000,000 |
2024-2027 Transportation Improvement Program (Approved TIP)
Longmont Microtransit Vehicles
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congressional Allocation-Transit) | $0 | $1,000,000 | $0 | $0 |
Local | $0 | $209,000 | $0 | $0 |
Total | $0 | $1,209,000 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $1,209,000 | $0 | $1,209,000 |
Date | Status | Description |
---|---|---|
06/26/2024 | Amended | Add new project funded with Congressionally Allocated funding. |
2024-2027 Transportation Improvement Program (Approved TIP)
CO7 Corridor Multimodal Improvements
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Congressional Allocation-Transit) | $0 | $500,000 | $0 | $0 |
Local | $0 | $104,000 | $0 | $0 |
Total | $0 | $604,000 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $604,000 | $0 | $604,000 |
Date | Status | Description |
---|---|---|
06/26/2024 | Amended | Add new project funded with Congressionally Allocated funding. |
2024-2027 Transportation Improvement Program (Approved TIP)
Denver Area Hydrogen Fueling Stations: FHWA CFI Grant
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Charging and Fueling Infrastructure) | $3,647,000 | $0 | $0 | $0 |
Local | $798,000 | $0 | $0 | $0 |
Total | $4,445,000 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $4,445,000 | $0 | $4,445,000 |
Date | Status | Description |
---|---|---|
06/26/2024 | Amended | Add new project funded with discretionary funds. |
2024-2027 Transportation Improvement Program (Approved TIP)
I25 Greenland Wildlife Overpass
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Faster Safety) | $0 | $0 | $0 | $0 |
Federal (Wildlife Crossings Pilot Program) | $0 | $22,000,000 | $0 | $0 |
State (Faster Safety) | $250,000 | $3,250,000 | $4,000,000 | $0 |
State (Legislative) | $500,000 | $0 | $0 | $0 |
Local | $0 | $0 | $0 | $0 |
Total | $750,000 | $25,250,000 | $4,000,000 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$750,000 | $30,000,000 | $0 | $30,750,000 |
Date | Status | Description |
---|---|---|
07/22/2024 | Amended | Add new project with new Wildlife Crossing Pilot Program funding. |
2024-2027 Transportation Improvement Program (Approved TIP)
I25/CO7 Interim Transit Improvements
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Faster Safety) | $0 | $0 | $0 | $0 |
State (Faster Safety) | $2,000,000 | $0 | $0 | $0 |
State (Legislative-Transit) | $0 | $0 | $0 | $3,500,000 |
State (Permanent Water Quality) | $1,249,000 | $0 | $0 | $4,800,000 |
Local | $0 | $0 | $0 | $0 |
Total | $3,249,000 | $0 | $0 | $8,300,000 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$14,000,000 | $11,549,000 | $0 | $25,549,000 |
Date | Status | Description |
---|---|---|
07/22/2024 | Amended | Create new project. Transfer $14,000,000 in prior year state Legislative-Transit funds from project 2020-100, $1,249,000 in state Permanent Water Quality funds from project 2018-011, and $2,000,000 in state FASTER-Safety funds from project 2008-076. Add $3,500,000 in state Legislative-Transit funds and $4,800,000 in state Permanent Water Quality funds. |
2024-2027 Transportation Improvement Program (Approved TIP)
Boulder County Electric Vehicle Charging Infrastructure
Funding Type | Federal Fiscal Year 2024 | Federal Fiscal Year 2025 | Federal Fiscal Year 2026 | Federal Fiscal Year 2027 |
---|---|---|---|---|
Federal (Charging and Fueling Infrastructure) | $4,900,000 | $0 | $0 | $0 |
Local | $2,100,000 | $0 | $0 | $0 |
Total | $7,000,000 | $0 | $0 | $0 |
Prior Funding | Four Year Period | Future Funding | Total Funding |
---|---|---|---|
$0 | $7,000,000 | $0 | $7,000,000 |
Date | Status | Description |
---|---|---|
07/22/2024 | Amended | Add new project with $4,900,000 in federal Charging and Fueling Infrastructure discretionary funds. |